Solicitation.pdf
PDF 216 KB Posted
- Attached to
- Replace Roof, Building 54 Bay 5 - DDSP Federal contract opportunity
- Solicitation number
- SP3300-20-B-0001
- Issued by
- Defense Logistics Agency Distribution
About this file
This solicitation seeks offers for roof replacement services at a Defense Logistics Agency facility. The contractor will remove an existing roof system and asbestos-containing materials, then install a new roof system at Building 54 Bay 5 at DLA Distribution New Cumberland, Pennsylvania. The work must be completed within 90 calendar days of receiving the notice to proceed, during regular working hours from 7:00 am to 3:30 pm Monday through Friday excluding federal holidays. This is a 100% small business set-aside with a size standard of $16.5 million. The acquisition value is estimated between $500,000 and $1 million. Questions must be submitted in writing by email by the date specified in the solicitation. Offerors must register in the System for Award Management and provide all information requested to be considered for award. The award will be made to the lowest priced responsive and responsible bidder.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SP3300-20-B-0001 Bid Abstract.pdf | ||
| SP3300-20-B-0001 - Amendment 0004.pdf | ||
| SP3300-20-B-0001 - Amendment 0003.pdf | ||
| Dwg G-001 Rev 1.pdf | ||
| Building 54 Bay 5 Roof Pictures.pdf | ||
| Section 01 14 00 Work Restrictions Rev 1.pdf | ||
| SP3300-20-B-0001 - Amendment 0002.pdf | ||
| Site visit attendance sheet.pdf | ||
| SP3300-20-B-0001 - Amendment 0001.pdf | ||
| Attach 8 - Bidders Schedule.pdf | ||
| Attach 6 - SF-25 - Performance Bond.pdf | ||
| Attach 5 - SF-25A - Payment Bond.pdf | ||
| Attach 3 - Submittal Registers.pdf | ||
| Attach 4 - Wage Determination.pdf | ||
| Attach 7 - Bid Bond.pdf | ||
| Attach 2 - Drawings.pdf | ||
| Attach 1 - Specifications.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Please wait...
If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.
You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.
For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.
Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED:
PAGE
OF
PAGES
PAGES
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED:
PAGE
PAGES
PAGE
PAGE
PAGE
PAGE
PAGE
PAGE
PAGE
PAGE
PAGE
PAGE
PAGE
2. TYPE OF SOLICITATION
NEGOTIATED (RFP)
3. DATE ISSUED
1. SOLICITATION NUMBER
SOLICITATION, OFFER,
AND AWARD
IMPORTANT
- The "offer" section on the reverse must be fully completed by offeror.
6. PROJECT NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
4. CONTRACT NUMBER
8. ADDRESS OFFER TO
7. ISSUED BY
CODE
9. FOR INFORMATION
CALL:
b. TELEPHONE NUMBER
(Include area code)
(NO
COLLECT
CALLS)
a. NAME
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
11. The contractor shall begin performance calendar days and complete it within calendar days after receiving (See notice to proceed. This performance period is award, mandatory negotiable.
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12b).
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
a. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by
NO
YES
(hour) local time
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes
b. An offer guarantee
STANDARD FORM 1442
(REV 9-16)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d)
NSN 7540-01-155-3212
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
(Title, identifying number, date) is, is not required.
SEALED BID (IFB)
(Construction, Alteration, or Repair)
FACILITY CODE
CODE
15. TELEPHONE NUMBER
(Include area code)
16. REMITTANCE ADDRESS
(Include only if different than Item 14.)
OFFER
(Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR
(Include ZIP Code) stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted calendar days after the date offers are due.
(Insert any number equal to or greater than the minimum requirement by the Government in writing within
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or Print)
20b. SIGNATURE
20c OFFER DATE.
AWARD
(To be completed by
Government)
22. AMOUNT
21. ITEMS ACCEPTED:
23. ACCOUNTING AND APPROPRIATION DATA
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
ITEM
10 U.S.C.2304(c)
41 U.S.C.3304(a)
27. PAYMENT WILL BE MADE BY
26. ADMINISTERED BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.)
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN
(Type or print)
31a. NAME OF CONTRACTING OFFICER (Type or print)
STANDARD FORM 1442 (REV 9-16)
BACK
31b. UNITED STATES OF AMERICA
31c. DATE
BY
30b. SIGNATURE
30c. DATE
(4 copies unless otherwise specified) ..\canvas.png ..\canvas.png 1.5 Solicitation, Offer, and Award skim Standard form Acrobat Distiller 4.0 for Windows D:20001204100218Z D:20090216084025-05'00'
CONTINUED ON NEXT PAGE
CONTINUED ON NEXT PAGE
CONTINUED ON NEXT PAGE
CONTINUED ON NEXT PAGE
CONTINUED ON NEXT PAGE
CONTINUED ON NEXT PAGE
CONTINUED ON NEXT PAGE
CONTINUED ON NEXT PAGE
CONTINUED ON NEXT PAGE
CONTINUED ON NEXT PAGE
CONTINUED ON NEXT PAGE
CONTINUED ON NEXT PAGE
CONTINUED ON NEXT PAGE
CONTINUED ON NEXT PAGE
CONTINUED ON NEXT PAGE
CONTINUED ON NEXT PAGE
CONTINUED ON NEXT PAGE
CONTINUED ON NEXT PAGE
CONTINUED ON NEXT PAGE
CONTINUED ON NEXT PAGE
CONTINUED ON NEXT PAGE
CONTINUED ON NEXT PAGE
CONTINUED ON NEXT PAGE
CONTINUED ON NEXT PAGE
CONTINUED ON NEXT PAGE
CONTINUED ON NEXT PAGE
CONTINUED ON NEXT PAGE
CONTINUED ON NEXT PAGE
CONTINUED ON NEXT PAGE
CONTINUED ON NEXT PAGE
CONTINUED ON NEXT PAGE
CONTINUED ON NEXT PAGE
| REFNUMBER: |
| Z_DEFAULTCONTINUATION_TEXT_1: |
| SECTIONHEADER: |
| CURRENTPAGE_1: |
| PAGECOUNT_1: |
| Z_DEFAULTCONTINUATION_TEXT_2: |
| CURRENTPAGE_2: |
| PAGECOUNT_2: |
| SECTION_TITLE: |
| Z_DEFAULTCURRENTPAGE_3: |
| Z_DEFAULTPAGECOUNT_3: |
| Z_DEFAULTCONTINUATION_TEXT_3: |
| Z_DEFAULTCURRENTPAGE_4: |
| Z_DEFAULTPAGECOUNT_4: |
| Z_DEFAULTCONTINUATION_TEXT_4: |
| Z_DEFAULTCURRENTPAGE_5: |
| Z_DEFAULTPAGECOUNT_5: |
| Z_DEFAULTCONTINUATION_TEXT_5: |
| Z_DEFAULTCURRENTPAGE_6: |
| Z_DEFAULTPAGECOUNT_6: |
| Z_DEFAULTCONTINUATION_TEXT_6: |
| Z_DEFAULTCURRENTPAGE_7: |
| Z_DEFAULTPAGECOUNT_7: |
| Z_DEFAULTCONTINUATION_TEXT_7: |
| Z_DEFAULTCURRENTPAGE_8: |
| Z_DEFAULTPAGECOUNT_8: |
| Z_DEFAULTCONTINUATION_TEXT_8: |
| Z_DEFAULTCURRENTPAGE_9: |
| Z_DEFAULTPAGECOUNT_9: |
| Z_DEFAULTCONTINUATION_TEXT_9: |
| Z_DEFAULTCURRENTPAGE_10: |
| Z_DEFAULTPAGECOUNT_10: |
| Z_DEFAULTCONTINUATION_TEXT_10: |
| Z_DEFAULTCURRENTPAGE_11: |
| Z_DEFAULTPAGECOUNT_11: |
| Z_DEFAULTCONTINUATION_TEXT_11: |
| Z_DEFAULTCURRENTPAGE_12: |
| Z_DEFAULTPAGECOUNT_12: |
| Z_DEFAULTCONTINUATION_TEXT_12: |
| Z_DEFAULTCURRENTPAGE_13: |
| Z_DEFAULTPAGECOUNT_13: |
| Z_DEFAULTCONTINUATION_TEXT_13: |
| Z_DEFAULTCURRENTPAGE_14: |
| Z_DEFAULTPAGECOUNT_14: |
| Z_DEFAULTCONTINUATION_TEXT_14: |
| ZSF1442_SOL_NO: SP3300-20-B-0001 |
| AD: |
| NG: |
| ISSUE-DATE: |
| DOC-CONTRACT-NO: |
| PR-NUMBER: |
| REQ-PROJ-NO: |
| ISS_CODE: |
| AGENCY-NAME: |
| RETURN-NAME: |
| DOC-CONTACT-NAME: |
| DOC-CONTACT-TEL: |
| SPS-DESCRIPTION01: |
| START-DAYS: |
| END-DAYS: |
| AW11: |
| NP11: |
| MD11: |
| NG11: |
| NP-SECTION: |
| Y12A: |
| N12A: |
| DAYS-12B: |
| NO-COPIES: |
| DUE-TIME: |
| DATE-SUBMISSION: |
| YB13: |
| NB13: |
| MIN-DAYS: |
| ImageField1: |
| CurrentPage: |
| PageCount: |
| CONTRACT-NAME: |
| CONTRACT-TIN: |
| CONTRACT-DUNS: |
| CONTRACT-TEL: |
| REMIT-NAME: |
| DAYS-VALID: |
| CON-VALUE: |
| OFFER-NAME: |
| OFFER-TITLE: |
| OFFER-DATE: |
| ITEMS-ACCEPTED: |
| CONTRACT-VALUE: |
| SPS-ACCOUNTING: |
| INV-COPIES: |
| INV-PL: |
| N1: |
| IFI1: |
| N2: |
| IFI2: |
| ADMIN-CODE: |
| ADMIN-NAME: |
| PAY-NAME: |
| NGX: |
| SIGN-COPIES: |
| AWX: |
| SIGN-NAME: |
| SIGN-TITLE: |
| SIGN-DATE: |
| CO-NAME: |
| AWARD-DATE: |
| OFFER-SIGN: |
| ZS_FORM_SIGNATURE: |
| ZSF1442_COTAR_SIGNA: |
| ccsecbrfx: |
| RICH_TEXT: |
| SECTIONTITLE: |
| BOLD_TEXT: |
| TEXT: |
| HDR_CELL_1: |
| HDR_CELL_2: |
| ROW_CELL_1: |
| ROW_CELL_2: |
File details come from the government source that posted it. Updated .