Attach 8 - Bidders Schedule.pdf
PDF 53 KB Posted
- Attached to
- Replace Roof, Building 54 Bay 5 - DDSP Federal contract opportunity
- Solicitation number
- SP3300-20-B-0001
- Issued by
- Defense Logistics Agency Distribution
About this file
This solicitation and bidder's schedule are for a roof replacement project at a Defense Logistics Agency facility. The contractor will remove the existing roof system and install a new roof system on Building 54 Bay 5 at DLA Distribution New Cumberland, Pennsylvania within 90 calendar days of receiving the notice to proceed. Work must occur during regular hours from 7:00 am to 3:30 pm, Monday through Friday, excluding federal holidays. The bid evaluation will be based on the total price for the base work in CLIN 001 and estimated additional work in CLINs 002 and 003 to replace unforeseen deteriorated wood and plywood. Payment for the optional CLINs will be for actual work completed up to the estimated quantities. This small business set-aside contract has an estimated value between $500,000 and $1 million. Questions are due by email to the acquisition specialist by the bid submission deadline.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SP3300-20-B-0001 Bid Abstract.pdf | ||
| SP3300-20-B-0001 - Amendment 0004.pdf | ||
| SP3300-20-B-0001 - Amendment 0003.pdf | ||
| Building 54 Bay 5 Roof Pictures.pdf | ||
| Section 01 14 00 Work Restrictions Rev 1.pdf | ||
| SP3300-20-B-0001 - Amendment 0002.pdf | ||
| Dwg G-001 Rev 1.pdf | ||
| Site visit attendance sheet.pdf | ||
| SP3300-20-B-0001 - Amendment 0001.pdf | ||
| Solicitation.pdf | ||
| Attach 4 - Wage Determination.pdf | ||
| Attach 7 - Bid Bond.pdf | ||
| Attach 2 - Drawings.pdf | ||
| Attach 1 - Specifications.pdf | ||
| Attach 6 - SF-25 - Performance Bond.pdf | ||
| Attach 5 - SF-25A - Payment Bond.pdf | ||
| Attach 3 - Submittal Registers.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
November 2019
Project No. P.2020.00030
BIDDER’S SCHEDULE
FY 2020 – Replace Roof Building 54 Bay 5
CLIN Contract Line Item No.
(description of bid item)
UOM UNIT PRICE QTY TOTAL PRICE
All work associated with removing existing roof system and installing proposed roof system making it complete and useable with exception of CLIN 002 and CLIN 003.
LS NA 1 $__________
removing and replacing unforeseen deteriorated tongue and groove wood boards on main roof discovered during demolition.
SF $__________ 2,500 $__________
removing and replacing unforeseen deteriorated ½” thick plywood on dock roof discovered during demolition.
SF $__________ 2,500 $__________
TOTAL AMOUNT OF ALL CLINS $__________
NOTES TO BIDDERS (May vary according to the type of project)
1. The low bidder for purpose of award will be determined on the basis of the bidder offering the lowest total of Contract Line Items (CLIN).
2. The bidders are required to bid on all items or their bid will be rejected.
3. Bidders are reminded that they must bid on issued plans and specifications, as amended. Any deviations, conditions or attachment made by the bidder themselves thereto may render the bid non-responsive and cause for its rejection.
4. Payment for CLINS 002 and 003 shall be based on actual square footage replaced in the field not to exceed quantity noted above. Quantity to be tracked and coordinated with the COR in the field.