SP4702-20-R-0027-.pdf
PDF 3 MB Posted
- Attached to
- Project: CSC-20009 Structural wall repairs and paint Federal contract opportunity
- Solicitation number
- SP4702-20-R-0027
- Issued by
- Defense Logistics Agency
About this file
This is a solicitation for a structural wall repairs and painting project at the Defense Supply Center Columbus complex in Ohio. The contractor will perform maintenance and repair work including tuck pointing of brick and masonry walls, structural concrete spot repairs, brick and EIFS replacement, expansion joint sealant replacement, and paint maintenance on exterior and interior walls of multiple buildings. The work must be completed within 180 calendar days of receiving the notice to proceed. Questions are due by August 10, 2020 and should be sent to the contracting officer. An optional pre-bid site visit will be held on July 30, 2020 with registration required by July 26. The solicitation includes base access procedures due to COVID-19 and guidance on submitting questions and attending the site visit.
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
CODE 8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 8/2014)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
SP4702-20-R-0027
DLA CONTRACTING SERVICES OFFICE, COLUMBUS
ATTN: DCSO-C
P. O. Box 3990 Columbus, OH 43218-3990
SEE TABLE OF CONTENTS PAGE 3 0F 371
DEFENSE SUPPLY CENTER, COLUMBUS
ATTN: DCSO-C
P. O. Box 3990 Columbus, OH 43218-3990 For Courier Services, offers must be address to:
3990 East Broad Street, Columbus, OH 43213-1152.
5. REQUISITION/PURCHASE REQUEST NUMBER
85041790
SP4702
William M. Hurley 614-692-0439
6. PROJECT NUMBER
CSC-20009
1 37107/17/2020 local time 08/31/2020
1:00 PM
(See Clause (FAR 52.211-10
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE.
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 8/2014) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
27. PAYMENT WILL BE MADE BY
10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
TABLE OF CONTENTS
SECTION
A. . . . . . . . . . Solicitation/Table of Contents – STANDARD FORM 1442
SECTION C. . . . . . . . . . Descriptions/Specifications/Performance Work Statement
SECTION D. . . . . . . . . . Packaging and Marking (Not Applicable)
SECTION E. . . . . . . . . . Inspection and Acceptance
SECTION F. . . . . . . . . . Deliveries or Performance
SECTION G. . . . . . . . . Contract Administration Data (Not Applicable). . . . . . . . . . . . . . . . . . . . N/A
SECTION H. . . . . . . . . Special Contract Requirements
SECTION I. . . . . . . . . . Contract Clauses
SECTION J. . . . . . . . . . List of Documents, Exhibits, and Other Attachments. . . . . . . . . . . . . . N/A
SECTION K. . . . . . . . . Representations, Certifications, and Other Statements of Offerors. . . 351
SECTION L. . . . . . . . . . Instructions, Conditions and Notices to Offerors
Attachment 1 DOL Wage Rate Determination
Attachment 2 Eng. Form 93 (2 Pages)
Attachment 3 Excavation Permit (1 Page)
Attachment 4 Drawing 3-1694 (21 sheets)
Attachment 5 Construction Cost Estimate
Attachment 6 Eng. Form 4025-R (2 Pages)
SECTION
B. . . . . . . .. . . . SUPPLIES OR SERVICES AND PRICES/COSTS
SECTION M. . . . . . . . . . EVALUATION FACTORS FOR AWARD 369
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
DESCRIPTION OF SERVICES
The contractor shall furnish all plant, labor, equipment, materials, supplies, testing and supervision required in performing all operations in conjunction with this project in strict accordance with the specifications (CSC-20009 Structural Wall Repairs & Painting for DSCC, FY20) , contract drawing No.
3-1694 (21 sheets), complete and subject to the terms and provisions of this contract. Contractor shall perform the following work to complete this project.
TERM OF CONTRACT
The period of performance for this project is 180 calendar days after the issuance of the Notice to Proceed.
OFFER FOR SERVICES
CONRACT
LINE TEM
NO.(CLIN)
SUPPLIES/SERVICES QUANTITY UNIT TOTAL AMOUNT
CSC-20009 Structural Wall Repairs & Painting for DSCC, FY20 1 JOB $
ALL CLIN PRICING SHALL BE INCLUSIVE OF OVERHEAD, PROFIT AND BONDING COSTS
When invoicing in Wide Area Work Flow, reverse the quantity and unit price as shown above on each CLIN. Failure to do so will result in a delay in payment of the invoice as the invoice will have to be rejected and resubmitted. If you have any questions regarding this matter, contact your WAWF representative Matt Foreman at 614-692-1050 or matthew.foreman@dla.mil.
(X)52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995), ALT I (FEB 1995) - FAR
(a)The clauses at FAR 52.236-2, Differing Site Conditions, and FAR 52.236-3, Site Investigations and Conditions affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b)Offerors are invited to attend an organized site visit by reporting to the Facilities Engineer, Building 306, Defense Supply Center (DSCC), Columbus, Ohio on 30 July 2020(date), at 10:00 AM (time).
(c)All interested offerors that want to attend the site visit need to register 4 days prior to site visit by e-mailing John.Patrick@dla.mil , William.Hurley@dla.mil and Matthew.Foreman@dla.mil
Masks are required in the Visitor Processing Center (Pass and ID). See “BASE ACCESS PROCEDURES” for driving through the gate. Visitor passes may only be issued for up to one week now. Not two weeks like it used to be. This would not be a change for one-day pre-bid site visits.
BASE ACCESS PROCEDURES: To mitigate and lower the possible spread of COVID-19, Defense Supply Center Columbus base access procedures have been modified. Anyone entering the installation must maintain a protective barrier between themselves and the officer at the access control gate. Upon approaching the gate, drivers will stop and lower their window only 1-2 inches – or enough to communicate with the officer – and place Common Access Cards against the window with the barcode facing the officer. Once the barcode has been scanned, flip the CAC over so the officer can verify your photo. Once verified, you may proceed through the gate. In cases of tinted windows, you may be asked to lower the window enough to display the CAC. The new base access procedure will remain in effect until further notice. For questions, contact Security & Emergency Services at 614-692-5907.
PASS & ID PROCEDURAL CHANGES: Masks are required when entering the Pass and ID Office, Bldg 61. In order to concentrate efforts to make servicing DSCC personnel our number one priority, and to better ensure the health and safety of our Pass & ID personnel, we are no longer using the RAPIDS Appointment Scheduler or taking walk-ins for Pass & ID services. DSCC personnel requiring these services should call 614-692-3023 and identify themselves as working on DSCC to schedule an appointment.
All Questions are due 10 August, 2020 at 1:00pm EST. They need to be sent to the Contracting Officer in an e-mail before that date and time. Contracting Officer's e-mail is: William.Hurley@DLA.MIL
SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
The text of any referenced FAR, DFARS, or DLAD clause/provision may be obtained electronically at http://farsite.hill.af.mil (DLA Procurement Regulations). The complete edition of Federal Acquisition Regulations (FAR) or DoD FAR Supplement (DFARS) may be obtained by purchase from the Superintendent of Documents, Government Printing Office, Washington, DC 20402.
The clauses/provisions incorporated by reference have the same force and effect as if they were in full text; however, those having no bearing on the instant acquisition become self-deleting.
MAGNITUDE OF THIS CONSTRUCTION PROJECT IN TERMS OF ESTIMATED COST:
( ) This Project is estimated less than $25,000.
( ) This Project is estimated between $25,000 and $100,000.
( ) This Project is estimated between $100,000 and $250,000 .
( ) This Project is estimated between $250,000 and $500,000 .
(X) This Project is estimated between $500,000 and $1,000,000 .
( ) This Project is estimated between $1,000,000 and $5,000,000 .
( ) This Project is estimated between $5,000,000 and $10,000,000.
( ) More than $10,000,000.
DESCRIPTION OF WORK:
The contractor shall furnish all plant, labor, equipment, materials, supplies, testing and supervision required in performing all operations in conjunction with this project in strict accordance with the specifications (CSC-20009 Structural Wall Repairs & Painting for DSCC, FY20) , contract drawing No.
3-1694 (21 sheets), complete and subject to the terms and provisions of this contract. Contractor shall perform the following work to complete this project.
NOTE: While the Government currently intends to purchase the requirements sought in this solicitation, it may nevertheless be canceled in the event of spending cutbacks necessitated by passage of the Balanced Budget and Emergency Deficit Control Act of 1985, P.L.99-177.
NOTICE: Any contract awarded to a contractor who, at the time of award was suspended, debarred, and ineligible for receipt of contracts with government agencies or in receipt of a notice of proposed debarment from any government agency, is voidable at the option of the Government.
(The following is applicable when marked with an "X".)
(X) Wage Rate Decision OH190001 6/19/2020 No. (attached).
Common Access Card (CAC) Procedures
Performance under this contract may require the contractor to obtain a Common Access Card (CAC). If CACs are issued under this contract, the contractor shall complete and comply with the following steps to obtain, control, and turn-in Government-issued CACs, as well as establish procedures to control and account for contractor CACs at all times. This process is only for the issuance and accountability of CACs. Contractors may be required to provide additional forms and follow additional procedures for other forms of access and/or background/security checks depending on local site/installation requirements.
1. The contractor has each contractor employee requiring a CAC complete and sign Sections I and II of the DD Form 1172-2. The instructions for completing the DD Form 1172-2 are located at http://www.cac.mil/docs/1172-2-Instructions.pdf.
o For Section II, Block 22 - If the contractor employee signs and the DD Form 1172-2 it is then forwarded by the contractor. This provides verification for the employee information. If the contractor is submitting a DD Form 1172-2 for him/herself (e.g., the owner), with no higher authority above them for verification, then the signature in Block 22 must be notarized to verify identity.
2. The contractor forwards the DD Form(s) 1172-2 via hand-carry, secure mail, or encrypted email to (NOTE: The contractor may forward these forms individually or as a group):
O The Contracting Officer’s Representative (COR) for the contract, if a COR was designated.
O The Contracting Officer (CO) for the contract, if no COR was designated.
3. Each contractor employee must verify his/her account information upon receipt of an email from the Government containing a username and password for the Trusted Associate Sponsorship System (TASS). The web link for TASS is included in the email.
4. Each contractor employee will receive an email via TASS when his/her account has been approved. The email will notify the employee to obtain a Government-issued CAC from the nearest Real-Time Automated Personnel Identification System (RAPIDS) office. The email will also provide a link that identifies the locations of RAPIDS offices.
5. Each contractor employee shall obtain his/her issued CAC from the RAPIDS office.
6. The contractor, within one (1) business day of issuance, provides written notice via email to the COR (or the CO, if no COR was designated) for each contractor CAC issued identifying the contractor employee’s name, the date of issuance, and the date of expiration of the CAC. This notification may be made individually for each contractor employee or together for a group of contractor employees.
7. The contractor establishes procedures to control and account for Government-issued contractor CACs at all times, to include the following:
O Ensure contractor CACs issued for this contract are only used for the purpose of performing under this contract.
O Ensure contractor CACs are secured in a manner that precludes unauthorized use and that recognizes the CAC is the property of the U.S. Government.
O Ensure contractor employees do not abuse or place holes in their CACs.
O Ensure contractor employees do not display their CACs in public.
8. If a contractor CAC is lost or stolen:
o The contractor employee shall immediately notify the contractor that the contractor CAC has been lost or stolen.
o The contractor shall immediately notify the COR (or the CO, if no COR was designated), detailing the circumstances regarding the lost or stolen contractor CAC, as follows:
• In person, followed within one (1) business day by a written notice via email, or
• In writing, via email, or
• By telephone, followed within one (1) business day by a written notice via email.
o The contractor shall report the lost or stolen CAC card to the local DLA
Police/host installation police, who will provide the contractor a police report. If there is no local DLA Police/host installation police, or no police report is provided, the contractor shall provide information to the COR/CO, as applicable, detailing the circumstances of how the CAC was lost or stolen. The COR/CO will provide a memorandum for the contractor employee to support issuance of new CAC.
o The contractor has the contractor employee bring the report/memorandum to the nearest RAPIDS office. If the CAC can be reissued within 24 hours, bring the report/memorandum to the nearest CAC office for reissue. If the CAC cannot be reissued in 24 hours, follow the steps for a new CAC, beginning at Step 1.
9. If the expiration date for a contractor CAC is prior to completion of the contract and the contractor employee is to continue working under the contract and still requires a CAC, the contractor:
o Notifies the COR as follows:
• In person, followed within one (1) business day by a written notice via email, or
• In writing, via email, or
• By telephone, followed within one (1) business day by a written notice via email o No less than two (2) weeks prior to the current CAC’s expiration date, completes and complies with the steps above beginning with Step 2 for issuance of a new contractor CAC for the employee.
o Brings the expiring CAC to the RAPIDS office for turn-in and receives new CAC.
o Notifies the COR once a new CAC has been issued.
10. The contractor/contractor employee turns in any found CACs immediately, via handcarry, to the nearest Federal law enforcement office.
11. The contractor immediately collects all contractor CAC(s) from the contractor employee(s) at:
o Contract completion or termination o Termination/Reassignment of an employee (this includes any reason the employee is no longer working for the contractor under the contract or otherwise no longer requires a
CAC)
12. The contractor:
o For contract completion or termination – within one (1) business day after collecting the contractor CAC(s), arranges for turn-in via one of the below methods:
i. If the COR/CO is co-located or near enough that in-person transfer of CACs can be arranged, the contractor:
• Arranges to meet the COR (or the CO, if no COR was designated) to turn-in the collected contractor CAC(s).
• Hand-carries all collected contractor CACs for turn-in to meet the COR (or the CO, if no COR was designated).
• Completes and signs the Government-Issued Contractor CAC Turn-In Receipt with the COR (or the CO, if no COR was designated). The contractor is provided a copy of the receipt.
ii. If in-person transfer of CAC cannot be arranged, the contractor:
• Sends, via certified mail, the CACs to the COR/CO. The contractor includes in the package the Government-Issued Contractor CAC Turn-In Receipt, with signed acknowledgement of contractor turn-in.
• Notifies COR/CO that CACs have been sent via certified mail.
• Receives a completed copy of the receipt from the COR/CO once the COR/CO has received the CACs.
o For termination/reassignment of an employee:
i. Immediately notifies the COR (or the CO, if no COR was designated) that the employee is no longer working for the contractor under the contract or otherwise no longer requires a CAC, as follows:
• In person, followed within one (1) business day by a written notice via email, or
• In writing, via email, or
• By telephone, followed within one (1) business day by a written notice via email.
ii. Follows the turn-in procedures above for contract completion or termination, as applicable.
Contractor Reporting Requirements: The contractor is required to submit, on a monthly basis, to the COR (or the CO, if no COR was designated) a report of all employees working on the contract who have been issued CAC cards and a verification of whether each listed employee still requires a CAC. The report must note where changes have occurred (additions or deletions) since the previous month. Contractor employees who already have a CAC related to another DLA or DoD contract must be included in the monthly report. Contractor shall note the issuing organization and the CAC expiration date. Contractor is still responsible for notifying the
COR/CO when the individual is no longer working under the subject contract.
The above procedures have been established as a DLA security measure. Contractors are advised that failure to comply with any of the above requirements will be considered a violation of the terms and conditions of the contract and the Contracting Officer may take action to remedy such violations. Specifically, failure to safeguard, follow these procedures, including reporting requirements, or turn-in CACs within the established timeframes may result in the following actions, which are in addition to other actions the Contracting Officer may take under governing law and regulation and the terms and conditions of the contract:
• Immediate work stoppage (issuance of a stop work order), not to be lifted until resolution of CAC issue
• Disapproval of invoices and delay of payment
• Withholding of final payment (in accordance with FAR 52.204-9)
• Documentation of CAC Non-Compliance in the Contractor Performance Assessment
Reporting System (CPARS)
TECHNICAL SPECIFICATIONS
TO
STRUCTURAL WALL REPAIRS & PAINTING, SITE WIDE
AT
DEFENSE SUPPLY CENTER COLUMBUS
3990 EAST BROAD STREET
COLUMBUS, OHIO 43218-3990
PROJECT CSC-20009
Feb 2020
LIST OF CONTENTS
DIVISION 01- GENERAL REQUIREMENTS
1 to 11
1 to 5
Pre-con Checklist
Section 01 11 00 Summary of Work
Section 01 20 00.00 20 Price and Payment Procedures 1 to 4
Section 01 33 00 Submittal Procedures 1 to 19
Submittal Register 1 to 5
Section 01 35 31 Security, Safety & Fire Provisions 1 to 18
Section 01 45 00.10 20 Quality Control for Minor Construction 1 to 11
Section 01 57 19 Temporary Environmental Controls 1 to 30
Section 01 74 19 Construction and Demolition Waste Management 1 to 7
Section 01 78 00 Closeout Submittals 1 to 12
Section 01 78 23 Operation and Maintenance Data 1 to 15
DIVISION 02- EXISTING CONDITIONS
Section 02 4100 Demolition and Deconstruction 1 to 10
Section 02 83 13.00 20 Lead Remediation 1 to 15
DIVISION 03 CONCRETE
Section 03 01 30.71 Concrete Rehabilitation 1 to 7
DIVISION 04 MASONRY
Section 04 01 00.91 Restoration and Cleaning of Masonry in Historic Structures 1 to 17
DIVISION 07 THERMAL AND MOISTURE PROTECTION
Section 07 24 00 Exterior Insulation & Finish Systems 1 to 18
Section 07 92 00 Joint Sealants 1 to 6
DIVISION 08- OPENINGS
Section 08 51 13 Aluminum Windows 1 to 16
Section 08 81 00 Glass and Glazing 1 to 11
DIVISION 09 FINISHES
Section 09 90 00 Paints and Coatings 1 to 16
Section 09 97 13.27 Exterior Coating of Steel Structures 1 to 20
DIVISION 32 EXTERIOR IMPROVEMENTS
Section 32 92 19 Seeding 1 to 10
END OF CONTENTS
Rev: 12/19
Project No. Contract No. Page
PRECONSTRUCTION CONFERENCE CHECKLIST & MINUTES
(Date, Time, Location of Meeting)
Project Title/Location: Structural Wall Repairs & Painting Site Project Number: 20009 Contract Number:
FOR
Name of Contractor:
Index:
SECTION A - GENERAL CONDITIONS AND REQUIREMENTS
SECTION B - LABOR STANDARDS
SECTION C - OTHER TOPICS DISCUSSED
PRECONSTRUCTION CONFERENCE SIGNATURE SHEET
A. CONTRACTOR ACKNOWLEDGMENT STATEMENT
B. SIGNATURE OF PERSONS ATTENDING CONFERENCE
SECTION A - GENERAL CONDITIONS AND REQUIREMENTS
___ 1. INTRODUCTIONS: Introduce everyone attending including their name, organization, title, and role on the project.
A. FUNCTION & AUTHORITY of U.S. Government and private personnel:
(1) Contracting Officer(CO) - (Name/Phone/Fax)
(a) The only person who can bind the Government.
(b) The only person who can make changes to the contract.
(c) Another contracting officer may sign contract documents in the absence of the above contracting officer.
(2) Representatives of the Contracting Officer:
(a) Contract Specialist - (Name/Phone/Fax)
(b) Contracting Officer's Representative(COR)/ Construction Representative(CR) – Office: 614-692- Cell:
Government employee assigned overall coordination of the construction project.
CM - Individual who serves as the primary contact for the construction contractor and performs day-to-day project administration.
Project No. Contract No. Page
(c) The responsibilities and limitations of authority of the COR and the CR are specified in Section 00800 of the contract.
B. CONTRACTOR PERSONNEL:
(1) Project Manager - (Name/Phone/Cell/Fax/email).
(2) Construction Superintendent - (Name/Phone/Cell/Fax/email).
(3) After hours/emergency contact the following individual(s):
(Name/Phone/Cell/Fax/email).
___ 2. COMMUNICATIONS:
A. COMMUNICATIONS between the Government and the Contractor shall be conducted through the Construction Representative (CR) unless directed otherwise.
B. RFIs: Requests for Information (RFIs): All Requests for information shall be in written form to the CR. All responses from the Gov't shall be in writing. Contractor may use PDFs and send via email.
C. DAILY CONSTRUCTION REPORTS (a.k.a. Daily Reports):
(1) Include daily activities, potential delays, stoppages, equipment usage, problems, accidents, significant decisions, meetings, requests by Government or local authorities, etc.
(2) Complete daily and submit by noon the following business day. We prefer daily reports be sent via email attachment.
___ 3. SECURITY CLEARANCE REQUIREMENTS
A. ACCESS TO THE SITE: No contractor, contractor employee or subcontractor employee will be allowed to perform any work under this contract without prior clearance being obtained through the CR.
B. PERMANENT BADGES: Contractor shall fill out excel spreadsheet that will be provided to contractor upon request. Spreadsheet may either be printed and hand delivered or password protected (add password to spreadsheet and then call with the password). This will minimize exposure of personally identifiable information of contractor personnel. Contractor badges will be issued to be worn at all times while performing duties on-site.
C. VISITOR BADGES: a phone call to the CR with the legal name of the individual requiring access to the site within 24 hours of arrival. This badge is good for 2 week durations. If the employee will be working onsite longer than 30 days typically a permanent badge is issued.
___ 4. CONSTRUCTION SCHEDULE(a.k.a. PROGRESS SCHEDULE
Project No. Contract No. Page
A. SCHEDULE: Schedule shall be revised and submitted with monthly progress payments.
___5. PERFORMANCE:
A. COMMENCEMENT, PROSECUTION & COMPLETION OF WORK
(Specification Section 00800-Supplementary Conditions)
(1) Period of Performance _________ calendar days.
(2) Notice to proceed received: ___________.
(3) Completion date __________.
(4) Proposed start work date:__________.
(5) Proposed Mobilization date (if different from start work) _______________.
(6) Delays and time extensions. The contractor is responsible for the completion of project work within the time designated in the contract. Any failure to meet the schedule subjects him to liquidated damages (or actual damages when liquidated damages are not provided for by the contract).
Failure of the contractor to pursue the work diligently subjects him to termination for default. Only when delays are justified for the reasons stated in the contract can the contractor secure a time extension. The contractor's responsibilities for providing immediate notice of delays to the Government and for justifying delays to secure a time extension, should be emphasized.
B. WORKING HOURS:
(1) Working hours for this contract will be from _______ a.m. to ________ p.m. during the workday, except for weekends and established government holidays.
(2) For after-hours access to the building, explain access procedures.
C. CRITICAL WORK SEQUENCING/PHASING ISSUES (e.g.). Review specifics and applicability to this project:
(1) Hazardous materials abatement
(2) Long-Lead time equipment deliveries
(3) Time Constraint Issues:
(4) Coordination with local authorities
D. COORDINATION OF THE WORK:
(1) The Contractor is responsible for coordination of all elements of the work and every aspect of the coordination of the subcontractor’s work.
Project No. Contract No. Page
(2) The Contractor is required to have a competent construction supervisor in charge of the work at all times. Construction supervisor may be a Working Foreman.
___ 6. SITE ISSUES:
A. PRE-MOBILIZATION REQUIREMENTS:
(1) Security clearances approved.
(2) Safety plan approved.
(3) Environmental Plan approved.
(4) Schedule of Values and Construction Schedule approved.
(5) Review Contractor's plan for mobilizing on site, including phasing, timing elements, crane operations, dumpster locations, coordination with local Gov't entities.
(6) Notify CO in writing that the required insurance has been obtained.
B. CONTRACTOR USE OF THE PREMISES:
(1) Confine operations to areas authorized. Discuss laydown areas, etc.
(2) Use of elevators; Use of established walkways, roadways
(3) Restroom facilities for Contractor Use.
(4) Telephones/Fax Machine: Contractor’s responsibility to provide his own phone/fax, as necessary.
(5) Welding and Burning Permits: Obtain permits from the Fire Department.
Hot work permits are typically turned around the same day by DSCC Fire Department.Fire Inspector’s phone number is 614-692-2921
C. TEMPORARY FACILITIES -Operations and Storage Area]:
(1) Temporary Buildings(e.g. storage sheds,trailer) approved by CR.
(2) Utilities - Availiability and Use of Utility Services
a. Temporary connections/water, gas, electricity may be provided by government upon contractor’s request. Contractor shall provide layout to the Government for requested utilities.
(3) Loading Dock Facilities and Equipment deliveries: Describe procedures.
(4) Parking for Contractor Personnel: Parking space(s) to be designated for the Contractor.
(5) Entry and Exit(a.k.a. access and egress) for equipment and materials.
(6) Locations and marking of underground utilities.
(7) dig permit for environmental office
D. ACCIDENT PREVENTION/SAFETY - Accident Prevention:
(1) Safeguard personnel and property
(2) Barricades, warning tape/signs.
(3) Protecting existing facilities/preserving existing vegetation - Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
(4) Notification of injuries - dial 614-692-2111 OR 911. Inform the Government immediately if an accident occurs. Submit an accident report to the Government no later than 7 calendar days after the accident.
(5) Notification of Fires - 614-692-2111 OR 911
Project No. Contract No. Page
(6) Safe Work Practices: Comply with OSHA Standards 29 CFR 1910 general standards, and 29CFR 1926 construction standards; [also Specification Section 01546 - Safety and Health
(7) Contractor Safety and Health Plan
(8) Hazardous Materials locations; potential underground hazards.
E. PERMITS: May be required for site utility work that interfaces with local utility authority equipment. Contractor to verify requirements with local authorities and include costs in bid. Not required for building interior work in Federally owned facilities.
F. HOUSEKEEPING AND CLEAN UP
(1) Daily, police and clean-up the work and storage areas
(2) Final Cleaning - leave work area in a neat, clean and orderly condition
G. UTILITY SERVICE INTERRUPTIONS (Section 01040)
(1) Prior to a service interruption, notify the CR in writing at least 14 calendar days in advance of the day of proposed interruption.
___7. SUBMITTALS:
A. GENERAL:
(1) Review Submittal timeliness classifications: "Initial Submittals," "Intermediate Submittals," " Closeout Submittals."
(2) The return of disapproved submittals and their resubmission is not a basis for time extension.
(3) Comply with "Submittal" paragraph procedures of the specifications sections.
(4) Submittal transmittals shall include the specification reference number.
B. SUBMITTAL REGISTER
(1) Submit the Submittal Register at the preconstruction conference.
___ 8. CHANGE ORDERS:
A. NEGOTIATION OF CHANGE ORDERS:
(1) Profit, overhead and commission ceilings.
(2) Government negotiations with the contractor will be conducted by the CM, the COR, or the Contracting Officer.
(3) Proposals in excess of $5,000 shall be accompanied by a complete itemized breakdown, including materials and labor for each element of the work.
(4) No work is authorized unless a change order is issued or a supplemental agreement is executed. A “change request” is a request for price
Project No. Contract No. Page proposal only; it does not authorize the work to be done. A change request is normally followed by a bilateral contract modification (supplemental agreement executed by both parties) setting forth the contract change and associated price adjustment. A “change order” is a unilateral contract modification issued by the Contracting Officer directing the contractor to perform changed work, prior to price agreement. A bilateral contract modification is expeditiously executed upon price agreement. Change orders are issued only if absolutely necessary to direct and authorize changed work.
___9. MISCELLANEOUS ADMINISTRATIVE ISSUES:
A. SPECIFICATIONS AND DRAWINGS: Compliance with specifications and drawings :
(1) Contractor responsible for all subcontractors having all amendments and change orders.
(2) Any discrepancies in the plans and specs must be brought to the attention of the CO prior to installation of the work.
(3) Overlapping/conflicting requirements between specifications and drawings.
B. LIQUIDATED DAMAGES [Spec. Section 00800, 01040]
(1) $________ per calendar day (Section 00800) for failure to complete the project within the specified time period.
(3) No liquidated damages after substantial completion.
C. PROJECT RECORD DOCUMENTS (Section 01700)
(1) Record Drawings (a.k.a. "Red-line Drawings") - Keep on job site, updated and current. Use erasable, colored pencil; RED for additions, GREEN for deletions.
(2) As-Built drawings shall be reviewed monthly by the CR when a progress payment is submitted. If as-builts are not accurate the CO may retain a percentage of pay until corrections are made.
D. GOVERNMENT FURNISHED PROPERTY: Review applicability to this contract.
Review responsibility for inventory; delivery dates, etc.
E. MEETINGS/TELECONFERENCES:
(1) Pre-Construction Conference
(2) Construction Coordination Meetings: Discuss frequency, agenda, etc..
(3) Commissioning Meetings: (Spec. Section 15995): Attendees, pre-requisites.
___ 10. PAYMENTS:
Project No. Contract No. Page
A. PROGRESS PAYMENT REQUESTS
(1) Contractor shall submit a draft progress payment to the COR prior to submitting for payment in iRAPT, formerly Wide Area Workflow (WAWF).
The Government shall have 2 business days to review and provide comment.
(2) All progress payments must be submitted in iRAPT.
(3) Payment for materials not incorporated in work. Big dollar items, easily inventoried, easily tracked. Must document when incorporated in work.
Generally, won't pay for small parts, components and other items incidental to the work.
(4) Retainage
B. BONDS -
(1) Will pay lump sum with first progress payment.
C. PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS. The Contractor shall pay the subcontracts for satisfactory performance not later than 7 days from receipt of payment from the Government. If payment is not made, notify the Contracting Officer as to why payment is being withheld. If payments are held without cause, the Contractor shall pay interest to the subcontract at the rate established by the Secretary of the Treasury.
D. STORED MATERIAL POLICY:
(1) Payment for materials stored and protected in bonded warehouse/storage facility off-site require complete back-up documentation. Limited to large ticket items, not high quantity miscellaneous parts, fittings, fasteners.
(2) Pay request to include proof of payent to suppliers and/or subcontractors.
(3) Generally, won't pay for stored materials.
E. FINAL PAYMENT/CLOSEOUT. In addition to the requirements of paragraph
"a" above, the final pay request shall be accompanied by a Release of Claims & Warranty Letter.
___11. WARRANTIES AND GUARANTEES :
A. One-year warranty in addition to any other warranties.
___12. TESTING, INSPECTION, FINAL INSPECTION, AND FINAL ACCEPTANCE :
A. TESTS: Tests to be performed prior to FINAL INSPECTION
(1) Review what testing is required by contract documents and when;
notification; test reports.
(2) Submit copies of all test reports.
B. FINAL INSPECTION for certification of SUBSTANTIAL COMPLETION:
(1) Final Inspection date must be coordinated far enough in advance to allow for correction of deficiencies prior to scheduled Substantial Completion
Project No. Contract No. Page date. The Final Inspection must be requested in writing to the COR a minimum of 14 business days in advance.
(2) Pre-requisites for final inspection:
a. Start-up testing(a.k.a. functional performance testing or commissioning) complete.
b. Operations and maintenance manuals must be given to the
Government and approved before instructions to government personnel can occur.
c. Training to Gov't personnel complete.
(3) Final Inspection procedures; expect the contractor to do his pre-final inspection before scheduling the final inspection with the Government. All punch list items shall be completed prior to the final inspection there should be no punch list.
C. FINAL ACCEPTANCE: All Contract requirements completed.
(1) Pre-requisites:
a. Punch list satisfactorily completed
b. Final clean-up, Record drwgs, warranties, spare parts, all completed.
c. Final payment with releases completed
(2) Final acceptance letter sent from CO to Contractor
SECTION B - LABOR STANDARDS
_____ 1. You must report actual and/or potential labor disputes
_____ 2. Davis-Bacon Act, requirements and violations
a. List of subcontractors and completed Standard Forms 1413 - Due 14 calendar days after the award of the contract
b. Classification and wage rates must be conspicuously posted on the site.
c. Use of apprentices/trainees - Apprenticeship program must be approved by the Bureau of Apprenticeship and Training.
d. Weekly submission of payrolls and affidavits, Statement of Compliance -failure to comply may delay payment
e. Must pay at least once a week.
_____ 3. CONTRACT WORK HOURS AND SAFETY STANDARDS ACT
a. Time-and-a-half pay for hours worked in excess of 40 hours in a workweek.
Project No. Contract No. Page
b. Liquidated damages
_____ 4. COPELAND ACT
_____ 5. EQUAL EMPLOYMENT OPPORTUNITY
a. Post notices of EEO and handicap employment opportunity practices.
b. Affirmative action goals for minorities and women.
c. Affirmative action for disabled veterans and veterans of Vietnam era and the handicapped
_____ 6. FIELD CHECKS may be made by procurement personnel, inspectors, COR, and the Department of Labor.
a. Contracts 90 days or less: each trade interviewed at least one time prior to final inspection.
b. Contracts over 90 days: each trade interviewed at least once a month.
_____ 7. In accordance with EXECUTIVE ORDER 12989, ECONOMY AND
EFFICIENCY IN GOVERNMENT PROCUREMENT THROUGH COMPLIANCE
WITH CERTAIN IMMIGRATION AND NATURALIZATION ACT PROVISIONS,
the contractor is hereby notified of their responsibility to comply with immigration laws prohibiting the unlawful employment of aliens, and that we will report suspected infractions to the Immigration and Naturalization Service (INS), and that a determination by INS that the contractor is in violation may result in suspension and debarment.
SECTION C - OTHER TOPICS DISCUSSED
Project No. Contract No. Page
Project No. Contract No. Page
PRECONSTRUCTION CONFERENCE SIGNATURE SHEET
A. CONTRACTOR ACKNOWLEDGMENT STATEMENT:
The above subjects have been discussed and explained to me and I have read and understand the provisions of the above cited contract and I am fully aware of my duties and responsibilities thereunder.
Signature of Contractor
Title
Date
Project No. Contract No. Page
B. SIGNATURE OF PERSONS ATTENDING CONFERENCE
Name (Print) Signature Agency/Firm Phone
Project No. Contract No. Page
END OF PRECONSTRUCTION CONFERENCE CHECKLIST/MINUTES
SECTION 01 11 00 Page 1
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL
REQUIREMENTS SECTION 01 11 00
SUMMARY OF WORK
12/19
PART 1 GENERAL
1.1 SUBMITTALS
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
1.2.2 Location
1.3 CONTRACT DRAWINGS
1.4 WORK RESCHEDULING
1.5 OCCUPANCY OF PREMISES
1.6 EXISTING WORK
1.7 ON-SITE PERMITS
1.7.1 Utility Outage Requests and Utility Connection Requests
1.7.2 Borrow, Excavation, Welding, and Burning Permits
1.8 LOCATION OF UNDERGROUND UTILITIES
1.8.1 Notification Prior to Excavation
1.9 GOVERNMENT-FURNISHED MATERIAL AND EQUIPMENT
1.9.1 Delivery Schedule
1.9.2 Delivery Location
1.10 GOVERNMENT-INSTALLED WORK
1.11 NAVY AND MARINE CORPS (NMCI) COORDINATION REQUIREMENTS
1.11.1 NMCI Contractor Access
1.12 SALVAGE MATERIAL AND
EQUIPMENT PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
SECTION 01 11 00 Page 2
SECTION 01 11 00
SUMMARY OF
WORK
08/15
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. Submit the following in accordance with Section 01
33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals G
Utility Outage Requests Utility
Connection Requests Borrow Permits
Excavation Permits
Welding Permits
Burning Permits
Salvage Plan;
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
The contractor shall furnish all plant, labor, equipment, materials, supplies and supervision required in performing all operations to perform the following maintenance and repair work to complete this project:
CLIN No. 1: Bldg. 9
• Tuck Pointing to Brick & Masonry Walls
• Structural Concrete Spot Repair at selected locations
• Brick Replacement
• Expansion Joint Sealant Material Replacement
• Paint Maintenance to Exterior & Interior Brick Walls and Concrete Structures
• Replace old industrial windows for the restrooms by brick fill w/ new small windows
SECTION 01 11 00 Page 3
• CLIN No. 2: Bldg. 18
• Tuck Pointing to Brick & Masonry Walls
• Structural Concrete Spot Repair at selected locations
• Brick Replacement
• Expansion Joint Sealant Material Replacement
• Paint Maintenance to Exterior & Interior Brick Walls and Concrete Structures
• CLIN No. 3: Bldg. 19
• Tuck Pointing to Brick & Masonry Walls
• Structural Concrete Spot Repair at selected locations
• Brick Replacement
• Expansion Joint Sealant Material Replacement
• CLIN No. 4: Bldg. 306
• Structural Concrete Spot Repair at selected locations
• Brick Replacement
• Expansion Joint Sealant Material Replacement
• CLIN No. 5: Bldg. 308
• Structural Concrete Spot Repair at selected locations
• Brick & EIFS Replacement
• Expansion Joint Sealant Material Replacement
The contractor shall perform all operations in conjunction with this project in strict accordance with specifications & drawings # 3-XXXX, sheets 1 through XX.
1.2.2 Location
The work is located within base wide at the DSCC Complex, Columbus, Ohio. The approximate location is shown on the drawings.
SECTION 01 11 00 Page 4
1.3 CONTRACT DRAWINGS
The following drawings accompany this specification and are a part thereof.
Drawing No. 3-xxxx
Sheets 1 through xx.
Electronic set of contract drawings, maps, and specifications will be furnished to the Contractor without charge. Reference publications will not be furnished. Immediately check furnished drawings and notify the Government of any discrepancies.
1.4 WORK RESCHEDULING
Normal duty hours for work are from 7:00 A.M. to 4:00 P.M., Monday through Friday. Requests for additional work requires written approval from the Contracting Officer 7 days in advance of the proposed work period.
1.5 OCCUPANCY OF PREMISES
NOT USED
1.6 EXISTING WORK
In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
1.7 ON-SITE PERMITS
1.7.1 Borrow, Excavation, Welding, and Burning Permits
1.8 LOCATION OF UNDERGROUND UTILITIES
Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities. Verify existing utility locations indicated on contract drawings, within area of work.
SECTION 01 11 00 Page 5
1.8.1 Notification Prior to Excavation
Notify the Contracting Officer at least 48 hours prior to starting excavation work.
1.9 GOVERNMENT-FURNISHED MATERIAL AND EQUIPMENT
NONE
1.10 GOVERNMENT-INSTALLED WORK
NONE.
1.11 NAVY AND MARINE CORPS (NMCI) COORDINATION REQUIREMENTS
1.12 SALVAGE MATERIAL AND EQUIPMENT
PART 2 PRODUCTS
Not used.
Not used.
-- End of Section --
SECTION 01 20 00.00 20 Page 1
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 20 00.00 20
PRICE AND PAYMENT PROCEDURES
1.1 REFERENCES
1.2 SUBMITTALS
1.3 SCHEDULE OF VALUES
1.3.1 Data Required
1.3.2 Schedule Instructions
1.4 CONTRACT MODIFICATIONS
1.5 CONTRACTOR'S INVOICE AND CONTRACT PERFORMANCE STATEMENT
1.5.1 Content of Invoice
1.5.2 Submission of Invoices
1.5.3 Final Invoice
1.6 PAYMENTS TO THE CONTRACTOR
1.6.1 Obligation of Government Payments
1.6.2 Payment for Onsite Materials
SECTION 01 20 00.00 20 Page 2
SECTION 01 20 00.00 20
PRICE AND PAYMENT PROCEDURES
02/19
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EP-1110-1-8 (2009) Construction Equipment Ownership and Operating Expense Schedule
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Schedule of Values; G
1.3 SCHEDULE OF VALUES
1.3.1 Data Required
Within 14 calendar days of notice to proceed, prepare and deliver to the Contracting Officer a Schedule of Values (construction contract) as directed by the Contracting Officer. Provide a detailed breakdown of the contract price, giving quantities for each of the various kinds of work, unit prices, and extended prices. Costs shall be summarized and totals provided for each construction category.
1.3.2 Schedule Instructions
Payments will not be made until the Schedule of Values has been submitted to and accepted by the Contracting Officer.
1.4 CONTRACT MODIFICATIONS
In conjunction with the Contract Clause "DFARS 252.236-7000, Modification Proposals-Price Breakdown," and where actual ownership and operating costs of construction equipment cannot be determined from Contractor accounting records, equipment use rates shall be based upon the applicable provisions of the EP-1110-1-8.
1.5 CONTRACTOR'S INVOICE AND CONTRACT PERFORMANCE STATEMENT
1.5.1 Content of Invoice
Requests for payment will be processed in accordance with the Contract Clause FAR 52.232-27, Prompt Payment Construction Contracts and FAR 52.232-5, Payments Under Fixed-Price Construction Contracts. The requests for payment shall include the documents listed below.
SECTION 01 20 00.00 20 Page 3
a. The Contractor's invoice, on ENG Form 93, showing in summary form, the basis for arriving at the amount of the invoice. ENG Form 93 shall include certification by Quality Control (QC) Manager as required by the contract. This form may be provided upon request or is available at the USACE Publications website:
http://www.publications.usace.army.mil/Portals/76/Publications/Eng ineerForms/Eng_Form_93_2014Mar.pdf
b. The Payment Estimate for Contract Performance showing in detail:
the estimated cost, percentage of completion, and value of completed performance for each of the construction categories stated in this contract
c. Updated Project Schedule and reports required by the contract.
d. Other supporting documents as requested.
e. Updated copy of submittal register.
f. Invoices not completed in accordance with contract requirements will be returned to the Contractor for correction of the deficiencies.
g. Materials on Site.
h. Monthly Work-hour report.
i. Solid Waste Disposal Report.
1.5.2 Submission of Invoices
If DFARS Clause 252.232-7003 is included in the contract, the documents listed in paragraph "CONTENT OF INVOICE" shall be provided in their entirety as attachments in Wide Area Work Flow (WAWF) for each invoice submitted. The maximum size of each WAWF attachment is two megabytes, but there are no limits on the number of attachments. If a document cannot be attached in WAWF due to system or size restriction it shall be provided as instructed by the Contracting Officer.
1.5.3 Final Invoice
a. A final invoice shall be accompanied by the Contractor's Final Release. If the Contractor is incorporated, the Final Release shall contain the corporate seal. An officer of the corporation shall sign and the corporate secretary shall certify the Final Release.
b. For final invoices being submitted via WAWF, the original Contractor's
Final Release must be provided directly to the respective Contracting Officer prior to submission of the final invoice. Once receipt of the original Final Release has been confirmed by the Contracting Officer, the Contractor shall then submit final invoice and attach a copy of the Final Release in WAWF.
c. Final invoices not accompanied by the Contractor's Final Release will be considered incomplete and will be returned to the Contractor.
1.6 PAYMENTS TO THE CONTRACTOR
Payments will be made on submission of itemized requests by the Contractor which comply with the requirements of this section, and will be subject to http://www.publications.usace.army.mil/Portals/76/Publications/EngineerForms/Eng_Form_93_2014Mar.pdf http://www.publications.usace.army.mil/Portals/76/Publications/EngineerForms/Eng_Form_93_2014Mar.pdf
SECTION 01 20 00.00 20 Page 4 reduction for overpayments or increase for underpayments made on previous payments to the Contractor.
1.6.1 Obligation of Government Payments
The obligation of the Government to make payments required under the provisions of this contract will, at the…
This is the start of the file's text. The full file is on GovTribe.