SOW.docx

DOCX document 18 KB Posted

Attached to
Volusia County Lift Station Maintenance and Repair
Solicitation number
26-B-06JJ
Issued by
Volusia County, Florida

About this file

This Scope of Work document outlines maintenance and repair services for the County of Volusia's lift station infrastructure. Volusia County is seeking qualified contractors to service 29 lift station locations containing 35 tanks and 61 pumps, including 19 E-One pumps distributed across multiple county facilities. The solicitation was released on October 15, 2025, with questions due by November 5, 2025, and final bid responses required by November 19, 2025, at 3:00 PM. The contract offers an initial three-year term with two optional one-year renewals, subject to mutual agreement and County Council approval. The County reserves the right to add or remove locations and services during the contract term.

Contractors must maintain one of three Florida licenses: Certified Plumbing Contractor, Underground Utility Contractor, or Electrical Contractor. Pricing must include all labor, materials, supervision, permits, equipment, freight, and transportation costs, with separate pricing required for different service types and timeframes. Routine service calls require 48-hour response times, while emergency calls require 4-hour response times. Maintenance includes quarterly inspections of pumps, float systems, alarm systems, electrical components, and check valves, as well as annual tasks including tank washing, megohm and lock rotor amp testing, sediment trap cleaning, E-One pump rebuilding, and holding tank pump servicing. Contractors must provide comprehensive insurance coverage of $1,000,000 per occurrence and $2,000,000 in general aggregate for commercial general liability, with $1,000,000 combined single limit auto liability coverage. The solicitation does not specify explicit set-aside designations or budget ranges, and contractors must submit a Prime/Subcontractor Form detailing all proposed subcontractors and their work percentages.

View the file

Other files

File Type Posted
Volusia_County_Lift_Station_Maintenance_and_Repair_(Addendum_#2_Revision).pdf PDF
IMG_2757.jpeg JPEG file
IMG_2755.jpeg JPEG file
IMG_2756.jpeg JPEG file
IMG_2758.jpeg JPEG file
sample_invoice_#4.pdf PDF
sample_invoice_#3.pdf PDF
sample_invoice_#2.pdf PDF
sample_invoice_#1.pdf PDF
Volusia_County_Lift_Station_Maintenance_and_Repair.pdf PDF
Lift_Station_List_of_Locations.pdf PDF
26-B-06JJ_Lift_Station_Maintenance_Repair_Insurance_Requirements.docx DOCX document
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls XLS spreadsheet
Lift_Station_List_and_Price_Sheet.xlsx XLSX spreadsheet
SOW.docx DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

1.0 SCOPE OF WORK

The County of Volusia seeks contractors to provide necessary labor, supervision, materials, permits, and equipment for maintenance and repair of lift stations located within the County. The current inventory includes 29 lift station locations with 35 tanks and 61 pumps total (including 19 E-One pumps). The County reserves the right to add and/or remove locations/services during the agreement term.

1.1 CONTRACTOR RESPONSIBILITIES

A. Documentation Requirements:

· Record and document all findings and submit to County Project Manager after each maintenance period

· Compare amp draw and run hours to previous records for declining performance signs B. General Requirements:

· Furnish all labor, materials, supervision, permits and equipment for all work and repairs

· Normal business hours: Monday through Friday, 7:30 AM through 5:00 PM

· After hours: Any time after 5:00 PM Monday-Friday, weekends, and County holidays C. Response Time Requirements:

· Routine service calls: Within 48 hours

· Emergency service calls: Within 4 hours D. Licensing Requirements:

· Must maintain State of Florida Certified Plumbing Contractor license, and/or

· Licensed State of Florida Underground Utility Contractor license, and/or

· State Certified Electrical Contractor license E. Additional Requirements:

· Provide documentation of retail prices for replacement parts upon request

1.2 MAINTENANCE REQUIREMENTS

Quarterly Maintenance (Quarters 1, 2, and 3):

1. Clean and inspect submersible pumps for obstructions, amp draw, and run hours

2. Clean and inspect the float system operation

3. Inspect the operation of the alarm system

4. Inspect all electrical components for tightness and corrosion

5. Inspect the operation of the check valves

6. Lube all locks and hinges

7. Complete repairs as needed Annual Maintenance (Quarter 4 plus above tasks):

1. Pump out and wash the holding tank and pump assembly

2. Perform megohm test and lock rotor amp test on all pump motors

3. Clean Bird Sanctuary Sediment Trap twice annually (coordinated with County)

4. Pull and rebuild one (1) Environment One (E-1) pump annually

5. Clean and service holding tank pumps annually

6. Complete repairs as needed

1.3 PRICING STRUCTURE

All pricing must include freight, transportation, labor, materials, supervision, permits, equipment, and additional costs. Separate pricing is required for different service types and timeframes.

Critical Service Requirements:

· Response Times: 48 hours routine, 3 hours emergency

· Licensing: Must hold Florida Certified Plumbing, Underground Utility, and/or Electrical Contractor licenses

File details come from the government source that posted it. Updated .