SOW.docx

DOCX document 18 KB Posted

Attached to
Volusia County Lift Station Maintenance and Repair
Solicitation number
26-B-06JJ
Issued by
Volusia County, Florida

About this file

The document is a Scope of Work (SOW) for Volusia County, Florida, seeking contractors to provide maintenance and repair services for lift stations within the county. The current project involves 29 lift station locations with 35 tanks and 61 pumps, including 19 E-One pumps, with the county reserving the right to add or remove locations during the contract term. Contractors are required to perform quarterly and annual maintenance tasks, including cleaning and inspecting submersible pumps, float systems, alarm systems, electrical components, and check valves. Response time requirements mandate 48-hour response for routine service calls and 4-hour response for emergency service calls.

Pricing must include all associated costs such as freight, transportation, labor, materials, supervision, permits, and equipment. Contractors must hold specific Florida licensing credentials, including Certified Plumbing Contractor, Underground Utility Contractor, or Electrical Contractor licenses. The maintenance requirements include detailed quarterly inspections and annual tasks such as tank washing, motor testing, sediment trap cleaning, and annual pump rebuilding. The contract emphasizes comprehensive maintenance with specific technical requirements for lift station infrastructure, ensuring thorough and professional service delivery for the county's critical infrastructure.

View the file

Other files

File Type Posted
Volusia_County_Lift_Station_Maintenance_and_Repair_(Addendum_#2_Revision).pdf PDF
IMG_2757.jpeg JPEG file
IMG_2755.jpeg JPEG file
IMG_2756.jpeg JPEG file
IMG_2758.jpeg JPEG file
sample_invoice_#4.pdf PDF
sample_invoice_#3.pdf PDF
sample_invoice_#2.pdf PDF
sample_invoice_#1.pdf PDF
Volusia_County_Lift_Station_Maintenance_and_Repair.pdf PDF
Lift_Station_List_of_Locations.pdf PDF
26-B-06JJ_Lift_Station_Maintenance_Repair_Insurance_Requirements.docx DOCX document
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls XLS spreadsheet
Lift_Station_List_and_Price_Sheet.xlsx XLSX spreadsheet
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

1.0 SCOPE OF WORK

The County of Volusia seeks contractors to provide necessary labor, supervision, materials, permits, and equipment for maintenance and repair of lift stations located within the County. The current inventory includes 29 lift station locations with 35 tanks and 61 pumps total (including 19 E-One pumps). The County reserves the right to add and/or remove locations/services during the agreement term.

1.1 CONTRACTOR RESPONSIBILITIES

A. Documentation Requirements:

· Record and document all findings and submit to County Project Manager after each maintenance period

· Compare amp draw and run hours to previous records for declining performance signs B. General Requirements:

· Furnish all labor, materials, supervision, permits and equipment for all work and repairs

· Normal business hours: Monday through Friday, 7:30 AM through 5:00 PM

· After hours: Any time after 5:00 PM Monday-Friday, weekends, and County holidays C. Response Time Requirements:

· Routine service calls: Within 48 hours

· Emergency service calls: Within 4 hours D. Licensing Requirements:

· Must maintain State of Florida Certified Plumbing Contractor license, and/or

· Licensed State of Florida Underground Utility Contractor license, and/or

· State Certified Electrical Contractor license E. Additional Requirements:

· Provide documentation of retail prices for replacement parts upon request

1.2 MAINTENANCE REQUIREMENTS

Quarterly Maintenance (Quarters 1, 2, and 3):

1. Clean and inspect submersible pumps for obstructions, amp draw, and run hours

2. Clean and inspect the float system operation

3. Inspect the operation of the alarm system

4. Inspect all electrical components for tightness and corrosion

5. Inspect the operation of the check valves

6. Lube all locks and hinges

7. Complete repairs as needed Annual Maintenance (Quarter 4 plus above tasks):

1. Pump out and wash the holding tank and pump assembly

2. Perform megohm test and lock rotor amp test on all pump motors

3. Clean Bird Sanctuary Sediment Trap twice annually (coordinated with County)

4. Pull and rebuild one (1) Environment One (E-1) pump annually

5. Clean and service holding tank pumps annually

6. Complete repairs as needed

1.3 PRICING STRUCTURE

All pricing must include freight, transportation, labor, materials, supervision, permits, equipment, and additional costs. Separate pricing is required for different service types and timeframes.

Critical Service Requirements:

· Response Times: 48 hours routine, 3 hours emergency

· Licensing: Must hold Florida Certified Plumbing, Underground Utility, and/or Electrical Contractor licenses

File details come from the government source that posted it. Updated .