This is a Program and Solicitation Overview presentation for DLA Energy's Western Pacific (WESTPAC) bulk petroleum contract.
The solicitation (SPE602-26-R-0706) seeks suppliers for three fuel products required for military operations in the Western Pacific and Middle East regions: F76 (Navy Distillate) at 207.67 million gallons, JA1 (Aviation Turbine Fuel) at 266.39 million gallons, and JP5 (Aviation Turbine Fuel) at 137.57 million gallons. Delivery modes include tanker (FOB Origin only), shallow draft tanker, barge, tank truck, railcar, and pipeline. The contract is a Fixed Price Indefinite Delivery/Indefinite Quantity with Economic Price Adjustment, featuring a 75% minimum lift guarantee of total contract volume and multiple awards. The ordering period extends from contract award through December 31, 2027, with actual delivery occurring January 1 through December 31, 2027. This is full and open competition with no small business set-asides. Contracting Officer is Christopher W. Clement. The solicitation was issued March 31, 2026, with offers due April 30, 2026 at 10:00 AM EDT (Fort Belvoir, Virginia time), and awards expected in the first week of November 2026.
Evaluation uses a two-phase gated approach: Phase 1 screens for inherent capability (offeror must be a refiner/manufacturer, provide a qualifying supply commitment letter, or have held a DLA Energy bulk petroleum contract within three years); Phase 2 applies Lowest Price Technically Acceptable evaluation across technical acceptability subfactors covering supplies/pricing, specifications, inspection/acceptance, and delivery/performance, plus price evaluation using the Bid Evaluation Model. Pricing uses prior 10-day average escalators with default escalators for each product (Platts Jet Kero FOB Singapore for JP5/JA1; Platts Gasoil 10ppm FOB Singapore for F76), with evaluation factors applied to uncommon escalators. Contractor responsibility determinations include pre-award surveys potentially requiring 30-45 days. JCCS vetting (required for CENTCOM locations) and AFRICOM Vendor Vetting System may apply. Trade Agreements Act compliance determination follows final pricing round with DLA Commander waiver approval authority.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS
DLA ENERGY
Western Pacific (WESTPAC) Program and Solicitation Overview
SPE602-26-R-0706
Christopher W. Clement Contracting officer April 16, 2026
OPENING REMARKS
Shelly A. Brayboy Division Chief
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS 3
CUI
CUI
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS
WESTPAC OVERVIEW
Estimated annual overseas bulk petroleum requirements in Western Pacific & Middle East
Djibouti, Qatar, Oman, UAE Guam, Japan, Korea, Marshall Islands, Philippines, UK, Wake Island
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS 4
CUI
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS
PROGRAM DESCRIPTION
• REQUIREMENTS:
o F76 (Fuel, Navy Distillate; 1.1a): 207,670,000 USG o JA1 (Turbine Fuel, Aviation; 1.1h): 266,390,000 USG o JP5 (Turbine Fuel, Aviation; 1.1c):137,574,000 USG
• DELIVERY MODES:
o Tanker (FOB Origin only), Shallow Draft Tanker, Barge, Tank Truck, Railcar, and/or
Pipeline
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS 5
CUI
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS
PROGRAM DESCRIPTION
• ORDERING PERIOD:
o Date of award through December 31, 2027
• DELIVERY PERIOD:
o January 1, 2027 through December 31, 2027
• CONTRACT TYPE:
o Fixed Price, Indefinite Delivery/Indefinite Quantity with Economic Price Adjustment (EPA)
Minimum Lift Guarantee of 75% of the total original contract volume
RFP DELIVERY-ORDER LIMITATIONS (SEP 2025)
Multiple Awards
• COMPETITION:
o Full and Open Competition IAW FAR 6.1 o No Set-Asides for Small Business Concerns
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS 6
CUI
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS
SOLICITATION OVERVIEW
• SOLICITATION
o SPE602-26-R-0706 o Negotiated Request for Proposal (RFP) o Published on Contract Opportunities via SAM.gov o System for Award Management (SAM) registration required at https://sam.gov/content/home
• TIMELINE AND KEY DATES:
o Solicitation issued on March 31, 2026 o Deadline for receipt of offers is expected to be April 30, 2026, 10:00 am EDT, Local
Fort Belvoir, Virginia time.
(“late is late!”) o Awards expected to be made on or around First week of November 2026 o Delivery period will begin January 1, 2027 https://sam.gov/content/home
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS 7
CUI
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS
SOLICITATION OVERVIEW (CONT’D)
• SOLICITATION SECTIONS:
Section B: Supplies or Services and Prices/Costs Section C: Description/Specifications/Statements of Work Section E: Inspection and Acceptance Section F: Deliveries and Performance Section G: Contract Administration Data Section I: Contract Clauses Section J: List of Attachments Section K: Representations, Certifications and Statements Section L: Instructions, Conditions and Notices Section M: Evaluation Factors for Award
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS 8
CUI
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS
OFFER SUBMISSION
• WHAT TO SUBMIT
o SF-1449 o Offeror Submission Package (OSP) o Applicable fill-in clauses/provisions o Representations and Certifications (Section K) o Quality Control Plan outline, estimated 2 pages in length (but see slide #17) o F-76 Traceability Page (*if applicable) o Supply Commitment Letter (see EVIDENCE OF RESPONSIBILITY and note below)
(*if applicable) o Any applicable amendments issued. Ensure Blocks 8 and 15 are fully completed.
o Tax Representations & Certifications Doc / TAA Cert DFARS 252.225-7020 o JOINT CONTINGENCY CONTRACTING SYSTEM (JCCS) (*if applicable) o AFRICOM VENDOR VETTING SYSTEM (AVVS) (*if applicable) o See RFP SF-1449 Notes and Section L: Instructions, Conditions, and Notices to Offerors or Respondents for full details o If the offeror's source of supply is a firm or refinery independent of the offeror, the offeror will be required to submit evidence of a supply commitment from such source(s) when submitting its offer under this solicitation. Evidence of supply commitments should extend to the subcontracting level at which the product is produced.
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS 9
CUI
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS
OFFER ENTRY TOOL (OET)
• OET OFFER SUBMISSION:
o Ensure access to the OET o STRONGLY RECOMMENDED:
Enter and test the system prior to submitting offer Allow sufficient time to submit offer by the deadline (Accounts may be locked, system issues may occur, etc.)
o All Technical documents MUST BE submitted through OET to be rated Technically
Acceptable o Best practice: Separate individual attachments with appropriate name when uploading to
OET
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS 10
CUI
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS
EVALUATION
• SOURCE SELECTION:
o Lowest Price Technically Acceptable Evaluation (LPTA) o Two Phase Gated Evaluation Approach
Phase 1: Inherent Capability (Pass/Fail screening for minimum requirements) Phase 2: Lowest Price Technically Acceptable Evaluation o Section M, FAR 52.212-2 EVALUATION – COMMERCIAL ITEMS (FEB 2026) o Tradeoffs will not be permitted
• PHASE 1: INHERENT CAPABILITY
o In accordance with GATED APPROACH CRITERIA, Offerors must meet the following minimum standards to be included in evaluation under PHASE 2:
The Offeror is a refiner/manufacturer; or The Offeror provides a Letter of Supply Commitment that meets the standards set in
EVIDENCEOF RESPONSIBILITY: or The Offeror has successfully held a DLA Energy Bulk Petroleum Products contract within the past three (3) years.
If an offeror fails to pass Phase 1 of the Gated Approach, they will be notified in accordance with FAR 15.206-1(a) and no negotiations will be conducted with no opportunity to revise their proposal.
Offerors that successfully pass Phase 1 of the gated approach will enter negotiations following the conclusion of the Phase 1 with a further opportunity to revise their proposals.
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS 11
CUI
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS
EVALUATION
PHASE 2: LOWEST PRICE/TECHNICALLY ACCEPTBLE EVALUATION
Factor 1: Technical Acceptability: Offer conforms to material solicitation requirements in the following subfactors:
Subfactor 1: Supplies or Services and Prices/Cost, Section B Subfactor 2: Description/Specifications/Statement of Work, Section C Subfactor 3: Inspection and Acceptance, Section E Subfactor 4: Deliveries or Performance, Section F
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS 12
CUI
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS
EVALUATION
Factor 1: Technical Acceptability continued
• Subfactor 1: Supplies or Services and Prices/Cost, Section B:
a. Offer meets all schedule requirements in Section B
b. Offered line items meet the delivery requirements of the schedule for additives required
c. Offered line items meets the delivery requirements of the schedule for mode and FOB point
d. Offered line items meet the required minimum and maximum quantity of the schedule
• Subfactor 2: Description/Specifications/Statement of Work, Section C:
a. Offer meets all specification requirements outlined in Section C provisions
b. For F76 offers, offer includes a completed and signed Traceability form in accordance with Quality Assurance Provision (QAP) C16.23 FUEL, NAVAL DISTILLATE (F-76)
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS 13
CUI
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS
EVALUATION
Factor 1: Technical Acceptability continued
• Subfactor 3: Inspection and Acceptance, Section E:
a. Offer meets all inspection requirements outlined in Section E
b. Offeror demonstrates an understanding of the quality assurance requirements in Quality
Assurance Provision (QAP) E1 of the solicitation by:
1)Certifying that it has a Quality Control Plan (QCP), applicable to a DLA Energy bulk petroleum contract, on file with DLA Energy that is no more than 24 months old; or 2)providing an outline, estimated to be no more than two pages in length, of a proposed QCP describing the offeror’s current inspection system and quality assurance procedures, with references to the corresponding requirements in QAP E1
• Subfactor 4: Deliveries or Performance, Section F:
a. Offer meets all requirements outlined in Section F provisions
b. Offer includes completed information under Sources of Supply for all products and shipping points
c. Offer includes completed information under Parcel Shipping Sizes and Daily Capacity for all products, modes and shipping points offered
d. Offer includes completed information under Tanker and Barge Loading Facility Data as applicable including but not limited to map coordinates for shipping points in the proper format as specified in Attachment – Map Coordinate Desk Guide
e. Offer includes completed information under Port Restrictions as applicable
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS 14
CUI
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS
EVALUATION
Factor 2: Price
• DLA Energy uses a computer evaluation model, the Bid Evaluation Model (BEM), to analyze numerous variables, to include the offerors’ proposed prices, fuel types, minimum and maximum offer quantities, shipping locations, shipment method capabilities, customer receipt locations, receipt mode capabilities, and any other conditions included in the offerors’ proposals.
• The BEM calculates the overall pattern of delivery from offerors’ facilities to specific customer locations that is the lowest total combination of price for product and transportation.
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS 15
CUI
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS
EVALUATION
• EVALUATION (FOB ORIGIN TANKER)
o Conformed for all programs o Evaluates one-way mileage instead of two-way mileage
• EVALUATION (EXCEPTIONS/DEVIATIONS)(BULK)
o Exceptions must be included in Section M of the OSP to be evaluated o Non-compliant exceptions will be rejected o Exceptions not explicitly accepted by Government in negotiations are considered rejected
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS 16
CUI
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS
CONTRACTOR RESPONSIBILITY
• FAR SUBPART 9.1: RESPONSIBLE PROSPECTIVE CONTRACTORS
o An affirmative responsibility determination must be made prior to award
• FAR 9.104 STANDARDS
o Reps and Certs (SAM.Gov)
• PREAWARD SURVEYS
o Pre-award Surveys (may take minimum of 30-45 days to coordinate/complete)
Ensure offer information is complete so that survey requests may be conducted in a timely manner.
o Financial Pre-award Surveys may be requested o Eligibility Reviews - Debarment, Suspension, and Ineligibility
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS 17
CUI
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS
JOINT CONTINGENCY CONTRACTING SYSTEM
(JCCS)
• JOINT CONTINGENCY CONTRACTING SYSTEM (JCCS)
o Required for awards in the U.S. Central Command (CENTCOM) Area of Operation
(AOR). Applicable when:
Offeror physical address located in CENTCOM Offeror is submitting FOB Destination offer to CENTCOM Offeror is submitting shipping point(s) located in CENTCOM o See SF1449 Note for details on JCCS website and information requirements.
Submit completed company profile and information as soon as possible, preferably with initial offer submission.
JCCS review can require 2-3 months for completion
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS 18
CUI
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS
TRADE AGREEMENTS ACT (TAA)
• TRADE AGREEMENTS ACT (FAR PART 25):
o Designated / Qualifying Countries o Determination whether to both request and grant a waiver
DLA Commander approval; waiver determination follows final pricing round Offerors may submit both TAA-compliant and TAA noncompliant offers
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS 19
CUI
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS
PROCUREMENT PROCESS OVERVIEW
*Several OET fields close for further revision following IPRs **Optional round(s); participation limited to offers rated Technically Acceptable
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS 20
CUI
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS
PROCUREMENTS PROCESS OVERVIEW
1) INITIAL OFFER ROUND
2) PHASE 1: INHERENT CAPABILITY
o All offerors are screened in accordance with GATED APPROACH CRITERIA
3) PHASE 2: LOWEST PROCE TECHNICALLY ACCEPTABLE
o Only Offerors who successfully pass Phase 1 will proceed to Phase 2.
i. INTERIM PROPOSAL ROUND (IPR) o Last opportunity for Offerors to revise or add shipping points, products, modes of delivery, sources of supply, FOB, escalators exception requests or add new bid lines.
o Offerors will be provided a Minimum Cost Bid Evaluation Worksheet (MCBEW)
ii. FINAL PROPOSAL REVISIONS (FPR) o Last opportunity to revise proposals to address any technical acceptability issues o The most recent OET submission will be evaluated as offeror’s FPR if an offeror chooses not to revise its offer during this round, and offer is not withdrawn
iii. PRICE REDUCTION ROUND(S) (PRR) o Optional Round(s), held at CO discretion o May be submitted only for Technically Acceptable offers o Multiple PRRs may be conducted o Offerors will be provided a MCBEW and a Laid Down Cost Report (LCR) o Govt will determine the lowest laid down cost and overall bid award pattern
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS 21
CUI
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS
HOW CAN OFFERORS HELP
• START EARLY!
• SUBMIT COMPLETE INITIAL PROPOSALS
o High quality, complete proposals, that fully address ALL solicitation requirements o Provide timely and complete verbal and written communications throughout process
• EXCEPTIONS/WAIVERS
o Long lead times may be needed for approval
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS 22
CUI
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS
PROGRAM PARTICIPANTS
FORT BELVOIR SUPPORT
• DEMAND PLANNERS (-QEVS)
• TRANSPORTATION DISTRIBUTION (-FENBA)
• INVENTORY MANAGEMENT (-FENBB)
• TANKER OPERATIONS (-FENBC)
• QUALITY OPERATIONS (-AQ)
• PRODUCT TECHNOLOGY & STANDARDIZATION (-AT)
• CONTRACT SPECIALISTS/OFFICERS (-FEBC)*
• PROCUREMENT PROCESS SUPPORT (-BP)
• BUSINESS PROCESS SUPPORT ANALYSTS (BPAs) (-BP)
• COUNSEL (-G)
• FINANCE (-F8F)
• SOURCE SELECTION AUTHORITY
REGION SUPPORT
• REGIONAL CONTRACT SPECIALISTS/OFFICERS
• QUALITY ASSURANCE
• SUPPLY PLANNERS
*All offeror questions should be directed to Contracting office only
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS 23
CUI
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS
PRICING
• Fixed Price with Economic Price Adjustment
• Economic Price Adjustment Explained o Price Escalators = Published prices used to adjust contract prices over time
(allows prices to fluctuate with the market) o Base reference price = Escalator price on the base reference date (1/7/26) o Offer price - Base reference price = Margin o Invoice price = Reference price on lift date + Margin
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS 24
CUI
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS
PRICING
• DEFAULT ESCALATORS
o Published price we believe most accurately reflects price movements for that product in the specified location o WESTPAC escalators are Prior 10-Day Averages
Average of the 10 published prices preceding the date of delivery
The 10-day average $/barrel price is rounded to 2 decimal places, and then divided by 42 to convert it to $/gal
JP5 & JA1: Platts Jet Kero FOB Spore Cargo
F76: Platts Gasoil 10ppm FOB Spore Cargo
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS 25
CUI
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS
PRICING
• UNCOMMON ESCALATORS
o Any escalator that differs from default escalator o Uncommon escalators not included in the solicitation may be proposed by offerors
Other assessment locations, product assessments or calculation methods
(pending approval) o Evaluation factors are applied to all offer prices based on uncommon escalators
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS 26
CUI
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS
PRICING
• Evaluation Factors
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS 27
CUI
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS
PRICING
• Evaluation Factors – Calculation
JP5
Jet Kero FOB
Spore Cargo (USD) Jet FOB Med Cargo
(USD)
Ref Price (12/21/21) 1.998571 1.985720
12 mo avg 1.711704 1.725125
Difference 0.286867 0.260595
Adjustment factor 0.026272
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS 28
CUI
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS
PRICING
• Evaluation factors – Why?
• Evaluate offers based on the relationship of the uncommon escalator and the default escalator for a 12-month period
• Looking at full 12-month average for the comparison allows us to see the "normal" relationship between the two escalators
• Used only for price evaluation – Will not be factored into invoice prices once contract performance begins
DLA ENERGY
Western Pacific (WESTPAC) Program and Solicitation Overview
SPE602-26-R-0706
Otho (Lee) Branch Inventory Management Specialist April 16, 2026
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS 30
CUI
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS
Technical Evaluation
• Lowest Price, Technically Acceptable (LPTA) o Source Selection Technical Team
• Comprised of representatives from Inventory & Planning, Tanker Operations, Transportation, Quality Assurance, and Product Technology & Standards.
• Technical Team reviews offers submitted through the Offer Evaluation Tool (OET) against the Solicitation posted on Sam.Gov website.
o Each offeror is evaluated solely based upon the offer's compliance with the solicitation factors and subfactors outlined in Section M for Award.
o Tech Team will ensure the evaluation process follows the evaluation criteria and the ratings are appropriately and consistently applied to all offers.
• Missing/Incomplete details may result in an Unacceptable rating for corresponding bid lines.
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS 31
CUI
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS
Technical Evaluation
• Examples of Missing Data:
o Mode, Min/Max Quantities, Shipping Point o Source/Refinery, Max Monthly Production o Inconsistent Shipping Point and Source Point Names o Parcel Shipping Sizes & Daily Capacity o Pipeline Shipping Point and Ingress, Min/Max Parcel Size, Lift Interval o Barge/Tanker Facility Loading and Port Information o Map Coordinates o Shutdown Period o Exceptions, Deviations, Waivers (if applicable)
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS 32
CUI
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS
Technical Evaluation
A.1. Origin Offer - Mode, Min/Max Quantities, Shipping Point
OET – Entering Offers Main Menu: Origin Bid Offers Sub-Menu: N/A
Seq Set
ID
Product Shipping Point
To Location
Line Item
Max Qty
(USG)
Min Qty
(USG)
Mod e
Price w/o Additi ves
(USD)
Total Additi ve Cost
% Bio-Fuel Included in Offer Qty**
EPA
Escalator
Total Offer Price
S5 A JAA Shipping Point A, VA
Ft Belvoir
0126 20,000,000 2,500,000 T
*.****** *.****** 0 *.****** *.******OET – Entering Offers Main Menu: Destination Bid Offers Sub-Menu: N/A
A.2. Destination offer – Mode, Min/Max Quantities, Shipping Point
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS 33
CUI
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS
Technical Evaluation
B. Total Additives
Seq Mode FSII Price
FSII Included / Optional / Not Included
SDA
Price
SDA
Included / Optional / Not Included
CI Price CI Included / Optional / Not Included
S1 P *.****** N *.****** N *.****** Y
S2 T *.****** Y *.****** Y *.****** Y
S3 K *.****** N *.****** N *.****** N
S4 B *.****** O *.****** N *.****** O
S5 T *.****** Y *.****** Y *.****** Y
OET – Entering Offers Main Menu: Origin/Destination Bid Offers Sub-Menu: Total Additives
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS 34
CUI
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS
Technical Evaluation
E.1. Maximum Monthly Production
1. State the monthly production capacity for each source of supply:
*Please provide maximum production that is offered with your Offer Submission Packet
E.2. Shipping Points Supplied via Source/Refinery
2. List all shipping points supplied by each refinery/source of supply:
OET – Offer Submission Data Main Menu: Source of Supply Sub-Menu: Production Capacity for Each Source
OET – Offer Submission Data Main Menu: Source of Supply Sub-Menu: Shipping Points Supplied By Each Refinery Source
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS 35
CUI
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS
Technical Evaluation
OET – Offer Submission Data Main Menu: Parcel Shipping & Daily Load/Move Capability Sub-Menu: Pipeline; Tanker, Truck
F.1. Parcel Shipping Sizes & Daily Capacity
1. Would the parcel size/lift interval for one product or mode impact the available parcel size/lift for any other product mode or mode at the same shipping point?
F.2. Parcel Shipping Sizes & Daily Capacity
2. Would awarded FOB Origin Truck volume affect awarded FOB Destination Truck volume or conversely awarded FOB Destination Truck volume affect FOB Origin Truck volume? If "Yes" give details below.
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS 36
CUI
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS
Technical Evaluation
F.3. Parcel Shipping Sizes & Daily Capacity F3a. For Truck and Railcar
a. State the Loading/Movement Capacity for FOB Origin offers:
Product/Mode Shipping Point
Days of Week Terminal Open
Hours Each Day Terminal is Open
No. Racks Max Load Per Normal Workday
JAA Shipping Point A, VA
Sun-Sat 0000-2359 2 13
F3b. For Truck and Railcar
b. State the Loading/Movement Capacity for FOB DESTINATION offers:
Product/Mode Shipping Point
Min Daily Quantity
Max Daily Quantity Days Available for Delivery
JAA Shipping Point A, VA
0 120,000 Sun-Sat
OET - Offer Submission Data Main Menu: Parcel Shipping Sizes & Daily Load/Move Capacity Sub-Menu: Truck/Railcar Origin Truck/Railcar Destination
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS 37
CUI
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS
Technical Evaluation
F.4. Parcel Shipping Sizes & Daily Capacity
4. Pipeline
a. State the pipeline that the product will move through and the minimum and maximum quantities (parcel sizes) available in barrels (BBLS) for each delivery and the minimum number of days between lifts (deliveries) into each pipeline (please state if there is no interval)
VENDOR NOTES: Ingress Points is Parrish, LA.
5. For Barge/Tanker/Shallow Draft Tanker
a. State the minimum and maximum quantities (parcel sizes) available in barrels (BBLS) for each delivery and the minimum number of days between lifts (deliveries):
F.4. Parcel Shipping Sizes & Daily Capacity
4. Pipeline
a. State the pipeline that the product will move through and the minimum and maximum quantities (parcel sizes) available in barrels (BBLS) for each delivery and the minimum number of days between lifts (deliveries) into each pipeline (please state if there is no interval)
VENDOR NOTES: Ingress Points is Parrish, LA.
5. For Barge/Tanker/Shallow Draft Tanker
a. State the minimum and maximum quantities (parcel sizes) available in barrels (BBLS) for each delivery and the minimum number of days between lifts (deliveries):
F.5. Parcel Shipping Sizes & Daily Capacity
OET – Offer Submission Data Main Menu: Parcel Shipping & Daily Load/Move Capacity Sub-Menu: Pipeline; Tanker
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS 38
CUI
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS
Technical Evaluation
G.1. FOB Origin Tanker/Barge/Shallow Draft Tanker Loading Facility Data
1. State your facility restrictions/capacities including cargo capacity, Mean Low Water (MLW) depth, vessel Length Overall (LOA) and draft:
Shipping Point
Mode Cargo Capacity
(BBLS)
Mean Low Water Depth
(FT)
LOA (FT) Draft (FT)
Shipping Point C, TX
TANKER 235,000 40 600 40
Shipping Point D, NJ
BARGE 50,000 35 300 38
G.2. FOB Origin Tanker/Barge/Shallow Draft Tanker Loading Facility Data
2. State your facility restriction/capabilities including ballast capacity, maximum loading rate in barrels per hour (BPH):
Shipping Point Mode Ballast Capacity (BBLS) Max Loading Rate (Pump Rate
BPH)
Shipping Point
C, TX
TANKER NONE 6,000
Shipping Point
D, NJ
BARGE NONE 2,000
G.3. FOB Origin Tanker/Barge/Shallow Draft Tanker Loading Facility Data
3. Provide the map coordinates for your shipping points/refinery:
Shipping Point Map Coordinates
Petroleum Company 00° 00' 00" N, 000° 00' 00" W
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS 39
CUI
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS
Technical Evaluation
H.1. Port Restrictions
1. For each shipping point specify:
Shipping Point Height Restrictions
– Sea Level to Manifold (FT)
Distance from Vessel Rail to Manifold (FT)
Maximum Vessel Size (DWT)*
Maximum Beam (FT)
Shipping Point C, TX
N/A N/A 100,000 120 feet
Shipping Point D, NJ
35 FT 15 FT 25,000 100 feet
H.2. Port Restrictions
2. Specify any other port restrictions that would apply to a vessel loading at the facility (i.e., requirements for inert gas systems; vapor control hook-ups; closed loading; and vessel inspections; etc.):
OET - Offer Submission Data Main Menu: Port Restrictions Restrictions/Capacities Cargo Sub-Menu: For Each Shipping Point, Other Restrictions
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS 40
CUI
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS
Technical Evaluation
H.3. Operating Hours for Berthing and Loading
3. Specify operating hours for berthing and loading at each shipping point:
Shipping Point Berthing Loading
Shipping Point C, TX 24 x 7 24 x 7
Shipping Point D, NJ 24 x 7 24 x 7
H.4. Additional Vetting Criteria & Port Restrictions
4. Provide any additional Vetting Criteria and Port Restrictions that have not been addressed above that would affect the ability to enter your facility and load product:
OET - Offer Submission Data Main Menu: Port Restrictions Sub- Menu: Operating Hrs for Berthing & Loading and Additional Vetting Criteria
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS 41
CUI
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS
Technical Evaluation
I. Quality Assurance
J. F3.02 Truck/Truck Trailer Free time and Detention Rates
OET - Offer Submission Data Main Menu: Quality Assurance & Truck Free Time & Detention Rates
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS 42
CUI
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS
Technical Evaluation
K. F92.02 Schedule of Refinery Shutdowns for Turnarounds
(1) No shutdowns planned []
(2) Shutdowns planned [X]
REFINERY LOCATION SHUTDOWN PERIOD IMPACT OF SHUTDOWN ON SUPPLY
AVAILABILITY
Refinery A, TX June-August 2022 None, Refinery will keep on hand barrels during shutdown
Refinery B, TX October 2022 No product will be available during shutdown.
OET - Offer Submission Data Main Menu: Schedule of Refinery Shutdowns For Turnarounds
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS 43
CUI
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS
Technical Evaluation
L. Requests for Exception
M.1. Clause/Provision Exception Requested Supplies or Services & Prices Section B of Solicitation
M.2.Clause/Provision Exception Requested Descriptions/Specifications/Statement of Work
Section C of Solicitation
M.3. Clause/Provision Exception Requested
Inspection & Acceptance Section E of Solicitation
M.4. Clause/Provision Exception Requested
Deliveries or Performance Section F of Solicitation
M.5. Clause/Provision Exception Requested
Other Exceptions Other Exceptions
OET - Offer Submission Data Main Menu: Requests for Exceptions Sub-Menu: M.1., M.2., M.3., M.4. M.5.
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS 44
CUI
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS
Technical Evaluation
N. General Comments
N. General Comments Any additional applicable comments
OET - Offer Submission Data Main Menu: K Clauses & General Comments
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS 45
CUI
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS
QUESTION SUBMITTALS
Interested vendors shall submit all questions to both:
Yuliya Kent, Yuliya.Kent@dla.mil,Contract Specialist Christopher Clement, Christopher.Clement@dla.mil, Contracting Officer
Questions regarding WESTPAC Solicitation SPE602-26-R-0706 mailto:Anthony.Brown@dla.mil mailto:Christopher.Clement@dla.mil
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS 46
WARFIGHTER ALWAYSPEOPLE PRECISION POSTURE PARTNERSHIPS 47
UNCLASSIFIED
UNCLASSIFIED
| Slide Number 1 |
| Slide Number 2 |
| WESTPAC OVERVIEW |
| Program Description |
| Program Description |
| SOLICITATION OVERVIEW |
| SOLICITATION OVERVIEW (CONT’D) |
| OFFER SUBMISSION |
| OFFER ENTRY TOOL (OET) |
| EVALUATION |
| EVALUATION |
| EVALUATION |
| Evaluation |
| EVALUATION |
| EVALUATION |
| CONTRACTOR RESPONSIBILITY |
| JOINT CONTINGENCY CONTRACTING SYSTEM (JCCS) |
| TRADE AGREEMENTS ACT (TAA) |
| PROCUREMENT PROCESS OVERVIEW |
| PROCUREMENTS PROCESS OVERVIEW |
| HOW CAN OFFERORS HELP |
| PROGRAM PARTICIPANTS |
| PRICING |
| PRICING |
| PRICING |
| PRICING |
| PRICING |
| PRICING |
| Slide Number 29 |
| Technical Evaluation |
| Technical Evaluation |
| Technical Evaluation |
| Technical Evaluation |
| Technical Evaluation |
| Technical Evaluation |
| Technical Evaluation |
| Technical Evaluation |
| Technical Evaluation |
| Technical Evaluation |
| Technical Evaluation |
| Technical Evaluation |
| Technical Evaluation |
| Technical Evaluation |
| Technical Evaluation |
| QUESTION SUBMITTALS |
| Slide Number 46 |
| Slide Number 47 |
File details come from the government source that posted it. Updated .