SF30_SP800023R0007-0002.pdf

PDF 160 KB Posted

Attached to
Electrolytic Manganese Metal (EMM) Federal contract opportunity
Solicitation number
SP8000-23-R-0007
Issued by
Defense Logistics Agency

About this file

This amendment to a solicitation modifies the requirements for an existing solicitation to procure electrolytic manganese metal. The solicitation seeks to purchase 7,140 metric tons of electrolytic manganese metal flakes with a minimum manganese content of 99.00% for delivery over an 18-month base period plus two 12-month option periods. The amendment reopens the solicitation period for seven days, updating the response deadline to July 7, 2023, at 3:00 PM EST. It also replaces the evaluation criteria attachment to add more detailed requirements for offerors to address scope of work, delivery schedule, technical specifications, sampling and testing, certifications, packaging, labeling, transportation, tariffs, delivery, and inspection and acceptance in their technical narrative. The Defense Logistics Agency intends to award a firm-fixed-price contract under FAR Part 12 for commercial items.

View the file

Other files for this federal contract opportunity

Other files attached to Electrolytic Manganese Metal (EMM), newest first.
File Type Posted
SF_30 --0003.pdf PDF
Attachment B - Evaluation Criteria_30JUN23.pdf PDF
Attachment C - CLIN Structure rv2.pdf PDF
SF30_SP800023R0007-0001.pdf PDF
Attachment A - SOW v2.pdf PDF
SF 1449 Final v1.pdf PDF
Attachement C - CLIN Structure rv1.pdf PDF
Attachment B - Evaluation Criteria final v1.pdf PDF
Attachment A - SOW.pdf PDF
Attachment D - Past Performance Questionnaire.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

1 2

2. AMENDMENT/MODIFICAITON NO.

0002 2023 JUN 30 See Block 14

SP8000

DCSO FORT BELVOIR

8725 JOHN J. KINGMAN ROAD

SUITE 1145 DCSO

FORT BELVOIR VA 22060-6223

USA

SP800023R0007

2023 MAY 26

Closing Date Changed:

FROM: 2023 JUN 26

TO: 2023 JUN 28 TIME 3:00 PM EST

See Attached Continuation Sheet(s).

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

CONTINUATION SHEET SP800023R0007 – 0002 PAGE 2 OF 2 PAGES

1. The purpose of this Amendment 0002 to Solicitation SP8000-23-R-0007 is to reopen the solicitation, provide updates to Attachment B–Evaluation Criteria, and to provide a new solicitation closing date. The Government will accept proposals up to the closing date listed below. Submitted proposals will be evaluated based on the requirements set forth in the solicitation including those changes resulting from this Amendment 0002.

2. Accordingly, the following specific updates are made to the solicitation:

a. Solicitation SP8000-23-R-0007 is hereby reopened for seven days. The solicitation closing date is changed—

FROM: 2023 JUN 28 / 3:00 PM EST

TO: 2023 JUL 07 / 3:00 PM EST

b. Attachment B – Evaluation Criteria. A revised version of Attachment B–Evaluation Criteria (“Attachment B – Evaluation Criteria_30JUN23.pdf”) is incorporated into the solicitation, replacing all prior version(s) of the document. Attachment B–Evaluation Criteria is updated as follows:

“(1) In a document named “Technical Narrative” the offeror must describe their ability to provide 7,140 metric tons (MT) of Electrolytic Manganese Metal, (EMM) flakes with the specifications and requirements set forth in the Statement of Work (SOW). The offeror must identify in a detailed narrative the ability to meet the requirements for the following:

a. Scope of Work. Explain in a detailed narrative the ability to meet the requirements of the SOW, Section 2–Scope of Work.

b. Delivery Schedule. Explain in a detailed narrative the ability to meet the requirements of the SOW, Section 3–Delivery Schedule.

c. Technical Requirements. Explain in a detailed narrative the ability to meet the requirements of the SOW, Section 5–Technical Requirements.

d. Sampling and Testing. Explain in a detailed narrative the ability to meet the requirements of the SOW, Section 6–Sampling and Testing.

e. Certificates of Analysis. Explain in a detailed narrative the ability to meet the requirements of the SOW, Section 7–Certificates of Analysis.

f. Packaging. Explain in a detailed narrative the ability to meet the requirements of the SOW, Section 8–Packaging.

g. Labeling. Explain in a detailed narrative the ability to meet the requirements of the SOW, Section 9–Labeling.

h. Transportation. Explain in a detailed narrative the ability to meet the requirements of the SOW, Section 10–Transportation.

i. Tariffs. Explain in a detailed narrative the ability to meet the requirements of the SOW, Section 11–Tariffs.

j. Delivery. Explain in a detailed narrative the ability to meet the requirements of the SOW, Section 12–Delivery.

k. Inspection and Acceptance. Explain in a detailed narrative the ability to meet the requirements of the SOW, Section 13–Inspection and Acceptance.”

3. All other terms and conditions of Solicitation SP8000-23-R-0007, other than those explicitly stated in this Amendment 0002, remain unchanged.

(End of Amendment Narrative)

SF_30--0002
Amendment 0002_EH

File details come from the government source that posted it. Updated .