Attachement C - CLIN Structure rv1.pdf

PDF 96 KB Posted

Attached to
Electrolytic Manganese Metal (EMM) Federal contract opportunity
Solicitation number
SP8000-23-R-0007
Issued by
Defense Logistics Agency

About this file

This solicitation seeks proposals for the delivery of Electrolytic Manganese Metal. The Defense Logistics Agency intends to purchase 7,140 metric tons of EMM flakes with a minimum 99.00% manganese content over an 18-month base period and two 12-month option periods. The contractor must deliver no more than 300 metric tons per month and 60 metric tons per day until 7,140 metric tons have been provided. Pricing is to be submitted using the Contract Line Item Numbers structure specified in Attachment C, which outlines delivery amounts and pricing for the base quantity and two options. Questions are due by June 7, 2023 and final proposals are due June 26, 2023. The solicitation will be conducted under FAR Part 12 for commercial items. Offerors must be registered in the System for Award Management to receive an award.

View the file

Other files for this federal contract opportunity

Other files attached to Electrolytic Manganese Metal (EMM), newest first.
File Type Posted
SF_30 --0003.pdf PDF
SF30_SP800023R0007-0002.pdf PDF
Attachment B - Evaluation Criteria_30JUN23.pdf PDF
Attachment C - CLIN Structure rv2.pdf PDF
SF30_SP800023R0007-0001.pdf PDF
Attachment A - SOW v2.pdf PDF
SF 1449 Final v1.pdf PDF
Attachment B - Evaluation Criteria final v1.pdf PDF
Attachment A - SOW.pdf PDF
Attachment D - Past Performance Questionnaire.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SP8000-23-R-0007

Attachment C:

Contract Line-Item Number (CLIN) Schedule Electrolytic Manganese Metal (EMM)

Defense Logistics Agency (DSO-F) intends to purchase a total of 7,140 metric tons (MT) of Electrolytic Manganese Metal (EMM) flakes with a minimum manganese (Mn) content of 99.00% by mass (Mn content = 100 x (mass of contained Mn ÷ mass of total substances). See below table for delivery breakdown, with base CLIN 0001and CLIN 1001 and CLIN 2001 being for option quantities and subject to availability of funds.

CLIN Material Weight (Maximum, MT) 0001 Metric Ton 3600 1001 Metric Ton 2100 2001 Metric Ton 1440

Below is a list of Contract Line-Item Number’s (CLIN’s) for a 24-month Base Period and one (1) Quantity Option:

CLIN 0001 –Metric Ton

The price associated with providing 3,600 MT of Electrolytic Manganese Metal (EMM) flakes with a minimum manganese (Mn) content of 99.00% by mass (Mn content = 100 x (mass of contained Mn ÷ mass of total substances). This includes the price associated with the material packaged in new UN 1A2 rated steel drums with a rated capacity of 30 or 55 gallons or metric equivalent capacity.

Quantity: 3,600

Unit: Metric ton

Unit Price $ _________________________

Amount $ ___________________________

Source Selection Information See FAR 2.101 and 3.104 Page 1 of 2

CLIN 1001 –Metric Ton

The price associated with providing 2,100 MT of Electrolytic Manganese Metal (EMM) flakes with a minimum manganese (Mn) content of 99.00% by mass (Mn content = 100 x (mass of contained Mn ÷ mass of total substances). This includes the price associated with the material packaged in new UN 1A2 rated steel drums with a rated capacity of 30 or 55 gallons or metric equivalent capacity.

Quantity: 2,100

Unit: Metric ton

Unit Price $ _________________________

Amount $ ___________________________

Notes:

1. Per FAR 52.217-7 Option for Increased Quantity-Separately Priced Line Item, The Contracting Officer may exercise the option by written notice to the Contractor.

2. Offerors may offer pricing on one or both CLIN’s quantities listed above.

CLIN 2001 –Metric Ton

The price associated with providing 1,440 MT of Electrolytic Manganese Metal (EMM) flakes with a minimum manganese (Mn) content of 99.00% by mass (Mn content = 100 x (mass of contained Mn ÷ mass of total substances). This includes the price associated with the material packaged in new UN 1A2 rated steel drums with a rated capacity of 30 or 55 gallons or metric equivalent capacity.

Quantity: 1,440

Unit: Metric ton

Unit Price $ _________________________

Amount $ ___________________________

Notes:

1. Per FAR 52.217-7 Option for Increased Quantity-Separately Priced Line Item, The Contracting Officer may exercise the option by written notice to the Contractor.

2. Offerors may offer pricing on both CLIN’s quantities listed above.

Source Selection Information See FAR 2.101 and 3.104 Page 1 of 2

CLIN 0001 –Metric Ton

File details come from the government source that posted it. Updated .