Attachment F - BLDG 5730 HVAC Equipment Schedule M-601.xlsx
XLSX spreadsheet 10 KB Posted
- Solicitation number
- SP060026R0399
- Issued by
-
Defense Logistics Agency Energy
About this file
Attachment F is an HVAC Equipment Schedule (Form M-601) that serves as an inventory list of all heating, ventilation, and air conditioning equipment located in Building 5730 at Lackland Air Force Base. The schedule catalogues 42 distinct HVAC components organized by equipment type, including two air handling units (AHU-1 and AHU-2), one dedicated outside air system with energy recovery (DOAS-1), three air-cooled condensing units (CU-1, CU-2, CU-3), one exhaust fan, three louvers, four return and exhaust air devices, five supply air devices, one split system air conditioning unit with its associated condensing unit, and 19 variable air volume reheat boxes distributed across two zones (VAV-1 series with seven units and VAV-2 series with 12 units).
This equipment inventory directly supports Solicitation SP0600-26-R-0399, a 100% Small Business Set-Aside for preventative maintenance and repairs of Building 5730's HVAC systems. The schedule provides contractors with a comprehensive reference of all equipment requiring maintenance and potential repair during the five-year performance period (1 July 2026 through 30 June 2031) under the proposed Blanket Purchase Agreement with one base year and four option years. This detailed equipment listing enables offerors to accurately scope maintenance requirements, develop pricing proposals, and understand the full extent of HVAC systems they will be responsible for maintaining at the specified location in San Antonio, Texas.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| HVAC Equipment Inventory Schedule M-601 | ||
| AIR HANDLING UNIT | AHU-1 | |
| AIR HANDLING UNIT | AHU-2 | |
| DEDICATED OUTSIDE AIR SYSTEM/ENERGY RECOVERY UNIT | DOAS-1 | |
| AIR COOLED CONDENSING UNIT | CU-1 | |
| AIR COOLED CONDENSING UNIT | CU-2 | |
| AIR COOLED CONDENSING UNIT | CU-3 | |
| EXHAUST FAN | EF-01 | |
| LOUVER | LV-1 | |
| LOUVER | LV-2 | |
| LOUVER | LV-3 | |
| RETURN AND EXHAUST AIR DEVICE | R1A | |
| RETURN AND EXHAUST AIR DEVICE | R1B | |
| RETURN AND EXHAUST AIR DEVICE | R2 | |
| RETURN AND EXHAUST AIR DEVICE | R3 | |
| RETURN AND EXHAUST AIR DEVICE | R4 | |
| SUPPLY AIR DEVICE | S1A | |
| SUPPLY AIR DEVICE | S1B | |
| SUPPLY AIR DEVICE | S1C | |
| SUPPLY AIR DEVICE | S1D | |
| SUPPLY AIR DEVICE | S2A | |
| SUPPLY AIR DEVICE | S2B | |
| SPLIT SYSTEM AIR CONDITIONING UNIT | SSAC-1 | |
| SPLIT SYSTEM CONDENSING UNIT | SSCU-1 | |
| VARIABLE AIR VOLUME REHEAT BOX | VAV-1-1 | |
| VARIABLE AIR VOLUME REHEAT BOX | VAV-1-2 | |
| VARIABLE AIR VOLUME REHEAT BOX | VAV-1-3 | |
| VARIABLE AIR VOLUME REHEAT BOX | VAV-1-4 | |
| VARIABLE AIR VOLUME REHEAT BOX | VAV-1-5 | |
| VARIABLE AIR VOLUME REHEAT BOX | VAV-1-6 | |
| VARIABLE AIR VOLUME REHEAT BOX | VAV-1-7 | |
| VARIABLE AIR VOLUME REHEAT BOX | VAV-2-1 | |
| VARIABLE AIR VOLUME REHEAT BOX | VAV-2-2 | |
| VARIABLE AIR VOLUME REHEAT BOX | VAV-2-3 | |
| VARIABLE AIR VOLUME REHEAT BOX | VAV-2-4 | |
| VARIABLE AIR VOLUME REHEAT BOX | VAV-2-5 | |
| VARIABLE AIR VOLUME REHEAT BOX | VAV-2-6 | |
| VARIABLE AIR VOLUME REHEAT BOX | VAV-2-7 | |
| VARIABLE AIR VOLUME REHEAT BOX | VAV-2-8 | |
| VARIABLE AIR VOLUME REHEAT BOX | VAV-2-9 | |
| VARIABLE AIR VOLUME REHEAT BOX | VAV-2-10 | |
| VARIABLE AIR VOLUME REHEAT BOX | VAV-2-11 | |
| VARIABLE AIR VOLUME REHEAT BOX | VAV-2-12 |
File details come from the government source that posted it. Updated .