SP0600-10-R-0808_Amd 0010.pdf

PDF 39 KB Posted

Attached to
Privatization of the Water Utility Sytem
Solicitation number
SP060010R0808
Issued by

View the file

Other files

File Type Posted
Amendment_0014.pdf PDF
2013.3.15_Revised_SF33.pdf PDF
Amendment_0013.pdf PDF
Amendment_0012.pdf PDF
Amendment_0011.pdf PDF
Exhibit JE1 Subcontracting Plan.pdf PDF
Amendment 0009 - SF 30.pdf PDF
Amendment 0008 - SF 30.pdf PDF
Amendment 0007 - SF 30.pdf PDF
QA 21 Jun 2010.docx DOCX document
QA 14Jun2010.docx DOCX document
Amendment 0006 - SF 30.docx DOCX document
Amendment 0005 - SF 30.pdf PDF
Admendment 0004 - SF30.pdf PDF
Amendment 0003 - SF 30.pdf PDF
Amendment 0002.pdf PDF
Mar 10 - Final Industry Brief template.ppt PPT presentation
Amendment 0001_04 Apr 10.pdf PDF
FBO secur access instructions.pdf PDF
PublicNoticeofpre-proposalconf.doc DOC document
SP06010R0808_RFP EPA Version 3 Template Final Feb 2010.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

K

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

June 28, 2012

4. REQUISITION/PURCHASE REQ. NO.

5. PROJECT NO. (If applicable)

6. ISSUED BY CODE

DEFENSE LOGISTICS AGENCY ENERGY

8725 JOHN J. KINGMAN ROAD, SUITE 3830

FORT BELVOIR, VA 22060-6222

BUYER/SYMBOL – TONYA W. MCLEAN / DLA-FEEAA

PHONE - (703) 767-9511 FAX 703-767-8506

tonya.mclean@dla.mil

SP0600 7. ADMINISTERED BY (If other than Item 6)

CODE

Same as block 6

8. NAME AND ADDRESS OF CONTRACTOR (NO., street,city,county,State,and ZIP Code)

X

9a. AMENDMENT OF SOLICITATION NO.

SP0600-10-R-0808

9b. DATED (SEE ITEM 11) 30 March 2010

10a. MODIFICATION OF CONTRACT/ORDER NO.

10b. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[X] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [X] is not extended Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning __1__ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers.

FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS; IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN

ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A. I2.05 CHANGES-FIXED PRICE (AUG 87)

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b)

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: FAR 43.01 D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor [ ] is not, [ x ] is required to sign this document and return _1_ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

See following pages

15A. NAME AND TITLE OF SIGNER (Type or print)

16A. NAME OF CONTRACTING OFFICER

FARHEENA KHAN

15B. NAME OF CONTRACTOR/OFFEROR

BY

(Signature of person authorized to sign)

15C.DATE

SIGNED

16B. UNITED STATES OF AMERICA

BY

(Signature of Contracting Officer)

16C.DATE SIGNED

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

FAR (48 CFR) 53.243

mailto:tonya.mclean@dla.mil

SP0600-10-R-0808

Amendment 0010

A. The purpose of this amendment is to incorporate the following changes into subject solicitation:

Section C.6, Access to the Utility System, is hereby deleted in its entirety and replaced with the following:

C.6.1 General C.6 Access to the Utility System

C.6.1 General The Contractor and its agents, employees, Contractors, and subcontractors shall have reasonable access to the Installation (Premises) to accomplish its duties and responsibilities under the Contract. Such access is subject to the general supervision and control of the Installation’s commander and his duly authorized representatives. In accepting the rights, privileges, and obligations established hereunder, the Contractor recognizes that the Installation serves the national defense and that the Government will not permit the operation, construction, installation, repair, and maintenance of a utility system and the provision of utility services to interfere with the Installation's mission.

C.6.2 Right of Access This Installation is an operating military installation that is closed to the public and is subject to the provisions of the Internal Security Act of 1950, 50 U.S.C. § 797, and of 18 U.S.C. § 1382. Access to the Installation is subject to the control of its Installation Commander and is governed by such regulations and orders as have been lawfully promulgated or approved by the Secretary of Defense or by any designated military commander. Any access granted to the Contractor, its officers, employees, Contractors of any tier, agents, and invitees is subject to such regulations and orders. This Right of Access is subject to all regulations and orders currently promulgated or which may be promulgated by lawful authority as well as all other conditions contained herein. Such regulations and orders may, by way of example and not by way of limitation, include restrictions on who may enter, how many may enter at any one time, when they may enter, and what areas of the Installation they may visit, as well as requirements for background investigations, including those for security clearances, of those entering. The Contractor is responsible for the actions of its officers, employees, Contractors of any tier, agents, and invitees while on the Installation and acting under this Right-of-Access.

In the event all or any portion of the Premises shall be needed by the United States or in the event the presence of the Contractor’s property shall be considered detrimental to governmental activities, the Contractor shall, from time-to-time and upon notice to do so, and as often as so notified, remove or relocate its property to such other location or locations on the Premises as may be required by the contracting officer or authorized representative, and in the event the Contractor’s property shall not be removed or relocated within ninety (90) days after any aforesaid notice, the Government may cause the same to be done. Any removal or relocation of the Contractor’s property at the direction of the Government under Section C.6.2 shall be at the Government’s expense.

The Contractor further recognizes that the operation, construction, installation, repair, and maintenance of the utility system on the Installation may be subject to requirements and approvals not ordinarily imposed by civilian authorities, including, but not limited to, compliance with the National Environmental Policy Act of 1969, as implemented. The Contractor agrees to abide by all applicable regulations.

The Contractor shall neither transfer nor assign this Right of Access nor any interests or rights thereunder without the prior written consent of the Government. No transfer or assignment of the Contractor’s rights or interests under this Right of Access shall occur except in connection with the Government’s recognition of a successor in interest to this contract under FAR Subpart 42.14.

C.6.2.1 Condition of the Premises The Contractor is granted access to the Premises in an “as is, where is” condition without any warranty, representation by the Government concerning the condition of the Premises, or obligation on the part of the Government to make any alterations, repairs, improvements, or corrections to defects whether patent or latent. At such times and for such part of the Premises as the Installation Commander may determine, the Government and the Contractor, hereinafter referred to as the “Parties,” will prepare and sign a Physical Condition Report to reflect the condition of the Premises prior to the Premises being disturbed by the activities of the Contractor. Such Report shall be used by the Government upon the expiration or termination of this Contract to determine whether the Contractor has fulfilled its obligations to maintain and restore the Premises to the condition required by this Right-of-Access.

C.6.2.2 Alteration of Premises If the Contractor’s property located on the Premises intrudes into airspace subject to regulation under the Federal Aviation Regulations or their Air Force counterparts, such property shall be operated, constructed, installed, repaired, and maintained in conformance with such regulations.

C.6.2.3 Government Access Nothing in the Contractor’s Right-of-Access shall be interpreted as interfering with or otherwise limiting the right of the Government and its duly authorized officers, employees, Contractors of any tier, agents, and invitees to enter upon the Premises for any lawful purpose.

C.6.2.4 Other Grants of Access This Right-of-Access is subject to all outstanding easements, rights of way, leases, permits, licenses, and uses for any purpose with respect to the Premises. The Government shall have the right to grant additional easements, rights of way, leases, permits, and licenses, and make additional uses with respect to the Premises. Provided however, that the Government shall not grant any such additional easements, rights of way, leases, permits, licenses, or uses which will, as determined in the sole discretion of the Government, unreasonably interfere with the Contractor's use of the Premises under this Right-of-Access.

C.6.2.5 Reserved

C.6.2.6 Liability for Damages Any interference with the use of or damage to any real or personal property under the control of the Government incident to the exercise of the rights and privileges granted to the Contractor under this Right of Access shall be promptly corrected by the Contractor to the satisfaction of the Installation Commander. If the Contractor fails to promptly repair or replace any damaged property after being notified to do so by the Installation Commander, the Government may repair or replace such property and the Contractor shall be liable to the Government for the costs of such repair or replacement.

C.6.2.7 Fire Protection C.6.2.7.1 The Contractor shall enter into a Memorandum of Understanding (MOU) with the Base Fire Department for fire protection of all facilities included in the purchase of the utility system. The MOU shall be completed during the transition period and a copy provided to the Contracting Officer.

C.6.2.7.2 The Contractor shall abide by Base fire protection requirements. The utility system purchased by the Contractor includes facilities. These facilities may or may not include fire alarm systems. Where required by federal, state, or local regulation, the Contractor shall maintain in the fire alarm system for all facilities owned and operated by the Contractor. The Contractor shall permit Fire Department personnel access to their facilities to perform fire inspections and emergency response.

C.6.3 Restoration of Premises at Expiration or Termination On or before the date of expiration or termination of this Contract, the Contractor shall vacate the Premises, remove all of its equipment, fixtures, structure, property and improvements of whatever nature from the Premises deemed unnecessary by the Installation Commander for the continued provision of utility services, and restore the Premises to a condition satisfactory to the Installation Commander without additional expense to the United States Government. Such restoration shall include, if applicable, removal of contamination caused by the Contractor.

The Contractor may, upon receipt of the prior written consent of the Government, which consent shall not be unreasonably withheld by the Government, abandon in place any buried conduits, pipes, duct banks, tubes, or wires (Underground Abandoned Utilities), provided that (i) the nature, location, and depth of such Underground Abandoned Utilities are known to the Contractor and shown on the Contractor’s records, and (ii) the Underground Abandoned Utilities neither contain any environmental contaminant nor pose an environmental or safety hazard.

The Contractor may also, upon receipt of the prior written consent of the Government, which consent shall be granted in the Government’s sole discretion, abandon in place all or part of any of the Contractor’s other above grade or below grade equipment, fixtures, structures, property and improvements (Other Abandoned Utilities). In the event of a dispute between the Contractor and the Government over whether certain of the Contractor’s equipment, fixtures, structures, property and improvements should be characterized as Underground Abandoned Utilities or Other Abandoned Utilities, such equipment, fixtures, structures, property and improvements shall be deemed to be Other Abandoned Utilities for purposes of this Contract.

B. All other terms and conditions remain unchanged.

(End of Amendment)

File details come from the government source that posted it. Updated .