Mar 10 - Final Industry Brief template.ppt
PPT presentation 987 KB Posted
- Attached to
- Privatization of the Water Utility Sytem
- Solicitation number
- SP060010R0808
- Issued by
-
Defense Logistics Agency Energy
About this file
Pre-proposal Industry Slides
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0014.pdf | ||
| 2013.3.15_Revised_SF33.pdf | ||
| Amendment_0013.pdf | ||
| Amendment_0012.pdf | ||
| Amendment_0011.pdf | ||
| SP0600-10-R-0808_Amd 0010.pdf | ||
| Exhibit JE1 Subcontracting Plan.pdf | ||
| Amendment 0009 - SF 30.pdf | ||
| Amendment 0008 - SF 30.pdf | ||
| Amendment 0007 - SF 30.pdf | ||
| QA 21 Jun 2010.docx | DOCX document | |
| QA 14Jun2010.docx | DOCX document | |
| Amendment 0006 - SF 30.docx | DOCX document | |
| Amendment 0005 - SF 30.pdf | ||
| Admendment 0004 - SF30.pdf | ||
| Amendment 0003 - SF 30.pdf | ||
| Amendment 0002.pdf | ||
| Amendment 0001_04 Apr 10.pdf | ||
| FBO secur access instructions.pdf | ||
| PublicNoticeofpre-proposalconf.doc | DOC document | |
| SP06010R0808_RFP EPA Version 3 Template Final Feb 2010.pdf |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Defense Energy Support Center Dover Air Force Base, Delaware Industry Pre-proposal Conference Brenda White & Ronald Moore 13 April 2010
Overview
| Purpose of the RFP |
| Offers |
| RFP Contents |
| Section B Highlights |
| Section C Highlights |
| Section F Highlights |
| Section H Highlights |
| The Submittal |
| The Four Volumes |
| Evaluation Process |
| Contractor Responsibility |
| Milestones |
| DESC Points of Contact |
Purpose of the RFP Privatize the Electric and Water system Utility Systems at Dover AFB, DE
Sell System Infrastructure Acquire Utility Services Contract (FAR 41) Provide Right-of-Access
Notes:
1. Purchase of the Commodity is not Included in the RFP
2. Selection of Contractor among economical proposals will be Based on Best-Value Determination
3. Government Privatizes if the Long Term Benefit Exceeds the Long Term Cost (must be at least 10% under GSCE)
4. Government Reserves the Right Not to Award the Contract
Offers
RFP Contents
| Section B – Supplies Or Services and Prices/Costs |
| Section C – Description/Specifications/Work Statement |
| Section D – Packaging and Marking |
| Section E – Inspection and Acceptance |
| Section F – Deliveries or Performance |
RFP Contents
| Section G – Contract Administration Data |
| Section H – Special Contract Provisions |
| Section I – Contract Clauses |
| Section J – List of Attachments |
| Section K – Representations, Certifications, & Offeror |
| Statements | |
| Section L – Instructions, Conditions, & Notices to |
| Offerors | |
| Section M – Evaluation Factors for Award |
Section B Highlights Regulated Utilities – Tariff (B-1)
Tariff Must be Fully and Independently Regulated (a “State-Wide” Public Utility Regulatory Authority with Jurisdiction over the Contractor)
Terms must be no less favorable than those offered to similar customers (B.5.1) Describe Regulatory Process Completed Price Schedule Data Sheets (see Section L)
Section B Highlights Non-Regulated Entities Utility Service Charge (B-2) FFP w/ EPA
Fully built up Monthly Service Charge for Utility Services
| Prices adjusted on annual basis | |
| Adjustment based on Bureau of Labor Statistics (BLS) Consumer Price Index Urban Regional | |
| Adjustments applicable to monthly utility | services charge only |
| Completed Price Data Sheets | |
| May submit alternative proposal(s) utilizing different index or multiple indices or take exception to RFP | |
| Offeror bears risk of unacceptability |
Section C Highlights C.1 Precedence In accordance with FAR 52.215-8, any inconsistency in this solicitation or contract shall be resolved by giving precedence in the following order: (a) The Schedule (excluding the specifications) and any Preamble; (b) Representations and other instructions; (c) Contract clauses appearing in the solicitation or contract; (d) Contract clauses incorporated by reference; (e) Other documents, exhibits, and attachments; and (f) The specifications. Additionally, the terms and conditions of Sections A through K, including the Section J Attachments, shall take precedence over any inconsistent provisions contained within portions of the Contractor’s proposal incorporated in or made Exhibits to the Contract. Exceptions not specifically identified by the Contractor in their proposal in accordance with the requirements of Section L of the solicitation and expressly accepted by the Contracting Officer in writing shall not be deemed to be part of the Contract and shall not be binding on the Government.
Section C Highlights Right-of-Access
The Government Provides Access Rights to the Installation and the Infrastructure May Restrict
Who May Enter How Many May Enter at Any One Time When They May Enter What Areas of the Installations They May Visit May Require Background Investigations, Including Those for Security Clearances
Contractor is Responsible for Actions of its Employees, Sub-Contractors, and Agents while on Installation
Section C Highlights
Technical
Service Interruption/Contingency and Catastrophic Loss Plan Operations and Maintenance Plan/Quality Management Plan System Deficiency Corrections and Renewals and Replacements Plan Operational Transition Plan
Service Interruption/Contingences & Catastrophes
Notification Procedures
| Defined Plan |
| Local or toll free 24 hours, 7 days a week |
| Regulated Utilities to follow their local procedures similar to other customers |
| Response Procedures |
| Emergency: Representative on Site within 1 Hr, Crew on Scene 2 Hrs, Remedied or Downgrade 24 Hrs |
| Urgent: Initial Response 24 Hrs, remedied within 5 Calendar Days |
| Routine: Initial Response 5 Calendar Days, Complete 30 Calendar Days |
Operations and Maintenance Plan/Quality Management Plan
Performance Standards (Local, State, Fed…National Elect Code, etc) O&M Procedures (Type & Frequency of Tests, Inspections, & Preventative Maintenance) Customer Feedback Mechanisms (Reports, Complaint Systems, Meetings, etc)
Speaker note read C.12 and hit underlined section C.12 Operations and Maintenance/Quality Management The Contractor shall establish and maintain an Operation and Maintenance/ Quality Management Plan.
The Plan shall ensure the provision of reliable, cost-effective, and compliant service over the term of the contract. The Contractor shall update the Plan as necessary and adhere to its requirements throughout the contract term. It shall not be materially altered without the Government’s consen
System Deficiency Corrections
| Initial – Section J Government or Industry 1st 5 years |
| Contractor can also identify |
| Future – Changes due to laws/regulations/industry standards |
| Renewals & Replacements Plan |
| Regulated |
| Non Regulated |
Conceptual Methodology for Scheduling Renewals & Replacements 50-Year Schedule of Renewals & Replacements System Deficiency Corrections and Renewals and Replacements Plan
Operational Transition Plan Seamless Transition Permit Acquisition / Transfer Permits required for New System owner to operate
Identification of Work that Must be Accomplished Prior to Transfer- Connections Joint Inventory and Transfer Procedures New Meter Installations and Joint Meter Readings (if applicable) Number of days for transition
| Provide training to ensure military personnel are fully capable of operating and properly certified to operate the Dover AFB system in the event that the Government must resume operations, temporarily or permanently, for any reason |
| Training Requirements/Master Task List |
Electric JA43 / JA43-1 Section 2 Water JA43 / JA43-3 Section 2
Specialty Training
Section F Highlights
Phase I Phase II Phase III
Contract Award Date Transition Period (Pre-performance) Contract Start Date
Fixed date in time after Government and Contractor have agreed to terms and conditions of utility services contract and Contracting Officer signs the Contract.
Contractor proposes duration of Transition Period; Transition Period begins upon execution of contract award unless a later date is specified.
Transition Period ends and Performance of Utility Services Contract begins.
Section H Highlights Insurance
Certificate Self Insure Government Repurchase Sole Option of the Government Hazardous Substances Known / Reasonably Ascertainable Unknown
CIAC - NO
The Submittal
| Four Volumes |
| Technical………….…Limit 200 Pages per System |
| Past Performance…………………..Limit 50 Pages |
| Contract Documentation ………………..No Limit |
| Price…………………………………………..No Limit |
| All Four Volumes – Provide One Signed Original Hardcopy |
| Provide 4 CD ROMs with All Four Volumes on Each (Technical, Past Performance, Contract Documentation & Price) |
| CDs must be certified virus free |
| Each volume must be complete and accurate without reference to other volumes |
Note: For Hardcopy…Provide a Separate Binder for Each Volume for Each Utility System
The Four Volumes -Volume I-
| Service Interruption/Contingency and Catastrophic Loss Plan |
| Purpose: To Address Capability to Respond to Outages: Emergency, Urgent, & Routine Service Calls; and Catastrophic Loss |
| Common Proposal Shortfalls |
| Not Complying with Response/Completion Times |
| Not Complying with Installation’s Excavation Permit Process and Emergency Restoration Plan |
| Not Allowing the Installation to Reschedule Routine Outages if They Adversely Affect Mission/Operations |
The Four Volumes -Volume I-
| Operations and Maintenance/Quality Management Plan |
| Purpose: To Identify Your Performance Standards and O&M Policies & Procedures |
| Common Proposal Shortfalls |
| Not Addressing Performance Standards for Each Line Item in Table L-1 of Section L.4.2 |
| Not Addressing the Procedures You Use (Tests, Inspections, etc) to Ensure Compliance with the Performance Standards for Each Line Item in Table L-1 of Section L.4.2 |
| Not Addressing Table L-1 Service Standards Criteria in Section L.4.2 of the RFP |
The Four Volumes - Volume I - System Deficiency Corrections (SDCs) and Renewals and Replacements Plan
Purpose: To Identify the System Deficiency Corrections and Renewals & Replacements the Offeror Intends to Accomplish
| Separately show Government Identified and Contractor Identified Deficiencies |
| Common Proposal Shortfalls |
| Not providing an initial 5 year ISDC plan |
| Not providing a conceptual methodology for entire 50 years |
| Not providing a Schedule 2 without cost in technical volume |
The Four Volumes - Volume l - Operational Transition Plan
Purpose: To Show How You Will Provide a “Seamless” Transition from Government to Contractor Operations Common Proposal Shortfalls
| Not Identifying the Person(s) Authorized to Sign for the Transfer of Inventory |
| Not Indicating When the Joint Inventory will Occur |
| Not Stating When any Requested New Meters will be Installed |
| Not Indicating When the Initial, Joint Meter Readings will take Place |
The Four Volumes
- Volume II-
| References: At least 2 but no more than 6 references within the last 5 years that are recent and relevant (JA39) |
| List of System Acquisitions* in Past 5 Years that Includes, as a Minimum: |
| Name of Acquisition or Project |
| Brief Description of Contract or Subcontract |
| Total Contract Value |
| Period of Performance |
| Principle Parties Involved, Phone Numbers, and Email Addresses |
* Don’t duplicate information in the JA39
The Four Volumes
- Volume III- Signed and dated SF-33
Acknowledge all Amendments Representations and Certifications
Completed on-line with Hardcopy in Volume III DFARS clauses must also be submitted (may not be in ORCA) CAS Notices and Certifications FAR
52.230-1 in Section K Exceptions to Terms and Conditions (Matrix IAW L.6.2)
The Four Volumes -Volume III-
| CAS Waiver Applicability |
| Include support in proposal |
| FAR 31 Deviation Request |
| include in initial proposal |
| Other Required Information |
| Authorized Personnel / Negotiators |
| Subcontracting Plan (Other Than Small Businesses) |
| Socioeconomic Plan-All Offerors must submit |
The Four Volumes - Volume IV - Schedule B-1 (Regulated Tariff)
CLIN 0001
Applicable Tariffs
Monthly Charge for Operations and Maintenance and Renewals and Replacements Monthly Credit as Payment for Purchase Price
Monthly Credit Number of Months Interest Rate
CLIN 0002
System Deficiency Corrections / Connection Charges
The Four Volumes - Volume IV - Schedule B-1 (Regulated Tariff)
CLIN 0003
Recoverable Portion of Purchase Price
CLIN 0004
Lump Sum Payment for Transition Period
The Four Volumes - Volume IV - Schedule B-2 (Firm Fixed Price)
CLIN 0001
| Utility Services Charge |
| Monthly Credit as Payment for Purchase Price |
Monthly Credit Number of Months Interest Rate
CLIN 0002
System Deficiency Corrections / Connection Charges
The Four Volumes - Volume IV - Schedule B-2 (Firm Fixed Price)
CLIN 0003
Recoverable Portion of Purchase Price
CLIN 0004
Lump Sum Payment for Transition Period
The Four Volumes -Volume IV- All offerors must submit:
Pricing assumption matrix Standard estimating methodology Cost Risk assessment matrix
The Four Volumes - Volume IV -
The Four Volumes -Volume IV-
Schedule B-1 Regulated Tariff
Dover AFB, Delware
Utility Systema: ___________________
CLINs Supplies/Services Tariff/Schedule/Rate
Applicable Tariff(s)a (See B.5.1) Monthly Credit as Payment for Purchase Price (see B.5.2).
$______________ Monthly Credit ______________ # months _______________ Interest Rate
TOTAL FOR CLIN 0001
Initial System Deficiency Corrections / Connection Charges b (See B.5.3 and B.7.4 (Schedule 3). This amount should not be included in the price offered for CLIN 0001.)
$ Varies – See Schedule 3
Recoverable Portion of Purchase Price b (See B.5.4 and B.7.5 (Schedule 4). This amount should not be included in the price offered for CLIN 0001.)
$ Varies – See Schedule 4
Transition Period (See B.5.5 and B.7.4 (Schedule 3). This amount should not be included in the price offered for CLIN 0001.)
See Schedule 3 a Utility system to be filled in by the Offeror. A B-1 must be completed for each utility system offered. Utility systems are shown in Schedule A paragraph B.3, Systems to be Privatized. Offerors shall provide a comprehensive description of proposed tariffs in their Price Proposals. See B.5.1.
b CLINs 0002 and 0003 are required only if the tariff provides for separate identification of initial system deficiency corrections, connection charges, and the recoverable portion of the purchase price. If separate identification is not provided, it will be assumed the tariff rate includes these costs.
NOTE:
The Purchase Price, Recoverable Portion of the Purchase Price, interest rate and amortization period are proposed by the Offeror.
Schedule B-2 Fixed-Price Economic Price Adjustment Proposal
Dover AFB, Delware
Utility Systema: ____________________
CLINS
SUPPLIES/SERVICES
MONTHLY SERVICE CREDIT/CHARGE
Utility Services Charge (see B.6.1 and B.7.2) The Contractor shall provide utility services in accordance with Section C, Descriptions, Specifications, and Work Statement.b Monthly Credit as Payment for Purchase Price. (see B.6.2)
$______________ Monthly Credit _______________ # of months _______________ Interest Rate
TOTAL FOR CLIN 0001:
Initial System Deficiency Corrections / Connection Charges (See B.6.3 and B.7.4 (Schedule 3). This amount should not be included in the price offered for CLIN 0001.)
$ Varies – See Schedule 3
Recoverable Portion of Purchase Price (See B.6.4 and B.7.5 (Schedule 4). This amount should not be included in the price offered for CLIN 0001.)
$ Varies – See Schedule 4
Transition Period (See B.6.5 and B.7.4 (Schedule 3). This amount should not be included in the price offered for CLIN 0001.)
See Schedule 3 a Utility system to be filled in by the Offeror. A B-2 must be completed for each utility system offered. Utility systems are shown in Schedule A paragraph B.3, Systems to be Privatized.
b The Offeror should enter the Utility Services Charge, as computed in Schedule 1 (see B.7.2). See B.6, Economic Price Adjustment Price Index Utility Privatization.
NOTE:
The Purchase Price, Recoverable Portion of the Purchase Price, interest rate and amortization period are proposed by the Offeror.
Schedule 5 – Proposal 50 Year Charges to the Government, Constant 20XX$
The Four Volumes
- Volume IV -
| Contract Year | Purchase Price Credit | Purchase Price Recovery | General & Admin | O&M | R&R | Capital Projects | Initial System Deficiency Corrections | Transition Cost | Other Costs & Credits, Net | Non-Federal Taxes & Fees | Federal Income Tax | Total Contract Payment | |
| Sched 1 | Sched 1 | Sched 1 | Sched 3 | Sched 3 | Sched 3 | As Applic | |||||||
| able | Sched 1 | Sched 1 | Total of Row | ||||||||||
| 1 | |||||||||||||
| 2 | |||||||||||||
| 3 | |||||||||||||
| 4 | |||||||||||||
| 5 | |||||||||||||
| 6 | |||||||||||||
| - | |||||||||||||
| 50 |
Evaluation Process
| General |
| Offerors Submit Proposals in 4 Volumes |
Factor 1: Technical Capability Subfactor 1: Service Interruption/Contingency and Catastrophic Loss Plan Subfactor 2: Operations and Maintenance Plan/Quality Management Plan Subfactor 3: Initial System Deficiency Corrections/Upgrades/Connections and Renewals and Replacements Plan Subfactor 4: Operational Transition Plan Factor 2: Past Performance
Evaluation Process Factor 3: Risk Subfactor 1: Performance:
Subfactor 2: Assurance of Long-term Price and Service Stability Subfactor 3: Cost Realism:
Subfactor 4: Other possible long-term costs and benefits to the United States Factor 4: Socioeconomic Plan Factor 5: Price
Order of Importance
| Technical Capability, Past Performance, and Risk are of approximately equal importance. Socioeconomic Plan is somewhat less important than Technical Capability, Past Performance and Risk. When combined, Technical Capability, Past Performance, Risk, and Socioeconomic Plan are significantly more important than Price. |
| Technical Capability and Risk will be evaluated at the subfactor level. |
| Under Technical Capability, all subfactors are of approximately equal importance; however a less than acceptable rating for any subfactor will result in a less than acceptable rating for the overall Technical Capability factor. |
| Under Risk, all subfactors are of approximately equal importance; however, a negative rating in any subfactor may result in a negative rating for the overall Risk factor. |
Determination of a
Responsible Contractor
FAR PART 9
General comments
Determination of Responsible Prospective Contractors Responsibility IAW 209.104-1
| Financial Risk Audit |
| Accounting System Audit |
| Cost Accounting System Audit |
Milestones
| Issue Request for Proposal | 30 Mar 2010 | ||
| Complete Technical Library | 24 Feb 2010 | ||
| Hold Preproposal Conference | 13 Apr 2010 | ||
| Complete Site Visits | 13 May 2010 | ||
| Receive Initial Proposals | 28 Jun 2010 | ||
| Projected Award | Fiscal Year 2011 |
DESC Points of Contact Contracting Officer
Brenda J. White, (703) 767-2397 brenda.white@dla.mil
Contract Specialist
Ronald J. Moore, (703) 767-9518 ronald.moore@dla.mil
DEFENSE LOGISTICS AGENCY