(SOW) MYR ATCT Refurbish Parking Lot.pdf
PDF 6 MB Posted
- Attached to
- MYR ATCT Refurbish Parking Lot
- Solicitation number
- 6973GH-26-R-00041
About this file
This document is a Statement of Work (SOW) for the Federal Aviation Administration's MYR ATCT Parking Lot and Site Refurbishment Project located in Myrtle Beach, South Carolina. The project involves comprehensive refurbishment of the parking lot and site at the air traffic control tower, addressing safety hazards, drainage deficiencies, and structural failures. Key scope of work includes pressure washing concrete surfaces, milling and replacing asphalt, extending the parking area, sealing and repairing asphalt surfaces, applying parking lot striping, replacing wheel stops, installing a new gravel area, replacing damaged concrete sidewalks, raising cable vault lids, and installing new aluminum canopies at side entry and generator room doors.
The project requires strict adherence to various regulatory standards, including FAA Operational Risk Management Program, OSHA safety regulations, and environmental and occupational safety requirements. The contractor must provide detailed project scheduling, maintain facility accessibility, coordinate with onsite FAA personnel, and ensure minimal disruption to facility operations. The work is to be performed during standard business hours (Monday through Friday, 7:00 AM-4:30 PM), with any work outside these hours requiring advance approval. The project is scheduled for completion by July 09, 2025, with specific requirements for site preparation, material handling, safety protocols, and quality control throughout the construction process.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FEDERAL AVIATION ADMINISTRATION
STATEMENT OF WORK
MYR ATCT – Parking Lot and Site Refurbishment Project Myrtle Beach, SC
July 09, 2025
1. GENERAL:
This statement of work sets forth the requirements for refurbishing parking lot and site at MYR ATCT located in Myrtle Beach, South Carolina.
All work must be in accordance with the following:
a) FAA Operational Risk Management Program (ORMP) requirements
b) OSHA CFR 29 Part 1926 – Safety and Health Regulations for Construction
c) OSHA CFR 29 Part 1910 – General Industry Standards Applicable to Construction Industry
d) FAA Environmental, Occupational Safety, and Health (EOSH), Safety Data Sheet (SDS) Review and
Approval
e) Electrical Safety, Lock-Out/Tag-Out (LOTO) procedures
f) Technical Specifications
2. BACKGROUND:
The MYR ATCT located in Myrtle Beach, SC is a mission critical facility supporting air traffic control operations. The existing parking lot and site has deteriorated to an unacceptable condition due extended exposure to seasonal weather, erosion, consolidation, and repetitive vehicular use. This project aims to address safety hazards, drainage deficiencies, and structural failures by implementing a comprehensive refurbishment of the parking lot and site.
3. PRE-BID CONFERENCE:
A pre-bid conference may be scheduled to allow potential vendors to conduct an initial site survey, observe onsite conditions, and review the project scope of work. Additional site visits may be arranged upon request;
however, these are not guaranteed and are subject to the availability of local FAA personnel. Vendors may also submit Pre-Bid Requests for Information (RFIs) to clarify project requirements.
4. GENERAL CONDITIONS:
a) Contractor must provide a detailed project schedule outlining all phases of the work including anticipated impact on the facility operations. All work must be coordinated to minimize the disruption to facility operations.
b) Contractor must provide a plan illustrating the phasing of work to ensure accessibility to facility and site is always maintained during the duration of work. The facility must remain in full operation during the entire duration of work. All work must be scheduled and phased to not obstruct facility personnel site access during project.
c) Contractor must maintain a clean site and remove temporary equipment if obstructing/disrupting operations. This includes immediate containment and/or removal of any debris that may become washed out, wind borne, or potential site hazard of any kind.
d) Contractor must locate and avoid underground site utilities and infrastructure. Manually excavate by hand digging using wood or fiberglass handled tools when any construction work is expected to come within 3 feet on each side of existing utilities and/or infrastructure.
e) Waste and debris must be disposed in accordance with local and federal regulations. FAA waste containers may not be used.
f) Contractor must coordinate mobilization and staging procedures with the onsite FAA facilities personnel.
g) Construction staging, deliveries, storage, and handling of materials must be field coordinated with local facilities personnel.
h) Contractor must provide ample and suitable sanitary conveniences with proper enclosures and hand washing facilities in accordance with CFR Part 1926, Subpart D for the use of the workers employed on the work. Temporary toilets must be properly maintained and serviced on a regular basis. Secure temporary toilets to prevent possible overturning.
i) Contractor must provide Safey Data Sheets (SDS) for all materials to be reviewed and approved by FAA Environmental Safety Occupational Health personnel prior to activity start.
j) Work Schedule:
a. Standard work schedule and normal business hours are Monday through Friday, 7:00AM-
4:30PM local, excluding Federal Holidays.
b. Work outside of the standard schedule may be permitted only with a minimum of forty-eight
(48) hours’ advance coordination and approval by both the Contracting Officer and the designated local FAA facilities representative. Approval of alternate workdays is contingent upon the availability of FAA personnel and is not guaranteed.
c. No work will be permitted on Federal Holidays.
5. SCOPE:
The contractor is responsible for accomplishing all items of work listed within the statement of work in accordance with applicable drawings and technical specifications. The scope of work includes the following:
a) Pressure wash and clean existing concrete hardscapes including curbs, gutters, drainage flumes, pads, wheel stops, and sidewalks.
b) Mill and remove 2” of existing asphalt at facility entrance road indicated on aerial view. Prepare, backfill, grade, compact, and place new 2” bitumen asphalt per attached details and specifications.
a. Place new asphalt pavement with 3’ thicken edge connection to existing asphalt pavement.
c) Extend existing parking area as indicated on the attached aerial view per the following, attached details, and specifications:
a. Remove existing vegetation and excavate soil to depth required for new parking area.
b. Prepare and compact subgrade.
c. Provide 4” compacted base coarse.
d. Apply prime coat per manufacturer’s written instructions.
e. Prepare and place 1.5” bituminous intermediate course.
f. Apply Bituminous Tack Coat per manufacturer’s written instructions.
g. Prepare and place 1.5” bituminous surface course.
h. Place new asphalt pavement with 3’ thicken edge connection to existing asphalt pavement.
d) Clean and prepare parking lot asphalt surfaces for seal coat application per seal coat manufacturer’s written instructions. Surface preparation includes treating oil and grease spots with manufacturers recommend oil spot primer/sealer.
e) Repair, seal, and patch existing cracks and soft spots in asphalt parking surfaces per seal coat manufacturer’s written instructions. Existing cracks in asphalt parking must be repaired with products compatible with asphalt seal coating. Any patched areas must be fully cured prior to seal coat application.
f) Apply two (2) coat parking lot seal coat system per manufacturer’s written instructions and as indicated on plan:
a. First coat must include:
i. Clean, silica sand, 50/70 sieve (minimum 3-5 lbs. per 1 gallon of sealer).
ii. High potency, acrylic emulsion-based additive for fast drying, performance boosting, color enhancing and viscosity building (minimum 1%-2%, no more than 3%).
b. Apply second coat perpendicular direction of the first coat to ensure even coverage.
c. Allow the first coat to dry sufficiently to take light traffic without scuffing prior to second coat application. The seal coating system must be fully cured prior to allowing vehicle traffic on the finished surface and application of parking lot striping traffic paint.
g) Apply parking lot striping, fast drying 100% acrylic traffic paint for lines, stalls, markings, and stenciling (Handicap) per manufacturer’s written instructions at existing and new, extended parking areas. Colors: Standard stalls and markings – White, Handicap stall and stenciling – Blue with White stenciling.
h) Remove and replaced twenty (20) damaged wheel stops with new precast concrete wheel stops.
Coordinate with onsite FAA personnel for location of damaged wheel stops requiring replacement.
Match existing.
i) Remove vegetation and install 4” thick, #57 stone/graded aggregate placed directly over 8 oz.
minimum Rip Rap Geotextile Underlayment placed directly over compacted subgrade with 95% minimum dry proctor density at area indicated on aerial view plan.
j) Remove existing, damaged concrete hardscapes at approximate location indicated on the aerial view.
Remove concrete up to nearest control joints from the damaged areas. Form and pour new concrete sidewalk at the location removed per the following and attached details:
a. Size: Match existing width and 4” minimum thickness.
b. Concrete strength: Minimum 3000 psi
c. Concrete finish: Broom finish applied in normal to direction of traffic.
d. Steel reinforcement:
i. Welded wire fabric, 6x6 – W1.4 xW1.4 at 2” from top of concrete slab
ii. Welded fabric must be overlapped a minimum of 6” and secured to prevent separation during concrete placement.
iii. Provide 3” cover between reinforcement and edge of concrete.
k) Excavate, remove debris, and prepare area for new motorcycle parking at location indicated on aerial view. Form and pour new concrete motorcycle parking per the following and attached details:
a. Size of new dumpster pad: 6” thick
b. Base: 4” compacted graded aggregate base course
c. Concrete strength: Minimum 3000 psi
d. Concrete finish: Broom
e. Expansion Joint: Provide and install pre-formed expansion joint material at areas new concrete pad abuts to existing asphalt, concrete, and structures.
f. Steel Reinforcement:
i. Welded wire fabric, 6x6 – W2.9 xW2.9 at 2 ½” from top of concrete slab.
ii. Welded wire fabric must be overlapped a minimum of 6” and secured to prevent separation during concrete placement.
iii. Provide 3” cover between reinforcement and edge of concrete.
l) Raise existing cable vault lids indicated on attached aerial view and photos:
a. Remove and dispose of existing wood timbers surrounding existing vault lids.
b. Remove and safeguard existing cable vault lids.
c. Provide and install pre-formed or pre-cast concrete vault extension/riser ring to ensure cable vault lid height is at surrounding grade elevation after re-installation.
d. Re-install existing cable vault lids.
m) Replace existing aluminum canopies at side entry door and E/G door with larger aluminum canopies with integrated drainage system.
a. Remove existing aluminum canopies and prepare surface for new canopy installation.
b. Prepare and provide detailed shop drawings for pre-engineered, prefabricated aluminum canopies.
c. Provide and install new canopies per the following:
i. Side entry door: Approximately 8’ wide x 12’ long x 10’ high
ii. Engine Generator Room Door: Approximately 5’ wide x 8’long x 8’ high
iii. Include integrated gutter, downspout, and drainage system.
iv. Style and color selection by onsite FAA personnel.
d. Provide and install per attached specifications, aerial view, and manufacturer’s written instructions.
n) Provide and install two (2) new prefabricated concrete Diffuser/splashpads to prevent erosion at fire pump drain and downspout at locations indicated on attached aerial view.
o) Replace rotten front façade (approximately 17’ wide x 12’ high) of small building indicated on aerial view. The new wall must be per the following and attached details:
a. Wall type: Concrete masonry block units matching existing walls and painted to match.
b. Door: Commercial grade, pre-hung steel double security doors w/ expandable steel frame.
i. Material: Steel door and frame, 1-3/4” thick, 18-gauge steel door, 16-gauge steel frame.
ii. Door opening: Height 84”, Width 96”
iii. Door hardware: Commercial grade, stainless steel with lockset to accept Best Lock core. Active door with lock and inactive door with flush bolts and lock strike.
iv. Clean and prepare door and frame surfaces to be painted per manufacturer's written instructions.
1. Apply one (1) coat of primer and two (2) coats of paint on new steel door and frame per the following:
a. Type: Exterior grade, DTM paint and compatible primer
b. Color: Provide color sample for selection by onsite FAA representative.
c. Apply primer and top coatings per manufacturer’s written instructions.
p) Remove and replace six (6) existing wall pack light fixtures with six (6) new commercial grade LED wall pack lights. All lights fixtures must be provided by ISO certified manufacturers and comply with FCC Title 47 Part 15B class B for emission limits. Coordinate lock/out and tag/out with local, onsite representative prior to removal.
q) Contractors must maintain a clean and organized site during construction. Upon passing the final Construction Acceptance Inspection (CAI), Contractor must clean up and demobilize without disruption.
r) The Contractor must warranty material and workmanship for a period of one (1) year and/or no less than the manufacturers’ materials warranty, starting from the date of final project acceptance by the
FAA.
6. CONSTRUCTION SCHEDULE:
The work plan and schedule prepared by the contractor must consist of a logical narrative plan. Include construction activities, submittal and approval of materials, samples, and shop drawings (if applicable), the procurement of critical materials and equipment, fabrication of special materials and equipment along with their installation and testing.
Within fifteen (15) calendar days of contract award, the contractor must submit the schedule and work plan.
Notice to Proceed (NTP) will not be issued until the schedule and phasing plan is approved.
FAA Maintenance Moratoriums:
A holiday maintenance moratorium is imposed annually by Technical Operations during the following peak holiday travel periods:
1. Memorial Day
2. Independence Day
3. Labor Day
4. Thanksgiving
5. Christmas and New Year’s
Maintenance and hard moratorium dates and times will be provided upon request.
Local Moratorium Events – The dates, times, and affected facilities for local moratorium events are determined at the district level in consultation with local Air Traffic. Coordinate with FAA onsite representative for Local Moratorium events.
Moratorium Waivers – No work is permitted during maintenance moratoriums without an approved wavier.
Coordinate waiver requests with FAA onsite representative. Moratorium waivers must be submitted via the Maintenance Moratorium Waiver System (MMWS) and are not guaranteed. No moratorium waivers will be granted during hard moratorium dates and times.
7. SPECIAL PRECAUTIONS and SAFETY:
Project facilities are United States Government, Federal Aviation Administration (FAA) facilities used in Air Traffic Control. Loss of Human Life may result from service interruption. Any person who interferes with Air Traffic Control, damages, or trespasses on this property will be prosecuted under Federal law. All persons, vendors or suppliers requiring facility access must coordinate entry with the local facility personnel at least 24 hours in advance.
General Safety Provisions – Safe working conditions must be provided and maintained for all onsite personnel for the full duration of project. Work in surroundings or under working conditions that are unsanitary, hazardous, or dangerous to the health and safety of the employee must not be permitted.
Accident Prevention – An accident prevention program must be maintained onsite to ensure frequent and regular inspections of the job site, materials, and equipment are conducted by a designated competent person.
Competent Persons – Competent person training documentation must be provided where required by 29 CFR 1910 and 29 CFR 1926, such as fall protection and crane/rigging operations. Additional training records may be required on a case-by-case basis.
Use of Equipment – All machinery, tools, material, or equipment utilized must follow OSHA regulations. Only employees qualified by training and/or experience must be permitted to operate equipment and machinery.
Accident Reporting – All accidents must be reported immediately to the local FAA facilities personnel.
Accident and investigation reports are to be copied to the local FAA facilities personnel. within 48 hours.
Accident scenes must not be disturbed until a full and complete accident investigation has been undertaken with the local FAA facilities personnel and other required personnel.
The FAA will not be held responsible for safety inspections to ensure conformance with the OSHA safety regulations; however, the FAA reserves the right to notify the Contractor of any deficiencies regarding worker safety.
8. SUPPLIES AND EQUIPMENT
Shipping and Receiving of Materials – FAA will not be responsible for shipping or receiving any material relating to this project.
Protection of Materials – All materials and supplies to be incorporated into this project must be protected and maintained in like new condition.
Storage of Materials – Temporary storage units/containers for material associated with work may be located on site for the duration of the project. The size and location of storage must be coordinated with the local FAA facilities personnel.
9. FAA RESPONSIBILITIES:
The following FAA Responsibilities applicable to this Statement of Work include:
a) Access – FAA will provide escort services and onsite access to the subject facility.
b) Supervision – FAA will provide facilities representative oversight for onsite contracted activities.
c) Document Review – FAA will review submittals for contractor plans, schedule, product data sheets, safety data sheets for all products, equipment, and materials. FAA will provide contractor one set of review comments with the following stipulations:
Data marked “Approved as Noted” is satisfactory, contingent upon contractor acceptance of corrections and/or notations, and if accepted does not require re-submittal. Data marked “Not Approved” does not meet job requirements, and contractor must re-submit on proper basis.
10. SUBMITTALS:
The following initial deliverables must be submitted and approved prior to start of work:
• Electronic .pdf copies of the project schedule.
• Electronic .pdf copies of work phasing plan.
• Electronic .pdf copies of the submittals including shop drawings, details, manufacturers’ product data sheets (PDS), and safety data sheets (SDS) for all proposed construction materials.
11. PROJECT LOCATION:
MYR ATCT
Address: Myrtle Beach International Airport, 3242 Tower Street, Myrtle Beach, SC 29577 GPS Coordinates: 33.683272, -78.933899
12. CONTACTS:
The following is a list of primary contacts involved in the project: Please contact us if you have any additional questions or concerns.
FAA REGIONAL & DISTRICT OFFICE CONTACTS
Chad E. Heurter, JAX District NIM (A) (470) 352-0845 Tim O’Leary, DFM (757)-709-0157
FAA MYR SSC CONTACTS
Joseph Palmer, MYR SSC Manager (843) 642-6741 John McDowell, MYR SSC Coordinator/COR (901) 498-3376
13. ATTACHMENTS:
1. Site Photos
2. Details
3. MYR ATCT Parking Lot and Site Refurbishment, Aerial View Plan
4. Specifications
ATTACHMENT 1 – SITE PHOTOS
Photo 1: Location of 5’ x 150’ asphalt parking extension.
Photo 2: Location of new gravel area to be established.
Photo 3: Existing cable vault lid to be raised. (Typ.)
Photo 4: Existing cable vault lid to be raised. (Typ.)
Photo 5: Existing cable vault lid to be raised. (Typ.)
Photo 6: Existing concrete sidewalk to be removed and replaced. (Typ.)
Photo 7: Existing concrete sidewalk to be removed
Photo 8: Existing concrete sidewalk to be removed
Photo 9: Existing concrete sidewalk to be removed
Photo 10: Existing concrete sidewalk to be removed
Photo 11: Existing concrete sidewalk to be removed
Photo 12: Existing asphalt at facility entrance road to be replaced. (Typ.)
Photo 13: Existing asphalt at facility entrance road
Photo 14: Existing asphalt at facility entrance road
Photo 15: Location of new concrete motorcycle parking area.
Photo 16: Location of new concrete motorcycle parking area.
ATTACHMENT 2 – DETAILS
Asphalt Pavement (New)
Asphalt Pavement (Connection to existing)
ASPHALT PAVEMENT DETAIL
Graded Aggregate, New Stone Area
Concrete Hardscape Pavement Detail
4” GRADED AGGREGATE
SURFACE COURSE
Concrete Hardscape Detail – Plan View
Concrete Hardscape Details – Section Views
Concrete Hardscape Details – Joints
Concrete Hardscape Details – Sidewalk Ramp
LEGEND:
1. Add/extend asphalt approximately 5'-0" x 150'-0"
2. Existing manholes to be raised. Three (3) total. to elevation even with existing grade.
3. Remove vegetation and Install geotextile fabric and 4" depth of #57 stone
4. Approximate location of concrete to be removed, replaced and/or added.
5. Mill and Replace 2" asphalt.
Install new prefabricated concrete downspout Diffuser/splashpad to prevent erosion
Existing precast concrete wheel stops Forty-seven (47) total.
Note: Twenty (20) existing wheel stops are damaged and must be replaced.
Coordinate with onsite FAA representative for wheel stops requiring replacement.
Install new prefabricated concrete downspout Diffuser/ splashpad at fire pump drain to prevent erosion
New concrete pad to be installed for motorcycle parking.
Precast concrete wheel stops to be relocated at 5' new asphalt extension.
Twelve (12) total. (Typ.)
Storage building with rotten front facade to be replaced with new CMU and steel, double security doors.
JUNE 2025
CRUSHED AGGREGATE BASE COURSE 32 11 23 - 1
FEDERAL AVIATION ADMINISTRATION
MYR ATCT - PARKING LOT AND SITE REFURBISHMENT
SECTION 32 11 23 - CRUSHED AGGREGATE BASE COURSE
PART 1 - GENERAL
1.01 RELATED DOCUMENTS:
A. Drawings and general provisions of the Contract, including General and Supplementary
1.02
Conditions apply to this Section.
SUMMARY:
A. This Section consists of a base course composed of crushed aggregates constructed on a
1.03 prepared course in accordance with these Specifications and in conformity to the dimensions and typical cross-sections shown on the Statement of Work.
RELATED REQUIREMENTS:
A. N/A
1.04 REFERENCE STANDARDS:
A. The publications listed below form a part of this Specification to the extent referenced. The publications are referred to within the text by the basic designation only.
1. ASTM International (ASTM):
a. ASTM C29 - Unit Weight of Aggregate.
b. ASTM C88 - Soundness of Aggregates by Use of Sodium Sulfate or Magnesium
Sulfate.
c. ASTM C117 - Materials Finer than No. 200 (75- m) Sieve in Mineral Aggregates by Washing.
d. ASTM C131 - Resistance to Degradation of Small-Size Coarse Aggregate by
Abrasion and Impact in the Los Angeles Machine.
e. ASTM C136 - Sieve Analysis of Fine and Coarse Aggregates.
f. ASTM D75 - Sampling Aggregate.
g. ASTM D422 - Particle Size Analysis of Soils.
h. ASTM D693 - Crushed Aggregate for Macadam Pavements.
i. ASTM D698 - Moisture-Density Relations of Soils and Soil-Aggregate Mixtures
Using 5.5-lb. (2.49-kg) Rammer and 12-inch (305-mm) Drop.
j. ASTM D1556 - Density of Soil in Place by the Sand-Cone Method.
k. ASTM D1557 - Test for Laboratory Compaction Characteristics of Soil Using
Modified Effort.
l. ASTM D2167 - Density and Unit Weight of Soil in Place by the Rubber Balloon
Method.
m. ASTM D2419 - Sand Equivalent Value of Soils and Fine Aggregate.
n. ASTM D6938 - In-Place Density and Water Content of Soil and Soil-Aggregate by
Nuclear Methods.
o. ASTM D3665 - Random Sampling of Construction Materials.
p. ASTM D4318 - Liquid Limit, Plastic Limit, and Plasticity Index of Soils.
1.05 SUBMITTALS:
A. Submit the following:
1. Product Data:
a. Sieve analysis.
b. Aggregate sources.
2. Test Reports.
MYR ATCT - PARKING LOT AND SITE REFURBISHMENT
JUNE 2025
CRUSHED AGGREGATE BASE COURSE 32 11 23 - 2
1.06 QUALITY ASSURANCE:
A. Equipment Approval:
1. All plant, equipment, and tools used in the performance of the Work will be subject to approval before the Work is started and shall be maintained in satisfactory working condition at all times. Submit a list of proposed equipment, including descriptive data.
Provide adequate equipment having the capability of producing the required compaction, meeting grade controls, thickness control, and smoothness requirements as set forth herein.
B. Sampling and testing are the responsibility of the Contractor and performed by a testing laboratory approved by the Engineer. Work requiring testing will not be permitted until the testing laboratory has been inspected and approved. Test the materials to establish compliance with the specified requirements; perform testing at the specified frequency. The Engineer may specify the time and location of the tests. Furnish copies of test results to the Engineer within 24 hours of completion of the tests.
1. Sampling:
a. Take samples for laboratory testing in conformance with ASTM D75/D75M.
When deemed necessary, the sampling will be observed by the Engineer.
2. Tests:
a. Perform the following tests in conformance with the applicable standards listed.
b. Sieve Analysis:
(1) Make sieve analysis in conformance with ASTM C117 and ASTM C136.
Sieves shall conform to ASTM E11.
c. Liquid Limit and Plasticity Index:
(1) Determine liquid limit and plasticity index in accordance with ASTM D4318.
d. Moisture-Density Determinations:
(1) Determine the laboratory maximum dry density and optimum moisture content in accordance with AASHTO T 180, Method D and corrected with
AASHTO T 224.
e. Field Density Tests:
(1) Measure field density in accordance with ASTM D2167, or ASTM D6938.
For the method presented in ASTM D6938 check the calibration curves and adjust them, if necessary, using only the sand cone method as described in Paragraph "Calibration," of the ASTM publication. Tests performed in accordance with ASTM D6938 result in a wet unit weight of soil, and ASTM D6938 shall be used to determine the moisture content of the soil. The calibration curves furnished with the moisture gauges shall also be checked along with density calibration checks as described in ASTM D6938. The calibration checks of both the density and moisture gauges shall be made by the prepared containers of material method, as described in Paragraph "Calibration" of ASTM D6938, on each different type of material being tested at the beginning of a job and at intervals as directed.
(a) Submit certified copies of test results for approval not less than 30 days before material is required for the Work.
(b) Submit calibration curves and related test results prior to using the device or equipment being calibrated.
(c) Submit copies of field test results within 24 hours after the tests are performed.
f. Wear Test:
(1) Perform wear tests on aggregate base course material in conformance with
ASTM C131.
g. Soundness:
JUNE 2025
CRUSHED AGGREGATE BASE COURSE 32 11 23 - 3
(1) Perform soundness tests on GCA in accordance with ASTM C88.
3. Testing Frequency:
a. Initial Tests:
(1) Perform one of each of the following tests, on the proposed material prior to commencing construction, to demonstrate that the proposed material meets all specified requirements when furnished. If materials from more than one source are going to be utilized, this testing shall be completed for each source.
(a) Sieve Analysis.
(b) Liquid limit and plasticity index.
(c) Moisture-density relationship.
(d) Wear.
(e) Soundness.
b. In Place Tests:
(1) Perform each of the following tests on samples taken from the placed and compacted aggregate base course. Samples shall be taken and tested at the rates indicated. Perform sampling and testing of recycled concrete aggregate at twice the specified frequency until the material uniformity is established.
(a) Perform density tests on every lift of material placed and at a frequency of one set of tests for every 250 square yards (250 square meters), or portion thereof, of completed area.
(b) Perform sieve analysis on every lift of material placed and at a frequency of one sieve analysis for every 500 square yards (500 square meters), or portion thereof, of material placed.
(c) Perform liquid limit and plasticity index tests at the same frequency as the sieve analysis.
(d) Measure the total thickness of the base course at intervals, in such a manner as to ensure one measurement for each 500 square yards (meters) of base course. Measurements shall be made in 3-inch (75-
mm) diameter test holes penetrating the base course.
4. Approval of Material:
a. Select the source of the material 30 days prior to the time the material will be required in the Work. Tentative approval of material will be based on initial tests results. Final approval of the materials will be based on sieve analysis, liquid limit, and plasticity index tests performed on samples taken from the completed and fully compacted course(s).
1.07 ENVIRONMENTAL REQUIREMENTS:
A. Perform construction when the atmospheric temperature is above 35ºF (2ºC). When the temperature falls below 35ºF (2ºC), protect all completed areas by approved methods against detrimental effects of freezing. Correct completed areas damaged by freezing, rainfall, or other weather conditions to meet specified requirements.
PART 2 - PRODUCTS
2.01 MATERIALS:
A. Aggregate:
1. Aggregates shall consist of clean, sound, durable particles of crushed stone, crushed gravel, or crushed slag and shall be free from coatings of clay, silt, vegetable matter, and other objectionable materials and shall contain no clay balls. Fine aggregate passing the No. 4 (4.75-mm) sieve shall consist of fines from the operation of crushing the coarse aggregate. If necessary, fine aggregate may be added to produce the correct gradation.
JUNE 2025
CRUSHED AGGREGATE BASE COURSE 32 11 23 - 4
The fine aggregate shall be produced by crushing stone, gravel, or slag that meets the requirements for wear and soundness specified for coarse aggregate.
2. The crushed slag shall be an air-cooled, blast furnace slag and shall have a unit weight of not less than 70 pounds per cubic foot (1.12 Mg/cubic meter) when tested in accordance with ASTM C29.
3. The coarse aggregate portion, defined as the material retained on the No. 4 (4.75-mm) sieve and larger, shall contain no more than 15%, by weight, of flat or elongated pieces as defined in ASTM D693 and shall have at least 90% by weight of particles with at least two fractured faces and 100% with at least one fractured face. The area of each face shall be equal to at least 75% of the smallest midsectional area of the piece. When two fractured faces are contiguous, the angle between the planes of fractures shall be at least 30 degrees to count as two fractured faces.
4. The percentage of wear shall not be greater than 45% when tested in accordance with ASTM C131. The sodium sulfate soundness loss shall not exceed 12%, after 5 cycles, when tested in accordance with ASTM C88.
5. The fraction passing the No. 40 (0.42-mm) sieve shall have a liquid limit no greater than 25 and a plasticity index of not more than 4 when tested in accordance with ASTM D4318. The fine aggregate shall have a minimum sand equivalent value of 35 when tested in accordance with ASTM D2419.
a. Sampling and Testing: In lieu of testing, the Engineer may accept certified state test results indicating that the aggregate meets Specification requirements.
Certified test results shall be less than 6 months old.
b. Gradation Requirements:
(1) The gradation (job mix) of the final mixture shall fall within the design range indicated in Table 1, when tested in accordance with ASTM C117 and ASTM C136. The final gradation shall be continuously well graded from coarse to fine and shall not vary from the low limit on one sieve to the high limit on an adjacent sieve or vice versa. Where environmental conditions (temperature and availability of free moisture) indicate potential damage due to frost action, the maximum percent of material by weight of particles smaller than
0.02 mm shall be 3% when tested in accordance with ASTM D422.
Table 1 Requirements for Gradation of Aggregate
Sieve Size Design Range Percentage by Weight
Job Mix Tolerances Percent
2 inch (50.0 mm) 100 0
1-1/2 inch (37.0 mm) 95-100 ±5
1 inch (25.0 mm) 70-95 ±8
3/4 inch (19.0 mm) 55-85 ±8
No. 4 (4.75 mm) 30-60 ±8
No. 30 (0.60 mm) 12-30 ±5
No. 200 (0.075 mm) 0-8 ±3
JUNE 2025
CRUSHED AGGREGATE BASE COURSE 32 11 23 - 5
(2) The job mix tolerances in Table 1 shall be applied to the job mix gradation to establish a job control grading band. The full tolerance still will apply if application of the tolerances results in a job control grading band outside the design range.
(3) The fraction of the final mixture that passes the No. 200 (0.075-mm) sieve shall not exceed 60% of the fraction passing the No. 30 (0.60-mm) sieve.
PART 3 - EXECUTION
3.01 PREPARING UNDERLYING COURSE:
A. The underlying course shall be checked and accepted by the Engineer before placing and spreading operations are started. Any ruts or soft yielding places caused by improper drainage conditions, hauling, or any other cause shall be corrected at the Contractor's expense before the base course is placed thereon. Material shall not be placed on frozen subgrade.
3.02 MIXING:
A. The aggregate shall be uniformly blended during crushing operations or mixed in a plant. The plant shall blend and mix the materials to meet the Specifications and to secure the proper moisture content for compaction.
3.03 PLACING:
A. The crushed aggregate base material shall be placed on the moistened subgrade in layers of uniform thickness with a mechanical spreader.
B. The maximum depth of a compacted layer shall be 6 inches (150 mm). If the total depth of the compacted material is more than 6 inches (150 mm), it shall be constructed in two or more layers. In multi-layer construction, the base course shall be placed in approximately equal-depth layers.
C. The previously constructed layer should be cleaned of loose and foreign material prior to placing the next layer. The surface of the compacted material shall be kept moist until covered with the next layer.
3.04 COMPACTION:
A. Immediately upon completion of the spreading operations, the crushed aggregate shall be thoroughly compacted. The number, type, and weight of rollers shall be sufficient to compact the material to the required density.
B. The moisture content of the material during placing operations shall not be below, or more than 2 percentage points above, the optimum moisture content as determined by ASTM D698.
3.05 ACCEPTANCE SAMPLING AND TESTING FOR DENSITY:
A. Aggregate base course shall be accepted for density on a lot basis. A lot will consist of one day's production where it is not expected to exceed 2,400 sq. yds. (2000 sq. m). A lot will consist of one-half day's production where a day's production is expected to consist of between 2,400 and 4,800 sq. yds. (2000 and 4000 sq. m).
B. Each lot shall be divided into two equal sublots. One test shall be made for each sublot.
Sampling locations will be determined by a random basis in accordance with statistical procedures contained in ASTM D3665.
C. Each lot will be accepted for density when the field density is at least 100% of the maximum density of laboratory specimens prepared from samples of the base course material delivered to the Job Site. The specimens shall be compacted and tested in accordance with ASTM D698.
The in-place field density shall be determined in accordance with ASTM D1556 or D2167. If the specified density is not attained, the entire lot shall be reworked and/or recompacted and
JUNE 2025
CRUSHED AGGREGATE BASE COURSE 32 11 23 - 6
two additional random tests made. This procedure shall be followed until the specified density is reached.
D. In lieu of the core method of field density determination, acceptance testing may be accomplished using a nuclear gauge in accordance with ASTM D6938. The gauge should be field calibrated in accordance with Section 120 and ASTM Standards. Calibration tests shall be conducted on the first lot of material placed that meets the density requirements.
E. When using the nuclear method ASTM D6938 shall be used to determine the moisture content of the material. The calibration curve furnished with the nuclear gauges shall be checked in accordance with ASTM standards. The calibration checks shall be made at the beginning of a job and at regular intervals.
F. If a nuclear gauge is used for density determination, two random readings shall be made and averaged for each sublot.
3.06 FINISHING:
A. The surface of the aggregate base course shall be finished by blading or with automated equipment especially designed for this purpose.
B. In no case will the addition of thin layers of material be added to the top layer of base course to meet grade. If the elevation of the top layer is 1/2 inch (12 mm) or more below grade, the top layer of base shall be scarified to a depth of at least 3 inches (75 mm), new material added, and the layer shall be blended and recompacted to bring it to grade. If the finished surface is above plan grade, it shall be cut back to grade and rerolled.
3.07 SURFACE TOLERANCES:
A. The finished surface shall not vary more than 3/8 inch (9 mm) when tested with a 16-foot
(4.8-m) straightedge applied parallel with or at right angles to the centerline. Any deviation in excess of this amount shall be corrected by the Contractor at the Contractor's expense.
3.08 THICKNESS CONTROL:
A. The completed thickness of the base course shall be within 1/2 inch (12 mm) of the design thickness. Four determinations of thickness shall be made for each lot of material placed. The lot size shall be consistent with that specified in Paragraph 3.05. Each lot shall be divided into four equal sublots. One test shall be made for each sublot. Sampling locations will be determined by a random basis in accordance with procedures contained in ASTM D3665.
Where the thickness is deficient by more than 1/2 inch (12 mm), the Contractor shall correct such areas at no additional cost by excavating to the required depth and replacing with new material. Additional test holes may be required to identify the limits of deficient areas.
3.09 MAINTENANCE:
A. The base course shall be maintained in a condition that will meet all specification requirements until the Work is accepted. Equipment used in the construction of an adjoining section may be routed over completed portions of the base course, provided no damage results and provided that the equipment is routed over the full width of the base course to avoid rutting or uneven compaction.
B. The Contractor shall remove all survey and grade hubs from the base courses prior to placing any bituminous surface course.
END OF SECTION 32 11 23
BITUMINOUS PRIME COAT 32 12 14 - 1
FEDERAL AVIATION ADMINISTRATION
MYR ATCT - PARKING LOT AND SITE REFURBISHMENT
SECTION 32 12 14 – BITUMINOUS PRIME COAT
PART 1 - GENERAL
1.01 RELATED DOCUMENTS:
A. Drawings and general provisions of the Contract, including General and Supplementary
1.02
Conditions apply to this Section.
SUMMARY:
A. This Section includes hot bituminous prime coat over previously prepared, crushed rock base course.
1.03 RELATED REQUIREMENTS:
A. Site Preparation and Earthwork: Section 31 20 50.
B. Crushed Aggregate Base Course: Section 32 11 23.
1.04 REFERENCE STANDARDS:
A. Applicable Standards:
1. ASTM International (ASTM): Equivalent AASHTO standards may be substituted as approved.
a. ASTM D140 - Practice for Sampling Bituminous Materials.
b. ASTM D633 - Volume Correction Table for Road Tar.
c. ASTM D977 - Emulsified Asphalt.
d. ASTM D1250 - Guide for Petroleum Measurement Tables.
e. ASTM D2027 - Cutback Asphalt (Medium-Curing Type).
f. ASTM D2028 - Cutback Asphalt (Rapid-Curing Type).
g. ASTM D2397 - Cationic Emulsified Asphalt.
2. American Association of State Highway and Transportation Officials (AASHTO):
a. M52 - Tar for Use in Road Construction.
3. Asphalt Institute (AI):
a. MS-6 Table IV-3 - Temperature-Volume Corrections for Emulsified Asphalts.
1.05 SUBMITTALS:
1.06
A. Submit as specified in Statement of Work B. Submit certifications for material specified and for each batch of material.
C. Certificates shall be prepared by an Engineer-approved testing laboratory and submitted to
Engineer by Contractor for acceptance prior to use in the Work.
QUALITY ASSURANCE:
A. Sampling and Testing:
1. Tests to determine conformance with all requirements of this Specification for quality and properties of all Contractor-secured materials shall be performed by an independent commercial laboratory retained and compensated by Contractor, and approved by Engineer. In lieu of testing, Contractor may submit certified state test results indicating that the material meets Specification requirements to Engineer for approval.
PART 2 - PRODUCTS
2.01 BITUMINOUS MATERIAL:
A. General Requirements: Bituminous material shall be either cutback asphalt, emulsified asphalt, or tar and shall conform to the appropriate ASTM (or AASHTO) standard.
JUNE 2025
BITUMINOUS PRIME COAT 32 12 14 - 2
B. Bituminous material shall conform to ASTM 2027 MC-70.
2.02 EQUIPMENT:
A. General Requirements:
1. Furnish and maintain all equipment, tools, and machines used in the performance of the Work in satisfactory working condition at all times.
2. Equipment shall be subject to approval of Engineer.
B. Bitumen distributor shall be as follows:
1. Designed and equipped so as to distribute bituminous material uniformly at even heat on variable widths of surface and to distribute the bituminous material at readily determined and controlled rates from 0.05 to 2.0 gal. per yd.² (0.25 to 9.0 L per m²).
2. Have pneumatic tires of such width and number that the load produced on the base surface does not exceed 650 lbs. per inch (290 kg per 25 mm) of tire width.
3. Have a pressure range of 25 to 75 psi (175 to 520 kPa).
4. Allowable variation from any specified rate shall not exceed 5%.
5. Equipped for circulation and agitation of the bituminous material during the heating process.
C. Distributor Equipment shall include the following:
1. Bitumen pump.
2. Tachometer.
3. Pressure gauges.
4. Volume measuring device.
5. Thermometer for temperature of tank contents.
6. Hose attachment to apply materials to spots unavoidably missed by distributor.
D. Heating Equipment shall include the following:
1. Steam coils and equipment for producing steam, or approved type retort heater manufactured for heating asphaltic products, at Contractor's option, designed so that steam will not be introduced into the material.
2. An armored thermometer (if storage tanks are used) with a range from 100 to 400ºF (38 to 205ºC), fixed to tank to continuously indicate temperature of bituminous material.
E. Power brooms and power blowers shall be of the industrial type and suitable for cleaning prepared base.
PART 3 - EXECUTION
3.01 PREPARATION OF SURFACE:
A. Remove all loose and objectionable material from surface by sweeping with power broom or airblasting.
B. Sprinkle surface with water immediately in advance of application if surface is excessively dry.
C. Obtain approval from Engineer prior to application of prime coat.
3.02 WEATHER LIMITATIONS:
A. Apply prime coat only when subgrade or aggregate base course is dry enough to permit uniform distribution and desired penetration.
B. Apply only when atmospheric temperature is above 60ºF (5ºC).
3.03 APPLICATION TEMPERATURE:
A. The application temperature of the prime coat shall be 120+ ºF.
3.04 SAMPLING AND TESTING:
A. Conform to ASTM D140.
JUNE 2025
BITUMINOUS PRIME COAT 32 12 14 - 3
B. Furnish the Supplier’s certified test reports for each carload, or equivalent, of bituminous material shipped to the Site. Test reports shall be delivered to Engineer prior to application of material.
3.05 APPLICATION OF BITUMINOUS MATERIAL:
A. Apply by means of a bituminous distributor at the temperature, pressure, and in amounts approved by Engineer to obtain uniform distribution at all points of surface.
B. Apply at approximate rate of 0.30 to 0.50 gal. per yd.² (1.4 to 2.3 L per m²) to prepared subgrade or aggregate base course. Engineer will determine exact quantities which will vary to suit field conditions.
C. Properly treat all spots unavoidably missed by distributor.
1. Protect all structures, curbs, gutters, and other roadway appurtenances from being splattered with bituminous material. If splattered, remove all traces of bituminous materials.
D. Allow surface to cure without being disturbed for such period as may be necessary to permit drying out and setting of the prime coat.
E. Maintain surface until the succeeding layer of pavement has been placed.
F. If directed by Engineer, areas deemed to have excess bituminous prime coat shall be blotted with approved material.
3.06 WAYBILLS AND DELIVERY TICKETS:
A. Submit daily during the progress of the Work.
END OF SECTION 32 12 14
BITUMINOUS TACK COAT 32 12 15 - 1
FEDERAL AVIATION ADMINISTRATION
MYR ATCT - PARKING LOT AND SITE REFURBISHMENT
SECTION 32 12 15 – BITUMINOUS TACK COAT
PART 1 - GENERAL
1.01 RELATED DOCUMENTS:
A. Drawings and general provisions of the Contract, including General and Supplementary
1.02
Conditions apply to this Section.
SUMMARY:
A. This Section includes hot bituminous tack coat over previously prepared bituminous base course.
1.03 RELATED REQUIREMENTS:
1. Asphalt Paving: Section 32 12 16.
1.04 REFERENCE STANDARDS:
A. Applicable Standards:
1. ASTM International (ASTM):
a. ASTM D140 - Practice for Sampling Bituminous Materials.
b. ASTM D633 - Volume Correction Table for Road Tar.
c. ASTM D977 - Emulsified Asphalt.
d. ASTM D1250 - Guide for Petroleum Measurement Tables.
e. ASTM D2028 - Cutback Asphalt (Rapid-Curing Type).
f. ASTM D2397 - Cationic Emulsified Asphalt.
2. American Association of State Highway and Transportation Officials (AASHTO):
a. AASHTO M52 - Tar for Use in Road Construction.
3. Asphalt Institute (AI):
a. MS-6 Table IV-3 - Temperature-Volume Correction for Emulsified Asphalts.
1.05 SUBMITTALS:
1.06
A. Submit as specified in Statement of Work.
B. Submit for material specified.
C. Submit for each batch of material.
D. Certificates shall be prepared by an Engineer approved testing laboratory and submitted to
Engineer by Contractor for acceptance.
QUALITY ASSURANCE:
A. Sampling and Testing:
1. Tests to determine conformance with all requirements of this Specification for quality and properties of all Contractor-secured sources of materials shall be performed by an independent commercial laboratory retained and compensated by Contractor and approved by Engineer. In lieu of testing, Contractor may submit certified state test results indicating that the aggregate meets Specification requirements to Engineer for approval.
PART 2 - PRODUCTS
2.01 BITUMINOUS MATERIAL:
A. General Requirements: Bituminous material shall be either cutback asphalt, emulsified asphalt, or tar and shall conform to the appropriate ASTM (or AASHTO) standard.
1. Emulsified asphalt: ASTM D977 or D2397
JUNE 2025
BITUMINOUS TACK COAT 32 12 15 - 2
2. Cutback asphalt: ASTM D2028
3. Tar: AASHTO M52
2.02 EQUIPMENT:
A. General Requirements:
1. Furnish and maintain all equipment, tools, and machines used in the performance of the work required by this Section in satisfactory working condition at all times.
2. Equipment shall be subject to approval of Engineer.
B. Bitumen Distributor:
1. Distributor shall be designed and equipped so as to distribute bituminous material uniformly at even heat on variable widths of surface.
2. Pneumatic tires shall be of such width and number that the load produced on the base surface does not exceed 650 lbs. per inch (290 kg per 25 mm) of tire width.
3. Distribute the bituminous material at readily determined and controlled rates from 0.05 to
2.00 gal. per yd.² (0.24 to 9.0 L per m²).
4. Distributor shall have a pressure range of 25 to 75 psi (175 to 525 kPa).
5. Allowable variation from any specified rate shall not exceed 10%.
6. Distributor shall be equipped for circulation and agitation of the bituminous material during the heating process.
C. Distributor Equipment shall include the following:
1. Bitumen pump.
2. Tachometer.
3. Pressure gauges.
4. Volume measuring device.
5. Thermometer for temperature of tank contents.
6. Hose attachment to apply materials to spots unavoidably missed by distributor.
D. Heating Equipment shall include the following:
1. Steam coils and equipment for producing steam, or approved type retort heater manufactured for heating asphaltic products, at Contractor's option, so designed that steam will not be introduced into the material.
2. An armored thermometer (if storage tanks are used) with a range from 100 to 400ºF (38 to 205ºC), fixed to tank to continuously indicate temperature of bituminous material.
E. Power brooms and power blowers shall be of the industrial type and suitable for cleaning prepared bases.
PART 3 - EXECUTION
3.01 PREPARATION OF SURFACE:
A. Remove all loose and objectionable material from surface by sweeping with a power broom and/or airblasting.
B. Sprinkle surface with water immediately in advance of application if surface is excessively dry.
C. Obtain approval from Engineer prior to application of tack coat.
3.02 WEATHER LIMITATIONS:
A. Apply tack coat only when base course is dry enough to permit uniform distribution and desired penetration.
B. Apply only when atmospheric temperature is above 60ºF (15ºC).
3.03 APPLICATION TEMPERATURE:
A. The application temperature of the tack coat shall be:
1. Emulsified asphalt: 75 - 130ºF
JUNE 2025
BITUMINOUS TACK COAT 32 12 15 - 3
2. Cutback asphalt: 120 - 160ºF
3. Tar: 60 - 120ºF
3.04 SAMPLING AND TESTING:
A. Conform to ASTM D140.
B. Furnish the Supplier’s certified test reports for each carload, or equivalent, of bituminous material shipped to the Site. Test reports shall be delivered to Engineer prior to application of material.
3.05 APPLICATION OF BITUMINOUS MATERIAL:
A. Apply by means of a bituminous distributor at the temperature, pressure, and in amounts approved by Engineer to obtain uniform distribution at all points of surface.
B. Apply at approximate rate of 0.05 to 0.15 gal. per yd.² (0.24 to 0.72 L per m²) to asphaltic base course. Engineer will determine exact quantities which will vary to suit field conditions.
C. Properly treat all spots unavoidably missed by distributor.
D. Allow surface to cure without being disturbed for such period as may be necessary to permit drying out and setting of the tack coat.
E. Maintain surface until the succeeding layer of pavement has been placed.
F. If directed by Engineer, areas deemed to have excess bituminous tack shall be blotted with approved material.
3.06 WAYBILLS AND DELIVERY TICKETS:
A. Submit daily during the progress of the Work.
END OF SECTION 32 12 15
ASPHALT PAVING 32 12 16 - 1
FEDERAL AVIATION ADMINISTRATION
MYR ATCT - PARKING LOT AND SITE REFURBISHMENT
SECTION 32 12 16 - ASPHALT PAVING
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Hot-mix asphalt patching.
2. Hot-mix asphalt paving.
3. Hot-mix asphalt overlay.
1.3 RELATED REQUIREMENTS
A. Section 32 12 14 Bituminous Prime Coat
B. Section 32 12 15 Bituminous Tack Coat
C. Section 32 11 23 Crushed Aggregate Base Course
1.4 REFERENCE STANDARDS
A. The publications listed below form a part of this Specification to the extent referenced.
This is the start of the file's text. The full file is on GovTribe.