Amendment 0009 - SF 30.pdf

PDF 30 KB Posted

Attached to
Privatization of the Water Utility Sytem
Solicitation number
SP060010R0808
Issued by

About this file

Amendment 0009

View the file

Other files

File Type Posted
Amendment_0014.pdf PDF
2013.3.15_Revised_SF33.pdf PDF
Amendment_0013.pdf PDF
Amendment_0012.pdf PDF
Amendment_0011.pdf PDF
SP0600-10-R-0808_Amd 0010.pdf PDF
Exhibit JE1 Subcontracting Plan.pdf PDF
Amendment 0008 - SF 30.pdf PDF
Amendment 0007 - SF 30.pdf PDF
QA 21 Jun 2010.docx DOCX document
QA 14Jun2010.docx DOCX document
Amendment 0006 - SF 30.docx DOCX document
Amendment 0005 - SF 30.pdf PDF
Admendment 0004 - SF30.pdf PDF
Amendment 0003 - SF 30.pdf PDF
Amendment 0002.pdf PDF
Mar 10 - Final Industry Brief template.ppt PPT presentation
Amendment 0001_04 Apr 10.pdf PDF
FBO secur access instructions.pdf PDF
PublicNoticeofpre-proposalconf.doc DOC document
SP06010R0808_RFP EPA Version 3 Template Final Feb 2010.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

K

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

May 4, 2012

4. REQUISITION/PURCHASE REQ. NO.

5. PROJECT NO. (If applicable)

6. ISSUED BY CODE

DEFENSE LOGISTICS AGENCY ENERGY

8725 JOHN J. KINGMAN ROAD, SUITE 3830

FORT BELVOIR, VA 22060-6222

BUYER/SYMBOL – FARHEENA KHAN / DLA-FEEAA

PHONE - (703) 767-4512 FAX 703-767-8506

farheena.khan@dla.mil

SP0600 7. ADMINISTERED BY (If other than Item 6)

CODE

Same as block 6

8. NAME AND ADDRESS OF CONTRACTOR (NO., street,city,county,State,and ZIP Code)

X

9a. AMENDMENT OF SOLICITATION NO.

SP0600-10-R-0808

9b. DATED (SEE ITEM 11) 30 March 2010

10a. MODIFICATION OF CONTRACT/ORDER NO.

10b. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[X] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [X] is not extended Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning __1__ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers.

FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS; IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN

ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A. I2.05 CHANGES-FIXED PRICE (AUG 87)

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b)

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: FAR 43.01 D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor [ ] is not, [ x ] is required to sign this document and return _1_ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

See following pages

15A. NAME AND TITLE OF SIGNER (Type or print)

16A. NAME OF CONTRACTING OFFICER

LISA S. GOINS-BERNTSEN

15B. NAME OF CONTRACTOR/OFFEROR

BY

(Signature of person authorized to sign)

15C.DATE

SIGNED

16B. UNITED STATES OF AMERICA

BY

(Signature of Contracting Officer)

16C.DATE SIGNED

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

FAR (48 CFR) 53.243

mailto:tonya.mclean@dla.mil

SP0600-10-R-0808

Amendment 0009

The purpose of this amendment is to delete Exhibit JE1 Subcontracting Plan and sections L.2.1.1 Conveyance, M.2.1 Order of Importance for Evaluating Factors and Subfactors and M.3 Conveyance of Determination, of SP0600-10-R-0808 in their entirety and replace with the following:

A. Exhibit JE1 Subcontracting Plan, form DESC 19.3 – August 2005 is replaced with Exhibit

JE1 Subcontracting Plan, form DLA Energy 19.3 - March 2011.

B. L.2.1.1 Conveyance

The Government will only acquire utility services if the Armed Service responsible for the installation issues a decision to covey the utility system(s). The Service’s decision whether to convey will be made in accordance with 10 U.S.C. § 2688 and applicable Department of Defense-issued guidance. Award will only be made, if at all, by the duly authorized execution of the utility services contract which is contingent upon the actual conveyance of the system. If for any reason conveyance does not occur, the Government’s termination liability will be limited to transition costs.

The sale of the utility system(s) is not governed by the FAR, the Federal Property and Administrative Services Act of 1949, or any of their implementing regulations. The Government may choose to adopt and adapt for use in the sale the processes and methods typically utilized in those laws and regulations but, by doing so, are not thereby subjecting the sale to those laws and regulations. The purchase of utility service(s) is an acquisition and will be governed by the FAR and its applicable supplements.

C. M.2.1 Order of Importance for Evaluating Factors and Subfactors:

Before a contract award can be made, a conveyance determination must be made by the Armed Service responsible for the installation (see, M.3). Should the Service decide to convey the utility system, proposals will then be evaluated using the following factors and subfactors.

Technical Capability, Past Performance, and Risk are approximately equal in importance.

Socioeconomic plans are significantly less important than Technical Capability, Past Performance, and Risk. When combined, Technical Capability, Past Performance, Risk, and Socioeconomic are significantly more important than Price. Technical Capability and Risk will be evaluated at the subfactor level. Under Technical Capability, all subfactors are approximately equal in importance; however, a less than acceptable rating for any subfactor will result in a less than acceptable rating for the overall Technical Capability factor. Under Risk, all subfactors are approximately equal in importance; however, a negative rating in any subfactor will result in a negative rating for the overall Risk factor.

D. M.3 Conveyance Determination

Before an award can be made, the Armed Service responsible for the installation must determine whether conveyance of the utility system(s) will be made. This conveyance decision is distinct and separate from the procurement decision and will be made by the Service in accordance with 10 U.S.C. § 2688 and guidance issued by the Department of Defense.

E. All other terms and conditions remain unchanged.

File details come from the government source that posted it. Updated .