This is a Statement of Work (SOW) for the remanufacture of TF33 Stators (vanes and shrouds) for the U.S. Air Force. The document was prepared on 17 March 2026 by the 421st Supply Chain Management Squadron at Tinker Air Force Base, Oklahoma, under Purchase Request Number FD2030-25-00415.

The contractor shall perform disassembly, cleaning, inspection, and remanufacture of TF33 Stators to restore them to original life expectancy in compliance with applicable Technical Orders (T.O. 2J-TF33-53 series, T.O. 2-1-111) and FAA Airworthiness Directives. The contractor must provide all materials and labor except for government-furnished stators. Key remanufacture procedures include: cleaning per T.O. 2-1-111 and 2J-TF33-53-5; visual and dimensional inspection per T.O. 2J-TF33-53-6; identification and segregation of stators with previous rework; conversion of silver-brazed N2 Stators to gold nickel or nickel braze; and rework of alignment pin holes. All remanufactured vanes must meet surface finish requirements of 35 microinches or smoother on 85 percent of the airfoil and 60 microinches or smoother on the remaining 15 percent. New replacement vanes must be procured from government-approved sources or through the Fed Mall System, with Pratt & Whitney listed as the approved manufacturing source. An Initial Production Evaluation (IPE) is required if the contractor has not previously remanufactured this component, involving submission of ten assets for government evaluation within ninety calendar days. The contractor must maintain ISO 9001 and AS9100 quality systems, report via Commercial Asset Visibility Air Force (CAV AF), submit monthly Contract Depot Maintenance production reports, maintain a Supply Chain Risk Management Plan addressing continuity of operations, foreign influence, and cybersecurity, and comply with all safety requirements per MIL-STD-882D and AFI standards. Documentation must be retained for five years. Attachment 1 provides input/output NSNs and part numbers for eight through fifteen stages; Attachment 2 specifies detailed inspection and repair criteria; Attachment 3 lists approved vane suppliers; and Attachment 4 contains acronyms.

View the file

Other files

File Type Posted
RQR_CSI.pdf PDF
DiD_ASDP_DR.pdf PDF
DiD_Production_Surge_Plan.pdf PDF
DID_GFM_by_NSN.pdf PDF
SPI_1797.pdf PDF
FA812126R0004.pdf PDF
Ordering_Procedures.pdf PDF
DiD_Report_Shipping_Packaging_Descrepancy.pdf PDF
DiD_SCRM_Plan.pdf PDF
DiD_CAV_Reporting.pdf PDF
SPI_1625.pdf PDF
4222577_TRNSPDATA_REPORT.pdf PDF
DiD_GP_Inventory_Report.pdf PDF
DiD_CDM_Production_Report.pdf PDF
SPI_1800.pdf PDF
SPI_8028.pdf PDF
FA812126R0004_Clauses.pdf PDF
4223003_PKGRQMT_REPORT.pdf PDF
SPI_1345.pdf PDF
GFP_Attachment.pdf PDF
CDRLs_A001_A008.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

File Number: FD2030-25-00415 Page 0

STATEMENT OF WORK (SOW)

for the

TF33 STATORS

(VANES AND SHROUDS)

PURCHASE REQUEST NUMBER: FD2030-25-00415

PREPARATION DATE: 17 MARCH 2026

REV: 0

PREPARING ORGANIZATION:

421st Supply Chain Management Squadron (SCMS)/GUME

Air Force Sustainment Center (AFSC) in conjunction with

Air Force Life Cycle Management Center (AFLCMC) Propulsion Sustainment Division (LPS)

TF33 Technical Services Flight (LPSAN)

TINKER AFB, OK 73145-3031

File Number: FD2030-25-00415 1

TABLE OF CONTENT Page 1

SECTION I: SCOPE

1.0 Introduction 02

1.1 General Services and Material 02

1.2 Receiving 02

1.3 Remanufacture Procedures 03

1.3.1 Cleaning 03

1.3.2 Inspection 03

1.3.3 Remanufacture 03

1.4 Documentation 04

1.5 Deviations 04

1.6 Initial Production Evaluation (IPE) Requirement 05

1.7 Designated Engineering Representative (DER) Processes and Procedures 05

1.8 Deliverables Quality 05

1.9 Reporting 06

1.10 Schedule 06

1.11 Deficiency Report (DR) Investigation 06

1.12 Condemned Assets 06

1.13 CAV AF CFM Reporting 06

1.14 Quality System and Quality Assurance Plan 06

1.15 Item Unique Identification (IUID) 07

1.16 Shipping and Transportation 07

1.17 Preservation 07

1.18 Packaging and Handling 07

1.19 Contract Data Requirement List 07

1.20 Document Storage 08

1.21 Supply Chain Risk Management (SCRM) 09

1.22 Subcontractor and Vendor Management 10

1.23 Safety 10

1.24 Contractor Manpower Reporting 10

1.25 Contractor Relocation 11

1.26 Contractor Identification to Government Employees 11

1.27 Mission Essential Service 11

1.28 Production Surge Plan 11

SECTION II: GOVERNMENT PROPERTY

2.0 Government Furnished Material (GMF) 13

2.1 Government Furnished Property (GFP) 13

APPENDIX “A”

ATTACHMENT 1: TF33 Stators (Vanes & Shrouds) Input/Output NSNs and PNs 14 ATTACHMENT 2: TF33 Stators (Vanes & Shrouds) Inspection and Repair Criteria 18 ATTACHMENT 3: Contractor Furnished Vanes (LPSAN Approved Sources) 26 ATTACHMENT 4: Acronyms 27

File Number: FD2030-25-00415 2

SECTION I: SCOPE

1.0 Introduction

The purpose of this Statement of Work (SOW) is to define the requirements necessary to ensure that the TF33 Stators (Vanes & Shrouds) are remanufactured as nearly as possible to the original life expectancy consistent with Air Force (AF) requirements. This SOW applies to the following National Stock Number (NSN) and Part Numbers (P/N):

SEE ATTACHMENT 1: TF33 STATORS (VANES AND SHROUDS)

The instructions stipulated herein provide brief, concise statements providing general requirements for the remanufacture of the TF33 Stators (Vanes & Shrouds). The contractor shall perform disassembly, cleaning, inspection, and remanufacture of the TF33 Stators (Vanes & Shrouds). The contractor must have the remanufacture requirements and capabilities to include appropriate technical data, remanufacturing documents, licensing agreements, and change in designs and test equipment required to accomplish the remanufacture of the TF33 Stators (Vanes & Shrouds). The contractor shall use the most current revision of the technical data referenced in this document.

The contractor is also responsible for the production, remanufacture, and scheduled delivery of a quality product. Each TF33 Vane and Shroud (Stator) identified as serviceable shall be delivered to the government defect free. New replacement vanes must be obtained from government approved sources. See Attachment (3) for list of approved sources. An Initial Product Evaluation (IPE) will be required if the contractor facility has not remanufactured this component previously or have not demonstrated all required repairing operations for the U.S. Air Force. IPE will be performed IAW guideline provided in Section 1.6 (Initial Production Evaluation).

1.1 General Services and Material

The contractor shall provide all materials for the remanufacturing processes required to execute this contract, except for the Government furnished modules that will be sent to the contractor for remanufacture.

1.2 Receiving

The contractor shall perform a receiving visual inspection upon receipt of each incoming TF33 Stator (Vanes & Shrouds) IAW T.O. 2J-TF33-53-6. Each item shall be inspected prior to placing in process to determine condition and ensure that the item identification corresponds to that shown on the current schedule. Nonconforming items shall be reported to the Procurement Contracting Officer (PCO) and Supply Planner (SP) within 30 days after receipt of asset.

The contractor shall report in accordance with the Supply Discrepancy Report (SDR), CDRL (A004) and obtain disposition instructions for any received assets which are misidentified, misdirected, have a variation in quantity, non-requisitioned items, lost or damaged parcel post or incorrect shipments.

The Contractor shall not destroy reusable shipping containers and will reuse them for return shipment. The contractor shall initiate an SDR for such shipments or any assets as described above or received in packaging other than the contracted packaging requirements through WEB SDR.

The WEB SDR is located at: https://www.daas.dla.mil/websdr/home.asp.

https://www.daas.dla.mil/websdr/home.asp

File Number: FD2030-25-00415 3

This system of reporting an SDR has been developed in compliance with DoD Manual 4140.01- V1, Supply Chain Material Management Procedures and 4000.25, Defense Logistics Management System (DLMS), which requires automated SDR processing and IAW Contractor Asset Visibility for the Air Force (CAV AF) Statement of Work (SOW). The prime packaging specialist may authorize exceptions to these requirements.

1.3 Remanufacture Procedures

The TF33 Stators (Vanes & Shrouds) shall be restored to original life expectancy, in compliance with the IAW 2J-TF33-53 series Technical Orders, T.O. 2-1-111, and Attachment 1 & 2 of this SOW, along with any outstanding FAA Airworthiness Directives. The contractor shall identify all TF33 Stators (Vanes & Shrouds) that will be processed through the contractor’s remanufacture facility as military parts prior to processing.

1.3.1 Cleaning

The contractor shall clean parts prior to inspection and rework IAW T.O.s 2-1-111 and 2J-

TF33-53-5.

1.3.2 Inspection

The contractor shall visually and dimensionally inspect assets for wear and serviceability per T.O. 2J-TF33-53-6, along with any outstanding FAA Airworthiness Directives.

Any Vane and Shroud (Stator) that has a previous rework/remanufacture that would cause the finished part to exceed present rework or inspection limits shall be held in a bond room for review by AFLCMC/LPSAN and provide disposition instructions.

The contractor shall identify and segregate all N2 Stators (Vanes & Shrouds) with previous partial vane replacements via silver braze. The contractor shall identify, by Part Number (P/N), the correct blueprint braze requirement. N2 Stators (Vanes & Shrouds) with silver braze will be remanufactured using either gold nickel or nickel braze.

The contractor shall inspect all stator alignment pin holes for oversized condition and/or missing pins; remanufacture pin holes and replace pins IAW 2J-TF33-53-7.

1.3.3 Remanufacture

The contractor shall remanufacture all TF33 Stators (Vanes & Shrouds) IAW T.O. 2J- TF33-53 series, T.O. 2-1-111, and Attachment 1 & 2 of this SOW along with the following:

1.3.3(a) Stators received with Nickel-Cadmium plating must be stripped before remanufacturing.

1.3.3(b) The uses of silver braze for remanufacture of the N2 Stators (Vane & Shrouds) are not authorized. N2 Stators (Vanes & Shrouds) that were previously remanufactured using silver braze must have the silver braze materials stripped out. The joints must be re-brazed using nickel braze.

1.3.3(c) Gold nickel brazed Stators (Vanes & Shrouds) that are found to have cracks in one or more of the vanes to shroud, braze joints must be remanufactured using nickel braze only.

1.3.3(d) All N2 Stators (Vanes & Shrouds) will be output as the latest master NSN and P/N per Attachment 1, reflecting the master output NSN and P/N.

1.3.3(e) Regardless of the original P/N braze specification, all 100% vane replacements will be done with nickel braze and vanes that are new and

File Number: FD2030-25-00415 4 unused or used vanes that meet the requirements of all vane airfoils must have a surface finish of 35AA or smoother on 85% of the airfoil and 60AA or smoother on remaining 15% of the airfoil (adjacent to the inner and outer shroud). New vanes will be procured from the lists provided per Attachment 2: Contractor Furnished Vanes (LPSAN Approved Sources).

1.3.3(f) N2 Stators (Vane and Shroud) that are silver brazed assemblies per the blueprint and stators that have been reidentified with a gold nickel or nickel braze P/N during a previous remanufacture and are subsequently discovered during the remanufacture process to be silver, will be remanufactured using nickel braze.

1.3.3(g) All vane airfoils must have a surface finish of 35AA or smoother on 85% of the airfoil and 60AA or smoother on remaining 15% of the airfoil (adjacent to the inner and outer shroud).

1.3.3(h) Stators may be produced with vanes salvaged from condemned assets.

The salvaged vanes must meet the requirements of all vane airfoils must have a surface finish of 35AA or smoother on 85% of the airfoil and 60AA or smoother on remaining 15% of the airfoil (adjacent to the inner and outer shroud). The salvaged vanes must also meet Serviceable Limits specified in TO 2J-TF33-53-6.

1.3.3(i) All tooling provided by Source of Repair (SOR) shall be approved by AFLCMC/LPSAN unless it is certified to have been built to the PWA drawing. Any modified tooling for inspection and test purposes will require approval prior to use.

1.3.3(j) All detailed and/or component parts required to accomplish the remanufacture of stators (vanes and shrouds) to finish end items, shall be contractor furnished, excluding prior identified NSN’s that will remain Government Furnished Material (GFM).

1.3.3(k) Process all N1 stators (vanes and shrouds) assemblies through final acceptance inspection as a matched set. All N1 stators (vanes and shrouds) assemblies sent to packaging prior to shipment to Tinker Air Force Base (TAFB) shall be banded together as a matched set. Output NSN for part number of stator (vanes and shrouds) assembly will not change.

1.4 Documentation

The contractor shall document all inspections and remanufacture required for each part. This documentation shall have the correct part number and/or assembly part number, serial number, and work accomplished annotated. The SOR shall provide complete documentation with each part that has been remanufactured with the intent of returning the part to a serviceable condition. The latest revision IAW 2J-TF33-53 series Technical Orders, T.O. 2-1-111 and Attachment 2 of this SOW, along with any outstanding FAA Airworthiness Directives.

1.5 Deviations

Prior to the remanufacturing of any TF33 Stators (Vanes and Shrouds), the contractor shall obtain written approval from the PCO for any deviations from the processes, materials, material processes, or procedures and must show that the intent of the process, materials, material process or procedures conform to processes required IAW 2J-TF33-53 series Technical Orders, T.O. 2-1-111, and Attachment 1 & 2 of this SOW, along with any outstanding FAA Airworthiness Directives.

File Number: FD2030-25-00415 5

The TF33 cognizant engineer reserves the right to approve or disapprove any processes or procedures when they fail to meet the intended requirements of the TF33 stators (Vanes and Shrouds).

1.6 Initial Production Evaluation Requirement

An Initial Production Evaluation (IPE) will be required as part of the Source Approval Request before the contractor can be considered an approved source. In support of performing on-site review of the critical repair procedures by Government Evaluation Team, the Contractor shall permit entrance to the Evaluation Team into its facilities. This includes access to Contractor telephones and other communication devices that will allow the Evaluation Team to consult with appropriate Government personnel in the accomplishment of the IPE evaluation.

The Contractor shall furnish written notice to the PCO and Evaluation Team through the ACO within fifteen (15) business days prior to having all required quantities of end-items ready to support a Government on-site verification for critical repair procedures.

The Government shall provide a quantity of one (01) asset of each stage for both N1 and N2 stators that will be repaired for a total quantity of ten (10) assets for IPE substantiation.

The Contractor and Government Evaluation Team shall jointly work together to complete IPE within ninety (90) calendar days from the date of IPE induction.

The Contractor and the Evaluation Team shall schedule the timing and reviews of the Government on-site verification of critical repair procedures via shop floor demonstration to meet the completion target of ninety (90) calendar days from IPE asset induction. The contractor shall demonstrate the repairs required in T.O. 2J-TF33-53-7, WP 009 00 & 010 00. All repairs listed in this technical data will be performed. The IPE requirement may be waived by the Government at the time of award.

Under no circumstances shall the Contractor accomplish remanufacture on any quantity of items on order or through any Induction-at-Risk/Early Induction contractual provision, other than the ten (Qty 10) IPE units that will be evaluated by the Evaluation Team prior to the accomplishment of the IPE. Only after the approval notice from the PCO shall the Contractor proceed with remanufacture on the remaining items on order or items under Induction-at-Risk/Early Induction provisions. The Government’s delivery schedule shall be held in abeyance until approval of the IPE by the Evaluation Team.

In any circumstances, the Evaluation Team has the right to require Non-Destructive/Destructive Analysis up to Three (Qty 3) Contractor repaired assets within USAF Facility at any time of IPE processes if deemed necessary to evaluate the Contractor’s capability.

1.7 Designated Engineering Representative (DER) Processes and Procedures Prior to the contractors’ use in the remanufacturing of the TF33 Stators (vanes and shrouds) or component parts, the contractor shall obtain written approval from the PCO for all DER processes and procedures on a DD Form 1694, per MIL-STD-481B.

1.8 Deliverables Quality

The contractor shall ensure that materials, parts, and accessories used in remanufactured components are restored to original life expectancy or nearly so and are interchangeable without alterations.

File Number: FD2030-25-00415 6

1.9 Reporting

The contractor shall provide completed Certificate of Conformance documentation, or a completed FAA Form 8130-3, Airworthiness Approval Tag with each TF33 Stator (vanes and shrouds) that have been remanufactured with the intent of returning the part to serviceable condition. This documentation shall have the part number, serial number, and work accomplished a serviceable tag, DD Form 1574.

1.10 Schedule

Any production or delivery issues that develop or have the potential to stop, interrupt, or impact the production or delivery of the TF33 Stators (vanes and shrouds) will be reported to the PCO within seven (7) calendar days. Any changes to the contractual milestones shall be made only with the PCO’s written approval.

1.11 Deficiency Report (DR) Investigation

The contractor shall investigate and submit findings to include root causes and a corrective action against all DRs submitted against reported defective items remanufactured by this contract. Each DR will be processed IAW T.O. 00-35-D-54 using SF Form 368, USAF Material Deficiency Reporting System, in a timely manner to meet suspense dates assigned by the action agency IAW Deficiency Report (CDRL A002).

1.12 Condemned Assets

The contractor shall visually and dimensionally inspect parts for wear and serviceability per T.O.

2J-TF33-53-6. Any TF33 Stator (vanes and shrouds) or component parts that exceed present remanufacture and inspection limits shall be held in a bond room for review by AFLCMC/LPSAN Engineers and provide disposition instructions.

Condemned assets shall not be counted toward production and be reported to the Production Management Specialist (PMS) with the 421 SCMS/GUME to establish usage rates and cost planning. The contractor shall report all condemned parts via CDRLs Commercial Asset Visibility Air Force (CAV-AF) System (CDRL A001) and Contract Depot Maintenance Production Report

(CDRL A003).

1.13 CAV AF CFM Reporting

Contract Depot Maintenance (CDM) guidance for contractor technical responsibilities and reporting requirements of the Commercial Asset Visibility Air Force (CAVAF) system. CAVAF shall be the primary system of record for providing daily status of all Government owned assets located at contractor repair facilities. Reporting within CAV AF shall not be limited to end items subject to repair but are to include assets stored at a contractor Inventory Control Point (ICP). Any CAVAF system down-time will be identified on the CAVAF home page banner. Contractors are responsible for ensuring current User Guides are utilized by their CAVAF reporters.

NOTE: Contractor User’s Guide may be accessed from the CAVAF Homepage.

1.14 Quality System and Quality Assurance Plan

The contractor shall develop and maintain a system that adheres to the requirements of International Standard Organization (ISO) 9001, AS9100, and NATO AQAP 270 and supplement requirements imposed by this contract. The contractor shall develop and implement procedures to properly maintain measuring and test equipment IAW ANSI/NCSL 2340-1. The quality system will include a clear and complete set of work documents for all maintenance required by this contract. The contractor shall develop a quality program that shall be designed to promptly detect and correct conditions adverse to quality.

File Number: FD2030-25-00415 7

1.15 Item Unique Identification (IUID)

The contractor shall follow the latest DoD instructions to install IUID compliant marks. T.O.s and drawings will be complied with for any component where direction is currently called out in the TO or drawings. Unless otherwise directed, the following Number Structure will be used as the IUID, in the order specified, in accordance with UII Construct #2 specified in MIL-STD-130N Table IV “UII construct business rules and supplemental data”. This number shall be incorporated into the box label, affixed, or attached to the exterior of the item packaging, and shall not be affixed or attached to the part itself.

Issuing Agency Code (IAC), Enterprise Identifier (CAGE code, DUNs number, or DODAAC), Original Part Number and Serial Number.

1.16 Shipping and Transportation

The Contractor shall meet the delivery schedule. The contractor shall ship or transport applicable assets, as appropriate, to have the assets available to support the customer’s operational requirements and in accordance with the contract’s delivery schedule. The contractor shall not destroy reusable shipping containers and will reuse them for return shipment.

1.17 Preservation

The contractor shall be responsible for the preservation and packaging of the TF33 Stators (vanes and shrouds) IAW the Special Packaging Instructions specified on AFMC Form 158. The contractor shall place a serviceable tag, Department of Defense (DD) Form 1574, inside the package along with the assembly as well as outside the package.

The contractor shall not destroy reusable shipping containers and will reuse them for return shipment. Units shall be packed IAW with T.O. 00-85B-3 using Special Packaging Instruction

(SPI).

1.18 Packaging and Handling

All units shall be packed IAW T.O. 00-85B-3, using Special Packaging Instruction (SPI) F000003X46 or MIL-STD-129, Rev R, Department of Defense Standard Practice, Military Marking for Shipment and Storage. The contractor shall meet the delivery schedule IAW the contract. The contractor shall ship or transport applicable assets as appropriate to have the assets available to support the customer’s operational requirements and IAW the contract. This contract does not allow for Commercial Packaging.

1.19 Contract Data Requirement List (CDRL)

The contractor shall ensure that all reporting as specified under the following Contract Data Requirement List (CDRL) is accomplished.

A001: Commercial Asset Visibility Air Force (CAV AF) End Item Reporting

The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF website IAW the referenced DID and/or IAW the CAV AF SOW and shall not be waived. The transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 8.0.1 or higher. For CAV AF reporting, the Contractor shall submit SDRs when required and IAW CDRL Form 1423-1.

File Number: FD2030-25-00415 8

A002: Deficiency Report (DR) Deficiency Reporting is initiated on the occurrence when deficient Government assets are received by the Contractor. The contractor shall refer to T.O. 00-35D-54 using SF Form 368 or equivalent and IAW CDRL DD Form 1423-1.

A003: Contract Depot Maintenance (CDM) Production Report

The contractor shall prepare the report using Table I in DID DI-PSSS-81995 as of the last working day of the month and forward to the PMS or original mail service NLT the fifth working day of the month during which the contracts assets are received. Reports will continue to be forwarded unless contract is terminated, and the last report will be annotated as “Final Report”. The contractor’s format with the same data elements as found on the CDM report may be accepted if approved by the PCO and IAW CDRL DD Form 1423-1.

A004: Shipping and Packaging Discrepancy Report (Supply Discrepancy Report) The contractor shall notify the government within five (5) working days of discovery or discrepancy when freight contents do not agree with the shipping documents and IAW CDRL Form 1423-1.

The contractor shall use WEBSDR to submit an electronic SF-364 (Standard Form) IAW T.O. 00-35D-54 or a paper SF 364s until access to WEBSDR is attained, upon discovery of discrepancies for items of supply received for: overage, wrong item, duplication of shipment, misdirected shipment, non-receipt, damage, and/or improperly packaged shipment.

A005: Government Property Inventory Report

The contractor shall maintain a 100% inventory listing of government property (both GFP and CAP) in the contractor’s possession (to include subcontractors) by contract IAW CDRL 1423-1 and shall not be waived.

A006: Supply Chain Risk Management (SCRM) Plan The contractor shall provide a SCRM Plan IAW DI-MGMT-82256A that will include a systematic process used to identify, assess, handle, and monitor supply chain risks associated with the product or service (to include its suppliers and subcontractors) to be provided to the government IAW CDRL Form 1423-1.

A007: Government Furnished Material (GFM) by National Stock Number (NSN) This data item description contains the format, content, and preparation instructions for the data product generated by the specific and discrete task requirements as delineated in the contract and provides NSN/Part Number visibility of Government Furnished Material (GFM) inventories.

A008: Production Surge Plan

This report delineates a contractor’s capability to rapidly accelerate and sustain production utilizing existing facilities and equipment in a peace time acquisition environment without a declaration of war or mobilization and subsequent use of emergency war powers.

1.20 Document Storage

All records and reports outlined in this SOW shall be prepared for each part and a copy kept on file by the contractor for five (5) years. The Government’s technical representative reserves the right to request and view any records at any time.

File Number: FD2030-25-00415 9

1.21 Supply Chain Risk Management (SCRM)

The contractor must provide a comprehensive Supply Chain Risk Management (SCRM) Plan IAW the instructions to offeror prior to contract award. This plan must be maintained during the performance of this contract, will be incorporated into the contract at award, and must illustrate executable processes for identifying supply chain risks as early as possible. The SCRM plan will address the broad spectrum of supply chain risks that have the potential to jeopardize the integrity of product, materiel, information, and finances needed for continued Air Force operations; and/or drive materiel cost increases to the program. The plan and processes apply to the Contractor and their suppliers, subcontractors, associated integrators, and vendors, spanning the entirety of the supply chain from raw material stage to delivery of a finished product.

The SCRM must clearly address the following:

(a) Continuity of Operations (COOP) The contractor will develop and/or update a Continuity of Operations Procedure/Plan (COOP), which outlines the processes and actions to prepare for, and respond to, planned/unplanned supply chain challenges.

(b) Foreign Influence The contractor will disclose any Foreign Ownership, Control, or Influence (FOCI) for the purpose of initial or continued facility clearance eligibility. A standard Form 328 certificate pertaining to foreign interest must be submitted to the Government cognizant security office.

(c) Cybersecurity The contractor will implement a cyber security protection of supply chain information plan and provide a copy to the U.S. Government. As part of this process, the contractor will conduct early and continuous monitoring throughout the life of the agreement to prevent or reduce impacts of cyber vulnerabilities where adversaries are able to exploit, steal, alter, manipulate, interrupt, or destroy system functionality, information, or technology.

The plan must:

1. Include a description of how the contractor and any of the contractor’s subcontractors will provide the Government a system security plan (or extract thereof) IAW the NIST Special Publication (SP) 800-171, “Protecting Controlled Unclassified Information in Non-Federal Systems and Organizations” in effect at the time the solicitation is issued or as authorized by the Contracting Officer, to describe the contractor’s unclassified information system(s)/network(s) where covered defense information associated with the execution and performance of this contract is processed, is stored, or transmits.

2. Include a description of how the contractor will protect the supply chain from exploitation due to the insertion of counterfeits/malware, unauthorized production, tampering, theft, insertion of malicious software and hardware, functionality alterations, and any other elements that would allow adversaries to gain unauthorized access to date, alter data, interrupt communications, or otherwise disrupt operations.

File Number: FD2030-25-00415 10

3. Inform the U.S. Government of any instances of unauthorized access and/or compromise, such as those listed in item “b” to the contractor’s digital information, parts, and components.

1.22 Subcontractor and Vendor Management

The contractor shall maintain a system for the management of subcontractors and vendors IAW the provisions of this contract. The contractor shall ensure that the subcontractor(s)/vendor(s) data, designs, and deliverables meet all TF33 Stators (vanes and shrouds) engineering and technical requirements and shall fulfill the requirements of this contract. The government personnel shall be provided with the opportunity to attend all subcontractor reviews and other problem-solving reviews as observers.

1.23 Safety

The Contractor shall maintain and execute a safety program using MIL-STD-882D, AFI 91-301 and AFI 91-204 as guides. The Contractor shall comply with all safety provisions and technical specifications listed in T.O. 2J-TF33-53 and T.O. 2-11-111 and Attachment 1 of this SOW, along with any outstanding FAA Airworthiness Directives. All contractor personnel and technicians shall comply with system safety engineering principles during all levels of remanufacturing.

While performing work under this contract the contractor shall comply with all applicable federal, state, and local regulations regarding occupational safety and health. The contractor shall notify the PCO within eight (8) hours of any damage to Government Furnished Property (GFP) where the dollar value exceeds $500,000.00 and within two workdays, for any damage to GFP less than $500,000.00 during the execution of the contract.

Mishap notifications shall contain, as a minimum, the following information:

a. Contract, Contract Number, Name and Title of Person(s) Reporting

b. Date, Time, and exact location of accident/incident

c. Brief Narrative of accident/incident (Events leading to accident/incident)

d. Cause of accident/incident, if known

e. Estimated cost of accident/incident (material and labor to remanufacture/replace)

f. Nomenclature of equipment and personnel involved in accident/incident

g. Corrective actions (taken or proposed)

h. Other pertinent information

If requested by the designated PCO, the contractor shall immediately secure the mishap scene/ damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office.

1.24 Contractor Manpower Reporting

The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the USAF via electronic Contractor Manpower Reporting Application (eCMRA) which is a secure data collection site. The contractor is required to completely fill in all required data fields at http://www.ecmra.mil.

Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY), which runs from 01 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported NLT 31 October of each calendar year. Contractors may direct questions to the CMRA helpdesk.

Uses and Safeguarding of Information:

http://www.ecmra.mil/

File Number: FD2030-25-00415 11

Information from the secure website is proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and dollars. At no time will any data be released to the public with the contractor’s name and contract number associated with the data.

User Manuals:

Data for Air Force service requirements must be input at the Air Force CMRA link. However, user manuals for the government personnel and contractors are available at the CMRA link at http://www.ecmra.mil.

1.25 Contractor Relocation

In the event relocation becomes necessary, the contractor shall prepare a relocation plan and make said plan available to the Government upon request. This plan shall include a listing of all completion dates of the steps required in the performance of the move and shall address on-site pre-teardown requirements, on-site re-assembly requirements, discrepancy correction, and transaction security. The contractor shall be responsible for the security of the TF33 Stators (vanes and shrouds) areas and equipment during relocation.

The contractor shall coordinate the relocation schedule with the PCO and QAR to ensure no conflicts exist. In the event of relocation, the contractor shall continue to provide support for the TF33 Stators (vanes and shrouds) at the new location IAW with the contract and this SOW.

1.26 Contractor Identification to Government Employees

Contractor employees shall identify themselves as contractor personnel by introducing themselves or being introduced as contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. In addition, contractor personnel shall appropriately identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence.

1.27 Mission Essential Services

Not applicable.

1.28 Production Surge Plan:

1.28.1 In the event that the DoD experiences an unplanned spike or sudden increase in demand, due to major theater warfare or a national emergency (also known as surge, reference DFARS 217.208-70 and DFARS 252.217-7001), and invokes the surge: The Contractor must be willing to work to meet and sustain this demand for quantity levels above and beyond normal peacetime requirements. The Contractor is required to provide the Government a surge plan. A CDRL and Data Item Description (DID) are associated with the surge requirement. After being notified of the surge demand in writing, the Contractor may see additional orders and/or will see the priority status elevated on current orders. The Contractor may do one or more of the following to fill the demand:

a. The Contractor will maintain a certain level of safety stock of components to draw from to perform additional repairs/overhauls.

b. Add additional shifts to increase production within the Contractor and with suppliers.

c. The Contractor will work with the various manufacturing sites and their supply chains to expedite production. The Contractor will be notified in advance of, and be given the opportunity to negotiate, any expedite charges that might apply at the time of surge. Contractual requirements for production of this contract are addressed in Part I. The schedule and surge requirements will be on a best-effort basis.

1.28.2 Surge plans have four basic phases (assessment, execution, sustainment, and exit/termination) and the plan associated with the surged items requested need to address those http://www.ecmra.mil/

File Number: FD2030-25-00415 12 phases. The Government will provide, in writing, the items on contract that are requested to be surged. That request will include the item, the quantity, and timeline with respect to delivery schedule with estimated termination dates when known.

1.28.3 Contractors will provide a plan that includes the identified surge items, how they are going to meet the requirement, timeline to implement the plan, ability to sustain the surge through termination, identify any limiting factors or supply chain risks that will impact current surge production and future requirements for identified items.

File Number: FD2030-25-00415 13

SECTION II: GOVERNMENT PROPERTY

2.0 Government Furnished Material (GFM)

NONE.

2.1 Government Furnished Property (GFP)

All items to be remanufactured will be shipped to the contractor.

File Number: FD2030-25-00415 14

ATTACHMENT 1:

TF33 STATORS (VANES AND SHROUDS)

INPUT/OUTPUT NSNs and PNs

2840-01-004-1794RV

8TH STAGE

(P100 AND P103)

INPUT

NSN INPUT PN OUTPUT

NSN OUTPUT PN

2840-00-765-8179RV 389388

2840-01-004-1794RV 748688

2840-00-867-5872RV

478578 704178 730668

2840-00-918-1625RV

516198 704188 730778

2840-00-966-8031RV 484098

2840-01-161-1131RV 748878

2840-01-003-1000RV 748678

2840-01-004-1794RV 748688

2840-01-004-1796RV

5TH STAGE

(P100 AND P103)

INPUT

NSN INPUT PN OUTPUT

NSN OUTPUT PN

2840-00-765-8932RV 389385

2840-01-004-1796RV 748685

2840-00-966-8028RV 484095

730695

2840-00-981-1804RV

478935 704175 730665

2840-01-003-0718RV 748675

2840-01-161-1132RV 748885

2840-01-004-1796RV 748685

2840-01-004-1797RV

7TH STAGE

(P100 AND P103)

INPUT

NSN INPUT PN OUTPUT

NSN OUTPUT PN

2840-00-765-8169RV 389387

2840-01-004-1797RV 749777

2840-00-918-1624RV

516197 704377 730687

2840-00-991-9209RV

480677 704177 730667

2840-01-003-2843RV 748677

2840-01-161-1133RV 749377

2840-01-004-1797RV 749777

File Number: FD2030-25-00415 15

INPUT/OUTPUT NSNs and PNs (continued)

2840-01-004-1798RV

10TH STAGE

(P103)

INPUT

NSN INPUT PN OUTPUT

NSN OUTPUT PN

2840-00-757-8260RV

523190 704180 730770

2840-01-004-1798RV 748690

765180 2840-00-765-9891RV 389467

2840-00-907-1484RV 523390

2840-01-004-1798RV 748690

765180

2840-01-004-1799RV

11TH STAGE

(P103)

2840-00-717-2716RV 389468

2840-01-004-1799RV 748681

765181

2840-00-757-8261RV

523191 704281 730791

2840-01-004-1799RV 748681

765181

2840-01-004-1800RV

12TH STAGE

(P103)

2840-00-759-6322RV

511472 704272

730782 2840-01-004-1800RV 748692

765182 2840-00-765-9894RV 389469

2840-01-004-1800RV 748692

765182

2840-01-004-1802RV

10TH STAGE

(P100)

2840-00-908-6065RV

512270 704170

730670 2840-01-004-1802RV 748680

765190 2840-00-981-9217RV 454380

2840-01-004-1802RV 748680

765190

File Number: FD2030-25-00415 16

2840-01-004-2179RV

6TH STAGE

(P100 AND P103)

2840-00-765-8178RV 389386

2840-01-004-2179RV 748686

2840-00-966-8029RV 748686

2840-00-991-9208RV 480676

730666

2840-01-004-2180RV 748676

2840-01-160-3212RV 749376

2840-01-004-2179RV 748686

2840-01-004-5771RV

(P100)

2840-00-908-6059RV

512271 704271

730781 2840-01-004-5771RV 748691

765191 2840-00-981-9215RV 454381

2840-01-004-5771RV 748691

765191

2840-01-004-5772RV

15TH STAGE

(P100)

2840-00-966-8060RV

476675 673985 704285

730675 2840-01-004-5772RV 749395

766595

2840-01-004-5772RV 749395

766595

2840-01-004-5773RV

14TH STAGE

(P100)

2840-00-966-8059RV

476674 704284

730794 2840-01-004-5773RV 748884

766594

2840-01-004-5773RV 748884

766594

2840-01-004-5774RV

(P100)

2840-00-999-3295RV

512272 704282

730792 2840-01-004-5774RV 748884

765192

2840-01-004-5774RV 748884

765192

File Number: FD2030-25-00415 17

2840-01-005-1882RV

13TH STAGE

(P100)

2840-00-966-8058RV

476673 704283

730793 2840-01-005-1882RV 748893

766593

2840-01-005-1882RV 748893

766593

2840-01-160-3216RV

(P103)

2840-00-765-8170RV 389470

2840-01-160-3216RV 765573 2840-00-819-6139RV

446073 704273 730783

2840-01-160-3216RV 765573

2840-01-160-3217RV

14TH STAGE

(P103)

2840-00-765-9885RV 389471

2840-01-160-3217RV 765574

2840-00-819-6143RV

446074 704274 730784

2840-01-004-1801RV 748684

765584

2840-01-160-3217RV 765574

2840-01-160-3218RV

(P103)

2840-00-819-6163RV

446075 704275 730785

2840-01-004-1795RV 748695

765585

2840-01-160-3218RV 765575

File Number: FD2030-25-00415 18

ATTACHMENT 2:

INSPECTION AND REPAIR CRITERIA

NOTE: A remanufacture shall be “100% EVR Vane & Shroud Replacement” when a stator is de-brazed, any vanes are removed, replaced, and the stator assembly is re-brazed, due to the level of work required. It does not necessarily require replacing every vane with brand new; vanes that have been inspected and meet the requirements of all vane airfoils must have a surface finish of 35AA or smoother on 85% of the airfoil and 60AA or smoother on remaining 15% of the airfoil (adjacent to the inner and outer shroud), and Serviceable Limits specified in TO 2J-TF33-53-6.

The following is the inspection and repair criteria for the TF33 Stators (vanes and shrouds) that require aluminum coating and air sealing ring replacement.

Rework and reidentify N1 Vanes and Shrouds IAW T.O. 2J-TF33-53-2, SWP 003 04.

Identify the N1 Vanes and Shrouds. Stages 5th through 8th, per the following:

2840-01-004-1797RV

7TH STAGE

7P3, 7P5, 7P7, 7P9, 7P11, 7P100, 7P102, AND 7P103

INPUT NSN INPUT P/N OUTPUT NSN OUTPUT P/N

2840-00-765-8169RV 389387

2840-01-004-1797RV 749777

2840-00-918-1624RV 516197

2840-00-918-1624RV 704377

2840-00-918-1624RV 730687

2840-00-991-9209RV 480677

2840-00-991-9209RV 704177

2840-00-991-9209RV 730667

2840-01-003-2843RV 748667

2840-01-004-1797RV

749777 (and/or when converting 7P3 to 7P7)

File Number: FD2030-25-00415 19

INSPECTION AND REPAIR CRITERIA (continued)

Rework and reidentify N2 Vanes and Shrouds IAW T.O. 2J-TF33-53-2, SWP 005 02.

Identify the N2 Vanes and Shrouds per the following:

2840-01-004-1802RV

10TH STAGE

10P7 AND 10P100

INPUT NSN INPUT

P/N MATERIAL OUTPUT NSN OUTPUT

P/N MATERIAL

2840-00-908-6065RV 512270 GOLD

NICKEL

2840-01-004-1802RV 748680

765190

GOLD

NICKEL

NICKEL

2840-00-908-6065RV 704170 GOLD

NICKEL

2840-00-908-6065RV 730670 GOLD

NICKEL

2840-00-981-9217RV 454380 SILVER

2840-01-004-1802RV 748680 GOLD

NICKEL

NICKEL

2840-01-004-1802RV 765190 GOLD

NICKEL

11P3, 11P5, 11P9, 11P11, AND 11P103

INPUT NSN INPUT

P/N MATERIAL OUTPUT NSN OUTPUT

P/N MATERIAL

2840-00-717-2716RV 389468 SILVER

2840-01-004-1799RV 748681

765181

GOLD

NICKEL

NICKEL

2840-00-757-8261RV 523191 GOLD

NICKEL

2840-00-757-8261RV 704281 GOLD

NICKEL

2840-00-757-8261RV 730791 GOLD

NICKEL

2840-00-907-1483RV 523391 SILVER

2840-01-004-1799RV 748681

GOLD

NICKEL

NICKEL

2840-01-004-1799RV 765181

GOLD

File Number: FD2030-25-00415 20

2840-01-004-5771RV

11TH STAGE

11P7 AND 11P100

INPUT NSN INPUT

P/N MATERIAL OUTPUT NSN OUTPUT

P/N MATERIAL

2840-00-908-6059RV 512271 GOLD

NICKEL

2840-01-004-5771RV 748691

765191

GOLD

NICKEL

NICKEL

2840-00-908-6059RV 704271 GOLD

NICKEL

2840-00-908-6059RV 730781 GOLD

NICKEL

2840-01-004-5771RV 748691

GOLD

NICKEL

NICKEL

2840-01-004-5771RV 765191

GOLD

2840-01-004-1800RV

12P3, 12P5, 12P9, 12P11, AND 12P103

INPUT NSN INPUT

P/N MATERIAL OUTPUT NSN OUTPUT

P/N MATERIAL

2840-00-759-6322RV 511472 GOLD

NICKEL

2840-01-004-1800RV 748692

765182

GOLD

NICKEL

NICKEL

2840-00-759-6322RV 704272 GOLD

NICKEL

2840-00-759-6322RV 730782 GOLD

NICKEL

2840-00-765-9894RV 389469 SILVER

2840-01-004-1800RV 748692

GOLD

NICKEL

NICKEL

2840-01-004-1800RV 765182

GOLD

File Number: FD2030-25-00415 21

2840-01-004-5774RV

12TH STAGE

12P7 AND 12P100

INPUT NSN INPUT

P/N MATERIAL OUTPUT NSN OUTPUT

P/N MATERIAL

2840-00-999-3295RV 512272 GOLD

NICKEL

2840-01-004-5774RV 748884

765192

GOLD

NICKEL

NICKEL

2840-00-999-3295RV 704282 GOLD

NICKEL

2840-00-999-3295RV 730792 GOLD

NICKEL

2840-01-004-5774RV 748884

GOLD

NICKEL

NICKEL

2840-01-004-5774RV 765192

GOLD

13P3, 13P5, 13P9, 13P11, 13P102, AND 13P103

INPUT NSN INPUT

P/N MATERIAL OUTPUT NSN OUTPUT

P/N MATERIAL

2840-00-765-8170RV 389470 NICKEL

2840-01-160-3216RV 765573 NICKEL 2840-01-008-4442RV 748683 SILVER

2840-01-008-4442RV 765583 NICKEL

2840-01-160-3216RV 765573 NICKEL

File Number: FD2030-25-00415 22

2840-01-005-1882RV

13TH STAGE

13P7 AND 13P100

INPUT NSN INPUT

P/N MATERIAL OUTPUT NSN OUTPUT

P/N MATERIAL

2840-00-966-

8058RV 476673 GOLD

NICKEL

2840-01-005-

1882RV

748893 766593

GOLD

NICKEL

NICKEL

2840-00-966-

8058RV 704283 GOLD

NICKEL

2840-00-966-

8058RV 730793 GOLD

NICKEL

2840-01-005-

1882RV 748893

GOLD

NICKEL

NICKEL

2840-01-005-

1882RV 766593

GOLD

2840-01-004-5772RV

15P7 AND 15P100

INPUT NSN INPUT

P/N MATERIAL OUTPUT NSN OUTPUT

P/N MATERIAL

2840-00-966-

8060RV 476675 GOLD

NICKEL

2840-01-004-

5772RV

749395 7665295

GOLD

NICKEL

NICKEL

2840-00-966-

8060RV 673985 SILVER

2840-00-966-

8060RV 704285 GOLD

NICKEL

2840-00-966-

8060RV 730675 GOLD

NICKEL

2840-01-004-

5772RV 749395

GOLD

NICKEL

NICKEL

2840-01-004-

5772RV 766595

GOLD

File Number: FD2030-25-00415 23

2840-01-004-1802RV

10TH STAGE

100% EVR Vane and Shroud Replacement for 10th Stage (P7 and P100)

INPUT NSN INPUT P/N OUTPUT NSN OUTPUT P/N

2840-00-908-6065RV 512270

2840-01-004-1802RV 765190

2840-00-908-6065RV 704170

2840-00-908-6065RV 730670

2840-00-981-9217RV 454380

2840-01-004-1802RV 748680

2840-01-004-1802RV 765190

100% EVR Vane and Shroud Replacement for 11th Stage (P3, P5, P9, P11, and P103)

INPUT NSN INPUT P/N OUTPUT NSN OUTPUT P/N

2840-00-717-2716RV 389468

2840-01-004-1799RV 748681

765181

2840-00-757-8261RV 523191

2840-00-757-8261RV 704281

2840-00-757-8261RV 730791

2840-00-907-1483RV 523391

2840-01-004-1799RV 748681

2840-01-004-1799RV 765181

2840-01-004-5771RV

100% EVR Vane and Shroud Replacement for 11th Stage (P7 and P100)

INPUT NSN INPUT P/N OUTPUT NSN OUTPUT P/N

2840-00-908-6059RV 512271

2840-01-004-5771RV 748691

765191

2840-00-908-6059RV 704271

2840-00-908-6059RV 730781

2840-00-981-9215RV 454381

2840-01-004-5771RV 748691

2840-01-004-5771RV 765191

File Number: FD2030-25-00415 24

2840-01-004-1800RV

12TH STAGE

100% EVR Vane and Shroud Replacement for 12th Stage (P3, P5, P9, P11 and P103)

INPUT NSN INPUT P/N OUTPUT NSN OUTPUT P/N

2840-00-759-6322RV 511473

2840-01-004-1800RV 765182

2840-00-759-6322RV 704272

2840-00-759-6322RV 730782

2840-00-765-9894RV 389469

2840-01-004-1800RV 748692

2840-01-004-1800RV 765182

2840-01-004-5774RV

100% EVR Vane and Shroud Replacement for 12th Stage (P7 and P100)

INPUT NSN INPUT P/N OUTPUT NSN OUTPUT P/N

2840-00-999-3295RV 512272

2840-01-004-5774RV 765192

2840-00-999-3295RV 704282

2840-00-999-3295RV 730792

2840-01-004-5774RV 748884

2840-01-004-5774RV 765192

100% EVR Vane and Shroud Replacement for 13th Stage (P3, P5, P9, P11, P102 and P103)

INPUT NSN INPUT P/N OUTPUT NSN OUTPUT P/N

2840-00-765-8170RV 389470

2840-01-160-3216RV 765573

2840-00-819-6139RV 446073

2840-00-819-6139RV 704273

2840-00-819-6139RV 730783

2840-01-008-4442RV 748683

2840-01-008-4442RV 765583

2840-01-160-3216RV 765573

2840-01-005-1882RV

100% EVR Vane and Shroud Replacement for 13th Stage (P7 and P100)

INPUT NSN INPUT P/N OUTPUT NSN OUTPUT P/N

2840-00-966-8058RV 476673

2840-01-005-1882RV 766593

2840-00-966-8058RV 704283

2840-00-966-8058RV 730793

2840-01-005-1882RV 748893

2840-01-005-1882RV 766593

File Number: FD2030-25-00415 25

2840-01-004-5772RV

15TH STAGE

100% EVR Vane and Shroud Replacement for 15th Stage (P7 and P100)

INPUT NSN INPUT P/N OUTPUT NSN OUTPUT P/N

2840-00-966-8060RV 476675

2840-01-004-5772RV 766595

2840-00-966-8060RV 673985

2840-00-966-8060RV 704285

2840-00-966-8060RV 730675

2840-01-004-5772RV 749395

2840-01-004-5772RV 766595

File Number: FD2030-25-00415 26

ATTACHMENT 3:

CONTRACTOR FURNISHED VANES

(LPSAN APPROVED SOURCES)

NOTE: The decision of sourcing the vanes to produce appropriate TF33 stators is under the contractor’s discretion within the following condition:

1) The specified vanes below shall ONLY be procured through Fed Mall System:

Contractor Furnished Material (CFM)-Vanes Compressor Stage NSN PN

5th 2840-00-767-5957RV 389755 6th 2840-00-768-2111RV 360156 8th 2840-00-768-2113RV 360158

13th 2840-00-966-8062RV 477053 14th 2840-00-966-8063RV 477054 15th 2840-00-966-8064RV 477055

2) Any other vanes NOT specified in ‘Contractor Furnished Material (CFM)-Vanes’ shall ONLY be procured from either Fed Mall System or from the Government Approved Sources.

Government Approved Sources

NSN P/N

APPROVED

MANUFACTURING

SOURCE

APPROVED

MANUFACTURING

SOURCE P/N

2840-00-759-6323RV 511660 PRATT & WHITNEY 77445

2840-00-759-6324RV 511661 PRATT & WHITNEY 77445

2840-00-759-6325RV 511662 PRATT & WHITNEY 77445

2840-00-768-2111RV 360156 PRATT & WHITNEY 77445

2840-00-768-2112RV 360157 PRATT & WHITNEY 77445

2840-00-768-2113RV 360158 PRATT & WHITNEY 77445

2840-00-819-6133RV 446064 PRATT & WHITNEY 77445

2840-00-819-6134RV 446065 PRATT & WHITNEY 77445

2840-00-962-6744RV 512362 PRATT & WHITNEY 77445

2840-00-962-6746RV 512360 PRATT & WHITNEY 77445

2840-00-962-6747RV 512361 PRATT & WHITNEY 77445

2840-00-963-1495RV 479055 PRATT & WHITNEY 77445

2840-00-966-8062RV 477053 PRATT & WHITNEY 77445

2840-00-966-8063RV 477054 PRATT & WHITNEY 77445

2840-00-966-8064RV 477055 PRATT & WHITNEY 77445

2840-01-159-6820RV 534465 PRATT & WHITNEY 77445

2840-01-160-3180RV 534461 PRATT & WHITNEY 77445

2840-01-160-3181RV 534460 PRATT & WHITNEY 77445

2840-01-160-3182RV 534462 PRATT & WHITNEY 77445

2840-01-160-3183RV 534463 PRATT & WHITNEY 77445

2840-01-160-3184RV 534464 PRATT & WHITNEY 77445

File Number: FD2030-25-00415 27

ATTACHMENT 4:

ACRONYMS

ACSS Air Combat Sustainment Squadron AF Air Force AFMC Air Force Materiel Command CAVAF Commercial Asset Visibility Air Force CDRL Contract Data Requirements List CMM Commercial Maintenance Manual DD Department of Defense DER Designated Engineering Representative DR Deficiency Report ESM Engine Shop Manual IAW In Accordance With ISO International Standards Organization IUID Item Unique Identification NSN National Stock Number OC-ALC Oklahoma City Air Logistics Center PCO Procurement Contracting Officer PCARSS Plant Clearance Automated Reutilization Screening System P/N Part Number PMS Production Management Specialist SB Service Bulletin SDR Supply Discrepancy Report S/N Serial Number SOR Source of Repair SOW Statement of Work SS Service Summary SOW Statement of Work TAFB Tinker Air Force Base USAF United States Air Force