SOW ATTACHMENT L PLUMBING PLANS.pdf
PDF 3 MB Posted
- Solicitation number
- 36C77624R0107_1
About this file
This document appears to be the plumbing plans (Attachment L) for a federal contract opportunity to Establish a Radiation Oncology Program at the Southeast Louisiana Veterans Health Care System in New Orleans, LA.
The key details include:
- This is a design-build project for the Department of Veterans Affairs Technology Acquisition Center Austin.
- The plumbing plans show the layout of various plumbing systems, including sanitary sewer, storm sewer, domestic water, and grease waste, for the new facility.
- The plans provide information on pipe sizes, riser locations, floor drains, equipment connections, and other plumbing requirements.
- The document includes general notes on installation requirements, such as supporting plumbing risers, providing isolation valves, and adjusting mixing valve temperature limits.
- Several Request for Information (RFI) responses are referenced that made changes to the original plumbing design, such as relocating piping, deleting fixtures, and revising pipe sizes.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT L - PLUMBING PLANS
629-335 Establish Radiology Oncology Program at SLVHCS
(4)2"W UP
(4)2"W UP
3"W&T UP
2"V UP
2"W UP
4"GW UP TO FCO 6"GW UP
6" LOWER LEVEL
BUILDING SANITARY SEWER
SEE CIVIL ENGINEERING
DWGS. FOR CONTINUATION
INV. EL. 90'-9"
8"BUILDING SANITARY SEWER
(M.C.)SEE CIVIL ENGINEERING
DWGS.FOR CONTINUATION
INV. EL. 94'
15"BUILDING STORM SEWER
SEE CIVIL ENGINEERING
DWGS. FOR CONTINUATION
INV. EL. 95'
(28,500 SQ. FT.)
10"RL UP
(8,350 S.F.)
" R
L
6"GREASE WASTE BUILDING
SEWER SEE CIVIL ENGINEERING
DWGS. FOR CONTINUATION
INV. EL. 94'-3"
6"RL UP TO AD 6"RL UP TO AD
6"RL UP TO AD 6"RL UP TO AD
BACKWATER VALVE
WITH ACCESS PIT
10"RL UP TO FCO
4"GW UP TO FCO
ALL BELOW SLAB PIPING
(SANITARY, STORM, AND WATER)
SHALL BE HUNG FROM THE
UNDERSIDE OF THE SLAB. REFER
TO DETAIL DRAWING ON DWG 0P503
2"W UP
2"W UP
4"S UP
2"V UP
2"W UP
2"V RISE
2"V UP
2"V RISE
4"S UP
ACCESS PIT BY
OTHERS. REFER TO
STRUTURAL DWGS.
2P100-F
2P100-G
(3)1/2"TP UP
TO MANIFOLD
(2)2"V UP
4"W&T UP TO FD
4"W&T UP TO FD
4"W UP TO FCO
4"W UP TO FCO
2" V
2" V
1/ 2"
T P
1/ 2"
T P
4" SAN
6" SAN6" SAN
2"W UP TO FCO
2"W UP
4"W UP TO FCO
4"W UP TO FCO
4"W UP TO FCO
2"W UP4"W UP TO FCO
4"W UP TO FCO
4"W UP TO FCO
4"RL UP TO FCO
START INV. EL.=
4"W UP TO FCO
START INV. EL:=95'-5"
START INV. EL:=94'-5"
4"W UP TO FCO
4"W UP TO FCO
4"GW UP TO FCO
L.P.C.
5' - 0"
4"W UP TO FCO
4"RL UP T O FCO
FIRST FLOOR FINISH ELEVATION = 100'-0"
6" GW
8" S
A N
(M .C
6" SAN
6"RL UP TO FCO
GRADE BEAM PENNETRATION GRADE BEAM PENNETRATION GRADE BEAM PENNETRATION GRADE BEAM PENNETRATION GRADE BEAM PENNETRATION GRADE BEAM PENNETRATION
L.P.C.
5' - 0"
L.P.C.
5' - 0"
10"BUILDING STORM SEWER
SEE CIVIL ENGINEERING
DWGS. FOR CONTINUATION
INV. EL. 94'
8"W UP TO FCO
L.P.C.
5' - 0"
(2)4"VS FROM EXTIRIOR
GREASE TRAP SEE
CIVIL ENGENEERING
DWGS. FOR CONTINUATION
4"V UP(LIFT STATION)
(2)4"V UP(GREASE TRAP)
8"SS UP (658 DRAINAGE FIXTURE UNITS UP)
12"RL UP
(20,150 SQ.FT.)
4"LIFT STATION VENT
SEE CIVIL ENGENEERING
DWGS. FOR CONTINUATION
L.P.C.
5' - 0"
4" V 4" V
12" RL
8" SAN (M.C.)
8" S
A N
(M .C
4" V
4" V
(2)1/2"TP UP
TO MANIFOLD
1/ 2"
T P
1/ 2"
T P
6" S
A N
4"W&T UP
6"W & T UP
2"V UP
2"W UP
2"W UP
4"W& T UP
4"W&T UP(2)2"V UP
2"V UP
4"W UP TO FCO
4"W UP TO FCO
6" S
A N
6" S
A N
6" SAN
4" S
A N
4" S
A N4"
S A
N
4" SAN
2"V UP
6"W UP TO FCO
LPC
5' - 0"
6" SAN
6" R
L 6" R
L
6" R
L
6" R
L
6" RL
6" R
L
6" R
L
6" R
L
6" RL
1008 DRAINAGE FIXTURE UNITS
+65.1GPM CONTINUOUS
FLOW FOR EQUIPMENT
254 DRAINAGE FIXTURE UNITS
6" SAN
4"W UP
2"V UP
4"W & T UP
1/2" TP
1/2" TP
2"W UP
1/ 2"
T P
(2)1/2"TP UP
1/2"TP UP
2"W UP
2"W UP
4"W UP
4"W UP4" SAN
3"W&T UP
2"V UP
4"S UP
2"V UP
2"W&T UP
2"V UP
2" W&T UP
2"V UP
4"S UP
2"V UP
2"W UP
3"W&T UP
2"W UP
4"S UP TO FCO
4"S UP TO FCO
6" S
A N
02 E 02 D C
02 B
XA
02 H F.9
A.5
AA
AA.2
Y49
16.1
02 J
13.2
A
EJ 3
02 F
6" S
A N
(2)4"S UP
3"W&T UP
(3)4"S UP
(2)3"W UP
3"W&T UP
(3)4"S UP
4"W UP TO FCO
2"V UP
2"V UP
4"S UP
2”W UP
4"W UP TO FCO 2"V UP
4"S UP
2”W UP
4"W UP TO FCO
3"W&T UP
2"V UP
2"V UP
2"W&T UP
2"V UP
4"S UP
2"W UP
2"W UP TO FCO
4"W UP TO FCO
6" RL
4"W UP TO FCO
10" RL
4"W UP TO FCO
2" S
A N
6" GW
4" S
A N
2" SAN
4" S
A N
4" S
A N
6" SAN
4" SAN
6" SAN
SS
6"RL UP TO AD
Q D2 D1
E2 E1
F2 F1
G2 G1
A2
A4
A5
A1
A6
B1
C1 C2
B2
H
J1 J2
L
K
M1 M2 M3
N1 N2
A7
D3
E3
F3
R1
R4
R2 R3
A3
08 P
PLAN
NORTH
DATE
LOCATION
CHECKED DRAWN
PROJECT TITLE PROJECT NUMBER
DOCUMENT SET PACKAGE
DRAWING NUMBERAPPROVED: PROJECT DIRECTOR
DRAWING TITLEARCHITECT/ENGINEERS:CONSULTANTS:
REVISIONS: DATE
B
A
D
C
E
VA FORM 08-6231
O N
E
EI
G H
T
IN
C H
O
N E
FO
O
T O
N E
Q U
AR
TE
R
IN
C H
O
N E
FO
O
T O
N E
H
AL
F
IN
C H
O
N E
FO
O
T
TH
R
EE
Q U
AR
TE
R S
IN
C
H
O N
E
FO
O T
TH
R
EE
IN
C H
ES
O N
E
FO
O T
O N
E
IN
C H
F
O R
TY
F
EE
T
(1
0'
6"
6"
0'
0'
123456
F
B
A
D
C
E
F
O N
E
SI
XT
EE
N
TH
IN
C
H
O N
E
FO
O T
O N
E
AN
D O
N E
H
AL
F
IN
C H
ES
O N
E
FO
O T
6"
BUILDING NUMBER
NEW ORLEANS, LOUISIANA
2PL100-G
BLDG 2 UNDERSLAB PLUMBING PLAN - AREA G
RVD CADDFebruary 29, 2012
02629-HS2-401SLVHCS REPLACEMENT MEDICAL
CENTER PROJECT
SCHRENK & PETERSON CONSULTING ENGINEERS / CIVIL
KORDA/NEMETH ENGINEERING / STRUCTURAL
BR+A CONSULTING ENGINEERS / MECH, ELECT, PLUMBING, LOW VOLTAGE
ARCHITECTURAL ENGINEERING/ PLUMBING
SCALES ASSOCIATES / FIRE PROTECTION
DESMAN ASSOCIATES / PARKING
CODE CONSULTANTS, INC. / CODE CONSULTANT
THE SEXTANT GROUP / AV & ACOUSTICAL
HAMMER DESIGN ASSOCIATES / FOOD SERVICE
PYBURN & ODOM / ABATEMENT
TATA & HOWARD / TANK CONSULTANT
Department of
Veterans Affairs
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
WP_08
CONSTRUCTION DOCUMENTS 1
FULLY SPRINKLERED
RFI 01165:
VALVE PIT
REMOVED
RFI:01275 - 12" storm sewer continuation in lieu of 15".
92.5'
RFI:01308 - Pipe Elevation Change
REFER TO SKETCH:
SK-8-1-NJ-2-PL-100-G-1
REFER TO SKETCH:
SK-8-1-NJ-2-PL-100-G-1
RFI 01758:
COMBINE VENT
STACKS INTO ONE
(1) FROM
UNDERSLAB TO
ROOF
UP
P-414P-414
P-101A
P-528
P-528
2P101-F
2P101-G
COMP
ADP STOR
1G167
C4
UNASSIGNED
1G197
G8
FEMALE
1G100A
T1
STAFF
LOUNGE
1G118
S15
EC
1G195
G2
SERVICE
BAY
1G227
G8A
TELECOM
1G227C
G2
EMER
ELEC
1G227B
G2
NORM
ELEC
1G227A
G2
MALE
1G100B
T1
CONF/
TRAINING
1G138
S9A
PAGERS
CELLS
1G184
C4
LAPTOPS
1G191
S2
PROF
STAFF
1G182
S4
WORK
AREA
1G174
S17
PROGRAM
1G176
S4B
PROGRAM
1G183
S4
HELP
1G188A
S4
HELP
1G190
S4
HELP
1G188B
S4
PC TECH
1G185D
S4B
PC TECH
1G166A
S4B
PC TECH
1G165
S4B
PC TECH
1G185E
S4B
PC TECH
1G185B
S4B
PC TECH
1G185H
S4B
PC TECH
1G185I
S4B
PC TECH
1G185C
S4B
PC TECH
1G185G
S4B
PC TECH
1G166B
S4B
CONFERENCE
1G196
S9A
OFFICE
ASST CH
1G169
S3A
REF LIB
1G186
S9
OFFICE
SEC CH
1G171
S3A
OFFICE
SEC CH
1G172
S3A
PROF
STAFF
1G178G
S4B
PROF
STAFF
1G178A
S4B
PROF
STAFF
1G175
S4
OFFICE
CIO
1G168
S3A
OFFICE
BUDGET
1G170
S3A
COPY
ROOM
1G173
S18
SECY
1G177
S4B
PROF
STAFF
1G178F
S4B
ST
1G181
T4
PROF
STAFF
1G178E
S4B
PROF
STAFF
1G178D
S4B
PROF
STAFF
1G178H
S4B
PROF
STAFF
1G178C
S4B
PROF
STAFF
1G178B
S4B
WS,VAVS
ORGANIZATION
1G115
C11
OFFICER
1G110
S3A OFFICER
1G109
S3A
CHIEF OF
SERVICE
1G111
S7
CONFERENCE
1G113
S9A
VOLUNTEER
LOUNGE
1G108
S15
RECEPTION/SECY
1G116
C11
STORAGE
1G106
C55E
MULTI-PURPOSE
WORK
1G107
S3A
SIGN-IN
1G105
C11
ST
1G180
T4
HK
1G125
C3
CUSTOMER
SERVICE
1G189
S9B
SECY/
WAITING
1G162
S4B
ID ISSUE
WAIT
1G149
CORR70A
ID/REG
ISSUE
1G148
S2
PHYSICAL
SECUR
OFFICER
1G157
S3A
EVIDENCE
1G151
C55E
MALE
LOCKER
1G141A
S14
DETECTIVE
1G156
S3A
DETECTIVE
1G159
S3
TRAINING
OFFICER
1G158
S3A
ASST
CHIEF
1G154
S3A
CLER
1G161G
S4B
ID/KEY
STORAGE
1G147
C55E
ARMORY
1G145
C55E
ARMORY
STORAGE
1G146
C55E
ASST
CHIEF
1G153
S3A
LT/SGT
SUPER
1G155
S3A
COPIER
1G150
S18
HOLDING
1G160
C55E
SECURITY
COMMAND
CENTER
1G139
S2
FEMALE
LOCKER
1G140A
S14
CLER
1G161K
S4B
CLER
1G161H
S4B
CLER
1G161A
S4B
CLER
1G161D
S4B
CLER
1G161B
S4B
CLER
1G161C
S4B
CLER
1G161E
S4B
CLER
1G161I
S4B
CLER
1G161J
S4B
CLER
1G161F
S4B
HC T/S
1G141C
T5A
HC T/S
1G140B
T5A
T/S
1G141B
T5A
ST
1G121
T4
ST
1G122
T4
CORR
1G-C06
C11
CORR
1F-C06
CORR70A
CORR
1G-C02A
CORR70A
CORR
1G-C04
CORR75
CORR
1G-C03
CORR70A
CORR
1G-C02C
CORR1
WC
STORAGE
1G198
C17
CORR
1G-02B
CORR70A
CORR
1G-C08
S4B
CORR
1G-C09
S4B
PC TECH
1G185F
S4B
PC TECH
1G185A
S4B
SECURITY
1G227D
S19
OFFICE
1G135
S2
CLERICAL
1G132
S4
RECPT/WAIT
1G131
S4B
LOCKERS
1G129
S14
CHIEF
1G133
S7
AO
OFFICE
1G134
S2
COPY
1G130
S18
STRETCHER
STOR
1G128
C4
DISPATCH
1G123A
S15
BREAK
1G123B
S15
UNASSIGNED
1G120
C55E
T
1G102
T2A
T
1G101
T2A
CORR
1G-C15
S4
CORR
1G-C16
S4
CAFE
1G103
P13B
STORAGE
1G104
P13D
STOR
1G113B
C55E
STOR
1G113A
C55E
CLERICAL
1G114
S4
CORR
1G-C18
CORR75
STAIR
2F152
G1
UNASSIGNED
1G161L
NONE
3"DCWL UP
2"DHWL UP
1"DHWLR UP
6"SS UP
6"VS UP
3"V UP
4"VS UP
4"SS UP
4"SS UP
6"GW UP
3"V UP
4"VS UP
FCO
4"SS UP
4"VS UP
FCO
6"SS UP
6"VS UP
12"RL UP&DN
(20,150 S.F.)
8"SS DN
(658 DRAINAGE
FIXTURE UNITS)
(3)4"V UP&DN
8"RL DN
(8,350 S.F.)
6"RL UP TO RD
(2,350 S.F.)
6"RL UP TO RD
(2,500 S.F.)
6"RL UP TO RD
(3,500 S.F.)
4"S DN & 2"V RISE
1 1/2"DCWL
1/2"DHWL DROP
2"W DN & V RISE
1/2"DHWL DROP
8" RL
8" RL
1/ 2" D C W L
2" DHWL
4"S UP
2"W UP
2"W UP
2" SAN (M.C.)
2"W UP
2"W UP
2"W UP
2"W UP
2"W UP
2"W UP
4"S UP
2"W DN&V RISE
1 1/2"DCWL DROP
1/2"DHWL DROP
2"V DN&RISE
4"S DN
2"W UP 2"W UP
2"W UP
2"W UP
1/2"DCWL DROP
2"V DN&RISE
1/2"DHWL DROP
2"V DN & RISE
4"S DN
2"V DN&RISE
1 1/2"DCWL DROP
1/2"DHWL DROP
2"W DN&V RISE
FCO
2"V DN&RISE
1/2"DCWL DROP
1/2"DHWL DROP
4"S DN
2"V DN&RISE
1 1/2"DCWL DROP
2"W DN&V RISE
1/2"DHWL DROP
2"V DN&RISE
1/2"DCWL DROP
1/2"DHWL DROP
4"S DN
2"V DN&RISE
1 1/2"DCWL DROP
2"W DN&V RISE
1/2"DHWL DROP
4"S UP 4"S UP
3"W&T UP
2"V UP
2"W UP
6" S A N (M
.C
4"SS UP
4"VS UP
2"W UP2"W UP
2"W UP
2"W UP
2"W UP
4"S UP
2"W DN&V RISE
3/4"DHWL DROP
2"DCWL DROP
4"S DN
2"V DN&RISE
4"S DN
2"V DN&RISE
3"W DN
3/4"DHWL DROP
3/4"DCWL DROP
6"SS UP
4"S DN
(2)4"S
2"V RISE
(2)4"S
2"V RISE
(2)4"S 2"V RISE
4"S
3"S DN&2"V RISE
2"V RISE
3"S UP
2"V RISE
3"S UP
3"S DN&2"V RISE
2 1/2"DCWL DROP
6"VS UP
2"W DN&V RISE
2"W UP
2"W DN&V RISE
3/4"DHWL DROP
3/4"DCWL DROP
2"W UP
2"W DN&V RISE
2"W UP
2"W DN&V RISE
2"W UP
1/2"CW DROP
2"W DN&V RISE
2" D C W L
FCO
P-101A
1/2"DHWL DROP
2"W DN&V RISE
1/2"DCWL DROP
6"RL UP TO AD 6"RL UP TO AD
6"RL UP TO AD
6"RL UP TO AD
6"RL UP TO AD
2"W UP
2"W UP
3"V UP
8" RL
8" RL
3" SAN (M.C.)
2" SAN (M.C.)
2" V
8" SAN (M.C.)
2" SAN (M.C.)
4"S DN & 2"V RISE
1 1/2"DCWL DROP
3/4"DCWL DROP
2"W DN&V RISE
3/4”DHWL DROP
6" RL6" RL
8" RL
1" D H W R L
1 1/2" DHWL
2" DHWL
3" D C W L
2" D C W L
3/ 4" D C W L
P-712
(5)P-101
(3)P-101 P-202
P-201
(4)P-417
(4)P-417
P-609
P-609
P-414P-414
P-101A P-101A
P-504
P-101A
P-414
P-414P-101A
1/2"DHWL DROP
2"W DN & V RISE
1/2"DCWL DROP
P-804
P-804
FCO
FCO
AHU BY HVAC
4"W&T UP
2"V UP
6" S A N (M
.C
6" S A N (M
.C
4"W&T UP
2"V UP
TP MANIFOLD
3/4"DCWL DROP
(3)1/2"TP DN
TO FD'S
1/2"TP UP
TO MANIFOLD
(2)2"V DN & RISE
3" V
2"W DN & V RISE
1 1/4"DCWL DROP
TMV
1 1/2"TW RISE
1-1/4"DHWL DROP
ACCESS PIT BY
OTHERS. REFER TO
STRUTURAL DWGS.
4"W&T UP
8" SAN (M.C.)
2"V UP
P-804
FCO
FCO
2PL405
4"FD-B
4"FD-B
3/ 4" D C W L
2" V
3" V
3/4"DCWL DROP
FCO
1" D H W R L
FCO
FCO
FCO
2" D H W L
3" S A N (M
.C
3" SAN (M.C.) 3" SAN (M.C.)
3" S A N (M
.C
2"W UP
4"FD-B
4"FD-B
TP MANIFOLD
3/4"DCWL DROP
(2)1/2"TP DN
TO FD'S
ALL OVERFLOW STORM WATER DRAINS AND
OVERFLOW STORM WATER RELEIF PIPING SHALL
TERMINATE WITH A DOWNSPOUT COVER AT THE
FACADE OF THE BUILDING PRIOR TO THE START
OF WORK. THE PLUMBING SUB CONTRACTOR SHALL
COORDINATE THE EXACT LOCATION OF COVERS
WITH THE ARCHITECT AND CONSTRUCTION MANAGER
1/ 2" T P
(2)1/2"TP UP
TO MANIFOLD
3" D C W L
3" D C W L
3/4" DCWL
2 1/2" DCWL
2 1/2" DCWL2" DCWL2" DCWL
2" DHWL
1 1/4" DHWL
1 1/2" DCWL
2" D H W L
1/ 2" D H W L
1 1/2" DHWL
1" DHWL
DSP-1 CHEMICAL DISPENSING
SYSTEM SEE DETAIL ON DWG OP508
8" R L
FCO
FCO
4"W & T UP
1/2"TP UP
2"V UP
4"W & T UP
1/2"TP UP
2"V UP
4" SAN (M.C.)
2"V UP
1/2"TP UP
4"W & T UP
3" V
4"OED SEE DETAIL ON DWG OP509
4"W DN & 2"V RISE
4"FD-B
2"V DN & RISE
1-1/2"DCWL DROP
1-1/2"RPBP FOR
HVAC
OP509
8"RLR
1/2"TP UP TO
MANIFOLD
P-101A
P-413
P-413
P-101A
P-528
P-701
P-701
P-414 P-101A
P-701
6" SAN (M.C.)
4"S UP
6" GW
4" S A N (M
.C
6"GW DN
FCO
1/2"DCWL DROP
2"W DN&V RISE
1/2"DHWL DROP
2"W UP
1/ 2" D H W L
1/ 2" D H W L
1/ 2" D H W L
PROVIDE EXPANSION
JOINT ASSEMBLIES
(FLEXIBLE CONNECTIONS)
IN ALL PIPING MAINS
PROVIDE EXPANSION
JOINT ASSEMBLIES
(FLEXIBLE CONNECTIONS)
IN ALL PIPING MAINS
PROVIDE EXPANSION
JOINT ASSEMBLIES
(FLEXIBLE CONNECTIONS)
IN ALL PIPING MAINS
PROVIDE EXPANSION
JOINT ASSEMBLIES
(FLEXIBLE CONNECTIONS)
IN ALL PIPING MAINS
1 1/4" DCWL
1/ 2" D H W L 1/ 2" D H W L
3" V
6" SAN (M.C.)
4" S A N (M
.C
8" SAN (M.C.)
4" S A N (M
.C
3" S A N (M
.C
2" SAN (M.C.)
3" S A N (M
.C
3"FD-C
3"FD-C
3"FD-C
TP MANIFOLD
3/4"DCWL DROP
(2)1/2"TP DN
TO FD'S
TP MANIFOLD
3/4"DCWL DROP
(1)1/2"TP DN
TO FD
2"V DN & RISE
3"W UP
3"W DN & 2"V RISE
3/4”DCWL DROP
FCO
2"W DN&V RISE
2"W UP
2"W DN&V RISE
2"W UP
2"W UP
2"W DN&V RISE
3/4"DCWL DROP
3/4"DHWL DROP
2"W UP
2"W DN&V RISE
2" V2" V2" V
1/2" TP
FCO
02 E 02 D C
02 B
XA
02 H F.9
A.5
AA
AA.2
16.1
02 J
EJ
3.1
13.2
A
EJ 3
02 F
FCO
FCO
2" D H W L
1" D H W R L
1/ 2" D C W L
1/ 2" D H W L
1/ 4" D H W L
2 1/2" DCWL
1" D H W L( 0)
1" D H W L( 0)
1/ 2" D H W R L( 0)
1/ 2" D H W R L( 0)
1" D H W L( 0)
1" DHWL(140)
1/2" DHWRL(140)
SS
4G
VS
4G
SS
4D
SV
4D
SL
1D
SS
4F
VS
4F
SS
4E
VS
4EVS
4B
SS
4B
SS
4C
VS
4C
SS
SS
4A
VS
4A
FCO
FCO
4" S A N (M
.C
8" R
LR
8" RLR
3" V
FCOFCO
FCO
FCO
3" V
3" V 3" V
3" V
3" V
3" V
3" V
FCO
2"W UP
6" S A N (M
.C
4" S A N (M
.C
2"FD-C
2"FD-C
2"FD-C
1/2" TP
3" V
1/ 4" D H W L
FCO
Q D2 D1
E2 E1
F2 F1
G2 G1
A2
A4
A5
A1
A6
B1
C1 C2
B2
H
J1 J2
L
K
M1 M2 M3
N1 N2
A7
D3
E3
F3
R1
R4
R2 R3
A3
08 P
PLAN
NORTH
DATE
LOCATION
CHECKED DRAWN
PROJECT TITLE PROJECT NUMBER
DOCUMENT SET PACKAGE
DRAWING NUMBERAPPROVED: PROJECT DIRECTOR
DRAWING TITLEARCHITECT/ENGINEERS:CONSULTANTS:
REVISIONS: DATE
B
A
D
C
E
VA FORM 08-6231
O N
E
EI
G H
T
IN
C H
O
N E
FO
O
T O
N E
Q U
AR
TE
R
IN
C H
O
N E
FO
O
T O
N E
H
AL
F
IN
C H
O
N E
FO
O
T
TH
R
EE
Q U
AR
TE
R S
IN
C
H
O N
E
FO
O T
TH
R
EE
IN
C H
ES
O N
E
FO
O T
O N
E
IN
C H
F
O R
TY
F
EE
T
(1
0'
6"
6"
0'
0'
123456
F
B
A
D
C
E
F
O N
E
SI
XT
EE
N
TH
IN
C
H
O N
E
FO
O T
O N
E
AN
D O
N E
H
AL
F
IN
C H
ES
O N
E
FO
O T
6"
BUILDING NUMBER
NEW ORLEANS, LOUISIANA
2PL101-G
BLDG 2 FIRST FLOOR PLUMBING PLAN - AREA G
RVD CADDFebruary 29, 2012
02629-HS2-401SLVHCS REPLACEMENT MEDICAL
CENTER PROJECT
SCHRENK & PETERSON CONSULTING ENGINEERS / CIVIL
KORDA/NEMETH ENGINEERING / STRUCTURAL
BR+A CONSULTING ENGINEERS / MECH, ELECT, PLUMBING, LOW VOLTAGE
ARCHITECTURAL ENGINEERING/ PLUMBING
SCALES ASSOCIATES / FIRE PROTECTION
DESMAN ASSOCIATES / PARKING
CODE CONSULTANTS, INC. / CODE CONSULTANT
THE SEXTANT GROUP / AV & ACOUSTICAL
HAMMER DESIGN ASSOCIATES / FOOD SERVICE
PYBURN & ODOM / ABATEMENT
TATA & HOWARD / TANK CONSULTANT
Department of
Veterans Affairs
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
WP_08
CONSTRUCTION DOCUMENTS 1
FULLY SPRINKLERED
1. ALL HORIZONTAL PIPING SHALL BE INSTALLED IN THE INTERSTITIAL
SPACE UNLESS OTHERWISE NOTED. CONTRACTOR SHALL OWN ALL
REQUIRED CORING, SLEEVING, FIRESTOPPING, ETC. REFER TO
ARCHITECTURAL PLANS FOR INTERSITIAL SLAB CONSTRUCTION.
2. ALL DOMESTIC (POTABLE)AND NON DOMESTIC (NONPOTABLE) HOT,
COLD, AND HOT WATER CIRCULATION PIPING SHALL BE INSTALLED AT
THE INTERSTITIAL SPACE FLOOR IN ORDER TO MAINTAIN HOT WATER
TEMPERATURE TO ALL FIXTURES. IF PIPING CAN'T BE INSTALLED AT
THE INTERSTITIAL SPACE FLOOR, PIPING SHALL BE INSTALLED
BETWEEN THE INTERSTITIAL SPACE FLOOR AND THE CEILING AND THE
PIPING SHALL BE LOOPED TO ALLOW CONTINUOS HOT WATER
CIRCULATION.
3. ALL STACKS AND RISERS SHALL BE SUPPORTED AT THE INTERSTITIAL
SPACE FLOOR OR JUST ABOVE THE CEILING WHERE THE INTERSTIAL
SPACE DOES NOT EXIST. SEE DETAILS ON DWG 0P506.
4. PROVIDE A BALL VALVE IN THE OPEN POSITION WITH A LOCK AND CHAIN
AT ALL EMERGENCY SHOWERS
5. DRAIN VALVES SHALL BE PROVIDED AT THE BASE OF ALL PLUMBING
RISERS
6. ALL ISOLATION VALVES AT RISERS SHALL BE INSTALLED IN AN
ACCESSIBLE LOCATION, NO MORE THAN 12" ABOVE FINISHED CEILING
7. ALL MIXING VALVE AT SHOWERS SHALL HAVE THE TEMPATURE LIMIT
STOP ADJUSTED TO THE REQUIRED VA STANDARDS
GENERAL NOTES
REFER TO SKETCH:
SK-8-1-NJ-2-PL-101-G-1
Prebid RFI EWP-08-0793:
Specification 22 05 11 2.15 applies to expansion joints
Correspondence No. 04924: Trap Primers have been deleted and Trap Guards installed.
Correspondence No. 04924: Trap Primers have been deleted and Trap Guards installed.
RFI 01809.1: DELETE (2) 4"
FD-B's, (1) P-804, (2) P-712, (1) RPBP for HVAC
RFI 029962: P-528 sink confirmed at this location.
RFI 06378: Sink type P-417 confirmed
RFI 06985.1:
Cap and grout
4" FD-B
DN
UP
UP
P-104A
P-414 P-414P-414
P-504
P-414
P-414
P-414
P-414
P-414
P-414
P-414
P-414
P-104A P-414
P-104A P-414
P-414
P-414
P-414
P-414
P-414
4"FD-B
2P102-F
2P102-G
P-414
P-414
UNASSIGNED
2G230
CORR
2G-C02
CORR
2G-C03
CORR
2G-C05A
CORR
2G-C07
CORR
2G-C06B
CORR
2G-C10
CORR
2G-C08A
CORR
2G-C09
CORR
2G-C11
CORR
2G-C04
CORR
2G-C06A
STAIR
STG-03
SHAFT
SHG13
CORR
2G-C05B
CORR
2G-C08B
CORR
2G-C06C
CC
2G119B
SCR
2G117
CLEAN
2G116
SOILED
HOLD
2G115MRI
2G129
MRI
2G128
CONTROL
2G131
SCR
2G127
GAS/CRY
ROOM
2G125
DRESS
2G194
DRESS
2G185
DRESS
2G191
DRESS
2G195
STRESS
2G193
STRESS
2G186
STRESS
2G196
STRESS
2G199
STRESS
2G190
ECHO
2G141
ECHO
2G140
STRESS
ECHO
2G139
PERIPHERAL
VASCULAR
2G182
VASC
TREAD
2G181
STRESS
ECHO
2G138
ECHO
2G136
EKG/
HOLTER
VIEW/WORK
2G192
DOSE
ADMIN NM
2G159
TILT
TABLE
2G180
CARD
EQUIP
2G183
T
2G143
T
2G202
NUCLEAR
MED
2G164
NUCLEAR
MED
2G151
DRESS
2G160
PET-CT
2G167
SCR
2G167B
HOT LAB
2G158
CONTROL
2G167A
NUCLEAR
MED
2G150
SUB-WAITING
2G201
RAD CONF
2G178
SERVICE
BAY
2G227
INTERVIEW
NM
2G189
DRESS
2G120
DRESS
2G114
DRESS
2G121
STAFF
WORK
2G119A
CARD
RECEPT
2G101C NUC MED
RECEPTION
2G101A
TELECOM
2G229A
EMER
ELEC
2G227B
NORM
ELEC
2G227A
PET READ
2G175
STORAGE
ECHO
2G137
SUB-WAIT
CARDIO
2G123
CONTROL
2G130
PAT HOLD
2G113
PAT HOLD
2G112
T
2G118
LINEN
2G124
EQUIP
STORAGE
2G122
HK
2G126
REF STOR
2G154
PHYSICIST
2G105
DRESS
2G198
RECEPTION
2G101B
STRET/WC
2G107
DRESS
2G155
DRESS
2G150A
DRESS
2G152
LINEN
2G163
AMBULETTE
2G145
AMBULETTE
2G144
DRESS
2G111
REF STOR
2G153
CC
2G184
EC
2G177
MALE
2G100B
LOUNGE
2G176
DRESS
2G200
MRI
WAITING
2G110
T
2G165
SERVICE
BAY
2G228
T
2G142
SECURITY
2G229B
STRESS
2G197
ECHO
READING
2G187
CARD
EQUIP
2G188
HK
2G106
SOILED
HOLD
2G166
COPY/WORK
2G103
STAIR
2F152
FEMALE
2G100A
SHAFT
SHG11
S H A F T
S H G
EC
2G183A
6"VS UP & DN
6"WS UP & DN
1 1/4"DHWRL UP & 1" DN
2 1/2"DHWL UP & 2" DN
4"DCWL UP & 3" DN
2"W UP
6"GW UP&DN
3"V DN&RISE
4"VS UP&DN
4"SS UP
4"SS DN&RISE
2"W UP
4"S UP
2"W UP
2"W UP
2"W UP
6" SS UP & DN
6"VS UP&DN
6"RL UP
(2375 S.F.)
6"RL UP
(2350 S.F.)
10"RL UP&12"RL DN
(20,150 SQ.FT.)
6"RD-B
(2,350 S.F.) 6"RD-B
(2,500 S.F.)
6"RD-B
(3,500 S.F.)
(2)2"W&V RISE
3/4"DHWL&DCWL DROP
2"W&V RISE
2"W UP
2"W DN&V RISE
2"W UP
1/2"DCWL DROP
3"W DN & 2"V RISE
6"SS UP&DN
2 1/2"DCWL DROP
(2)4"S
2"V RISE
(2)4"S
2"V RISE
(2)4"S
2"V RISE
4"S
3"S DN&2"V RISE
(2)2"V RISE
3"S DN&2"V RISE
6"VS UP&DN
(2)2"W&V RISE
3/4"DHWL&DCWL DROP
2"W&V RISE
2"W UP
2"W DN&V RISE
2"W UP
P-414
1/2"DHWL DROP
2"W DN&V RISE
1/2"DCWL DROP
3" S
A N
(M .C
3" SAN (M.C.)
4" SAN (M.C.)
3" SAN (M.C.)
(3)2"W UP
3" SAN (M.C.)
4"SS UP&DN
4"VS UP&DN
1/2"DHWL DROP
2"W DN&V RISE
1/2"DCWL DROP
1/2"DHWL DROP
2"V RISE
2"DCWL DROP
4"S DN&2"V RISE
2"W UP
4"S UP
2"W UP
1/2"DCWL DROP
2"W DN&V RISE
1/2"DHWL DROP
3/4"DCWL DROP
3"W DN& 2"V RISE
3/4"DHWL DROP
2"W UP
2"W UP
2"W UP
4"S DN&2"V RISE
1 1/2"DCWL DROP
1/2"DHWL DROP
2"W&V RISE
4"S DN&2"V RISE
1 1/2"DCWL DROP
1/2"DHWL DROP
1/2"DCWL DROP
2"W&V RISE
1/2"DHWL DROP
1/2"DHWL DROP
2"W DN&V RISE
1/2"DCWL DROP
1/2"DHWL DROP
2"W DN&V RISE
1/2"DCWL DROP
1/
4" D
H W
L
1/ 4"
D H
W L
1 1/2" DHWL
1 1/4" DHWL
2" DCWL2" DCWL
1/2"DCWL DROP
2"W DN & V RISE
1/2"DHWL DROP
1/2"DCWL DROP
2"W DN & V RISE
1/2"DHWL DROP
1/2"DHWL DROP
2"W DN & V RISE
1/2"DCWL DROP
2" DCWL
2" D
C W
L
1/ 2"
D H
W L
1/
2" D
H W
L 1 1/2" DHWL
1 1/2" DCWL
1/2" DCWL
1/2"DCWL DROP
2"W DN & V RISE
1/2"DHWL DROP
2"W UP
1/2"DHWL DROP
2"W DN & V RISE
1/2"DCWL DROP
1/2"DHWL DROP
2"W DN & V RISE
1/2"DCWL DROP
1/2" DCWL
1/2"DCWL DROP
2"W DN & V RISE
1/2"DHWL DROP
1/2"DHWL DROP
2"W DN & V RISE
1/2"DCWL DROP
2”W UP
1/
2" D
H W
L
1/2"DHWL DROP
2"W DN & V RISE
1/2"DCWL DROP
1/2"DHWL DROP
2"W DN&V RISE
1/2"DCWL DROP
4"S UP
2"V UP
2"W UP
2"W&V RISE
2"DCWL DROP
1/2"DHWL DROP
4"S DN&2"V RISE
4"S UP
1 1/2" DHWL1 1/2" DHWL
2" DCWL
4"SS UP&DN
4"VS UP&DN
3"V DN&RISE
4"VS UP
4"SS UP&DN
3" V
1/ 2"
D C
W L
1/2"DCWL DROP
2"W DN & V RISE
1/2"DHWL DROP
1/2"DHWL DROP
2"W DN & V RISE
1/2"DCWL DROP
P-414
P-414
P-414
P-104A
P-414
P-414
4"S DN&2"V RISE
1/2"DHWL DROP
1 1/2"DCWL DROP
2"W V RISE
P-528
P-414
P-414 P-104A
P-504
(3)P-104 P-202 P-201
2"W UP
2" S
A N
(M .C
2"W UP
2"W UP 2"W UP
2" DHWL
2" DCWL2" DCWL
2" DCWL1 1/2" DCWL
3" V
2" V
3" V
3" V
1/
4" D
H W
R L
P-712
2"W DN & V RISE
1-1/4"DCWL DROP
TMV
1 1/2"TW RISE
1-1/4"DHWL DROP
1/ 2"
D C
W L
1/
4" D
H W
L
2" DCWL
1 1/2" DHWL 1 1/2" DHWL
1 1/4" DHWL1
1/
2" D
H W
L
1 1/2" DHWL
1 1/4" DHWL
1 1/2" DHWL
(4)P-417
P-804
4"FD-B
2"V DN & RISE
2"V UP
4"W&T UP
TP MANIFOLD
3/4"DCWL DROP
1/2"TP DN
TO FD'S
1/2"TP UP
TO MANIFOLD
3/4"DCWL DROP
TO HOSE BIBB
P-804
3/4" DCWL
2" V3" V
2" V
4" S
A N
(M .C
1/2" TP
AHU BY HVAC
4"W&T UP
AHU BY HVAC
1/2"TP UP
TO MANIFOLD
2"V DN & RISE
2" V
2" V
2" V
2" SAN (M.C.)
4" S
A N
(M .C
2" V
2" V
2" V
2" V
2" V 2" V
2" V
4" S
A N
(M .C
4" SAN (M.C.)4" SAN (M.C.)
4" S
A N
(M .C
2"V UP
(3)4"VS UP&DN
TP MANIFOLD
3/4"DCWL DROP
1/2"TP DN
TO FD'S
1 1/4"DCWL DROP
TMV
1 1/2"TW RISE
1 1/4"DHWL DROP
P-804
3/4"DCWL DN
P-609
P-609
TP MANIFOLD
3/4"DCWL DROP
(2)1/2"TP DN
TO FD'S
1/2" DCWL
1/2" TP
1/2" TP
(2)1/2"TP UP
TO MANIFOLD
1" D
C W
L
3/ 4"
D C
W L
1 1/2" DHWL
1 1/4" DHWL
1/ 2"
D C
W L
1 1/4" DHWL
P-804
CHEMICAL DISPENSING
SYSTEM SEE DETAIL
ON DWG. OP508
DSP-1
DSP-1
CHEMICAL DISPENSING
SYSTEM SEE DETAIL
ON DWG. 0P508
2" S
A N
(M .C
4” FD-B
4” FD
3" V
4” FD
2"V DN & RISE
2"DCWL DROP
2"RPBP
TP MANIFOLD
3/4"DCWL DROP
(1)1/2"TP DN
TO FD'S
TP MANIFOLD
3/4"DCWL DROP
(1)1/2"TP DN
TO FD'S
2"DCWL DROP
2"RPBP
2"V DN & RISE
1 1/2" DCWL
6" R
L
4"S UP 4"S UP
(2)2"W UP
TP MANIFOLD
3/4"DCWL DROP
3/4"RPBP
1/2"TP DN TO FD
(5)P-104
(4)P-417
4" SAN (M.C.)
2"W UP
2"W UP
2"W UP
2" S
A N
(M .C
2" SAN (M.C.)
4" S
A N
(M .C
4" SAN (M.C.)
1 1/4" DHWL
1/2" DCWL
2" DCWL
1 1/4" DHWL
2"W UP
4"S UP
2"W UP
3"V DN&RISE
2"W UP
1/2"DHWL DROP
2"W DN&V RISE
1/2"DCWL DROP
4" SAN (M.C.)
2" S
A N
(M .C
.) 3/4"DCWL DROP
3/4"DHWL DROP
3"W DN
2"V DN&RISE
1/2"DHWL DROP
2"WDN&VRISE
1/2"DCWL DROP
1/2"DCWL DROP
2"W DN&V RISE
1/2"DHWL DROP
1/2"DHWL DROP
2"W DN&V RISE
1/2"DCWL DROP
2"V DN
3"W&T UP
2"V UP
3" S
A N
(M .C
4" SAN (M.C.)
2" SAN (M.C.)
4" S
A N
(M .C
3" SAN (M.C.)
4" S
A N
(M .C
2"W UP 2"W UP
2"W UP
1/
2" D
C W
L
1/ 2"
D C
W L
2" SAN (M.C.)
2"W UP
2" V
P-712
2" V
2"W UP
2"W DN & V RISE
1/
2" D
H W
L
1/
4" D
H W
L
3" V
4" SAN (M.C.)
3" V
3" V
3" V
1/ 2"
T P
1/2" TP
(4)1/2"TP UP
1/ 2"
T P
1/ 2"
T P
02 E 02 D C
02 B
XA
02 H F.9
A.5
AA
AA.2
Y49
16.1
EJ
3.1
A
EJ 3
02 F
1/2"DHWL DROP
2"W DN & V RISE
1/2"DCWL DROP
1/2"DHWL DROP
2"W DN & V RISE
1/2"DCWL DROP
4"S UP
SL
1D
3" V
2" V 2" V
SS
4A
VS
4A
VS
4B
SS
4B
SS
4C
VS
4C
SS
4D
VS
4D
SS
4E
VS
4E
SS
4F
VS
4F
SS
4G
VS
4G
3" V
2" V
1/
2" D
C W
L
1/
4" D
H W
R L
4"FD-A
4"FD-A
Q D2 D1
E2 E1
F2 F1
G2 G1
A2
A4
A5
A1
A6
B1
C1 C2
B2
H
J1 J2
L
K
M1 M2 M3
N1 N2
A7
D3
E3
F3
R1
R4
R2 R3
A3
08 P
PLAN
NORTH
DATE
LOCATION
CHECKED DRAWN
PROJECT TITLE PROJECT NUMBER
DOCUMENT SET PACKAGE
DRAWING NUMBERAPPROVED: PROJECT DIRECTOR
DRAWING TITLEARCHITECT/ENGINEERS:CONSULTANTS:
REVISIONS: DATE
B
A
D
C
E
VA FORM 08-6231
O N
E
EI
G H
T
IN
C H
O
N E
FO
O
T O
N E
Q U
AR
TE
R
IN
C H
O
N E
FO
O
T O
N E
H
AL
F
IN
C H
O
N E
FO
O
T
TH
R
EE
Q U
AR
TE
R S
IN
C
H
O N
E
FO
O T
TH
R
EE
IN
C H
ES
O N
E
FO
O T
O N
E
IN
C H
F
O R
TY
F
EE
T
(1
0'
6"
6"
0'
0'
123456
F
B
A
D
C
E
F
O N
E
SI
XT
EE
N
TH
IN
C
H
O N
E
FO
O T
O N
E
AN
D O
N E
H
AL
F
IN
C H
ES
O N
E
FO
O T
6"
BUILDING NUMBER
NEW ORLEANS, LOUISIANA
2PL102-G
BLDG 2 SECOND FLOOR PLUMBING PLAN - AREA G
RVD CADDFebruary 29, 2012
02629-HS2-401SLVHCS REPLACEMENT MEDICAL
CENTER PROJECT
SCHRENK & PETERSON CONSULTING ENGINEERS / CIVIL
KORDA/NEMETH ENGINEERING / STRUCTURAL
BR+A CONSULTING ENGINEERS / MECH, ELECT, PLUMBING, LOW VOLTAGE
ARCHITECTURAL ENGINEERING/ PLUMBING
SCALES ASSOCIATES / FIRE PROTECTION
DESMAN ASSOCIATES / PARKING
CODE CONSULTANTS, INC. / CODE CONSULTANT
THE SEXTANT GROUP / AV & ACOUSTICAL
HAMMER DESIGN ASSOCIATES / FOOD SERVICE
PYBURN & ODOM / ABATEMENT
TATA & HOWARD / TANK CONSULTANT
Department of
Veterans Affairs
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
WP_08
CONSTRUCTION DOCUMENTS 1
FULLY SPRINKLERED
1. ALL HORIZONTAL PIPING SHALL BE INSTALLED IN THE INTERSTITIAL
SPACE UNLESS OTHERWISE NOTED. CONTRACTOR SHALL OWN ALL
REQUIRED CORING, SLEEVING, FIRESTOPPING, ETC. REFER TO
ARCHITECTURAL PLANS FOR INTERSITIAL SLAB CONSTRUCTION.
2. ALL DOMESTIC (POTABLE)AND NON DOMESTIC (NONPOTABLE) HOT,
COLD, AND HOT WATER CIRCULATION PIPING SHALL BE INSTALLED AT
THE INTERSTITIAL SPACE FLOOR IN ORDER TO MAINTAIN HOT WATER
TEMPERATURE TO ALL FIXTURES. IF PIPING CAN'T BE INSTALLED AT
THE INTERSTITIAL SPACE FLOOR, PIPING SHALL BE INSTALLED
BETWEEN THE INTERSTITIAL SPACE FLOOR AND THE CEILING AND THE
PIPING SHALL BE LOOPED TO ALLOW CONTINUOS HOT WATER
CIRCULATION.
3. ALL STACKS AND RISERS SHALL BE SUPPORTED AT THE INTERSTITIAL
SPACE FLOOR OR JUST ABOVE THE CEILING WHERE THE INTERSTIAL
SPACE DOES NOT EXIST. SEE DETAILS ON DWG 0P506.
4. PROVIDE A BALL VALVE IN THE OPEN POSITION WITH A LOCK AND CHAIN
AT ALL EMERGENCY SHOWERS
5. DRAIN VALVES SHALL BE PROVIDED AT THE BASE OF ALL PLUMBING
RISERS
6. ALL ISOLATION VALVES AT RISERS SHALL BE INSTALLED IN AN
ACCESSIBLE LOCATION, NO MORE THAN 12" ABOVE FINISHED CEILING
7. ALL MIXING VALVE AT SHOWERS SHALL HAVE THE TEMPATURE LIMIT
STOP ADJUSTED TO THE REQUIRED VA STANDARDS
GENERAL NOTES
Correspondence No. 04924: Trap Primers have been deleted and Trap Guards installed.
Correspondence No. 04924: Trap Primers have been deleted and Trap Guards installed.
Correspondence No. 04924:
Trap Primers have been deleted and Trap Guards installed.
RFI 01809.1: DELETE (1) P-804, (1)
P-712 ((1) 4" FD-B to remain for humidifier and add (1) 4" OED)
RFI 01809.1:
DELETE (1) P-804,
(1) P-712 ((1) 4" FD-B to remain for humidifier and add
(1) 4" OED)
RFI 05643: Sinks remain. Refer to RFI for requirements
RFI 05643.1: Re-confirmed that sinks are to remain.
RFI 05644: Compressor for MRI doors goes here. Drains into 2G126 mop sink
RFI 05782: Compressor shelf requirements provided
RFI 05782.1: Additional compressor shelf requirements provided. Condensate will drain into SCR floor drain
RFI 07396: MRI sinks removed & relocated to corridor. See attached sketch.
RFI 08098.1: Route Condensate lines to mop sink in Room 2G126 instead of floor drain
RFI 08367.1: Tie Backup bypass panel to 2" domestic water and provide required filter
RFI 08367.1: Tie Backup bypass panel to 2" domestic water and provide required filter
DN
UP
UP
P-104A
P-414
P-104A
P-414
P-104A
P-414
N-2
P-414
P-414 P-414 P-414
P-414
P-104 P-202
(2)P-104
P-414
P-414
P-414
P-505
P-414
P-504
(2)P-413
P-528
P-528
P-414
P-414
P -4
P -1 A
P -1 A
(2)P-413
P-414 P-414 P-414
P-414 P-414
P-414
P-414
P-414
P-417
2P103-F
2P103-G
P-609
STAIR
STG-03
CORR
3G-C02A
C O R R
3G -C C
CORR
3G-C02B
CORR
3G-C01
CORR
3G-C03B
C O R R
3G -C A
C O R R
3G -C B
CORR
3G-C08A
CORR
3G-C08B
CORR
3G-C03A
CORR
3G-C04
CORR
3G-C06
SHAFT
SHG13
STAFF
LOCKERS
3G193
GI ASSIST
3G145O
PHYS
3G146C
RN TECH
3G145K
ADMIN
3G146A
PHYS
3G145C
PHYS
3G145F
PHYS
3G145E
PHYS
3G145D
PHYS
3G145A
SECY
3G146B
RN TECH
3G145N
RN TECH
3G145L
RN TECH
3G145M
STAFF
LOCKERS
3G192
GI ASSIST
3G145J
GI ASSIST
3G145I
MALE
3G100B
EQUIP
STOR
3G108
STAFF
LOUNGE
3G194
PULM
RECEPT
3G101
EC
3G186
SERVICE
BAY
3G228
NURSES
STATION
3G124
STRETCHER
STORAGE
3G152
DIG
DISEASE
RESIDENTS
3G185
DICT/
VIEW
3G178
DG CLER
3G145P
PHYS
3G145B
T 3G127
PHYS
3G145G
CC
3G128
SERVICE
BAY
3G227
TELECOM
3G227A
EMER
ELEC
3G227D
NORM
ELEC
3G227C
FEMALE
3G100A
T 3G126
ISOL
3G103
ISOL
3G104
PULM
SCREEN
3G106
PFT
3G105
EXERCISE
PHYS
3G102
CYLINDER
3G108C
CC
3G107
PHYS
LOUNGE
3G191
STORAGE/
COPY
3G144
RES
CONF/
CLASSROOM
3G181
OFFICE
CHIEF
CARDIO
3G138
CHIEF
RESIDENT
3G137
OFFICE
NURSE
MGR
3G139
CONFERENCE
ROOM
(CL)
3G180
TEST
3G129
SOILED
3G134
RECOVERY
3G116
RECOVERY
3G122
RECOVERY
3G121
RECOVERY
3G118
CLEAN
3G125
RECOVERY
3G120
RECOVERY
3G117
GENERAL
ENDO
3G169
GENERAL
ENDO
3G168
ERCP
3G166
CLEAN
SCOPE
STORAGE
3G160
SCOPE
STORE
3G158
STRETCHER
STORAGE
3G171
T 3G165
T 3G175
CLEAN
3G162
SOILED
3G161
COPY/
WORK
3G179
PROCEDURE
BRONCH
3G153
GENERAL
ENDO
3G156
GENERAL
ENDO
3G155
CONTROL
3G153A
DG
PRIVATE
INTERVIEW
3G141
DG CHIEF
OFFICE
3G140
DG NURSE
MANAGER
3G143
DG SECY/
FILES
3G142
RECOVERY
3G119
LINEN
STOR
3G157
EQUIP
CLEAN-UP
3G159
STRETCHER
STORAGE
3G170
STRETCHER
STORAGE
3G154
HK
3G190
BLOOD
GAS
3G135
CLEAN
3G133
FULL
CYLINDER
3G151
RECOVERY
3G123
PHYS
3G145H
HC ST/S
3G192C
ST
3G176
ST
3G177
EMPTY
CYLINDER
3G150
CORR
3G-C11
CORR
3G-C12
CORR
3G-C09
CORR
3G-C10
CORR
3G-C13
TRAINING/
WORK
3G187
SECURITY
3G227B
MED PREP
3G163
PHYS
WORK
3G164
EUS/COMPLEX
3G167
SHAFT
SHG14
SHAFT
SHG11
HC ST/S
3G193C
RT
3G110C
RT
3G110D
RT
3G110E
RT
3G110B
RT
3G110A
CORR
3G-C12
RECOVERY
3G115
CORR
3G-C11
SECY/WAIT
3G136
6"RL UP & 10" RL DN
(15,425 SQ.FT.)
6"GW DN
4"SS UP&DN
4"VS UP&DN
8"RL UP
(5,450 SQ.FT.)
6"VS UP & DN
6"WS UP & DN
1 1/4"DHWRL UP & DN
2 1/2"DHWL UP & DN
4"DCWL UP & DN
4"W&T UP
2"W UP
2"W&T UP
2"V UP
4"SS DN&VS RISE
4"VS UP&DN
4"SS UP&DN
4"VS UP&DN
6" SS DN
6"VS UP&DN
4"S UP
3"W&T UP
3"W&T UP
GREASE AND SOLIDS INTERCEPTOR
SITTING ON STAND AT INTERSTITIAL
SPACE. SEE DETAIL ON 0PL509
6"RL UP
8"OFD UP
(2350 S.F.)
6"RL DN
(2375 S.F.)
6"RL DN
(2350 S.F.)
1/2"DCWL DROP
2"W DN&V RISE
1/2"DHWL DROP
1/2"DCW DROP
2"W DN & V RISE
1/2"DHW DROP
1/2"DCW DROP
2"W DN & V RISE
1/2"DHW DROP
1/2"DCW DROP
2"W DN & V RISE
1/2"DHW DROP
1/2"DCW DROP
2"W DN & V RISE
1/2"DHW DROP
1/2"DCW DROP
2"W DN & V RISE
1/2"DHW DROP
1/2"DCW DROP
2"W DN & V RISE
1/2"DHW DROP
1/2"DCW DROP
2"W DN & V RISE
1/2"DHW DROP
2"DCW DROP
2"W DN & V RISE
1/2"DHW DROP
1 1/2"DCW DROP
2"W DN & V RISE
1/2"DHW DROP
1/2"DHW DROP
2"W DN & V RISE
1/2"DCW DROP
1/2"DCW DROP
2"W DN & V RISE
1/2"DHW DROP
1/2"DCW DROP
2"W DN & V RISE
1/2"DHW DROP
1/2"DHW DROP
2"W DN & V RISE
1/2"DCW DROP
1 1/4"DCW DROP
4"S DN & 2"V RISE
3/4"DHW DROP
1/2"DCW DROP
2"W DN & V RISE
1/2"DHW DROP
1/2"DHW DROP
2"W DN & V RISE
1/2"DCW DROP1 1/2"DCWL DROP
4"S DN & 2"V RISE
3/4"DHWL DROP
1/2"DHW DROP
2"W DN&V RISE
1 1/2"DCW DROP
4"W DN&2"V RISE
3/4"DHWL DROP
4"S DN&2"V RISE
3/4"DCWL DROP
2"W DN & V RISE
1 1/2"DCW DROP
3/4"DHW DROP
1/2"DCWL DROP
2"W DN&V RISE
1/2"DHWL DROP
1/2"DCWL DROP
2"W DN & V RISE
1 1/2"DHWL DROP
2" D H W L2" D H W L
4"S DN
2" DHWL
2" DHWL
2" DHWL
2" DHWL
2" D H W L
1/ 2" D H W L
1/2"DW DROP
1/2"DCW DROP
2"W DN & V RISE
1/ 4" D H W L
2" D C W L
1 1/4" DHWL 1 1/4" DHWL
3" D C W L
1" D H W R L
1 1/4" DHWL
1" DHWRL
1" DHWRL
1/2"DCW DROP
2"W DN & V RISE
2"W UP
2"W DN & V RISE
1/2"DCW DROP
1/2"DHW DROP
(3)2"W UP
6"SS UP
6"SS DN & RISE
(2)4"S
2"V RISE
2"DCW DROP
2"V RISE
4"S & 2" V RISE
3"S DN & 2"V RISE
6"VS UP & DN
1/2"DHWL DROP
2"W DN & V RISE
1/2"DCWL DROP
2"W UP
2"W DN & V RISE
(2)2"W UP
1/2"DCWL DROP
1/2"DHWL DROP
2"W UP
P-414
2"V UP
6"GW&T UP
P-414
8"RWL UP
(5,575 SQ FT)
4"S DN & 2"V RISE
2"DCW DROP
2"W DN & V RISE
1/2"DHW DROP
4"S DN & 2" V RISE
2"DCW DROP
2"W DN & V RISE
1/2"DHW DROP
2"V UP
4"W & T UP
2"DCW DROP
2"W DN & V RISE
1/2"DHW DROP
4"S DN & 2" V RISE
1" DHWL1" DHWL1 1/4" DHWL1 1/4" DHWL
1/2" DCWL
P-104A
P-414
P-414
P-414
P-505
P-414
P-505
2"W DN & V RISE
3/4"DHWL DROP
3/4"DCWL DROP
2"W & V
1/2"DHWL DROP
2"W DN & V RISE
1/2"DCWL DROP
2" V
2"W DN & V RISE
3/4"DHWL DROP
3/4"DCWL DROP
2"W & V
1/2"DHWL DROP
2"W DN & V RISE
1/2"DCWL DROP
6" GW
6" G W
6" GW
4" GW
6" GW
4" GW
4" GW
4" G W
P-712
2"W UP
2"W DN & V RISE
1-1/4"DCW DROP
TMV
1 1/2"TW RISE
1-1/4"DHW DROP
1 1/4" DHWL
P-414
P-414
P-414
3" V 2" V
2" V
2" V
2" V
2" V
2" V2" V 2" V
2" V
2" V
3" V
2" V
2" V
3/4" DCWL
2" V
3" V
2" V2" V
6" R L 6" R L
6" RL
4"FD-B
2"V DN & RISE
2"V UP
4"W&T UP
AHU BY HVAC
(2)1/2"TP UP
TO MANIFOLD
TP MANIFOLD
3/4"DCW DROP
1/2"TP DN
TO FD'S
3/4"DCW DROP
TO HOSE BIBB
P-804
4" SAN (M.C.)
2" V
TP MANIFOLD
3/4"DCWL DROP
1/2"TP DN
TO FD'S
AHU BY HVAC
1 1/4"DCWL DROP
TMV
1 1/2"TW RISE
1-1/4"DHWL DROP
P-804
3/4"DCWL DROP
2"V UP
1/2" TP UP
TO MANIFOLD
2" V
1/ 2" T P
2"V DN & RISE
4"FD-B
1/2"DCW DROP
2"W DN&V RISE
1/2"DHW DROP
4" RL
4" R L
4" RL
2" DHWL
2" D H W L
3" D C W L
1" D H W R L
1/ 4" D H W L
1" D C W L
1 1/2" DCWL
1 1/4" DHWL
3/4" DCWL
1/2" TP
(3)VS UP& DN
2" V
1" D H W R L
P-609
2" DHWL
(2)P-417
2 1/2" DCWL
3" DCWL
2"
2" DCWL
1" D H W L
TP MANIFOLD
3/4"DCWL DROP
(2)1/2"TP DN
TO FD'S
(2)1/2"TP UP
TO MANIFOLD
1/2" TP
1/ 2" T P
1/ 2" T P
1/ 2" T P
1 1/4" DHWL
1 1/2" DCWL
(2)1/2"TP UP
TO MANIFOLD
4"W UP
P-804 P-804
TP MANIFOLD
3/4"DCWL DROP
(4)1/2"TP DN
TO FD'S
4"RL UP
8" RL
8" RL
" O
FD
" O
FD
10" OFD
8" O
FD
8" OFD
8" O
FD
15"OFD
SPILL TO FACADE
(4,725 SQ.FT.)
2" DCWL
4"W & T UP
2"V UP
1/2" TP 1/2" TP
(2)P-417
P-528
1/2"DHW DROP
2"W DN & V RISE
2"DCW DROP
4" SAN (M.C.)
4" SAN (M.C.)
4" S A N (M
.C
2 1/2" DCWL
4" S A N (M
.C
4" S A N (M
.C
2" V
2" V
2"V DN&RISE
3"W DN
3/4"DCWL DROP
3/4"DHWL DROP
3/ 4" D C W L
2" D H W L
2" D H W L
3"W&T UP
2"V UP
3" SAN (M.C.)
4" S A N (M
.C
2" V
2" V
2 1/2" DCWL2 1/2" DCWL
2" V
4"VS UP&DN
4"SS UP&DN
2" V
2" V
2" V
2" SAN (M.C.)
P-712 1/2"DHWL DROP
2"W DN & V RISE
1/2"DHWL DROP
2"W DN & V RISE
2"W UP
6" GW
6" G W
3" V
3" V
4"W UP & T
2"V UP
8" RL
2" DCWL
02 E 02 D C
02 B
XA
02 H F.9
A.5
AA
AA.2
16.1
EJ
3.1
A
02 F
2 1/2" DCWL2" DCWL 2" DCWL2" DCWL3/4" DCWL
1/ 2" D C W L
2" D H W L
1/ 2" D C W L 2" D H W L
1/ 2" D C W L
2" D C W L
10" OFD
SL
1D
SS
4G
VS
4G
SS
4A
VS
4A
SV
4B
SS
4B
SS
4C
VS
4C
SS
4D
VS
4D
SS
4E
VS
4E
SS
4F
VS
4F
8" R L
3" V
2" D C W L
3" V3" V
3" V
3" V 2" V 2" V
3" S A N (M
.C
1 1/2" DHWL
6" GW
2"V UP
6"GW&T UP
4" SAN (M.C.)
4"GW&T UP
2"V UP
4"W&T UP
2"V UP
4"W&T UP
2"V UP
2"W UP
2"V UP
4"GW&T UP
2"V UP
2"W UP
4"GW&T UP
2"V UP2" V
2"W UP
4"W&T UP
2"V UP
4"W&T UP
(2)2"V UP
4"W&T UP
4"W&T UP
2"V UP
4"GW&T UP
2"V UP
(2)2"V UP
2"W UP
4"GW&T UP
(2)2"V UP
4"GW&T UP
(4)4"GW&T UP
(3)2"V UP 2"V UP
(3)2"GW UP
4"GW&T UP
2"V UP
4"GW&T UP
2"V UP
2"W UP
4"W&T UP
2"V UP
Q D2 D1
E2 E1
F2 F1
G2 G1
A2
A4
A5
A1
A6
B1
C1 C2
B2
H
J1 J2
L
K
M1 M2 M3
N1 N2
A7
D3
E3
F3
R1
R4
R2 R3
A3
08 P
PLAN
NORTH
DATE
LOCATION
CHECKED DRAWN
PROJECT TITLE PROJECT NUMBER
DOCUMENT SET PACKAGE
DRAWING NUMBERAPPROVED: PROJECT DIRECTOR
DRAWING TITLEARCHITECT/ENGINEERS:CONSULTANTS:
REVISIONS: DATE
B
A
D
C
E
VA FORM 08-6231
O N
E
EI
G H
T
IN
C H
O
N E
FO
O
T O
N E
Q U
AR
TE
R
IN
C H
O
N E
FO
O
T O
N E
H
AL
F
IN
C H
O
N E
FO
O
T
TH
R
EE
Q U
AR
TE
R S
IN
C
H
O N
E
FO
O T
TH
R
EE
IN
C H
ES
O N
E
FO
O T
O N
E
IN
C H
F
O R
TY
F
EE
T
(1
0'
6"
6"
0'
0'
123456
F
B
A
D
C
E
F
O N
E
SI
XT
EE
N
TH
IN
C
H
O N
E
FO
O T
O N
E
AN
D O
N E
H
AL
F
IN
C H
ES
O N
E
FO
O T
6"
BUILDING NUMBER
NEW ORLEANS, LOUISIANA
2PL103-G
BLDG 2 THIRD FLOOR PLUMBING PLAN - AREA G
RVD CADDFebruary 29, 2012
02629-HS2-401SLVHCS REPLACEMENT MEDICAL
CENTER PROJECT
SCHRENK & PETERSON CONSULTING ENGINEERS / CIVIL
KORDA/NEMETH ENGINEERING / STRUCTURAL
BR+A CONSULTING ENGINEERS / MECH, ELECT, PLUMBING, LOW VOLTAGE
ARCHITECTURAL ENGINEERING/ PLUMBING
SCALES ASSOCIATES / FIRE PROTECTION
DESMAN ASSOCIATES / PARKING
CODE CONSULTANTS, INC. / CODE CONSULTANT
THE SEXTANT GROUP / AV & ACOUSTICAL
HAMMER DESIGN ASSOCIATES / FOOD SERVICE
PYBURN & ODOM / ABATEMENT
TATA & HOWARD / TANK CONSULTANT
Department of
Veterans Affairs
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
WP_08
CONSTRUCTION DOCUMENTS 1
FULLY SPRINKLERED
1. ALL HORIZONTAL PIPING SHALL BE INSTALLED IN THE INTERSTITIAL
SPACE UNLESS OTHERWISE NOTED. CONTRACTOR SHALL OWN ALL
REQUIRED CORING, SLEEVING, FIRESTOPPING, ETC. REFER TO
ARCHITECTURAL PLANS FOR INTERSITIAL SLAB CONSTRUCTION.
2. ALL DOMESTIC (POTABLE)AND NON DOMESTIC (NONPOTABLE) HOT,
COLD, AND HOT WATER CIRCULATION PIPING SHALL BE INSTALLED AT
THE INTERSTITIAL SPACE FLOOR IN ORDER TO MAINTAIN HOT WATER
TEMPERATURE TO ALL FIXTURES. IF PIPING CAN'T BE INSTALLED AT
THE INTERSTITIAL SPACE FLOOR, PIPING SHALL BE INSTALLED
BETWEEN THE INTERSTITIAL SPACE FLOOR AND THE CEILING AND THE
PIPING SHALL BE LOOPED TO ALLOW CONTINUOS HOT WATER
CIRCULATION.
3. ALL STACKS AND RISERS SHALL BE SUPPORTED AT THE INTERSTITIAL
SPACE FLOOR OR JUST ABOVE THE CEILING WHERE THE INTERSTIAL
SPACE DOES NOT EXIST. SEE DETAILS ON DWG 0P506.
4. PROVIDE A BALL VALVE IN THE OPEN POSITION WITH A LOCK AND CHAIN
AT ALL EMERGENCY SHOWERS
5. DRAIN VALVES SHALL BE PROVIDED AT THE BASE OF ALL PLUMBING
RISERS
6. ALL ISOLATION VALVES AT RISERS SHALL BE INSTALLED IN AN
ACCESSIBLE LOCATION, NO MORE THAN 12" ABOVE FINISHED CEILING
7. ALL MIXING VALVE AT SHOWERS SHALL HAVE THE TEMPATURE LIMIT
STOP ADJUSTED TO THE REQUIRED VA STANDARDS
GENERAL NOTES
REFER TO SKETCH:
SK-8-1-NJ-2-PL-103-G-1
RFI 01505: Rotate the mop basin 90 degrees to avoid conflict with the 2T2 steel truss
Correspondence No. 04924: Trap Primers have been deleted and Trap Guards installed.
Correspondence No. 04924: Trap Primers have been deleted and Trap Guards installed.
RFI 01809.1:
DELETE (1) P-804,
(1) P-712 ((1) 4" FD-B to remain for humidifier and add
(1) 4" OED)
RFI 01809.1: DELTETE (1)
P-804, (1) P-712 ((1) 4"FD-B
to remain and add (1) 4"
OED)
SEE RFI 02746 - EXPAND COLUMN
WRAP 3" EAST TO
ACCOMMODATE 6" GW RISER
RFI 03219: Interstitial capable of supporting interceptor assembly
THIS DRAWING HAS BEEN AFFECTED BY THE BIM
COORDINATION PROCESS. PLEASE REFER TO THE
BIM COORDINATED SHOP DRAWINGS FOR DETAILS.
LEVEL 3 GRAVITY LEVEL 3 PRESSURE
LEVEL 3i GRAVITY LEVEL 3i PRESSURE
SEE RFI 05314: Shifts wall and sink 20" North to accommodate foot pedals and bedpan washer
UP
P-202P-201
P-104A
P-104A P-202
(2)P-413
(4)P-417
4"FD-B
2P104-F
2P104-G
TELECOM
4G227A
STAIR
STG-03
SHG13
CORR
4G-C01A
CORR
4G-C04
CORR
4F-C09B
CORR
4G-C05B CORR
4G-C06
TELE PBX
4G108
SERVICE
BAY
4G227
EMER
ELEC
4G227D
NORM
ELEC
4G227C
NETWK
4G106J
PBX
4G106P
PBX
4G106N
TELE UPS
4G108A
PBX
4G106L
NETWK
4G106A
COMPUTER
ROOM MIS
4G110C
COMP
ACTIVE
STOR
4G110E
PBX
4G106M
PBX
4G106O
NETWK
4G106D
NETWK
4G106C
IMAGE
4G106T
IMAGE
4G106Q
IMAGE
4G106R
NETWK
4G106E
IMAGE
4G106S
NETWK
4G106K
TRAIN/
CONF RM
4G140
SUPV
TECH
4G121A
SUPV
TECH
4G121B
SUPV
TECH
4G121C
PRIVATE
MEETING
RM
4G142
CHIEF
NUTRITION
4G148
RECEPT
4G151
ASST
CHIEF
NUTRITION
4G146
CLINICAL
ADM SEC
CHIEF
4G144
SUPV
TECH
4G121D
CLERK
4G149B
CLERK
4G149A
DIET TECH
COMM
CENTER
4G147
PATIENT
PROD
MGR
4G150
DIET TECH
COMM
CENTER
4G145
RECEIVING
4G136
MAIN
KITCHEN
PATIENT
TRAY
SERIVCE
4G126
MAIN
KITCHEN
SANITATION
4G122
MAIN
KITCHEN
FOOD
PREP
4G124
DRY
GOODS
STOR
4G130
DHCP
COMPUTER
4G110B
EC
4G138
KITCHEN
ELEC RM
4G120
VISTA
4G106G
VISTA
4G106I
VISTA
4G106H
SECTION
CHIEF
4G101
STAFF
LOUNGE
4G134
HK
4G104
FEMALE
4G139
MALE
4G137
SERVICE
BAY
4G228
FEMALE
4A100A
MALE
4A100B
UPS ELEC
RM
4G110D
CORR
4G-C05A
CORR
4G-C07
CORR
4G-C05
SECURITY
4G227B
TEAM
SPACE
4G106U
STAIR
2F152
BACK-UP
SECURITY
COMMAND
CENTER
4G105
STOR
4G119A
HK
4G119B
SECTION
CHIEF
4G103
CABLE
VAULT
4G108B
CORR
4G-C01B
SHG11
S H G
MAIN
COMPUTER
ROOM
4G110A
CORR
4G-C01B
6"SS UP&DN
6"VS UP&DN
4"VS DN&RISE
4"SS DN&VS RISE
4"VS DN & RISE
4"SS DN & RISE
4"VSUP
4"SS DN&VS RISE
4"VS DN&RISE
4"VS DN&RISE
4"SS DN&VS RISE
10"OFD SPILL TO FACADE
10"OFD SPILL TO FACADE
6"RL UP
8"OFD UP
(2,650 SQ.FT.)
6"RL UP
8"OFD UP
(2,800 SQ.FT.)
6"RL UP
6"OFD UP
(2,700 SQ.FT.)
6"RL UP
8"OFD UP
(2,875 SQ.FT.)
6"RL UP
(4,400 SQ.FT.)
12"OFD
SPILL TO FACADE
(11,025 SQ.FT.)
6"RL DN
(4,400 SQ.FT.)
8"RL DN
(5,450 SQ.FT.)
8"RL DN
(5,575 SQ.FT.)
4"OFD UP
4"RL UP
(300 SQ.FT.)
6"VS DN
6"SS DN
4"DCWL DN
2 1/2"DHWL DN
1 1/4"DHWRL DN
QC-1
2"V DN&RISE
2"V DN&RISE
3"W DN
3"V DN&RISE
3"V DN&RISE
2"V DN
2"V DN&RISE
2"V DN&RISE
(4)3"GW DN
2"W DN&V RISE
2"V DN&RISE
2"W DN&V RISE
3"FD-C
3"FD-C 4"S DN
2PL404
2"DCWH DN
3/4"DHWH DN
3"V DN
10"OFD UP
(7,000 SQ.FT.)
1/
2" D
C W
H
1 1/4" DHWRH
1/2"DHWH DROP
2"W DN & V RISE
1/2"DCWH DROP
(2)2"W DN & V RISE
3/4"DHWH DROP
3/4"DCWH DROP
2"W DN & V RISE
6"SS DN
(2)4"S
2"V RISE
(2)4"S
2"V RISE
2 1/2"DCWH DROP
2"V DN & RISE
4"S
2"V RISE
3"S DN & 2"V RISE
4"S
2"V RISE
3"S DN & 2"V RISE
6"VS DN & RISE
3/4"DHWH DROP
2"V DN & RISE
3"W DN
3/4"DCWH DROP
1 1/4" DHWH
3/ 4"
D C
W H
3/4" DCWH
2" V
1 1/4" DHWRH(140)
2 1/2" DHWH(140)
2" DHWH
1 1/2" DCWH
1/
4" D
C W
H
1 1/4" DHWRH(140)
2 1/2" DHWH
3" V3" V
3" V
3" V
3" V
3" V
3" V
3" V
2" V
3" V
3" V
3" V
2" DHWH
2" D
H W
H
12" OFD
6" RL
" O
FD
8" OFD
6" RL
8" OFD
6" RL8" OFD
2" V
2" V
2" V
1/
4" D
C W
H
1 1/2" DHWH
" O
FD
" O
FD
2" V
2" V
2" V
2" V
2" V
(5)P-104
(3)P-104
(4)P-417
P-504
P-504
3" V
1/
4" D
H W
H
TP MANIFOLD
3/4"DCWH DROP
(2)1/2"TP DN
TO FD'S
6"VS UP
6" V
6" V
4" V
2" V
P-712
1-1/4"DCWH DROP
TMV
1 1/2"TW RISE
1-1/4"DHWH DROP
2"W DN & V RISE
3/4"DCWH DROP
TO HOSE BIBB
P-804
1 1/2" DCWH
1 1/4" DHWH
3/4" DCWH
TP MANIFOLD
3/4"DCWH DROP
1/2"TP DN
TO FD'S
1-1/4"DHWH DROP
TMV
1 1/2"TW RISE
2"W DN & V RISE
1 1/4"DCWH DROP
3/4"DCWH DROP
TO HOSE BIBB
4"W&V UP
2"V UP
AHU BY HVAC
2"V DN & RISE
2" V
1 1/2"DCWH UP
1 1/2"DHWH UP
P-804
1/2"TP UP
TO MANIFOLD
2" V
4"VS UP
2"V UP
4"W&T UP
2"V UP
4"W&T UP
1 1/2"DCWH UP
1 1/2"DHWH UP
4"W&T UP
4"FD-B
4"W&T UP
2"V DN & RISE
4"W&T UP
2"V UP
4"V UP
AHU BY HVAC
4" R
L
4"RL UP
4"RL UP
P-804
P-804
4"RL UP TO PLENUM DRAIN
1/
4" D
H W
R H
(1
4"
D C
W L
1/
4" D
H W
R L
3" D
C W
H
1/ 4"
D H
W R
H
1/ 2"
D H
W H
(1
4" D
C W
L
1/
2" D
H W
R L
1/
2" D
H W
L
ALL OVERFLOW STORM WATER
DRAINS AND OVERFLOW STORM
WATER RELIEF PIPING SHALL
TERMINATE WITH DOWNSPOUT
COVER AT THE FACADE OF THE
BUILDING. PRIOR TO THE START
OF WORK THE PLUMBING
SUBCONTRACTOR SHALL
COORDINATE EXACT LOCATIONS
OF COVERS WITH THE
ARCHITECT AND THE
CONSTRUCTION MANAGER.
ALL OVERFLOW STORM WATER DRAINS
AND OVERFLOW STORM WATER RELIEF
PIPING SHALL TERMINATE WITH DOWNSPOUT
COVER AT THE FACADE OF THE BUILDING.
PRIOR TO THE START OF WORK THE PLUMBING
SUBCONTRACTOR SHALL COORDINATE EXACT
LOCATIONS OF COVERS WITH THE ARCHITECT
AND THE CONSTRUCTION MANAGER.
(3)4"VS DN&RISE
(3)4"VS UP
4"W&T UP
2"V UP
2" D
H W
H
1/
2" D
C W
H
4" S
A N
(M .C
2" V
4" NG
1/
2" N
G
1/2" TP
1/ 2"
T P
2" V
2" V
1/ 2"
T P
4" V 2" V
P-712
2 1/2" DCWH
2" DHWH
2" D
H W
H
1 1/4" DHWH
1 1/4" DHWH
2 1/2" DCWH
1/2"DHWH DROP
2"W DN & V RISE
1/2"DCWH DROP
(2)2"W DN & V RISE
3/4"DHWH DROP
3/4"DCWH DROP
2"W DN & V RISE
1" D
C W
H
3/4" DCWH
2 1/2" DHWH(140)
2 1/2" DHWH(140)
1/
2" D
H W
H (1
TP MANIFOLD
3/4"DCWL DROP
(2)1/2"TP DN
TO FD'S
3/ 4"
D C
W H
(3)1/2"TP UP
TO MANIFOLD
TP MANIFOLD
3/4"DCWH DROP
(2)1/2"TP DN
TO FD'S
P-804 P-804
(2)2"V UP
SANITARY DRAINAGE PIPING
FROM FLOOR DRAINA
AT THE CONCOURSE
FOR CONTINUATION
REFER TO CONCORSE
DWGS.
4"W DN
10" OFD
6" R
L
" O
FD
6" RL
8" OFD
1/
4" D
H W
H
1/
2" D
H W
H (1
CHEMICAL DISPENSING
SYSTEM SEE DETAIL
ON DWG 0P508
DSP-1
CHEMICAL DISPENSING
SYSTEM SEE DETAIL
ON DWG OP508
DSP-1
4"RL UP TO
PLENUM DRAIN
4"RL UP TO
PLENUM DRAIN
4"RL DN
4"V UP
4" NG
1 1/2" DHWH 1 1/2" DHWH
2" DHWH
10"OFD UP
(7,400 SQ.FT.)
P-104A
(2)P-413
2"V DN & RISE
1-1/2"DCWL DROP
1-1/2"RPBP FOR
HVAC
4"FD-B
4" SAN (M.C.)
4" SAN (M.C.)
2" V
2"W UP
2"W UP
2" SAN (M.C.)
1/3"DCWH DROP
2"W DN&V RISE
1/2"DCWH DROP
2"W UP
8" R
L
4" RL
8" R
L
4" SAN (M.C.)
2"V UP
" O
FD
4" RL
" O
FD
1/
2" D
H W
H
1/
2" D
H W
L
1/
2" D
H W
H 3"
D C
W H
4" RL
02 E 02 D C
02 B
XA
02 H F.9
A.5
AA
AA.2
16.1
EJ
3.1
A
02 F
4" N
G
2 1/2" DHWH
2 1/2" DCWH
1" D
C W
H
2" DCWH
2" D
H W
H
3" D
C W
H
1/
2" D
H W
H (1
1/
2" D
H W
L
1/
2" D
H W
H
1/
2" D
C W
H
1/
4" D
H W
R H
(1
SL
1D
SS
4A
VS
4A
SV
4B
SS
4B
SS
4C
VS
4C
SS
4D
VS
4D
SS
4E
VS
4E
SS
4F
VS
4F
SS
4G
VS
4G
4" V 4" V
4" V
3" V
2" V
4" NG
Q D2 D1
E2 E1
F2 F1
G2 G1
A2
A4
A5
A1
A6
B1
C1 C2
B2
H
J1 J2
L
K
M1 M2 M3
N1 N2
A7
D3
E3
F3
R1
R4
R2 R3
A3
08 P
PLAN
NORTH
DATE
LOCATION
CHECKED DRAWN
PROJECT TITLE PROJECT NUMBER
DOCUMENT SET PACKAGE
DRAWING NUMBERAPPROVED: PROJECT DIRECTOR
DRAWING TITLEARCHITECT/ENGINEERS:CONSULTANTS:
REVISIONS: DATE
B
A
D
C
E
VA FORM 08-6231
O N
E
EI
G H
T
IN
C H
O
N E
FO
O
T O
N E
Q U
AR
TE
R
IN
C H
O
N E
FO
O
T O
N E
H
AL
F
IN
C H
O
N E
FO
O
T
TH
R
EE
Q U
AR
TE
R S
IN
C
H
O N
E
FO
O T
TH
R
EE
IN
C H
ES
O N
E
FO
O T
O N
E
IN
C H
F
O R
TY
F
EE
T
(1
0'
6"
6"
0'
0'
123456
F
B
A
D
C
E
F
O N
E
SI
XT
EE
N
TH
IN
C
H
O N
E
FO
O T
O N
E
AN
D O
N E
H
AL
F
IN
C H
ES
O N
E
FO
O T
6"
BUILDING NUMBER
NEW ORLEANS, LOUISIANA
2PL104-G
BLDG 2 FOURTH FLOOR PLUMBING PLAN - AREA G
RVD CADDFebruary 29, 2012
02629-HS2-401SLVHCS REPLACEMENT MEDICAL
CENTER PROJECT
SCHRENK & PETERSON CONSULTING ENGINEERS / CIVIL
KORDA/NEMETH ENGINEERING / STRUCTURAL
BR+A CONSULTING ENGINEERS / MECH, ELECT, PLUMBING, LOW VOLTAGE
ARCHITECTURAL ENGINEERING/ PLUMBING
SCALES ASSOCIATES / FIRE PROTECTION
DESMAN ASSOCIATES / PARKING
CODE CONSULTANTS, INC. / CODE CONSULTANT
THE SEXTANT GROUP / AV & ACOUSTICAL
HAMMER DESIGN ASSOCIATES / FOOD SERVICE
PYBURN & ODOM / ABATEMENT
TATA & HOWARD / TANK CONSULTANT
Department of
Veterans Affairs
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
WP_08
CONSTRUCTION DOCUMENTS 1
FULLY SPRINKLERED
1. ALL HORIZONTAL PIPING SHALL BE INSTALLED IN THE INTERSTITIAL
SPACE UNLESS OTHERWISE NOTED. CONTRACTOR SHALL OWN ALL
REQUIRED CORING, SLEEVING, FIRESTOPPING, ETC. REFER TO
ARCHITECTURAL PLANS FOR INTERSITIAL SLAB CONSTRUCTION.
2. ALL DOMESTIC (POTABLE)AND NON DOMESTIC (NONPOTABLE) HOT,
COLD, AND HOT WATER CIRCULATION PIPING SHALL BE INSTALLED AT
THE INTERSTITIAL SPACE FLOOR IN ORDER TO MAINTAIN HOT WATER
TEMPERATURE TO ALL FIXTURES. IF PIPING CAN'T BE INSTALLED AT
THE INTERSTITIAL SPACE FLOOR, PIPING SHALL BE INSTALLED
BETWEEN THE INTERSTITIAL SPACE FLOOR AND THE CEILING AND THE
PIPING SHALL BE LOOPED TO ALLOW CONTINUOS HOT WATER
CIRCULATION.
3. ALL STACKS AND RISERS SHALL BE SUPPORTED AT THE INTERSTITIAL
SPACE FLOOR OR JUST ABOVE THE CEILING WHERE THE INTERSTIAL
SPACE DOES NOT EXIST. SEE DETAILS ON DWG 0P506.
4. PROVIDE A BALL VALVE IN THE OPEN POSITION WITH A LOCK AND CHAIN
AT ALL EMERGENCY SHOWERS
5. DRAIN VALVES SHALL BE PROVIDED AT THE BASE OF ALL PLUMBING
RISERS
6. ALL ISOLATION VALVES AT RISERS SHALL BE INSTALLED IN AN
ACCESSIBLE LOCATION, NO MORE THAN 12" ABOVE FINISHED CEILING
7. ALL MIXING VALVE AT SHOWERS SHALL HAVE THE TEMPATURE LIMIT
STOP ADJUSTED TO THE REQUIRED VA STANDARDS
GENERAL NOTES
REFER TO SKETCH:
SK-8-1-NJ-2-PL-104-G-1
REFER TO SKETCH:
SK-8-1-NJ-2-PL-104-G-1
RFI:01639 - Fixtures shall be type P-101
Correspondence No.
04924: Trap Primers have been deleted and Trap Guards Installed
Correspondence No.
04924: Trap Primers have been deleted and Trap Guards Installed
RFI 01809.1: DELETE (1) 4" FD-B's,
(1) P-804, (1) P-712, (1) RPBP for HVAC ((1) 4" FD-B to remain for humidifier and add (1) 4" OED)
RFI 01809.1:
DELETE (1) P-804,
(1) P-712 ((1) 4" FD-B t remain and add (1) 4" OED)
RFI 03032: Provide P-528 stainless steel sink.
15"
15"
SEE RFI 03553: Revises OFD piping to accomodate 12" Line from CON-A4
Re-routed out of column per PCO
811327, CO-07C
RFI 05524: Relocate plumbing lines out of the MCR
RFI 05524: Relocate plumbing lines out of the MCR
RFI 05524: Relocate plumbing lines out of the MCR
REFER TO SKETCH: nova Bulletin 040 Sketch - MCR plumbing revision - 2PL104-G
RFI 06587: P-609 fixture not required at this location
RFI 06587: P-609
fixture not required at this location