Tab 09 Att FAR Part 12 Addenda_AMD 0005_CONFORMED.pdf
PDF 773 KB Posted
- Solicitation number
- SPE602-26-R-0706
- Issued by
-
Defense Logistics Agency Energy
About this file
This is an addendum to FAR Part 12 instructions for commercial products and commercial services solicitations, effective February 2026.
The solicitation requires offerors to submit offers using the mandatory Bulk Offer Entry Tool (OET), with offers imported into a Bulk Bid Evaluation Model (BEM) for price evaluation. The OET operates through three standard rounds: Initial (allowing full data field editing including shipping locations, quantities, and prices), Interim Proposal Revision or IPR (permitting changes to most fields with this being the final round to add new shipping points, products, delivery modes, sources of supply, FOB terms, exception requests, or bid lines), and Final Proposal Revision or FPR (restricting edits to prevent adding new shipping points, products, or bid lines). An optional OET Price Reduction round may be conducted at the Contracting Officer's discretion, limiting offerors to lowering prices only. Offerors must participate in the Initial round, pass Phase 1, and be in the competitive range for subsequent round eligibility. The solicitation employs a Two-Part Negotiation process: Part 1 includes Opening of Negotiations letters sent to competitive range offerors with discussions before IPR closing, and Part 2 occurs after the interim round closes with a Closing of Negotiation letter. Each offeror receives a Minimum Cost Bid Evaluation Worksheet (MCBEW) after IPR and before FPR detailing evaluated prices, delivery methods, transportation costs, and laid-down prices per location.
Additional submission requirements include: selecting one transportation mode and shipping point per sequence bid line; providing map coordinates per specification; notifying DLA Energy of transportation restrictions; submitting all PDF attachments without electronic signatures; completing an F76 Traceability Sheet if proposing F76 sequences; listing multiple Authorized Negotiators with full legal names; and maintaining Joint Contingency Contracting System (JCCS) registration if operating in CENTCOM or AFRICOM regions. For FOB Origin Tanker awards, contractors must provide a Facility Security Officer point of contact for post-award Naval Criminal Investigative Service Port Assessment. The period of acceptance is 270 days. Prior to award, apparently successful offerors must submit Safety Data Sheets (SDS) complying with 29 CFR 1910.1200(g) and Federal Standard No. 313, citing solicitation number, CAGE code, manufacturer name, and NSN; current contract holders need not resubmit an acceptable SDS submitted within the past four years but must provide updated sheets every four years and within 30 days of composition changes or standard revisions. Contractors bear responsibility for property protection, spill prevention, containment, cleanup, and disposal of oil spills with no Government expense.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT – FAR PART 12 ADDENDA
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES
ADDENDA TO FAR 52.212-1 INSTRUCTIONS TO OFFERORS–COMMERCIAL PRODUCTS
AND COMMERCIAL SERVICES (FEB 2026)
(a) Submission of offers. The following is hereby added:
(7) Offers must be submitted using the Bulk Offer Entry Tool (OET). Use of the OET is mandatory for this solicitation so offers can be imported directly into the Bulk Bid Evaluation Model (BEM) for the evaluation of Factor 2: Price. Any documents not submitted in the OET will be evaluated as part of the vendor’s offer submission package (OSP).
(i) The OET has three Standard rounds: Initial, Interim Proposal Revision (IPR), and Final Proposal Revision (FPR). An optional “OET Price Reduction” round may be conducted at the Contracting Officer’s discretion. After the solicitation has been posted to the SAM.gov website, it will then be posted to the OET as the Initial Standard round.
Offerors must participate in the Initial Standard round, pass Phase 1, and be in the competitive range to be eligible to participate in any subsequent rounds.
a. Initial round: offerors can edit all data fields in its OSP by adding shipping locations, origin and destination bid lines, quantities, prices, and offer conditions.
b. IPR round: offerors may change most data fields in its offer, including adding and removing shipping locations, adding or removing origin and destination bid lines, quantities, prices, and offer conditions. The IPR is the last round offerors are allowed to add new shipping points, products, modes of delivery, sources of supply, FOB terms, exception requests, or new bid lines. Interim OET round submittal is also the last opportunity for offerors to request additional bid lines to propose tiered pricing.
c. FPR round: offerors shall be unable to add new shipping points, products, modes of delivery, sources of supply, FOB, escalators exception requests, or new bid lines.
Offerors will only be able to edit the other fields of its offer in the OET.
d. OET Price Reduction round (Optional): If the Contracting Officer determines that a Price Reduction round will be held, offerors will only be allowed to lower their offered price and be unable to revise any other OET fields. Offerors will be provided with an updated copy of the Minimum Cost Bid Evaluation Worksheet (MCBEW) and a “Laid-Down Cost Report” (LCR). The LCR will provide information on the price currently in line for award at each line item. This report is limited to providing the solicitation line item, demand location, quantity currently in line for award, and the laid down price for the quantity currently in line for award (laid down price as defined under: FACTOR 2: PRICE in this solicitation). Revisions received after the stated closing date and time will not be considered. If there was no new offered price submitted during the OET Price Reduction round, then the previous submitted offered price shall be used for evaluation.
(ii) Revisions submitted after the close of a round will not be considered.
(iii) For an Offeror’s proposal to be accepted in writing, all of the following conditions must apply:
• Experienced significant technical issues when submitting its proposal on OET;
• Notified the Contracting Officer immediately of the significant technical issues; and
• The significant technical issues were out of Offeror’s control and not due to Offeror’s fault or negligence.
If these conditions apply, then the Contracting Officer will allow Offeror to submit its proposal in writing. If allowed, and it is the IPR or FPR round, then Offeror must make it clear which sections of the OSP they are revising (e.g., Shipping Point NAME rail to manifold should be updated to XX); there is no need to revise the sections if it is the Initial Round.
(8) The solicitation will have a Two-Part Negotiation. Part 1 begins with the Opening of Negotiations letters, which are sent to offerors who are in the competitive range. Discussions will be held before the date and time specified for the closing of the IPR. Part 1 will conclude with the submission of IPRs. Part 2 of Negotiations will occur after the closing of the Interim OET round. Offerors will be notified of negotiation issues that must be resolved in the FPR. Part 2 will conclude with date and time indicated in the Closing of Negotiation letter.
Each offeror will be provided with a “Minimum Cost Bid Evaluation Worksheet” (MCBEW) after IPR and before FPR. The MCBEW will provide detailed information on how an offer is evaluated to each demand location. This report includes offered prices, method of delivery for each leg of the route, transportation and additive costs, any applicable evaluation factors, and the evaluated laid down price for each location. This information will be generated separately for each offeror, and each offeror will receive only the information applicable to its offer.
Offerors will be given time to review the MCBEW, after which DLA Energy will close negotiations and call FPRs. FPRs submitted through the OET will be evaluated in the BEM. Unless the offer is withdrawn, the offeror’s most recent OET price submission for this acquisition (initial offer, IPR, or FPR, as applicable) will be evaluated as a final offer in the BEM for possible award. The Government reserves the right to either make awards based on the FPR BEM evaluation, or to conduct additional Standard rounds or an OET price reduction rounds.
If the Contracting Officer holds a price reduction round, offerors will be provided with an updated copy of the MCBEW and an LCR. Revisions received after the stated closing date and time will not be considered.
If there was no new offered price submitted during the OET Price Reduction round, then the previous submitted offered price will be used for evaluation.
(9) Offerors must select only one mode of transportation and shipping point per sequence bid line offered in the OET. For example, a unique sequence bid line is necessary if an offeror wants to propose:
(i) multiple transportation modes from the same shipping point, or
(ii) multiple shipping points with the same transportation mode
(10) Offerors shall not propose FOB Destination and Tanker mode on sequence bid lines. The Military Cargo Preference Act of 1904 requires that 100% of cargoes for the U.S. military forces shall be carried on U.S. flag vessels.
(11) All offer sequences must specify the Reference Price Formula ID upon which the offer is based in the OET. Offers for F76, JP5, and JA1 may use any or all of the stated Reference Prices for that product. The corresponding default Reference Price Formula (shown in shading in the table, above) will be assigned to any sequences for which a specific Reference Price Formula ID is not selected.
(12) Offerors shall notify DLA Energy if the shipping points proposed have any transportation restrictions to any of the demand locations solicited. If transportation restrictions are in place from the proposed shipping point, Offerors must provide documentation from the cognizant port authority or management verifying the ability to provide product to the specific location(s) that has a delivery restriction. If sufficient documentation is not submitted, the bid lines will not be evaluated to the location that has restrictions to receive fuel from the proposed shipping point.
(13) All attachments in the Bulk OET must be in PDF format and NOT include any electronic signatures.
(14) Multiple PDF attachments are allowed to be uploaded with an offer in the Bulk OET. There are no size restrictions.
(15) When an OSP is submitted in the OET, a SF1449 that contains the preparer’s electronic signature will be included as part of the offer submission package. If the SF1449 is signed by someone other than the authorized negotiator/individual submitting the offer in the OET, then please attach the completed and signed SF1449 as part of the OSP.
(16) All offerors shall return Attachment – Fill-Ins. Offerors that complete representations and certifications electronically in SAM.gov, as instructed in FAR 52.212-1(a)(5), must verify that the dated provisions match what is in the solicitation. If the date of a representation and certification provision is older than what is in the solicitation, then the offeror shall complete the newer version in the solicitation.
(17) All offerors that propose an F76 sequence shall complete and sign Attachment – F76 Traceability Sheet. If it includes an additive that is not approved, offerors shall submit an exception request.
(18) Map coordinates shall be provided as specified in Attachment – Map Coordinate Desk Guide.
(19) Offerors shall submit more than one Authorized Negotiator and provide the full legal name for each Authorized Negotiator. The Government may not discuss a proposal with an individual who is not listed.
(20) If an offeror has a physical address in the U.S. Central Command (CENTCOM); is submitting FOB Destination Offer(s) to CENTCOM; and/or is offering FOB Origin Shipping Point(s) in CENTCOM, then the offeror shall be registered in the Joint Contingency Contracting System (JCCS) to be considered for contract award. If awarded, active registration shall be maintained throughout the contract period of performance. Countries in CENTCOM include Afghanistan, Bahrain, Egypt, Iran, Iraq, Jordan, Kazakhstan, Kuwait, Kyrgyzstan, Lebanon, Oman, Pakistan, Qatar, Saudi Arabia, Syria, Tajikistan, Turkmenistan, United Arab Emirates, Uzbekistan, and Yemen.
Likewise, if an offeror has a physical address in the U.S. Africa Command (AFRICOM); is submitting FOB Destination Offer(s) to AFRICOM; and/or is offering FOB Origin Shipping Point(s) in AFRICOM, then the offeror shall be registered in JCCS to be considered for contract award.
(21) Any award to a contractor, who, at the time of award, was suspended, debarred, or ineligible for receipt of contracts with Government agencies or in receipt of a notice of proposed debarment from any Government agency, is voidable at the option of the Government.
(22) Any exceptions shall be submitted in the OET and the offerors must reference the contract provision, clause or text for evaluation in accordance with EVALUATION (EXCEPTIONS/DEVIATIONS)(BULK) by no later than the IPR OET submission.
(23) PORT ASSESSMENT: If an award is extended for a FOB Origin Tanker offer, the offeror will be required to provide the government a Facility Security Officer point of contact for the awarded shipping points so a post-award Port Assessment (PA) can be completed. Naval Criminal Investigative Service (NCIS) shall perform a PA prior to the delivery period. The Facility Security Officer provided shall coordinate with NCIS, as needed. Validity terms of the PA are based on Force Protection Condition (FPCON) and may range from one to three years.
(24) PROTECTION OF GOVERNMENT PROPERTY AND SPILL PREVENTION
(a) The Contractor shall use reasonable care to avoid damaging or contaminating existing buildings, equipment, asphalt pavement, soil, or vegetation (such as trees, shrubs, and grass) on the Government installation. If the Contractor fails to use reasonable care or fail to comply with the requirements of this contract and damages or contaminates any such buildings, equipment, asphalt pavement, soil or vegetation, or other Government facilities, he shall replace the damaged items or repair the damage at no expense to the Government and to the satisfaction of the Government.
Should the Contractor fail or refuse to make such repairs or replacements, the Government may have the said repairs or replacement accomplished, and the Contractor shall be liable for the cost thereof which may be deducted from the amounts which become due under this contract. Informal agreement with the Contractor upon replacement, repairs, or costs to be deducted shall first be attempted by the Installation Commander or Ordering Officer. If disagreement persists, the matter shall be referred to the Contracting Officer. Unless approved by the Contracting Officer, no costs shall be deducted from amounts due or owing without the Contractor's consent.
(b) The Contractor shall take all measures as required by law to prevent oil spills (including, but not limited to, any spilling, leaking, pumping, pouring, emitting, emptying or dumping into or onto any land or water). In the event the Contractor spills any oil (including, but not limited to, gasoline, diesel fuel, fuel oil, or jet fuel), the Contractor shall be responsible for the containment, cleanup, and disposal of the oil spilled. Should the Contractor fail or refuse to take the appropriate containment, cleanup, and disposal actions, the Government may do so itself. The Contractor shall reimburse the Government for all expenses incurred including fines levied by Federal, State, or local governments.
(25) SAFETY DATA SHEETS – COMMERICAL ITEMS
(a) For each item to be delivered under this contract, the apparently successful offeror shall submit, prior to award, a Safety Data Sheet (SDS), NOT a Material Safety Data Sheet (MSDS), that meets the requirements of both 29 CFR 1910.1200(g) and the latest version of Federal Standard No. 313.
All data on the SDS shall be current, accurate, complete, and in compliance with Federal Standard No. 313. The apparently successful offeror is responsible for satisfying this requirement whether or not it is the actual manufacturer of the item. Failure to submit an SDS for each item to be delivered prior to award may result in the apparently successful offeror being considered non-responsible and ineligible for award.
(b) All SDSs shall be submitted to the Contracting Officer. Each SDS must cite the solicitation or contract number, the applicable Commercial and Government Entity (CAGE) code of the Contractor and the name of the manufacturer, and the National Stock Number (NSN).
(c) For current contracts, the apparently successful offeror need not submit an SDS for an item for which they have submitted an acceptable SDS to DLA Energy within the past four years. At minimum, a new SDS must be prepared, dated, and submitted every four years.
(d) If, at any time prior to or after award, there is either a change in the composition of the item(s) or a revision to Federal Standard No. 313 that renders incomplete or inaccurate the data submitted under paragraph (a) of this contract text, the apparently successful offeror or Contractor shall promptly notify the Contracting Officer and submit a new SDS that is complete and accurate within 30 days of said change or revision.
(b) Period of Acceptance. Period of Acceptance shall be changed to 270 days.
(c) Late submissions, modifications, revisions, and withdrawals of offers.
(5) Offerors wishing to withdraw their offer may only do so in writing to the Contracting Officer and by formally withdrawing their offer in the OET.
(d) Contract award. The following is hereby added: The Government may evaluate offers and award a contract after conducting negotiations with offerors whose offers have been determined to be within the competitive range. If the Contracting Officer determines that the number of offers that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of offers in the competitive range to the greatest number that will permit an efficient competition among the most highly rated offers. Therefore, the offeror’s initial offer should contain the offeror’s best terms from a price and technical standpoint.
(End of Addenda)
File details come from the government source that posted it. Updated .