CSC-20009 Structural Wall Repairs Base Wide-Bid Sheet.xlsx
XLSX spreadsheet 94 KB Posted
- Attached to
- Project: CSC-20009 Structural wall repairs and paint Federal contract opportunity
- Solicitation number
- SP4702-20-R-0027
- Issued by
- Defense Logistics Agency
About this file
This document contains a bid sheet and related federal contract opportunity for structural wall repairs at a military base. The bid sheet provides pricing details for repairs to buildings 9, 10, 17, 18, 19, 306 and 308, including repointing, concrete patching, window replacement, and paint restoration. The federal contract opportunity is solicited by the Defense Logistics Agency for project CSC-20009. The work includes tuckpointing, structural concrete repair, brick replacement, expansion joint replacement, and paint maintenance at various buildings. An optional site visit is scheduled for July 30, 2020 and questions regarding the solicitation are due by August 10, 2020. The contracting officer is William Hurley at the Defense Logistics Agency.
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| PROJECT NOMBER: | CSC-20009 | DRAWING NO. | 3-1656 | DATE: | |
| PROJECT TITLE: | Structural Wall Repairs & Paint Maintenance, Base Wide FY20 | ||||
| ARCHITECT/ENGINEER: | Sinan Falah | ESTIMATOR: | |||
| FINAL DESIGN | X | OTHER |
| ITEM | QUANTITY | Materials | LABOR | EQUIP COST | TOTAL COST | |||||
| NO. OF UNITS | UNIT OF MEASURE | PER UNIT | TOTAL | UNIT MANHOUR | TOTAL MANHOURS | RATE PER HOUR | TOTAL | |||
| BUILDING 9 | ||||||||||
| General Requirements, Asbestos testing & Project Management | 1 | JOB | ||||||||
| Structural Wall Repairs: | ||||||||||
| Repointing: Repointing includes removal of old caulking, grout, non-original mortar to a minimum depth of 2.5 times the width of the joint and installation of new repointing mortar and curing of new mortar. | ||||||||||
| Brick Removal and Replacement: Removal of entire units from joint to joint includes damaged or deteriorated brick units, mortar, support and protect remaining wall that surrounds removal area; Installation of new bricks to match in color, shape, size, texture and appearance to the existing bricks includes repointing joints to match rest of the wall and clean replacement areas to remove excess mortar. | ||||||||||
| Concrete Structural Patching: Concrete wall patching incl. saw cutting, chipping out unsound concrete, removing & cleaning old concrete materials, rust removal from rebars, prime rebars and application of new bonding agent, new mortar & cleaning & curing mortar. | ||||||||||
| Paint Restoration for Concrete & Masonry Surfaces: | ||||||||||
| Exterior Surface Preparation includes pressure wash, based on 2500 lb. operating pressure, sanding, filling & masking. | ||||||||||
| Spray, latex, paint, Block Filler first coat | ||||||||||
| Spray, latex, paint, Intermediate coat | ||||||||||
| Spray, latex, paint, Topcoat | ||||||||||
| Replace 3 Windows, Section 3, West Side | ||||||||||
| Replace existing windows, with operable aluminum blast resistant windows, using existing opening size | EA | |||||||||
| SUBTOTAL | ||||||||||
| Cost to General Contractor: | OH 8% | |||||||||
| Profit 7% | ||||||||||
| Bond 1.5% | ||||||||||
| TOTAL | ||||||||||
| BUILDING 10 | ||||||||||
| General Requirements, Asbestos testing & Project Management | JOB | |||||||||
| Structural Wall Repairs: | ||||||||||
| Repointing: Repointing includes removal of old caulking, grout, non-original mortar to a minimum depth of 2.5 times the width of the joint and installation of new repointing mortar and curing of new mortar. | ||||||||||
| Concrete Structural Patching: Concrete wall patching incl. saw cutting, chipping out unsound concrete, removing & cleaning old concrete materials, rust removal from rebars, prime rebars and application of new bonding agent, new mortar & cleaning & curing mortar. | ||||||||||
| Paint Restoration for Concrete & Masonry Surfaces: | ||||||||||
| Exterior Surface Preparation includes pressure wash, based on 2500 lb. operating pressure, sanding, filling & masking. | SF | |||||||||
| Spray, latex, paint, Block Filler first coat | SF | |||||||||
| Spray, latex, paint, Intermediate coat | SF | |||||||||
| Spray, latex, paint, Topcoat | SF | |||||||||
| SUBTOTAL | ||||||||||
| Cost to General Contractor: | OH 8% | |||||||||
| Profit 7% | ||||||||||
| Bond 1.5% | ||||||||||
| TOTAL | ||||||||||
| BUILDING 17 | ||||||||||
| General Requirements, Asbestos testing & Project Management | JOB | |||||||||
| Structural Wall Repairs: | ||||||||||
| Repointing: Repointing includes removal of old caulking, grout, non-original mortar to a minimum depth of 2.5 times the width of the joint and installation of new repointing mortar and curing of new mortar. | ||||||||||
| Concrete Structural Patching: Concrete wall patching incl. saw cutting, chipping out unsound concrete, removing & cleaning old concrete materials, rust removal from rebars, prime rebars and application of new bonding agent, new mortar & cleaning & curing mortar. | ||||||||||
| Paint Restoration for Concrete & Masonry Surfaces: | ||||||||||
| Exterior Surface Preparation includes pressure wash, based on 2500 lb. operating pressure, sanding, filling & masking. | ||||||||||
| Spray, latex, paint, Block Filler first coat | ||||||||||
| Spray, latex, paint, Intermediate coat | ||||||||||
| Spray, latex, paint, Topcoat | ||||||||||
| SUBTOTAL | ||||||||||
| Cost to General Contractor: | OH 8% | |||||||||
| Profit 7% | ||||||||||
| Bond 1.5% | ||||||||||
| TOTAL | ||||||||||
| BUILDING 18 | ||||||||||
| General Requirements, Asbestos testing & Project Management | 1 | JOB | ||||||||
| Structural Wall Repairs: | ||||||||||
| Repointing: Repointing includes removal of old caulking, grout, non-original mortar to a minimum depth of 2.5 times the width of the joint and installation of new repointing mortar and curing of new mortar. | ||||||||||
| Concrete Structural Patching: Concrete wall patching incl. saw cutting, chipping out unsound concrete, removing & cleaning old concrete materials, rust removal from rebars, prime rebars and application of new bonding agent, new mortar & cleaning & curing mortar. | ||||||||||
| Concrete Fill: Fill 3" or more wide holes in ground with 1500 psi flowable concrete. | ||||||||||
| Paint Restoration for Concrete & Masonry Surfaces: | ||||||||||
| Exterior Surface Preparation includes pressure wash, based on 2500 lb. operating pressure, sanding, filling & masking. | ||||||||||
| Exterior Painting on Concrete foundation walls, upper beams & columns & masonry systems: | ||||||||||
| Spray, latex, paint, Block Filler first coat | ||||||||||
| Spray, latex, paint, Intermediate coat | ||||||||||
| Spray, latex, paint, Topcoat | ||||||||||
| SUBTOTAL | ||||||||||
| Cost to General Contractor: | OH 8% | |||||||||
| Profit 7% | ||||||||||
| Bond 1.5% | ||||||||||
| TOTAL | ||||||||||
| BUILDING 19 | ||||||||||
| General Requirements, Asbestos testing & Project Management | 1 | JOB | ||||||||
| Structural Wall Repairs: | ||||||||||
| Repointing: Repointing includes removal of old caulking, grout, non-original mortar to a minimum depth of 2.5 times the width of the joint and installation of new repointing mortar and curing of new mortar. | ||||||||||
| Concrete Structural Patching: Concrete wall patching incl. saw cutting, chipping out unsound concrete, removing & cleaning old concrete materials, rust removal from rebars, prime rebars and application of new bonding agent, new mortar & cleaning & curing mortar. | ||||||||||
| Paint Restoration for Concrete & Masonry Surfaces: | ||||||||||
| Exterior Surface Preparation includes pressure wash, based on 2500 lb. operating pressure, sanding, filling & masking. | ||||||||||
| Exterior Painting on Concrete foundation walls, upper beams & columns & masonry systems: | ||||||||||
| Spray, latex, paint, Block Filler first coat | ||||||||||
| Spray, latex, paint, Intermediate coat | ||||||||||
| Spray, latex, paint, Topcoat | ||||||||||
| SUBTOTAL | ||||||||||
| Cost to General Contractor: | OH 8% | |||||||||
| Profit 7% | ||||||||||
| Bond 1.5% | ||||||||||
| TOTAL | $0.00 | |||||||||
| BUILDING 306 | ||||||||||
| General Requirements, Asbestos testing & Project Management | JOB | |||||||||
| Structural Wall Repairs: | ||||||||||
| Concrete Structural Patching: Concrete wall patching incl. saw cutting, chipping out unsound concrete, removing & cleaning old concrete materials, rust removal from rebars, prime rebars and application of new bonding agent, new mortar & cleaning & curing mortar. | ||||||||||
| Paint Restoration for Concrete & Masonry Surfaces: | ||||||||||
| Exterior Surface Preparation includes pressure wash, based on 2500 lb. operating pressure, sanding, filling & masking. | ||||||||||
| Exterior Painting on Concrete foundation walls, upper beams & columns & masonry systems: | ||||||||||
| Spray, latex, paint, Block Filler first coat | ||||||||||
| Spray, latex, paint, Intermediate coat | ||||||||||
| Spray, latex, paint, Topcoat | ||||||||||
| SUBTOTAL | ||||||||||
| Cost to General Contractor: | OH 8% | |||||||||
| Profit 7% | ||||||||||
| Bond 1.5% | ||||||||||
| TOTAL | $0.00 | |||||||||
| BUILDING 308 | ||||||||||
| General Requirements, Asbestos testing & Project Management | JOB | |||||||||
| Structural Wall Repairs: | ||||||||||
| Repointing: Repointing includes removal of old caulking, grout, non-original mortar to a minimum depth of 2.5 times the width of the joint and installation of new repointing mortar and curing of new mortar. | ||||||||||
| Stucco Repair from grade beam to upper beam | ||||||||||
| Concrete Structural Patching: Concrete wall patching incl. saw cutting, chipping out unsound concrete, removing & cleaning old concrete materials, rust removal from rebars, prime rebars and application of new bonding agent, new mortar & cleaning & curing mortar. | ||||||||||
| Paint Restoration for Concrete & Masonry Surfaces: | ||||||||||
| Exterior Surface Preparation includes pressure wash, based on 2500 lb. operating pressure, sanding, filling & masking. | ||||||||||
| Exterior Painting on Concrete foundation walls, upper beams & columns & masonry systems: | ||||||||||
| Spray, latex, paint, Block Filler first coat | ||||||||||
| Spray, latex, paint, Intermediate coat | ||||||||||
| Spray, latex, paint, Topcoat | ||||||||||
| SUBTOTAL | ||||||||||
| Cost to General Contractor: | OH 8% | |||||||||
| Profit 7% | ||||||||||
| Bond 1.5% | ||||||||||
| TOTAL | ||||||||||
| COST SUMMARY | ||||||||||
| TOTAL FOR BUILDING 9 | ||||||||||
| TOTAL FOR BUILDING 10 | ||||||||||
| TOTAL FOR BUILDING 17 | ||||||||||
| TOTAL FOR BUILDING18 | ||||||||||
| TOTAL FOR BUILDING 19 | ||||||||||
| TOTAL FOR BUILDING 306 | ||||||||||
| TOTAL FOR BUILDING 308 | ||||||||||
| ESTIMATED PROJECT COST | $0.00 |