Attachment F - BLDG 5730 HVAC Equipment Schedule M-601.xlsx

XLSX spreadsheet 10 KB Posted

Attached to
Amendment 0002 Preventative maintenance and repairs to Building 5730 Lackland Air Force Base, San Antonio, Texas
Solicitation number
SP060026R0399
Issued by

About this file

Attachment F is an HVAC Equipment Schedule (Form M-601) that serves as an inventory list of all heating, ventilation, and air conditioning equipment located in Building 5730 at Lackland Air Force Base. The schedule catalogues 42 distinct HVAC components organized by equipment type, including two air handling units (AHU-1 and AHU-2), one dedicated outside air system with energy recovery (DOAS-1), three air-cooled condensing units (CU-1, CU-2, CU-3), one exhaust fan, three louvers, four return and exhaust air devices, five supply air devices, one split system air conditioning unit with its associated condensing unit, and 19 variable air volume reheat boxes distributed across two zones (VAV-1 series with seven units and VAV-2 series with 12 units).

This equipment inventory directly supports Solicitation SP0600-26-R-0399, a 100% Small Business Set-Aside for preventative maintenance and repairs of Building 5730's HVAC systems. The schedule provides contractors with a comprehensive reference of all equipment requiring maintenance and potential repair during the five-year performance period (1 July 2026 through 30 June 2031) under the proposed Blanket Purchase Agreement with one base year and four option years. This detailed equipment listing enables offerors to accurately scope maintenance requirements, develop pricing proposals, and understand the full extent of HVAC systems they will be responsible for maintaining at the specified location in San Antonio, Texas.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

HVAC Equipment Inventory Schedule M-601
AIR HANDLING UNITAHU-1
AIR HANDLING UNITAHU-2
DEDICATED OUTSIDE AIR SYSTEM/ENERGY RECOVERY UNITDOAS-1
AIR COOLED CONDENSING UNITCU-1
AIR COOLED CONDENSING UNITCU-2
AIR COOLED CONDENSING UNITCU-3
EXHAUST FANEF-01
LOUVERLV-1
LOUVERLV-2
LOUVERLV-3
RETURN AND EXHAUST AIR DEVICER1A
RETURN AND EXHAUST AIR DEVICER1B
RETURN AND EXHAUST AIR DEVICER2
RETURN AND EXHAUST AIR DEVICER3
RETURN AND EXHAUST AIR DEVICER4
SUPPLY AIR DEVICES1A
SUPPLY AIR DEVICES1B
SUPPLY AIR DEVICES1C
SUPPLY AIR DEVICES1D
SUPPLY AIR DEVICES2A
SUPPLY AIR DEVICES2B
SPLIT SYSTEM AIR CONDITIONING UNITSSAC-1
SPLIT SYSTEM CONDENSING UNITSSCU-1
VARIABLE AIR VOLUME REHEAT BOXVAV-1-1
VARIABLE AIR VOLUME REHEAT BOXVAV-1-2
VARIABLE AIR VOLUME REHEAT BOXVAV-1-3
VARIABLE AIR VOLUME REHEAT BOXVAV-1-4
VARIABLE AIR VOLUME REHEAT BOXVAV-1-5
VARIABLE AIR VOLUME REHEAT BOXVAV-1-6
VARIABLE AIR VOLUME REHEAT BOXVAV-1-7
VARIABLE AIR VOLUME REHEAT BOXVAV-2-1
VARIABLE AIR VOLUME REHEAT BOXVAV-2-2
VARIABLE AIR VOLUME REHEAT BOXVAV-2-3
VARIABLE AIR VOLUME REHEAT BOXVAV-2-4
VARIABLE AIR VOLUME REHEAT BOXVAV-2-5
VARIABLE AIR VOLUME REHEAT BOXVAV-2-6
VARIABLE AIR VOLUME REHEAT BOXVAV-2-7
VARIABLE AIR VOLUME REHEAT BOXVAV-2-8
VARIABLE AIR VOLUME REHEAT BOXVAV-2-9
VARIABLE AIR VOLUME REHEAT BOXVAV-2-10
VARIABLE AIR VOLUME REHEAT BOXVAV-2-11
VARIABLE AIR VOLUME REHEAT BOXVAV-2-12

File details come from the government source that posted it. Updated .