NAS_Whidbey_Island_RFP.pdf
PDF 805 KB Posted
- Solicitation number
- SPE600-16-R-0513
- Issued by
-
Defense Logistics Agency Energy
About this file
Solicitation SPE600-16-R-0513
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30 0062391840
1. REQUISITION NUMBER
2. CONTRACT NO. 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER
SPE600-16-R-0513
5. SOLICITATION NUMBER
2016 AUG 01
6. SOLICITATION ISSUE
DATE
Jackie Robinson PARFK35
a. NAME
Phone: 703-767-9382
b. TELEPHONE NUMBER (No Collect calls)
2016 SEP 01
8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY CODE SPE600
DLA ENERGY
8725 JOHN J KINGMAN RD STE 4950
FT BELVOIR VA 22060-6222
USA
10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
8 (A)
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
493190NAICS:
$27.5 MillionSIZE STANDARD:
11. DELIVERYFOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ IFB RFP
15. DELIVER TO CODE 16. ADMINISTERED BY CODE
17a. CONTRACTOR/ CODE
OFFEROR
FACILITY
CODE
TELEPHONE NO.
18a. PAYMENT WILL BE MADE BY CODE
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
See Schedule
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
29. AWARD OF CONTRACT: REF. OFFER
DATED . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER (Type or Print) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or Print) 31c. DATE SIGNED
SEE SCHEDULE
7. FOR SOLICITATION
INFORMATION CALL:
SEE SCHEDULE
01:00 PM
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE ADDENDUM
EDWOSB
SPE600-16-R-0513
Whidbey Island, WA
A. A pre-proposal conference is scheduled for August 15, 2016 at NAS Whidbey Island, WA. (See clause L-0006 L198 for details and directions). Interested parties planning to attend should submit names, phone numbers, email address and company represented to Jackie Robinson via email at Jackie.robinson@dla.mil before August 25, 2016, 1:00 p.m. local Fort Belvoir, VA (See clause L-0006 L198 for details).
B. The NAICS code is 493190 and the threshold is $27.5 million in annual receipts. The point of contact for Small
Business Affairs is Mr. Gregory Thevenin, 703-767-9465.
C. DLA ENERGY-FESAA is the designated office for receipt of offers. All offerors shall clearly mark envelopes/packages sent in response to this solicitation with the words, “Offer Under Solicitation SPE600-16-R- 0513.” Mailed offers should be mailed to the following address:
US Post Office/US Post Office Express Mail offer only: Hand Carried/Courier Delivery Service only:
ATTN: DLA Energy-FESAA (Jackie Robinson) Room 2945 ATTN: DLA Energy-FESAA (Jackie Robinson) Room 2945 Defense Logistics Agency Energy Defense Logistics Agency Energy 8725 John J. Kingman Road, Suite 2945 8725 John J. Kingman Road, Suite 2945 Fort Belvoir, Virginia 22060-6222 Fort Belvoir, Virginia 22060-6222
For Verification of Receipt: Contact Jackie.robinson@dla.mil, (703) 767-9382.
D. Your offer must be received in DLA Energy-FESAA by 1:00 pm local Ft. Belvoir, VA time on September 1, 2016.
Facsimile proposals are not authorized. Do not return the entire solicitation package. Simply complete and return one original, one copy and one PDF electronic copy of the Offeror Submission Package data (including ORCA certification) and one original, one copy and one PDF electronic copy of the Technical Proposal submissions as described in 52.212-1 Instructions to Offers—Commercial Items with Addendum (Feb 2012). Your prices must be inserted in Clause B-0001 B34.01 in the Offeror Submission Package. Proposed prices that are unrealistically low may be considered an indication of a lack of understanding of the solicitation requirements.
E. FAXED PROPOSALS ARE NOT AUTHORIZED. Please e-mail your proposal to: bidcustodian@dla.mil and
CC: Jackie.robinson@dla.mil. All e-mail proposals MUST be followed-up with the hard copy (consisting of two volumes as outlined below) NO LATER THAN (5) business days after solicitation closing. Late proposals will be processed in accordance with FAR 15.208 – Submission, Modification, Revision, and Withdrawal of Proposals.
Offeror’s proposals shall be prepared in two separate volumes and provided in the quantities shown below:
Volume Title No. of Copies Required Page Limit I Technical Proposal 1 original, 1 hard copies and PDF electronic copy 50 II Price Proposal 1 original, 1 hard copy and PDF electronic copy & MS
Excel electronic copy of Attachment II – OFFEROR
SUBMISSION PACKAGE
F. Unless you specifically state otherwise, your offer is assumed to accept all terms and conditions of this solicitation.
Any exceptions to any part of this solicitation must be specifically identified in a cover letter to your proposal.
G. The Government intends to evaluate proposals and award contract after written or oral discussions with all responsible offerors that submit proposals within the competitive range. This procurement will use Source Selection Procedures. See FAR 52.212-2 Evaluation—Commercial Items (Oct 2014) for evaluation factors. The resulting type of contract will be Firm Fixed Price.
H. Any contract awarded to a contractor who, at the time of award, was suspended, debarred, or ineligible for receipt of a Government contract is voidable at the option of the Government.
I. Care should be taken to mail correspondence relating to this solicitation or resulting contract to the appropriate office as indicated in the applicable clauses.
SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS
B‐0001 B34.01 SERVICES TO BE FURNISHED AND PRICES (DLA ENERGY FEB 1991)
SECTION C DESCRIPTION/SPECIFICATIONS/STATEMENTOFWORK
SECTION D PACKAGING AND MARKING
52.247‐9012 REQUIREMENTS FOR TREATMENT OF WOOD PACKAGING MATERIAL (WPM) (FEB 2007)
SECTION E INSPECTION AND ACCEPTANCE
252.246‐7000 MATERIAL INSPECTION AND RECEIVING REPORT (MAR 2008)
E‐0001 E1.11 QUALITY CONTROL PLAN (DLA ENERGY MAR 2000)
E‐0002 E22.01 QUALITY REPRESENTATIVE (DLA ENERGY JUL 1992)
E‐0003 E28 CONTRACTOR INSPECTION RESPONSIBILITIES (STORAGE) (DLA ENERGY DEC 2011)
E‐0004 E35 NONCONFORMING SUPPLIES AND SERVICES (DLA ENERGY DEC 2011)
E‐0005 E29 INITIAL ON‐STATION INSPECTION (AARD) (DLA ENERGY MAR 1997)
E‐0006 E29.01 CONTRACT TURNOVER INSPECTION (DLA ENERGY MAR 2000)
SECTION F DELIVERIES OR PERFORMANCE
52.242‐15 STOP‐WORK ORDER (AUG. 1989)
F‐0001 F1.05 GENERAL SHIPPING CONDITIONS (DLA ENERGY OCT 1997)
SECTION G CONTRACT ADMINISTRATION DATA
52.219‐28 POST‐AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUL 2013)
252.232‐7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEVIATION) (MAY 2014) DFARS
252.201‐7000 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 1991)
G‐0001 G3 INVOICE NUMBERING REQUIREMENTS (DLA ENERGY AUG 1998)
G‐0002 G9.06 ADDRESS TO WHICH REMITTANCE SHOULD BE MAILED (DLA ENERGY DEC 1999)
G‐0003 . G9.07 ELECTRONIC TRANSFER OF FUNDS PAYMENTS ‐ CORPORATE TRADE EXCHANGE (DLA ENERGY JUL 2007)
G‐0004 G21 DESIGNATION OF PROPERTY ADMINISTRATOR (DLA ENERGY MAY 2009)
G‐0005 G22 DESIGNATION OF THE DEFENSE FUEL REGION (DLA ENERGY JUL 1997)
SECTION H SPECIAL CONTRACT REQUIREMENTS
H‐0001 H11 GUARD SERVICE (DLA ENERGY MAR 1982)
H‐0002 H19 REPORTING AND CONTAINING OIL SPILLS (DOMESTIC STORAGE) (DLA ENERGY JAN 2012)
H‐0003 51.03 INSURANCE REQUIREMENTS FOR CONTRACTORS AND SUBCONTRACTORS (DLA ENERGY JAN 2012)
SECTION I CONTRACT CLAUSES
52.202‐1 DEFINITIONS. (NOV 2013)
52.203‐3 GRATUITIES. (APR 1984)
52.203‐6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEP 2006)
52.230‐7 ANTI‐KICKBACK PROCEDURES (MAY 2014)
52.203‐8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)
52.203‐10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)
52.203‐11 CERTIFICATION AND DISCLOSURE REGARDING PAYMENTS TO INFLUENCE CERTAIN FEDERAL
TRANSACTIONS (SEPT 2007)
52.203‐12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (OCT 2010)
52.204‐4 PRINTED OR COPIED DOUBLE SIDED ON POSTCONSUMER FIBER CONTENT PAPER (MAY 2011)
52.204‐7 SYSTEM FOR AWARD MANAGEMENT (JUL 2013)
52.204‐9 PERSONAL IDENTIFY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)
52.204‐9000 CONTRACTOR PERSONNEL SECURITY ( MAY 2009)
52.204‐13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (JUL 2013)
52.209‐6 PROTECTING THE GOVERNMENT’S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS
DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (AUG 2013)
52.212‐4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS (SEP 2013)
52.243‐1 CHANGES – FIXED‐PRICE W/ALTERNATE II (AUG 1987/APR 1984)
52.212‐5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS –
COMMERCIAL ITEMS (APR 2015)
52.215‐8 ORDER OF PRECEDENCE – UNIFORM CONTRACT (OCT 1997)
52.217‐8 OPTION TO EXTEND SERVICES (NOV 1999)
52.217‐9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
52.219‐1 SMALL BUSINESS PROGRAM REPRESENTATIONS (OCT 2014) (ALT 1)
52.219‐8 UTILIZATION OF SMALL BUSINESS CONCERNS (OCT 2014)
52.219‐9 SMALL BUSINESS SUBCONTRACTING PLAN (OCT 2014)
52.219‐16 LIQUIDATED DAMAGES SUBCONTRACTING PLAN (JAN 1999)
52.222‐1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES. (FEB 1997)
52.222‐26 EQUAL OPPORTUNITY (APR 2015)
52.222‐42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 2014)
52.222‐99 ESTABLISHING A MINIMUM WAGE FOR CONTRACTORS (DEVIATION 2014‐O0017)(JUNE 2014)
52.223‐5 POLLUTION PREVENTION AND RIGHT‐TO‐KNOW INFORMATION (MAY 2011)
52.223‐6 DRUG‐FREE WORKPLACE (MAY 2001)
52.223‐10 WASTE REDUCTION PROGRAM (MAY 2011)
52.223‐19 COMPLIANCE WITH ENVIRONMENTAL MANAGEMENT SYSTEMS. (MAY 2011)
52.224‐1 PRIVACY ACT NOTIFICATION (April 1984)
52.227‐1 AUTHORIZATION AND CONSENT (DEC 2007)
52.228‐5 INSURANCE ‐‐ WORK ON A GOVERNMENT INSTALLATION (JAN 1997)
52.229‐3 FEDERAL, STATE, AND LOCAL TAXES. (FEB 2013)
52.232‐8 DISCOUNTS FOR PROMPT PAYMENT (FEB 2002)
52.232‐9 LIMITATION OF WITHHOLDING OF PAYMENTS (APR 1984)
52.232‐11 EXTRAS
52.232‐17 INTEREST (OCT 2010)
52.232‐23 ASSIGNMENT OF CLAIMS (MAY 2014)
52.232‐33 PAYMENT BY ELECTRONIC FUNDS TRANSFER – SYSTEM FOR AWARD MANAGEMENT (JUL 2013)
52.232‐40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (DEC 2013)
52.233‐1 DISPUTES (MAY 2014)
52.233‐3 PROTEST AFTER AWARD (AUG 1996)
52.233‐4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)
52.237‐2 PROTECTION OF GOVERNMENT BUILDINGS, EQUIPMENT, AND VEGETATION (APR 1984)
52.237‐3 CONTINUITY OF SERVICES (JAN 1991)
52.242‐13 BANKRUPTCY (JUL 1995)
52.245‐9 USE AND CHARGES (APR 2012)
52.246‐25 LIMITATION OF LIABILITY—SERVICES (FEB 1997)
52.252‐1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
52.252‐2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
52.253‐1 COMPUTER GENERATED FORMS (JAN 1991)
252.203‐7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER DEFENSE‐CONTRACT‐ RELATED
FELONIES (DEC 2008)
252.203‐7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (SEP 2013)
252.204‐7000 DISCLOSURE OF INFORMATION (AUG 2013)
252.204‐7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)
252.204‐7004 ALTERNATE A, SYSTEM FOR AWARD MANAGEMENT (FEB 2014)
252.204‐7008 COMPLIANCE WITH SAFEGUARDING COVERED DEFENSE INFORMATION CONTROLS (DEC 2015)
252.204‐7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT REPORTING (DEC 2015)
252.209‐7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE GOVERNMENT OF A
COUNTRY THAT IS A STATE SPONSOR OF TERRORISM (DEC 2014)
252.209‐7998 REPRESENTATION REGARDING CONVICTION OF A FELONY CRIMINAL VIOLATION UNDER ANY FEDERAL
OR STATE LAW (DEVIATION MAR 2012‐O0007)
252.209‐7999 REPRESENTATION BY CORPORATIONS REGARDING AN UNPAID DELINQUENT TAX LIABILITY OR A
FELONY CONVICTION UNDER ANY FEDERAL LAW DEVIATION 2012‐00004) {JAN 2012)
252.211‐7008 USE OF GOVERNMENT‐ASSIGNED SERIAL NUMBERS (SEPT 2010)
252.225‐7031 SECONDARY ARAB BOYCOTT OF ISRAEL
252.233‐7004 DRUG‐FREE WORK FORCE (SEP 1988)
252.243‐7001 PRICING OF CONTRACT MODIFICATIONS (DEC 1991)
52.215‐9016 NOTICE TO CONTRACTORS AND DEFENSE FINANCE ACCOUNTING SERVICES (DFAS) (NOV 2011)
52.232‐9010 ACCELERATED PAYMENTS TO SMALL BUSINESS (APR 2014)
52.233‐9001 DISPUTES – AGREEMENT TO USE ALTERNATIVE DISPUTE RESOLUTION (NOV 2011)
I‐0001 I102.02 FAIR LABOR STANDARDS ACT AND SERVICE CONTRACT ACT ‐‐ PAYROLL TAX ADJUSTMENT
(DLA ENERGY JAN 2012)
I‐0002 I116 RESPONSIBILITY FOR GOVERNMENT‐OWNED PETROLEUM PRODUCTS (DLA ENERGY JAN 2012) ... 75
I‐0004 I116.01 LIABILITY FOR FUEL SPILLS (DLA ENERGY JAN 2012)
I‐0005 I119.04 INVENTORY CONTROL RECORDS AND SYSTEMS OF RECORD (DLA ENERGY JAN 2012)
I‐0006 I121 CUSTODY OF PERTROLEUM PRODUCT (DLA ENERGY APR 1968)
I‐0007 I122 USE OF FACILITIES (DLA ENERGY APR 2009)
I‐0008 I147 DEMURRAGE (DLA ENERGY NOV 1989)
I‐0009 I291 CONTRACTOR PUBLIC KEY INFRASTRUCTURE (PKI) (DLA ENERGY APR 2009)
I‐0010 I180.02 ENVIRONMENTAL PROTECTION (STORAGE) (DLA ENERGY JAN 2012)
I1.01‐9 DEFINITIONS (CONT’D) (AARD/TESTING) (DLA ENERGY JUN 2009
I11.01‐2 ADMINISTRATIVE COST OF TERMINATION FOR CAUSE – COMMERCIAL ITEMS (DLA ENERGY FEB 1996) 81
I123 TITLE TO FACILITIES (DLA ENERGY JUL 1991)
I130 RISK OF LOSS OR DAMAGE TO GOVERNMENT‐OWNED AND/OR CHARTERED AIRCRAFT (DLA ENERGY
APR 1968)
SECTION J – ATTACHMENTS
SECTION K REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF OFFERORS
OR RESPONDENTS
52.203‐2 CERTIFICATE OF INDEPENDENT PRICE DETERMINATION (APR 1985)
52.204‐5 WOMEN‐OWNED BUSINESS (OTHER THAN SMALL BUSINESS) (OCT 2014)
52.209‐5 CERTIFICATION REGARDING RESPONSIBILITY MATTERS (APR 2010)
52.209‐7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL 2013)
52.212‐3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS ‐‐ COMMERCIAL ITEMS ALTERNATE I (OCT 2014) .. 85
52.219‐1 SMALL BUSINESS PROGRAM REPRESENTATIONS (OCT 2014) ALT 1 (MAY 2014)
52.225‐25 PROHIBITION ON CONTRACTING WITH ENTITIES ENGAGING IN CERTAIN ACTIVITIES OR TRANSACTIONS
RELATING TO IRAN‐REPRESENTATION AND CERTIFICATION (DEC 2012)
K‐0001 K15 RELEASE OF PRICES (DLA ENERGY MAR 2009)
K‐0002 K33.01 AUTHORIZED NEGOTIATORS (DLA ENERGY APR 2007)
K‐0003 K150 WIDE AREA WORKFLOW (DLA ENERGY AUG 2012)
SECTION L – INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS
52.212‐1 INSTRUCTIONS TO OFFERORS ‐ COMMERCIAL ITEMS (OCT 2015)
ADDENDUM TO 52.212‐1 – INSTRUCTIONS TO OFFERS – COMMERCIAL ITEMS (OCT 2015)
52.216‐1 TYPE OF CONTRACT (APR 1984)
52.232‐38 SUBMISSION OF ELECTRONIC FUNDS TRANSFER INFORMATION WITH OFFER (JUL 2013)
52.233‐2 SERVICE OF PROTEST. (SEP 2006)
52.237‐1 SITE VISIT (APR 1984)
52.252‐5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)
52.212‐9002 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUES OR
EXECUTIVE ORDERS APPLICABLE TO DEFENSE ACQUISITIONS OF COMMECIAL ITEMS (NOV 2014)
52.215‐9003 USE OF PAST PERFORMANCE INFORMATION RETRIEVAL SYSTEM – STATISTICAL REPORTING (PPIRS‐SR)
INFORMATION IN PAST PERFORMANCE EVALUATION (APR 2014)
52.215‐9007 PREPROPOSAL CONFERENCE (FEB 2005)
52.233‐9000 AGENCY PROTESTS (NOV 2011)
L‐0001 L1.02 PROPOSAL ACCEPTANCE PERIOD (DLA ENERGY NOV 1991)
L‐0002 L2.06 EVIDENCE OF RESPONSIBILITY (AARD) (DLA ENERGY NOV 1989)
L‐0003 L2.11‐4 EMAIL PROPOSALS (DLA ENERGY OCT 2010)
L‐0004 L7 SOCIOECONOMIC PROPOSAL (DLA ENERGY MAR 2007)
L‐0005 L73 INSPECTION OF PREMISES (AARD) (DLA ENERGY FEB 1970)
L‐0006 L82 WAGE DETERMINATION (DLA ENERGY FEB 2009)
L‐0007 L198 PREPROPOSAL CONFERENCE (SERVICES) (DLA ENERGY FEB 2009)
SECTION M – EVALUATION FACTORS FOR AWARD
52.212‐2 EVALUATION ‐‐ COMMERCIAL ITEMS (OCT 2014)
ADDENDUM TO 52.212‐2 – EVALUATION – COMMERCIAL ITEMS (OCT 2014)
52.217‐5 EVALUATION OF OPTIONS (JUL 1990)
M‐0001 M7 SOCIOECONOMIC/SUBCONTRACTING PROPOSAL EVALUATION (DLA ENERGY FEB 2005)
M‐0002 M43.01 EVALUATION OF OPTIONS (DLA ENERGY MAR 2009)
M‐0003 M72 EVALUATION OF OFFERS (EXCEPTIONS/DEVIATIONS) (DLA ENERGY APR 1997)
SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS
B-0001 B34.01 SERVICES TO BE FURNISHED AND PRICES (DLA ENERGY FEB 1991)
The services to be furnished during the period specified herein and the unit prices are as follows: The contract shall be for a period of four (4) years with one 5-year renewal option and a potential option to extend services for up to (6) months in accordance with FAR 52.217-8 – Option to Extend Services. The Offeror is required to provide a monthly price for the facility.
Due to Enterprise Business System (EBS) constraints, the CLIN structure will reflect a yearly MUCG. However, the offered MUCG for each year under the base will be the same. Furthermore, the offered MUCG for each year under each option period will also be the same.
BASE PERIOD
(January 1, 2017 through December 31, 2020)
Years 1-4:
LINE ITEM 0001- NON PERSONAL SERVICES (FIRM-FIXED PRICE): The prices for the services and Government-owned, Contractor operated (GOCO) facilities to be provided during the performance of the initial 4-years period. Offeror is required to provide a monthly price for the facility (MUCG) at NAS Whidbey Island. Level unit pricing for each period of performance is required.
MUCG GOCO Services Years 1-4
Bulk/Retail Location : ______________________ per Month
OPTION
(January 1, 2021 through December 31, 2025)
Years 5-9:
LINE ITEM 0002- NON PERSONAL SERVICES (FIRM-FIXED PRICE): The prices for the services and and Government-owned, Contractor operated (GOCO) facilities to be provided during the performance period. Offeror is required to provide a monthly price for the facility at NAS Whidbey Island. Level unit pricing for each period of performance is required.
MUCG GOCO Services Years 5-9
Bulk/Retail Location (Main Post): ______________________ per Month
This space is intentionally left blank.
SECTION C DESCRIPTION/SPECIFICATIONS/STATEMENTOFWORK
See Attachment I
SECTION D PACKAGING AND MARKING
52.247-9012 REQUIREMENTS FOR TREATMENT OF WOOD PACKAGING MATERIAL (WPM) (FEB 2007)
(a) This clause only applies when wood packaging material (WPM) will be used to make shipments under this contract and/or when WPM is being acquired under this contract.
(b) Definition.
Wood packaging material (WPM) means wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frame and cleats. The definition excludes materials that have undergone a manufacturing process, such as corrugated fiberboard, plywood, particleboard, veneer, and oriented strand board (OSD).
(c) All wood packaging material (WPM) used to make shipments under Department of Defense (DOD) contracts and/or acquired by DOD must meet requirements of international standards for phytosanitary measures (ISPM) 15, “Guidelines for Regulating Wood Packaging Materials in International Trade.” DOD shipments inside and outside of the United States must meet ISPM 15 whenever WPM is used to ship DOD cargo.
(1) All WPM shall comply with the official quality control program for heat treatment (HT) or kiln dried heat treatment (KD HT) in accordance with American Lumber Standard Committee, Incorporated (ALSC) wood packaging material program and WPM enforcement regulations (see http://www.alsc.org/).
(2) All WPM shall include certification/quality markings in accordance with the ALSC standard. Markings shall be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides of the pallet and be contrasting and clearly visible. All containers shall be marked on a side other than the top or bottom, contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved dunnage stamp.
(d) Failure to comply with the requirements of this restriction may result in refusal, destruction, or treatment of materials at the point of entry. The Agency reserves the right to recoup from the Contractor any remediation costs incurred by the Government."
SECTION E INSPECTION AND ACCEPTANCE
252.246-7000 MATERIAL INSPECTION AND RECEIVING REPORT (MAR 2008)
(a) At the time of each delivery of supplies or services under this contract, the Contractor shall prepare and furnish to the Government a material inspection and receiving report in the manner and to the extent required by Appendix F, Material Inspection and Receiving Report, of the Defense FAR Supplement.
(b) Contractor submission of the material inspection and receiving information required by Appendix F of the Defense FAR Supplement by using the Wide Area WorkFlow (WAWF) electronic form (see paragraph (b) of the clause at 252.232-7003) fulfills the requirement for a material inspection and receiving report (DD Form 250). Two copies of the receiving report (paper copies of either the DD Form 250 or the WAWF report) shall be distributed with the shipment, in accordance with Appendix F, Part 4, F-401, Table 1, of the Defense FAR Supplement.
E-0001 E1.11 QUALITY CONTROL PLAN (DLA ENERGY MAR 2000)
(a) Upon award, the Contractor shall prepare, in triplicate and in English, a Quality Control Plan (QCP). Prior to the first receipt of Government-owned product into the facility, two copies of the QCP shall be forwarded to the Contracting Officer and one copy to the assigned Quality Assurance Representative for approval.
(b) The QCP shall include the following quality control procedures employed by the Contractor.
(1) Receiving (both product and additives);
(2) Blending;
(3) Sampling;
(4) Testing;
(5) Storage and handling;
(6) Loading and shipping;
(7) Calibration program for testing and measuring equipment in accordance with ISO 10012-1, "Quality Assurance Requirements for Measuring Equipment, Part I." Equivalent local regulation, as appropriate, may be used as well. Whichever program used must include a section addressing meter proving (used to determine quantity) and must comply with the American Petroleum Institute
Manual of Petroleum Measurement Standards, Chapters 4, 5, and 6, or equivalent foreign standard. For any item that requires calibration but is not covered by ASTM, API, or IP publications, the applicable manufacturer's recommended calibration method(s) outlined in the applicable industry publication shall be used if acceptable to the Government;
(8) Quantity measurement;
(9) Records and reports; and
(10) Corrective action procedures (to include, but not be limited to, procedures for notification of Quality Representative, actions to be taken on discovery of off-spec product during receipts/shipments, upgrading procedures for Contractor-caused contamination, leaks, etc.). The QCP shall also include an organizational chart of key personnel and their responsibilities and a schematic diagram of the facility with key inspection/activity points marked for each product handled.
(c) The QCP shall require that each Contractor employee be familiar with its content and shall state that it must be reviewed semiannually and revised as needed. Revision should occur when any change is made to the inspection system, when any corrective action needs to be incorporated due to quality problems, and as otherwise necessary. The Contractor shall sign and date each revision of the QCP.
E-0002 E22.01 QUALITY REPRESENTATIVE (DLA ENERGY JUL 1992)
The Quality Office assigned inspection responsibility under this contract is DLA Energy American East.
E-0003 E28 CONTRACTOR INSPECTION RESPONSIBILITIES (STORAGE) (DLA ENERGY DEC 2011)
(a) Inspection and tests by the Government of services, facilities, and equipment specified within this contract does not relieve the Contractor from responsibility to meet all requirements of the contract.
(b) The Contractor shall furnish personnel, facilities, and equipment on-site to accomplish the following routine tests and procedures. These on-site resources may be provided by Contractor personnel or by a commercial source action on behalf of the Contractor. The Quality Representative will not be responsible for performing any of these services for the Contractor.
(1) Sampling of storage tanks, shipments and receipts in accordance with ASTM D 4057, Standard Practice for Manual Sampling of Petroleum and Petroleum Products (API Manual of Petroleum Measurement Standards (MPMS), Chapter 8.1);
(2) Retaining of product composite samples from shipments and receipts as follows:
MINIMUM
METHOD OF SHIPMENT MINIMUM QUANTITY RETENTION PERIOD
Pipeline 20 liters 60 days Tanker/Barge Parcel Composite 20 liters 90 days Each compartment 0.5 liters 90 days Navy Fleet Oilers/Vessels 10 liters 60 days Tank Truck/Car 1 liter 15 days
NOTE: After the minimum retention period, samples shall be tested for Appearance, Color (Visual), API Gravity/Density and Flash Point and, if found to be on-specification, shall be returned to like Government stock on-site. Sample containers may be reused if properly cleaned.
(3) Determining the presence of water in storage tanks, shipments and receipts. Ensure that accurate water cuts are obtained by means of a water indicating paste conforming to MIL-W-83779B. Two suggested sources are Stewart Hall Chemical Testmaster Water Indicating Paste or Sartomer Sar Gel Water Indicating Paste (see Note 2 below);
(4) Determining Density at 15 degrees Celsius or API gravity of products by ASTM D 1298 or ASTM D 4052 (see Note 2 below);
(5) Determining the temperature of products by the API MPMS, Chapter 7 (see Note 2 below);
(6) Determining the Appearance of applicable products using ASTM D 4176, Procedure 1 (see Note 2 below);
(7) Determining the visual color of products.
(8) Determining the Flash Point of applicable products using test methods cited in the appropriate product specification (see Note 2 below);
(9) Conversion of gross to net gallonage (liters);
(10) Determining the percentage (volume) of fuel system icing inhibitor (FSII) by means of a portable refractometer in accordance with ASTM D 5006. One suggested source is H.B. Industries, Inc., Glenview, IL 60025 (B/2 Anti-Icing Additive test kit) (see Note 2 below); and
(11) Determining the range of fuel electrical conductivity using ASTM D 2624. One suggested source for a conductivity meter is Emcee Electronics, Inc., Sarasota, FL 33581 (Model 1152) (see Note 2 below).
Note 1: All costs for providing the above tests and procedures shall be included in the monthly service charge. The only exception to the Contractor’s obligation to provide these services as part of the monthly service charge is when the tests described above are part of the higher order analysis (defined as the following categories: Composite Samples, Storage Tanks After Receipt, Interface Mixtures, Dormant Stocks and Individual Tests (including particulate contamination) found in the attachment to the solicitations entitled MINIMUM REQUIREMENTS FOR STORAGE SAMPLING AND TESTING. Provisions for providing higher order analyses are covered in the SAMPLING AND TESTING OF PETROLEUM PRODUCTS (STORAGE) contract provision.
Note 2: Upon request, the Contractor shall permit the Quality Representative unrestricted use of the equipment and ancillary supplies needed to perform this test/procedure on behalf of the Government.
(c) During the contract, the Contractor shall furnish representative samples of the product in each storage tank, shipment or receipt at the request of, and in the manner and to the place designated by, the Quality Representative. Sample size will be 2 gallons for gasoline-type fuels and one gallon or 10 gallons for jet diesel-type fuels. The number of samples to be furnished during any 12-month period shall not exceed eight times the number of tanks specified in the contract. Such samples shall be packed, marked, and shipped by the Contractor, shipping expense prepaid, in containers and shipping boxes furnished by the Contractor. Sample containers shall be epoxy coated on the interior. This requirement is in addition to sampling required elsewhere in this contract provision and the contract. All reasonable direct shipping costs associated with samples required by this paragraph shall be reimbursed upon request from the Contractor and such costs shall not be included in the monthly service charge. However, all other costs related to this requirement shall be included as part of the monthly service charge.
E-0004 E35 NONCONFORMING SUPPLIES AND SERVICES (DLA ENERGY DEC 2011)
(a) DEFINITION: As used in this contract provision:
Deviation is defined as a written authorization granted after contract award and prior to manufacture of an item, to depart from a particular performance or design requirement of a contract, specification, or referenced document, for a specific number of units or specific period of time, normally the duration of the contract.
Extraordinary situation means the matter cannot await resolution until the next DLA Energy business day (0800 to 1630 hours EST, Monday through Friday, Federal Holidays excluded).
Waiver is defined as a written authorization granted after contract award to accept a configuration item or other designated item which, during production or after having been submitted for inspection, is found to depart from specified requirements, but nevertheless is considered suitable for use “as is” or after repair by an approved method. Approval is on a case-by-case basis and is normally for a set period of time.
(b) The Government may, at its discretion, accept nonconforming supplies or services. In such cases, the Contractor must obtain a deviation or waiver from the Contracting Officer prior to acceptance.
(c) The following procedures shall be used to request a deviation or waiver.
(1) Requests for deviations and waivers shall be submitted by the Contractor to the Contracting Officer with a copy to the appropriate Inspection Office referenced in the LIST OF INSPECTION OFFICES FOR DLA ENERGY CONTRACTS or QUALITY REPRESENTATIVE contract provision of this contract. Each request shall provide the following information: Contractor name; name and contact information of the contractor’s authorized negotiator; contract number; contract line item number and product nomenclature, clause or contract provision number, paragraph and subparagraph, as appropriate; the nature of the request; the reason for the request; the corrective action being taken by the Contractor to correct and prevent recurrence of the condition(s) causing the nonconformance; and an agreement to pay an equitable price reduction, estimated and proposed by DLA Energy, over and above the administrative fee, contingent on the impact of the specific circumstances on DLA Energy relative to approval of the deviation or waiver.
(2) In extraordinary situations, the Contractor may initially submit a verbal request for a waiver, but not a deviation, to the Contracting Officer. Written requests shall be submitted to the Contracting Officer by the next DLA Energy business day (0800 to 1630 hours EST, Monday through Friday, Federal Holidays excluded). If the Contracting Officer cannot be reached, the Duty Officer shall be contacted to provide the necessary information to the proper individuals as soon as possible. The Duty Officer's telephone number is (800) 286-7633 or (703) 767-8420.
(3) If a deviation or waiver is granted, the contract will be modified to accept the nonconforming supplies or services and to require the Contractor to provide an equitable price reduction or other adequate consideration commensurate with the deviation or waiver being granted. If the situation warrants, a deviation or waiver may be granted without prior agreement on price reduction or other consideration, subject to agreement by the Contractor, or its representative, to subsequent negotiation. Such an agreement, in addition to a brief description of the terms of the deviation or waiver, shall be documented on the shipping document or other appropriate correspondence. After negotiations, failure to agree on adequate consideration shall be a dispute concerning a question of fact within the meaning of the Disputes paragraph of the CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS contract provision of this contract.
(4) If a deviation or waiver is granted and the nonconforming supplies are accepted, then in no event will consideration be less than $500, which covers administrative costs, plus any additional cost of Government reinspection or retest, if necessary.
(5) If a deviation or waiver is granted modifying this contract, but the supplies accepted are subsequently determined to be in conformity with contract specifications, the Contractor shall still be obligated to pay the consideration originally agreed upon in support of the deviation or waiver. If, however, this consideration exceeds $1000, a second contract modification shall be issued reducing the Contractor's obligation to $1000 (the administrative cost of issuing the two required modifications), plus, if appropriate, any cost of Government reinspection or retest performed as a result of the deviation or waiver being granted.
(d) When notification of nonconforming supplies is received after the supplies have been accepted, and the Government determines not to exercise its right to reject or to require correction under the INSPECTION OF SUPPLIES – FIXED-PRICE, INSPECTION OF SERVICES – FIXED PRICE, or CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS contract provision, then in no event will consideration be less than $500 to cover administrative costs. This $500 fee is in addition to—
(1) Consideration commensurate with the extent of nonconforming supplies; and
(2) Cost of Government reinspection or retest, if necessary.
The administrative fee will apply to each claim letter issued for off-specification product delivered to an activity.
(e) Contractors shall be held responsible for payment of any fines or penalties imposed on a receiving activity by an environmental enforcement agency, resulting from the delivery of nonconforming supplies under a DLA Energy contract.
(f) Repeated tender of nonconforming supplies or services, including those with only minor defects, will be discouraged by appropriate actions, including, but not limited to, rejecting the supplies or services whenever feasible and documenting the Contractor's performance records.
E-0005 E29 INITIAL ON-STATION INSPECTION (AARD) (DLA ENERGY MAR 1997)
(a) INSPECTION. The initial on-station inspection is for the sole benefit of the Government and the Government may partially or totally waive its right of inspection at its discretion. The date, time, and place of inspection may be changed by the mutual agreement of the parties.
(b) TIMEFRAME. Unless notified otherwise, all equipment shall be available for Government inspection at the installation where services are to be performed four calendar days prior to the start of the delivery period. No work may be performed on the equipment during the inspection period except as permitted by the Government. The Government will complete inspection of the Contractor's equipment no later than the calendar day preceding the date aircraft fuel delivery services are to commence.
(c) ENTRY. The Contractor is responsible for making necessary arrangements with the Commanding Officer of such installation or an authorized representative regarding entry into the installation.
(d) TANK INTERIORS. Equipment presented for inspection shall be vapor free.
(e) FILTRATION MEDIA. If requested by the Government, the Contractor shall be responsible for disassembling filtration units to facilitate the inspection. The Contractor shall present, at the time of the inspection, written certification attesting to the last date on which each filter element was changed and shall provide a historical record denoting pressure drip data for each filter element (if such certification and pressure drip data exists).
(f) CONTRACTOR REPRESENTATIVE. Representation by the Contractor at the inspection shall be limited to one individual except when additional personnel have been specifically authorized by the Government.
(g) DEFAULT. If the Contractor fails to make the equipment available on the date specified or otherwise mutually agreed upon, or if the inspection discloses that the equipment is not in conformance with contract requirements, the Government may terminate this contract for default.
(h) REINSPECTION. If the Government discovers equipment deficiencies during the initial inspection, the Government may, at its discretion, conduct a reinspection at the Contractor’s expense.
E-0006 E29.01 CONTRACT TURNOVER INSPECTION (DLA ENERGY MAR 2000)
The outdoing Contractor, during the last 10 working days of the contract, shall permit personnel of the successor Contractor access to all contacted facilities to observe operations. The successor Contractor shall, during the last 96 hours of the expiring contract, be provided assistance by the outgoing Contractor, DLA Energy representatives, and the Contracting Officer’s Representative in accomplishing a joint facilities turnover inspection. The inspection shall provide for a facilities walk-through and property inventory, product sampling and testing, and a complete product inventory. The successor Contractor agrees to protect and not disclose any inadvertently disclosed proprietary information of the outgoing Contractor discovered during the turnover period.
SECTION F DELIVERIES OR PERFORMANCE
52.242-15 STOP-WORK ORDER (AUG. 1989)
(a) The Contracting Officer may, at any time, by written order to the Contractor, require the Contractor to stop all, or any part, of the work called for by this contract for a period of 90 days after the order is delivered to the Contractor, and for any further period to which the parties may agree. The order shall be specifically identified as a stop-work order issued under this clause. Upon receipt of the order, the Contractor shall immediately comply with its terms and take all reasonable steps to minimize the incurrence of costs allocable to the work covered by the order during the period of work stoppage. Within a period of 90 days after a stop-work is delivered to the Contractor, or within any extension of that period to which the parties shall have agreed, the Contracting Officer shall either --
(1) Cancel the stop-work order; or
(2) Terminate the work covered by the order as provided in the Default, or the Termination for Convenience of the Government, clause of this contract.
(b) If a stop-work order issued under this clause is canceled or the period of the order or any extension thereof expires, the
Contractor shall resume work. The Contracting Officer shall make an equitable adjustment in the delivery schedule or contract price, or both, and the contract shall be modified, in writing, accordingly, if --
(1) The stop-work order results in an increase in the time required for, or in the Contractor’s cost properly allocable to, the performance of any part of this contract; and
(2) The Contractor asserts its right to the adjustment within 30 days after the end of the period of work stoppage; provided that, if the Contracting Officer decides the facts justify the action, the Contracting Officer may receive and act upon the claim submitted at any time before final payment under this contract.
(c) If a stop-work order is not canceled and the work covered by the order is terminated for the convenience of the Government, the Contracting Officer shall allow reasonable costs resulting from the stop-work order in arriving at the termination settlement.
(d) If a stop-work order is not canceled and the work covered by the order is terminated for default, the Contracting Officer shall allow, by equitable adjustment or otherwise, reasonable costs resulting from the stop-work order.
F-0001 F1.05 GENERAL SHIPPING CONDITIONS (DLA ENERGY OCT 1997)
(a) The Contractor will prepare the inspection and shipment documents covering deliveries made from the terminal in accordance with instructions contained in the Documentation and Product Property Control Plan. Normally, the document will consist of DD Form 250 for tank car, tank truck, pipeline, and packaged shipments, and DD Form 250-1 and ullage/innage reports in the case of barge and tanker shipments. The Contractor will distribute the DD Forms 250 and the Quality Representative (QR) will distribute the DD Forms 250-1. When the QR is not present for release or shipment of product inspected at these facilities, and the Contractor's quality control program has been approved by the responsible Government Quality Office in accordance with paragraph 246.471 of the DOD FAR Supplement, the Contractor will insert the following certification on the inspector's copy of the shipping documents:
"I certify that the above supplies were (a) in the quantity indicated, (b) taken from Government-owned and approved stocks and (c) loaded into inspected and approved containers. This shipment was released in accordance with paragraph 246.471-2 of the DoD FAR Supplement under authorization of (NAME and TITLE OF THE
AUTHORIZED REPRESENTATIVE OF THE CONTRACT ADMINISTRATION OFFICE)
in a letter dated (DATE OF AUTHORIZING LETTER). (SIGNATURE AND TITLE OF
CONTRACTOR'S DESIGNATED REPRESENTATIVE)."
(b) Shipment of products hereunder will be made only pursuant to a "release" furnished by the Product Property Administrator or his designated representative. The "release" will indicate the consignees who are authorized to issue "calls" or "orders" for shipment of product. Such "release" will be periodically furnished to the Contractor by the cognizant Product Property Administrator.
(c) Conveyances required for shipments shall be furnished or designated by the Government. The Contractor shall inspect all shipping conveyances prior to loading to insure that product loaded will not be lost or contaminated by the condition of the equipment.
Tank truck inspection must be performed by qualified Contractor personnel. Delegation of this responsibility shall not be passed to the tank truck operator/driver. The tank truck operator/driver may be permitted to physically load the tank truck; however, the loading operation must be under the surveillance and direction of Contractor personnel. Equipment found to be unsatisfactory shall be reported as follows: (1) TANKERS AND BARGES. Report immediately by telephone to the QR; if not present, the master of the tanker or barge or to the carrier's agent or general office; (2) TANK CARS. Report to the QR and by wire (Government Rate, Collect) to Commander, Eastern Area, Military Traffic Management Command, ATTN: MTE-INR-O, Brooklyn, NY 11250. Any shortage or overage of tank cars shall be similarly reported; (3) TRANSPORT TRUCKS. Contractor shall expeditiously report to the Traffic Manager of the appropriate Defense Fuel Region, Government QR, and to the carrier's terminal where equipment is domiciled.
(d) Except when loading barges or tankers, or making pipeline deliveries, strainers of 100 mesh or finer shall be utilized in loading aviation fuels and jet lubricating oil and 60 mesh or finer in the case of reciprocating engine oil. Strainers shall be located as near the loading point as practicable. Contractor shall furnish and periodically inspect and clean such strainers and repair same, if necessary, keeping a written record thereof.
(e) Contractor shall affix serially numbered seals to the dome covers of tank cars and all openings in the case of tank trucks in such a manner that entry could only be gained by breaking a seal. Such seals will be furnished by the Contractor. Seal numbers will be indicated on shipping documents.
(f) Placards, as required by 49 CFR 172.506 and 49 CFR 172.508, shall be furnished and affixed to all tank cars and tank trucks by Contractors unless placards are already affixed.
(g) FOR TANK CARS ONLY.
(1) If Government-owned or leased tank cars are furnished, the Contractor will maintain records showing each day a car is received or forwarded by car number and will furnish the information to the Defense Fuel Regional Office upon request.
(2) Bottom outlet gaskets and manway cover gaskets, when required due to deterioration or loss shall be furnished and applied to tank cars by the Contractor.
(3) The Contractor shall (i) inspect empty Government-owned tank cars located on the Contractor's premises and (ii) ship tank cars located on the Contractor's premises to repair facilities as directed by the Government.
(h) Unless otherwise directed, the Contractor shall prepare and distribute Government bills of lading utilized in shipments.
Such bills of lading, routing instructions, and transportation assistance will be furnished by the Defense Fuel Region placing orders.
(i) The Contractor shall comply with routing instructions furnished by the Government. Such instruction will include names, routes, route order numbers, and other pertinent information. The Contractor shall be responsible for scheduling of commercial transport trucks, trucks and trailer, and tank wagons to its plant in accordance with such routing instructions and consonant with the applicable order. The Contractor shall provide sufficient advance notice to carriers and schedule the carrier's equipment for loading. The Contractor shall reimburse the Government for any demurrage incurred as a result of improper scheduling.
(j) Custody of product shipped by pipeline, and risk of loss thereof, shall pass from the Contractor to the carrier when the product passes the flange connecting the Contractor's pipeline and the carrier's pipeline.
(k) Custody of product shipped by transport truck, and risk of loss thereof, shall pass from the Contractor to the carrier when the loaded transport truck is released for shipment by the Contractor.
(l) Custody of product shipped by tank car, and risk of loss thereof, shall pass from the Contractor to the carrier when the loaded tank car is picked up by the carrier.
(m) Custody of product delivered to tanker or barge, and risk of loss thereof, shall pass from the Contractor to the carrier when the fuel passes the vessel’s permanent hose connection.
(n) The Contractor shall be held accountable for demurrage charges arising from delay(s) in shipment by tank cars and transport trucks except when those delays are caused by reasons beyond the control and without the fault or negligence of the Contractor and its subcontractors.
(o) The following subparagraphs only apply to barges and tankers.
(1) SCHEDULED ARRIVAL DATE AND BASIC ALLOWED LAYTIME.
(i) Notice shall be furnished to the Contractor in advance of the date on which loading is to be made, which date is hereinafter referred to as the "Scheduled Arrival Date." Each notice will specify the quantity to be loaded, the cargo number, and name of the vessel and the scheduled loading date. For tankers, notice will also include the size of the vessel and the expected time of arrival.
Notice of delivery will be furnished at least 72 hours in advance of the scheduled arrival date for tankers, and at least 48 hours in advance of the scheduled arrival date for barges. When anticipated vessel transit time to the loading point is less than 72/48 hours, the Government will provide the maximum notice practicable. Any change in the scheduled arrival date of less than 48 hours’ notice for barges and 72 hours’ notice for tankers will require verbal approval of the Contractor, confirmed in writing..
(ii) The Contractor shall provide as soon as possible, but within 3 hours after issue of notice of readiness to load from a barge and within 6 hours after the Contractor receives notice of readiness to load from a tanker, a reachable berth, free of cost to the Government, where the vessel can be safely moored and afloat with necessary access thereto PROVIDED, however --
(A) If the vessel is tendered for loading on a date earlier than the last agreed scheduled arrival date, the Government’s vessel shall be loaded as soon as possible in its proper turn with other vessels, and laytime shall not commence until the vessel moors alongside or, for barges, 3:00 A.M. local time; for tankers, 6:00 A.M. local time, on the last agreed scheduled arrival date, whichever occurs first.
(B) If the vessel is tendered for loading later than 12:00 noon of the day following the last scheduled arrival date, the vessel shall be loaded in its proper turn with other vessels. Laytime shall commence when the vessel moors alongside, provided a good faith effort is made by the Contractor to moor the vessel in its turn with other vessels as loading berths become available. If the vessel is not moored in its proper turn with other vessels, laytime will commence at 6:00 A.M. on the date the Government vessel’s turn occurred.
(iii) Laytime shall commence either (A) at the expiration of the notice period prescribed in subparagraph (ii) above, berth or no berth, or (B) immediately when the vessel moors alongside, with or without notice of readiness, whichever occurs first.
(iv) Laytime, once started, shall continue 24 hours per day, 7 days per week, without interruption, from its commencement until loading of the barge or tanker is completed and hoses have been removed.
(v) Unless otherwise provided in the Schedule, the Contractor shall be allowed and will complete unloading within laytime determined as follows:
(A) FOR BARGES: One hour for each 2,000 barrels of product to be loaded.
(B) FOR TANKERS: Thirty-six hours for load of full vessel cargo. When partial vessel cargoes are to be loaded, the 36 hours will be prorated based on quantities loaded by each supplier.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .