0502 AMD 0003.pdf
PDF 19 KB Posted
- Attached to
- FUELS MANAGEMENT SERVICES Federal contract opportunity
- Solicitation number
- sp0600-11-r-0502
- Issued by
- Defense Logistics Agency Energy
About this file
AMD 0003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 0502 AMD 0006.pdf | ||
| 0502 AMD 0005.pdf | ||
| 0502 AMD 0004.pdf | ||
| Attch III - 11R0502 OSP.pdf | ||
| 0502 AMD 0002.pdf | ||
| 0502 AMD 0001.pdf | ||
| Attch II - Sheppard AFB TX PWS.pdf | ||
| Attch IV - CBA IAMAW Vance AFB OK.pdf | ||
| Attch V - CBA IAMAW Sheppard AFb TX.pdf | ||
| Attch III - 11R0502 OSP.pdf | ||
| DD 254 Vance.pdf | ||
| Attch I - Vance AFB OK PWS.pdf | ||
| Solicititation SP060011R0502.pdf | ||
| DD 254 Sheppard.pdf | ||
| Solicititation SP060011R0502 DRAFT.pdf | ||
| DRAFT PWS Vance.pdf | ||
| DRAFT PWS Sheppard.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
February 14, 2011
4. REQUISITION/PURCHASE REQ. NO.
N/A
5. PROJECT NO. (If applicable)
AETC Sheppard/Vance
6. ISSUED BY CODE SP0600 7. ADMINISTERED BY (If other than Item 6) CODE SP0600
DLA Energy
8725 JOHN J. KINGMAN RD., SUITE 4950
FT. BELVOIR, VA 22060-6222
BUYER/SYMBOL – JACOB VIGIL/DLA Energy BXA
PHONE - (703) 767-9331 FAX - (703) 767- 9338
Email –Jacob.vigil@dla.mil 6.1
8. NAME AND ADDRESS OF CONTRACTOR (NO., street,city,county,State,and ZIP Code)
X
9a. AMENDMENT OF SOLICITATION NO.
SP0600-11-R-0502
9b. DATED (SEE ITEM 11)
January 21, 2011
10a. MODIFICATION OF CONTRACT/ORDER NO.
10b. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
[ xx ] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [] is extended, [ xx ] is not extended
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning ____1___ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required) N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b)
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor [ ] is not, [ ] is required to sign this document and return _______ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
See Attached
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME OF CONTRACTING OFFICER (Type or print)
15B. NAME OF CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C.DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C.DATE SIGNED
NSN 7540-01-152-8070 STANDARD FORM 30 (REV. 10-83)
Previous edition unusable Prescribed by GSA FAR (48 CFR) 53.243
SP0600-11-R-0502
AMD 0003
Amendment 0003 amends the above solicitation as follows:
1. INT-B34.01, CLIN 1002 is corrected as follows:
*FUELS MANAGEMENT SERVICES – OPTION PERIOD. OCTOBER 1, 2016 – SEPTEMBER 30, 2021. FIRM FIXED PRICE (Pro-rated for part months). Non-personal Services. Provide all supervision, personnel, equipment, transportation, material, and all else necessary to perform fuels management services at Vance AFB, OK in accordance with Attachment I, Performance Work Statement (PWS). FOB DESTINATION.
2. As a result of the above correction, a revised Attachment III – Offeror Submission Package is attached.
3. PWS Changes:
a. Vance AFB PWS – Appendix C, Workload Estimates, 1(d)(1).
1 General Purpose Vehicle is deleted from the above Appendix.
4. Questions & Answers:
a. Addendum to 52.212-1(c) and Section M, Factor 2 (Past Performance. Will the Government consider the past performance of a major subcontractor when evaluating Factor 2, Past Performance?
Answer: Yes, offerors are encouraged to submit past performance information for the three most recent contracts and subcontracts for both the Prime and the major subcontractor.
b. Is the past performance information to be included in the volume with the OSP, as part of the Technical/Management volume or as a stand-alone volume?
Answer: Past performance information may be included in either a separate volume or with the OSP, but should NOT be part of the technical/management volume.
c. Is there a Past Performance questionnaire that offerors need to send out to references?
Answer: No, the Government will contact submitted references and reserves the right to consider any additional information from other sources.
d. Is the transition period included in the base period? What is the length of the transition (phase in) period at each site?
Answer: The transition period is not included in the base period. Awardee will be given a 30 day phase-in period prior to the base period commencing. Phase-in/out will not be separately priced and must be included in the overall offeror’s price.
5. Cut-off date for questions is established as 3:00 EST (Ft Belvior time) February 28, 2011.
File details come from the government source that posted it. Updated .