SP3300-20-B-0001 - Amendment 0002.pdf
PDF 272 KB Posted
- Attached to
- Replace Roof, Building 54 Bay 5 - DDSP Federal contract opportunity
- Solicitation number
- SP3300-20-B-0001
- Issued by
- Defense Logistics Agency Distribution
About this file
This document provides details for a federal contract solicitation to replace the roof on Building 54 Bay 5 at the Defense Logistics Agency Distribution facility in New Cumberland, Pennsylvania. The contractor shall remove existing asbestos and roofing materials, install a new roof system as specified in the contract drawings, and replace sections of the existing roof deck. The period of performance is 90 calendar days from notice to proceed. Regular work hours are weekly from 7:00 am to 3:30 pm excluding federal holidays, though all demolition and disposal must occur nightly between 8:30 pm and 5:00 am. The acquisition is set aside exclusively for small businesses with a NAICS code of 238290 and size standard of $16.5 million. The estimated value of the contract is between $500,000 and $1 million. Questions must be submitted in writing by the specified deadline to the identified contracting officer.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SP3300-20-B-0001 Bid Abstract.pdf | ||
| SP3300-20-B-0001 - Amendment 0004.pdf | ||
| SP3300-20-B-0001 - Amendment 0003.pdf | ||
| Building 54 Bay 5 Roof Pictures.pdf | ||
| Section 01 14 00 Work Restrictions Rev 1.pdf | ||
| Dwg G-001 Rev 1.pdf | ||
| Site visit attendance sheet.pdf | ||
| SP3300-20-B-0001 - Amendment 0001.pdf | ||
| Solicitation.pdf | ||
| Attach 8 - Bidders Schedule.pdf | ||
| Attach 4 - Wage Determination.pdf | ||
| Attach 7 - Bid Bond.pdf | ||
| Attach 2 - Drawings.pdf | ||
| Attach 1 - Specifications.pdf | ||
| Attach 6 - SF-25 - Performance Bond.pdf | ||
| Attach 5 - SF-25A - Payment Bond.pdf | ||
| Attach 3 - Submittal Registers.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
SP3300
SEE CONTINUATION PAGE(S)
DLA Distribution Acquisition Operations, J-7 Mifflin Avenue, Bldg 430 New Cumberland, PA 17070
POC: James Heslop
(P) 717-770-3112 james.heslop@dla.mil
SP3300-20-B-0001
1 3
05/15/2020
04/09/2020
SP3300-20-B-0001
AMENDMENT 0002
Amendment 0002 is hereby incorporated into solicitation SP3300-20-B-0001.
Amendment 0002 is being issued to modify the working hours identified in the Project Specifications, Section 01 14 00, Part 1.4.2 and Part 1.4.3; on drawing no. G-001, sheet 1, section Construction Constraint Notes, note 2, and in solicitation document, and to correct the NAICS code identified in the solicitation, and to provide pictures from the site visit.
1. Section 01 14 00 Part 1.4.2 Working Hours, is being changed:
From: Regular working hours must consist of an 8-1/2 hour period, between 0700 and 1530, Monday through Friday, excluding Government holidays. Exception, daily asbestos removal and disposal to occur between the hours of 0300 to 0700 prior to start of normal working hours for the day.
To: Regular working hours shall consist of an 8-1/2 hour period, between 0700 and 1530, Monday through Friday, excluding Government holidays. Exception, all demolition and disposal shall be performed at night between the hours of 2030 thru 0500 prior to start of regular working hours for the day.
2. Section 01 14 00 Part 1.4.3 is being changed:
From: Work outside regular working hours requires Contracting Officer Representative approval. Make application 15 working days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve or deny work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer Representative. The Contractor shall coordinate its efforts to make all utility cutovers outside normal working hours or on Saturdays, Sundays, to the greatest extent possible to minimize impact to existing operations unless directed otherwise.
To: Work outside regular working hours requires Contracting Officer Representative approval with the exception of hours defined above for performing all demolition and disposal. Make application 15 working days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve or deny work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer Representative. The Contractor shall coordinate its efforts to make all utility cutovers outside normal working hours or on Saturdays, Sundays, to the greatest extent possible to minimize impact to existing operations unless directed otherwise.
3. Drawing G-001, sheet 1, section Construction Constraint Notes, note # 2 is being changed:
From: All demolition and disposal shall be performed at night between the hours of 2030 thru 0500 hours.
Roof installation may be performed during normal business hours see note 1 above. All safety precautions shall be followed for working at night.
To: All demolition and disposal shall be performed at night between the hours of 2030 thru 0500 hours. Roof installation shall be performed during normal business hours (0700-1530) see construction constraint note 1 above. All safety precautions shall be followed for working at night.
4. On page 4 of the solicitation document, Hours of Work is being changed:
From: Contractor's working hours, the work hours shall be unlimited, excluding Government holidays.
Federal holidays are those days officially observed by the Federal Government. Saturday holidays are observed on the preceding Friday and Sunday holidays the following Monday. New Year's Day, Martin Luther King Day, President's Day, Memorial Day, July Fourth, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, Christmas Day, and any other day as may be declared by the President to be a Federal holiday.
SP3300-20-B-0001
AMENDMENT 0002
To: Contractor's working hours shall consist of an 8-1/2 hour period, between 0700 and 1530, Monday through Friday, excluding Government holidays. Exception, all demolition and disposal shall be performed at night between the hours of 2030 thru 0500 prior to start of regular working hours for the day. Federal holidays are those days officially observed by the Federal Government. Saturday holidays are observed on the preceding Friday and Sunday holidays the following Monday. New Year's Day, Martin Luther King Day, President's Day, Memorial Day, July Fourth, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, Christmas Day, and any other day as may be declared by the President to be a Federal holiday.
5. The NAICS code and corresponding SBA size standard, identified in Section K of the solicitation, is being changed: From: 238210, $15,000,000.00 to 238160, $16,500,000.00.
6. Pictures from the site visit are in the attached file, titled Building 54 Bay 5 Roof Pictures.
All other terms and conditions remain unchanged.
END OF AMENDMENT 0002