This document outlines requirements for replacing HVAC systems at Building L/149 at Pinecastle Bombing Range. The contractor shall replace five HVAC units, including replacing a 5-ton packaged heat pump unit with backup electric heat that provides air conditioning for the operations control center, replacing an existing 3.5-ton packaged heat pump unit with a 3.5-ton straight cooling air conditioning unit that provides air conditioning for the IT server room, and installing a new 3-ton split CRAC unit with humidifier/electric reheat package for the IT server room. The contractor must route refrigerant lines and electrical circuits, relocate electrical devices, and install outdoor units according to specifications provided. Work must be completed per Statement of Work requirements for the Navy's Pinecastle HVAC replacement contract under Solicitation Number N6945020R0120.

View the file

Other files

File Type Posted
AMD 02 RFP N6945020R0120.pdf PDF
AMD 01 RFP N6945020R0120.pdf PDF
PRE-PROPOSAL INQUIRY FORM.xlsx XLSX spreadsheet
Price Proposal spreadsheet.xls XLS spreadsheet
Pinecastle B149 HVAC Repl SOW .docx DOCX document
SOW Pinecastle B149 HVAC Repl Sketch.pdf PDF
RFP N6945020R0120.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pinecastle Bombing Range A/C Units Building L/149

PMB / Building (L/149) Pinecastle

Replace 5 Ton Packaged Heatpump With Back-Up Electric Heat (Unit #1)

This Unit Provides Conditioned Air For The Operations Control Center

Existing 5 Ton Package Unit Shall Be Replaced. Unit

Replacement Shall Include Replacing All Interior

Lined Ductwork On The Exterior Of Bldg. L/149

Electrical Panel (Labeled Panel 16)

Feeds Both Existing HVAC Units

Electrical Panel 16 Has A 200 Amp Main Breaker

Panel 16 Index Card

Replace existing 3.5 Ton Packaged Heatpump (Unit # 2) with a 3.5 Straight Cool A/C Unit

Unit Replacement Shall Include Replacing All Interior Lined Ductwork On The Exterior Of Bldg. L/149

(This Unit Provides Conditioned Air To The IT Server Room)

Contractor Shall Provide And Install An Additional Unit For The IT Server Room. The New Unit Shall Be

A 3-Ton Split CRAC Unit With A Humidifier/Electric Reheat Package.

New Indoor Modular Cabinet Shall Be Mounted (On The Northwest Wall) With A 4” Channel Spacer To

Stand The Indoor Unit Off The Wall To Allow For Routing Of Refrigerant, Condensate Drain And Electrical Circuit

Connections.

Contractor Shall Route Refrigerant & Electrical

Circuits Up The Wall To The Overhead. Items

Shown Below Electrical Devices (Cabinet On

Casters) Will Be Relocated By Occupants

Once Refrigerant Lines & Primary Electrical Circuit/Conduit Is

In The Overhead They Shall Route Toward The West Wall Of

Server Room. Electrical Circuit/Conduit Shall Extend Thru

Wall To The Exterior Of Bldg.

Refrigerant Lines Continue Around Wall

(Above Door To The Exterior) To

Southwest Corner Of Bldg.

Refrigerant Lines Continue Along Wall

(From Column To Column) To Where

They Penetrate Exterior Wall, Continue

Down Wall To The New Outdoor Unit

Location

New Outdoor Unit Location

Refrigerant Lines Down Exterior Wall

(On The Interior Or Exterior Side Of

Wall) Preferably Interior Side.

Condensate Drain Line Shall Be Routed Out The Right Side Of The Modular Cabinet Spacer Along Wall 90° At