01-Section 01 11 00 Summary of Work 08 11 2020.pdf

PDF 274 KB Posted

Attached to
Project: CSC-20009 Structural wall repairs and paint Federal contract opportunity
Solicitation number
SP4702-20-R-0027
Issued by
Defense Logistics Agency

About this file

This solicitation package seeks maintenance and repair services for five buildings at the Defense Supply Center Columbus complex in Ohio. The scope of work includes tuck pointing, structural concrete repair, brick and EIFS replacement, expansion joint sealant replacement, and interior and exterior paint maintenance for Buildings 9, 18, 19, 306, and 308. Drawings and specifications are provided under number 3-1694. Questions are due by August 10, 2020 and site visits can be scheduled by contacting provided points of contact by July 27. The Defense Logistics Agency is the issuing agency.

View the file

Other files for this federal contract opportunity

Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 01 11 00 Page 1

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL

REQUIREMENTS SECTION 01 11 00

SUMMARY OF WORK

12/19

PART 1 GENERAL

1.1 SUBMITTALS

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.2.1 Project Description

1.2.2 Location

1.3 CONTRACT DRAWINGS

1.4 WORK RESCHEDULING

1.5 OCCUPANCY OF PREMISES

1.6 EXISTING WORK

1.7 ON-SITE PERMITS

1.7.1 Utility Outage Requests and Utility Connection Requests

1.7.2 Borrow, Excavation, Welding, and Burning Permits

1.8 LOCATION OF UNDERGROUND UTILITIES

1.8.1 Notification Prior to Excavation

1.9 GOVERNMENT-FURNISHED MATERIAL AND EQUIPMENT

1.9.1 Delivery Schedule

1.9.2 Delivery Location

1.10 GOVERNMENT-INSTALLED WORK

1.11 NAVY AND MARINE CORPS (NMCI) COORDINATION REQUIREMENTS

1.11.1 NMCI Contractor Access

1.12 SALVAGE MATERIAL AND

EQUIPMENT PART 2 PRODUCTS

PART 3 EXECUTION

-- End of Section Table of Contents --

SECTION 01 11 00 Page 2

SECTION 01 11 00

SUMMARY OF

WORK

08/15

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. Submit the following in accordance with Section 01

33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals G

Utility Outage Requests Utility

Connection Requests Borrow Permits

Excavation Permits

Welding Permits

Burning Permits

Salvage Plan;

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.2.1 Project Description

The contractor shall furnish all plant, labor, equipment, materials, supplies and supervision required in performing all operations to perform the following maintenance and repair work to complete this project:

CLIN No. 1: Bldg. 9

• Tuck Pointing to Brick & Masonry Walls

• Structural Concrete Spot Repair at selected locations

• Brick Replacement

• Expansion Joint Sealant Material Replacement

• Paint Maintenance to Exterior & Interior Brick Walls and Concrete Structures

SECTION 01 11 00 Page 3

• CLIN No. 2: Bldg. 18

• Tuck Pointing to Brick & Masonry Walls

• Structural Concrete Spot Repair at selected locations

• Brick Replacement

• Expansion Joint Sealant Material Replacement

• Paint Maintenance to Exterior & Interior Brick Walls and Concrete Structures

• CLIN No. 3: Bldg. 19

• Tuck Pointing to Brick & Masonry Walls

• Structural Concrete Spot Repair at selected locations

• Brick Replacement

• Expansion Joint Sealant Material Replacement

• Paint Maintenance to Exterior & Interior Brick Walls and Concrete Structures

• CLIN No. 4: Bldg. 306

• Tuck Pointing to Brick & Masonry Walls

• Structural Concrete Spot Repair at selected locations

• Brick Replacement

• Expansion Joint Sealant Material Replacement

• Paint Maintenance to Exterior & Interior Brick Walls and Concrete Structures

• CLIN No. 5: Bldg. 308

• Tuck Pointing to Brick & Masonry Walls

• Structural Concrete Spot Repair at selected locations

• Brick & EIFS Replacement

• Expansion Joint Sealant Material Replacement

• Paint Maintenance to Exterior & Interior Brick Walls and Concrete Structures

The contractor shall perform all operations in conjunction with this project in strict accordance with specifications & drawings # 3-1694, sheets 1 through 21.

1.2.2 Location

The work is located within base wide at the DSCC Complex, Columbus, Ohio. The approximate location is shown on the drawings.

SECTION 01 11 00 Page 4

1.3 CONTRACT DRAWINGS

The following drawings accompany this specification and are a part thereof.

Drawing No. 3-xxxx

Sheets 1 through xx.

Electronic set of contract drawings, maps, and specifications will be furnished to the Contractor without charge. Reference publications will not be furnished. Immediately check furnished drawings and notify the Government of any discrepancies.

1.4 WORK RESCHEDULING

Normal duty hours for work are from 7:00 A.M. to 4:00 P.M., Monday through Friday. Requests for additional work requires written approval from the Contracting Officer 7 days in advance of the proposed work period.

1.5 OCCUPANCY OF PREMISES

NOT USED

1.6 EXISTING WORK

In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.

1.7 ON-SITE PERMITS

1.7.1 Borrow, Excavation, Welding, and Burning Permits

1.8 LOCATION OF UNDERGROUND UTILITIES

Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities. Verify existing utility locations indicated on contract drawings, within area of work.

SECTION 01 11 00 Page 5

1.8.1 Notification Prior to Excavation

Notify the Contracting Officer at least 48 hours prior to starting excavation work.

1.9 GOVERNMENT-FURNISHED MATERIAL AND EQUIPMENT

NONE

1.10 GOVERNMENT-INSTALLED WORK

NONE.

1.11 NAVY AND MARINE CORPS (NMCI) COORDINATION REQUIREMENTS

1.12 SALVAGE MATERIAL AND EQUIPMENT

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --