SOW ATTACHMENT J ARCHITECTUAL.pdf

PDF 4 MB Posted

Attached to
Y1DB--Establish Radiation Oncology Program at SLVHCS Design Build - New Orleans
Solicitation number
36C77624R0107_1
Issued by

About this file

This document appears to be an architectural attachment for a federal design-build solicitation to establish a radiation oncology program at the Southeast Louisiana Veterans Health Care System (SLVHCS) in New Orleans, LA. The key details include:

The solicitation number is 36C77624R0107_1 and the agency is the VA Technology Acquisition Center. The project involves the design and construction of a new radiation oncology facility at the SLVHCS campus. The architectural drawings and specifications provided in this attachment cover the layout and design of the new facility, including room names/numbers, square footages, and construction details for the various spaces such as exam rooms, treatment areas, support spaces, and circulation. The drawings indicate the project will be a multi-story building with service bays and an interstitial level. Specific performance or design requirements are not provided in this attachment, which appears to be focused on the architectural design details.

View the file

Other files

File Type Posted
SOW ATTACHMENT L PLUMBING PLANS.pdf PDF
SOW ATTACHMENT F DRAWING INDEX.pdf PDF
SOW ATTACHMENT I STRUCTURAL.pdf PDF
SOW ATTACHMENT D Google Map Facility and Construct Area.pdf PDF
RFP Attachment 18 - PPQ.docx DOCX document
SOW ATTACHMENT K - Pt 5 - MECHANICAL PLANS.pdf PDF
RFP Attachment 3 - 00 01 15 Drawing List.pdf PDF
RFP Attachment 9 - Rad Onc Site Supporting Drawings_Part6.pdf PDF
RFP Attachment 11 - FINAL Brand Name JA Rad Onc NOLA.pdf PDF
RFP Attachment 15 - Limitations on SubK SB.xlsx XLSX spreadsheet
SOW ATTACHMENT K - Pt 1 - MECHANICAL PLANS.pdf PDF
RFP Attachment 8 - Rad Onc Site Supporting Drawings_Part5.pdf PDF
RFP Attachment 2 - Specifications.pdf PDF
SOW ATTACHMENT C Block Graphic.pdf PDF
SOW ATTACHMENT K - Pt 4 - MECHANICAL PLANS.pdf PDF
SOW ATTACHMENT H FOUNDATION PLANS.pdf PDF
FINAL SOW NOLA Estab Rad Onc Program - 11-19-24.pdf PDF
SOW ATTACHMENT K - Pt 3 - MECHANICAL PLANS.pdf PDF
SOW ATTACHMENT G SITE UTILITIES.pdf PDF
SOW ATTACHMENT E Geotechnical Engineering Reports.pdf PDF
SOW ATTACHMENT M ELECTRICAL PLANS.pdf PDF
SOW ATTACHMENT K - Pt 2 - MECHANICAL PLANS.pdf PDF
RFP Attachment 1 - Radiation Therapy Design Guide.pdf PDF
SOW ATTACHMENT A Existing OIT Space.pdf PDF
SOW ATTACHMENT B Portion of OIT Space - Rad Onc.pdf PDF
RFP Attachment 4 - Rad Onc Site Supporting Drawings_Part1.pdf PDF
RFP Attachment 10 - RAD ONC PRELIM SKETCH.pdf PDF
RFP Attachment 14 - Services Rates - Orleans - 7-22-24.pdf PDF
RFP Attachment 13 - DBA Rates - Orleans - 7-19-24.pdf PDF
RFP Attachment 7 - Rad Onc Site Supporting Drawings_Part4.pdf PDF
RFP 36C77624R0107 11-21-24.pdf PDF
RFP Attachment 12 - Site Visit Information.pdf PDF
SOW ATTACHMENT N PROGRAM FOR DESIGN.pdf PDF
RFP Attachment 5 - Rad Onc Site Supporting Drawings_Part2.pdf PDF
RFP Attachment 6 - Rad Onc Site Supporting Drawings_Part3.pdf PDF
RFP Attachment 16 - Small Business SubK Plan LB.docx DOCX document
RFP Attachment 17 - Division Cost Breakdown.xlsx XLSX spreadsheet
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT J - ARCHITECTUAL

629-335 Establish Radiation Oncology Program at SLVHCS

1F125.2 1F125.1 1F-C01B.21F -C

B.

1F-C01B.1

2AI101-F1

2AI101-G1

FEC FEC

EXTERIOR -

MAINTENANCE

ACCESS ONLY

EXTERIOR -

MAINTENANCE

ACCESS ONLY

STG-03

1F -C

1F125.2

CONFERENCE

ROOM

1G199

EC

1G195

CONFERENCE

ROOM

1G138

PAGERS

CELLS

1G184

LAPTOPS

1G191

PROF

STAFF

1G182

WORK

AREA

1G174

PROGRAM

1G183

HELP

1G188A

HELP

1G190

HELP

1G188B

PC

TECH

1G185D

PC

TECH

1G166A

PC

TECH

1G165

PC

TECH

1G185E

PC

TECH

1G185B

PC

TECH

1G185H

PC

TECH

1G185I

PC

TECH

1G185C

PC

TECH

1G185G

PC

TECH

1G166B

CONFERENCE

ROOM

1G196

OFFICE

ASST

CH

1G169

REF

LIB

1G186

OFFICE

SEC

CH

1G171

OFFICE

SEC

CH

1G172

PROF

STAFF

1G178G

PROF

STAFF

1G178A

PROF

STAFF

1G175

OFFICE

CIO

1G168

COPY

ROOM

1G173

SECY

1G177

ST

1G181

PROF

STAFF

1G178D

PROF

STAFF

1G178C

PROF

STAFF

1G178B

ST

1G180

CUSTOMER

SERVICE

1G189

SECY/

WAITING

1G162

EVIDENCE

1G151

MALE

LOCKER

1G141A

DETECTIVE

1G159

CLER

1G161G

ID/KEY

STORAGE

1G147

ARMORY

1G145 ARMORY

STORAGE

1G146

COPIER

1G150HOLDING

1G160

SECURITY

COMMAND

CENTER

1G139

FEMALE

LOCKER

1G140A

CLER

1G161K

CLER

1G161H

CLER

1G161A

CLER

1G161D

CLER

1G161B

CLER

1G161C

CLER

1G161E

CLER

1G161I

CLER

1G161J

CLER

1G161F

HC T/S

1G141C

T/S 1G141B

CORR

1GC04

COMP

ADP

STOR

1G167

PC

TECH

1G185A

1G-C08

ID

ISSUE

WAIT

1G149

HC T/S

1G140B

OFFICE

1G135

CLERICAL

1G132

RECPT/WAIT

1G131

LOCKERS

1G129

CHIEF

1G133

PIV

OFFICE

1G134

COPY

1G130

CORR

1GC15

CORR

1GC16

1G160

PC

TECH

1G185F

1G

0B

1G197

1F125.1 1F-C01B.2

1G

1G196

1G-C09

1G

1G

1G

1G

1G

1G178

1G

1G -C

1G

1G184 1G

1G173

1G

1G185

1F -C

B.

1G

1G150

1G

1G

1G152

1G159

1G147

1G

1G

1G -C

1G146

1G

1F-C01B.1

1G

1G186

1G

7A

1G167C

1G151

1G145

1G

1G

1B

1G141A

1G141C

1G140A

1G139

1G

1G174

1G02C

1G129

1G133

1G134

1G-C16

1G -C

1G135

1G -C

STOR

1G138B

STOR

1G138A

HVC

1G128.21G128.1

H

VC

FEC

DP

1G130

ID/REG

ISSUE

1G148

STRETCHER

STOR

1G128

FE

C

FEC

CHIEF

OF

SERVICE

1G152

FE

CFEC

FECFEC

HVC

FEC

SCC

RACK

ROOM

1G139A

1G139A

EXTERIOR -

MAINTENANCE

ACCESS ONLY

UNASSIGNED

1G197

1G199

1G

8B

1G

8A

1G

546SF

110SF

124SF

80SF

1921SF

128SF

94SF

101SF

221SF

94SF

120SF

78SF

51SF 51SF

981SF

135SF

133SF

66SF

389SF

69SF

215SF

31SF

500SF

306SF

127SF

123SF

120SF

118SF

31SF

117SF 74SF 97SF 268SF

105SF

191SF

122SF

137SF

65SF

108SF

1316SF

1G

7C

CORR

1GC02C

SHAFT

SHG13

FEMALE

1G100A

STAFF

LOUNGE

1G228

SERVICE

BAY

1G227

TELECOM

1G227C

EMER

ELEC

1G227B

NORM

ELEC

1G227A

MALE

1G100B

HK

1G125

ST

1G121

ST

1G122

WC

STORAGE

1G198

SECURITY

1G227D

DISPATCH

1G123A

BREAK

1G123B

UNASSIGNED

1G120

1G198.1

T 1G102

T 1G101

1G

7B

1G227

1G

7A

1G

1G

-C

1G-C02C

1G123

1G122

1G

1G

1G198.2

H

VC

1G

7D

FE

C

HVC

HVCDP

1G

1G

FEW

00AI101-A4

00AI101-A5

1G228

482SF

843SF

122SF 75SF

297SF

98SF

137SF 139SF

63SF

63SF

65SF57SF53SF

408SF

455SF

ELEV

LOBBY

1F125

PROG

1F147C

AN

1F142A

MSA

1F146EAN

1F140

CUB

1F147A

CUB

1F147B

AN

1F140

1F107.13 1F107.14

1G135

509SF

1G131

716SF

1G129

1G130

CUBICLES AREA

1G130A

1G130B

1G130C

135SF

1G130D

128SF

1G130E

122SF

1G130G

160SF

1G130H

1G130J1G130K 1G130L1G130M

1G130.1

1G130.2

1G130.4

1G130.3

1G126

1G126.1

1G126.2

1G126.3

1G126.41G126.5

1G126.6 1G126.7

1G126.81G126.91G126.101G126.11

1G126.12

1G126B

1G126A

1G126C

1G126D 1G128

1G126E

1G126D1

1G126D2

1G126D3

1G122

1G122B 1G122A

1G111R 1G111S

1G111R1 1G111R2 1G111R3

1G111S1

1G111S2

1G111P 1G111Q 1G1091G109A

1982SF

1G111

CUBICLES AREA

1G111M

1G111O

1G111N

1G124 1G124A

1G111L

1G111K

186SF

1G111J

OFFICE

1G158

132SF

1G111H

OFFICE

1G157

147SF

1G111G

OFFICE

1G156

137SF

1G111F

OFFICE

1G155

142SF

1G111E

OFFICE

1G154

133SF

1G111D

OFFICE

1G153

155SF

1G111C

1G111B

1G111A

1G111.13

1G111.1 1G111.2 1G111.3 1G111.4 1G111.5 1G111.6 1G111.7

1G111.81G111.91G111.111G111.12

1G130.6

1G130.5

1G120

1G107D 1G105

1G107.1

121SF1G107.2

1G107A

1G107B

1G107C

1G106

1G104 1G102

1G100

1G108

1G110 1G112A

1G112B

305SF

1G112

1G112C

1G114

1G116

1A206

1A208

1A204

1A202

EXAM

1D###

1D### 125 S.F

ROOM NAME

OLD ROOM #

NEW ROOM #

SQ. FOOTAGE

NEW AND OLD ROOM NUMBER LEGEND

PROF

STAFF

1G130.8

PROF

STAFF

1G130.7

UNASSIGNED

1G161L

1G111.10

73SF

1G170

107SF

1G130F

OFFICE

BUDGET

CORR

1F-C06

CORR

1FC03A.1

390SF

696SF

CORR

1GC02A

CORR

1GC02B

1443SF 1425SF

CORR

1GC03

CORR

1F-C05A.2

479SF

614SF

98SF

1G109A.1

153SF

1G178

1G133

23SF

CORR

1F-C01C

CORR

696 SF

CORR

1F-C01B

CORR

1F-C01B

1045SF

148 SF

111SF

4659 SF 1233 SF

IT

TECHS

1STG03

431SF

STAIR

1G-C05

PIV

PIV

PIV

PIV

PIV

1G107 SUITE

EWC

1A202A

EWC

1A204A

Q D2 D1

E2 E1

F2 F1

G2 G1

A2

A4

A5

A1

A6

B1

C1 C2

B2

H

J1 J2

L

K

M1 M2 M3

P

N1 N2

A7

D3

E3

F3

R1

R4

R2 R3

A3

PLAN

NORTH

DATE

LOCATION

CHECKED DRAWN

PROJECT TITLE PROJECT NUMBER

DOCUMENT SET PACKAGE

DRAWING NUMBERAPPROVED: PROJECT DIRECTOR

DRAWING TITLEARCHITECT/ENGINEERS:CONSULTANTS:

REVISIONS: DATE

B

A

D

C

E

VA FORM 08-6231

O N

E

EI

G H

T

IN

C H

O

N E

FO

O

T O

N E

Q U

AR

TE

R

IN

C H

O

N E

FO

O

T O

N E

H

AL

F

IN

C H

O

N E

FO

O

T

TH

R

EE

Q U

AR

TE

R S

IN

C

H

O N

E

FO

O T

TH

R

EE

IN

C H

ES

O N

E

FO

O T

O N

E

IN

C H

F

O R

TY

F

EE

T

(1

0'

6"

6"

0'

0'

123456

F

B

A

D

C

E

F

O N

E

SI

XT

EE

N

TH

IN

C

H

O N

E

FO

O T

O N

E

AN

D O

N E

H

AL

F

IN

C H

ES

O N

E

FO

O T

6"

BUILDING NUMBER

2AI101-G2

BLDG 2 FIRST FLOOR PLAN - AREA G2

ML AG/DMKFebruary 29, 2012

02629-HS2-401SLVHCS REPLACEMENT MEDICAL

CENTER PROJECT

NEW ORLEANS, LOUISIANA

SCHRENK & PETERSON CONSULTING ENGINEERS / CIVIL

KORDA/NEMETH ENGINEERING / STRUCTURAL

BR+A CONSULTING ENGINEERS / MECH, ELECT, PLUMBING, LOW VOLTAGE

ARCHITECTURAL ENGINEERING / PLUMBING

SCALES ASSOCIATES / FIRE PROTECTION

DESMAN ASSOCIATES / PARKING

CODE CONSULTANTS, INC. / CODE CONSULTANT

THE SEXTANT GROUP / AV & ACOUSTICAL

HAMMER DESIGN ASSOCIATES / FOOD SERVICE

PYBURN & ODOM / ABATEMENT

TATA & HOWARD / TANK CONSULTANT

Department of Veterans Affairs

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

WP_08

CONSTRUCTION DOCUMENTS 1

FULLY SPRINKLERED

I.S.C. GROUP, INC. / IRRIGATION

DAN EUSER WATER ARCHITECTURE, INC. / WATER FEATURE

SCALE: 1/8" = 1'-0"

BLDG 2 FIRST FLOOR PLAN - AREA G1 AND G2

15 BULL 015B - PRE-AWARD 08/30/2013

16 BULL 015B - VE 08/30/2013

DIAGNOSTIC AND TREATMENT BUILDING

REVISED STAIRWELL NUMBER 06/10/2020

NEW LOCATON OF PIV OFFICE 1G107 04/22/2022

WATER FOUNTAIN LOCATION NUMBER 03/28/2023

G

F

E

C

B

A.5 02

A

AA.2

AA

XA

5.3

7.6

8.1

9.7

10.4

02 9

M 02 L

G.2

G.1

2.2

8.3

02 K 02 J.5 02 J

13.2

16.1

Y49

I-1D227

OPEN TO

LEVEL 01

SERVICE BAY

OPEN TO

LEVEL 01

SERVICE BAY

OPEN TO SERVICE

BAY BELOW

OPEN TO

LEVEL 01

SERVICE BAY

I-1 F2

.1

I-1F-STF-4.1

D

2AI101-D3

I-1 E1

I-1 G

I-1F-STF-4.2

J_4

P24

P24

P24AB

A14

A14

A14

A14

P24

J_4

J_4 J_4

J_4

P26AB

P26AB

P26AB

A14

J_4 P24

VEST

STD-O5-1i

ELEV

LOBBY

1D201

STAIR

STD-05

ELEV

DS-01

ELEV

DS-02

SH

D

SHD03

STD-01

ELEV

DP-10

ELEV

DP-09

SHE06

SHE07

A14

STF-04

ELEV

FS-08

SHF-16

STF-02 ELEV

FP-03

ELEV

FP-04

ELEV

FP-05

ELEV

FS-06

ELEV

FS-06

SHF08

SH

F1

I-1 G

7A

SH

G

SH

G

SH

G

INTERIOR EXPANSION JOINT

COVERS ALONG THIS LINE:

FLOOR: EFF-S

WALL: EWW-S

STG-03

OPEN TO TOP OF

EXTERIOR SOFFIT

SYSTEM BELOW

EXTERIOR -

OPEN TO BELOW

EXTERIOR -

OPEN TO BELOW

OPEN TO TOP OF EXTERIOR

SOFFIT/INTERIOR CEILING

SYSTEM BELOW

OPEN TO

LEVEL 01

BELOW

OPEN TO LEVEL 01

CEILING BELOW

EXTERIOR -

OPEN TO BELOW

EXTERIOR -

OPEN TO BELOW

OPEN TO LEVEL 01

CEILING BELOW

INTERIOR EXPANSION JOINT

COVERS ALONG THIS LINE:

FLOOR: EFF-S

WALL: EWW-S P24AB

J_4

D24AB

A14

J_4

J_4

J_4J_4

J_4

J_4

D24AB

A14

GENERAL NOTE: WALL

DIMENSIONS PER LAYOUT OF 2-

HR OCCUPANCY SEPARATION

WALL ON LEVEL 01

1' - 1" 16' - 9"

1'

1"

H

P24B

P24B

F1

0AI511

P24AB

P24AB

T28

2.7

1.5

PAN-AM

CONNECTOR

1D200

02 09040608

01030507

Q D

D

E2 E1

F2 F1

G

G 1 A2A4

A5 A1A6

B1C

C

B2

HJ1

J2

L

K

M

M

M

P

N

N

A7

D

E3

F3

R

R

R

R

A3

PLAN

N

O R

TH

D

ATE

LO

C

ATIO

N

C H

EC

KED

D R

AW

N

PR

O

JEC

T TITLE

PR

O

JEC

T N

U M

BER

D O

C U

M

EN

T SET PAC

KAG

E

D R

AW

IN

G N

U M

BER

APPR

O

VED

: PR

O

JEC

T D

IR

EC

TO

R

D R

AW

IN

G

TITLE

AR

C

H

ITEC

T/EN

G

IN

EER

S:

C

O N

SU

LTAN

TS:

R

EVISIO

N S:

D

ATE

B AD CE

VA FO

R

M 08-6231

ONE EIGHT INCH = ONE FOOT ONE QUARTER INCH = ONE FOOT ONE HALF INCH = ONE FOOT THREE QUARTERS INCH = ONE FOOT THREE INCHES = ONE FOOT ONE INCH = FORTY FEET (1" = 40')

0 4 8 16 0 4 8 0 4 06" 2 6" 0 0' 15' 30' 0' 40' 80'

F

B AD CEF

ONE SIXTEENTH INCH = ONE FOOT

0 4 8 32

ONE AND ONE HALF INCHES = ONE FOOT

06" 116

BU

ILD

IN

G

N U

M

BER

N

EW

O R

LEAN

S, LO

U

ISIAN

A

2AI101i

BLD

G

2 - FIR

ST FLO

O R

IN

TER

STITIAL PLAN

M L

AG

/D

M K

February 29, 2012

629-H

S2-401

SLVH

C S R

EPLAC

EM

EN

T M

ED

IC

AL

C

EN

TER

PR

O

JEC

T

SC

H

R

EN

K & PETER

SO

N C

O N

SU

LTIN

G

EN

G

IN

EER

S / C

IVIL

KO

R D

A/N

EM

ETH

EN

G

IN

EER

IN

G

/ STR

U C

TU

R

AL

BR

+A C O

N

SU

LTIN

G

EN

G

IN

EER

S / M

EC

H

, ELEC

T, PLU

M

BIN

G

, LO

W

VO

LTAG

E

AR

C H

ITEC

TU

R

AL EN

G

IN

EER

IN

G

/ PLU

M

BIN

G

SC

ALES ASSO

C

IATES / FIR

E PR

O

TEC

TIO

N

D

ESM

AN

ASSO

C

IATES / PAR

KIN

G

C O

D E C

O N

SU

LTAN

TS, IN

C

. / C O

D E C

O N

SU

LTAN

T

TH

E SEXTAN

T G

R O

U

P / AV & AC

O U

STIC

AL

H

AM

M

ER

D

ESIG

N

ASSO

C

IATES / FO

O D

SER

VIC

E

PYBU

R N

& O D

O M

/ ABATEM

EN

T

TATA & H

O W

AR

D

/ TAN

K C

O N

SU

LTAN

T D ep artm en t o f V eteran s A ffairs

O

FFIC

E O F

C O

N

STR

U C

TIO

N

AN

D

FAC

ILITIES

M

AN

AG

EM

EN

T

W P_08

C O

N

STR

U C

TIO

N

D O

C U

M

EN

TS 1

FU

LLY SPR

IN

KLER

ED

I.S.C . G

R O

U

P, IN

C

. / IR

R

IG

ATIO

N

D

AN

EU

SER

W

ATER

AR

C

H

ITEC

TU

R

E, IN

C

. / W

ATER

FEATU

R

E

SCALE: 1/16" = 1'-0"

BLDG 2 FIRST INTERSTITIAL FLOOR PLAN1

KEY

PLAN

NORTH

BU

LL 015B - VE

08/30/2013

J_4KK24

RFI 07686

1.

S

J_4P24

RFI 07686

RFI 03308: Wall type to change to D24A around the volunteer space added in bulletin 15B

5'-10"

R F

I 03308: W all type to change to D 24A around the volunteer space added in bulletin 15B

R F

I 03308: W all type to change to D 24A around the volunteer space added in bulletin 15B

R F

I 03308: W all type to change to D 24A and S

H G

12 is deleted all levels

RFI 05095: Wall shifts to encapsulate the Pipe Hangers

RFI 06085: continues drywall from Level 1. Caulk joint at handrail

RFI 04534: Slab edge and partition change, reference item 3

RFI 07296: shaft above doesn't need to be closed from interstitial

RFI 05095.1: All beams exposed in Service Bays need to be fireproofed

RFI 06968 infill opening in concrete with a 2 hour horizontal shaft enclosure

RFI 07653: Leave Depression as shown

J_4

RFI 07239

RFI 07686

J_4P24

RFI 07686

RFI 07695.1/07695.2:

Engineering judgment to maintain fire rating

RFI 07698: Add 2 Hour Shaft around beam in Stair Shaft and fire caulk

RFI 07759: Wall Deleted

RFI 07759: Wall Deleted

RFI 07759: Wall Deleted

RFI 07810:

Wall Change

RFI 07816.2: Laminate Shaft board and 2 Layers of GWB to bottom of beam and continue 2 hour rating to deck, See Detail 2 in RFI Sketch

D24ABP24

RFI 07816.2

RFI 08046: Build 2 Hour Wall to fill gap between Interstitial Slab and Vestibule Depression

RFI 07686

RFI 07686.1

RFI 08095: Add 2 Layers of GWB around W Beams and finish ends to close 2 Hr Rating Gap at Shaft Walls

RFI 08155: Add Framing, Shaft Board, and GWB around Beam to create 2 Hour Rating for Stair Shaft

RFI 02854.1: Enlarge Shaft Wall Dimensions to hit horizontal sections of duct

8" CMU Wall continued from Level 1

RFI 08381: Shaft Wall location change on Level 1

P24

RFI 08337

RFI 08337: Infill with 2 HR horiz. shaft

CORR

2F-C06

ULTRASOUND

2F148PAT

HOLD

2F155I

MEDS

2F149

TEE

ROOM

2F165

RECOVERY

BAY

2F155H

TEE

SCOPE

HOLD

2F166 T

2F157

PAT

HOLD

2F155A

CONTROL

2F175

PAT

HOLD

2F155B

EXAM

2F164

RESIDENT

WORK

2F176

ULTRASOUND

2F151

ULTRASOUND

2F147

ULTRASOUND

2F150

2F

2F-C06

2F

2F176

2F

2F

2F -C

.1

2F -C

2F

2F175 2F

CRDP

2AI102-F2

2AI102-G2

CORR

2F-C05

DP

63SF

292SF

172SF

291SF 287SF

76SF75SF

269SF

125SF

592SF

130SF

H

G

F

E

D

C

B

A.5

SERVICE

BAY

2F227

A

AA.2

AA

XA

SHAFT

SHF10

2F227.1 2F107 2F303

2F301

2F244

2F246 2F248

2F242

2F240A2F240K 2F155 2F151

2F160

2F147

303SF

2F143

EXAM

1F###

1F### 125 S.F

ROOM NAME

OLD ROOM #

NEW ROOM #

SQ. FOOTAGE

NEW AND OLD ROOM NUMBER LEGEND

2F303A

2F303B

CORR

2G-C02

CORR

2G-C03

CORR

2G-C05A

CORR

2G-C07

CORR

2G-C10

CORR

2G-C08A

CORR

2G-C09

CORR

2G-C11

CORR

2G-C04

CORR

2G-C06A

STAIR

STG-03

CORR

2G-C05B

CORR

2G-C08B

CC

2G119B

SCR

2G117

CLEAN

2G116

SOILED

HOLD

2G115

MRI

2G129

MRI

2G128

CONTROL

2G131

SCR

2G127

GAS/CRY

ROOM

2G125

DRESS

2G194

DRESS

2G185

DRESS

2G191

DRESS

2G195

STRESS

2G193

STRESS

2G186

STRESS

2G196

STRESS

2G199

STRESS

2G190

ECHO

2G141

ECHO

2G140

STRESS

ECHO

2G139

PERIPHERAL

VASCULAR

2G182

VASC

TREAD

2G181

STRESS

ECHO

2G138

ECHO

2G136

WORKSPACE

2G192

DOSE

ADMIN

NM

2G159

TILT

TABLE

2G180

CARD

EQUIP

2G183

T 2G143

T/D 2G168

T 2G202

NUCLEAR

MED

2G164

DRESS

2G160

PET-CT

2G167

THYROID

UPTAKE

2G170

SCR

2G167B

HOT

LAB

2G158

CONTROL

2G167A

NUCLEAR

MED

2G149

NUCLEAR

MED

2G150

SUB-WAITING

2G201

CONFERENCE

ROOM

2G178

OFFICE

2G189 DRESS

2G120

DRESS

2G114

DRESS

2G121

STAFF

WORK

2G119A

PET

READ

2G175

CC

2G156

STORAGE

ECHO

2G137

SUB-WAIT

CARDIO

2G123

CONTROL

2G130

PAT

HOLD

2G113

PAT

HOLD

2G112

T 2G118

LINEN

2G124

EQUIP

STORAGE

2G122

HK

2G126

REF

STOR

2G154

DRESS

2G198

HK

2G169 T

2G157

DRESS

2G155

DRESS

2G150A

LINEN

2G163

AMBULETTE

2G145

AMBULETTE

2G144

DRESS

2G111

LINEN

2G148A

CC

2G184

EC

2G177

LOUNGE

2G176

DRESS

2G200

MRI

WAITING

2G110

T 2G165

SERVICE

BAY

2G228

T 2G142

2G183.1

2G

STRESS

2G197

ECHO

READING

2G187

CARD

EQUIP

2G188

SOILED

HOLD

2G166

STAIR

2F152

2G -C

B

HVC

2G

2G

2G

-C

2G107

2G

2G1202G121

2G

2G1302G131

2G116

2G115

2G

2G

2G -C

B

2G-C05A.2

2G

2G169

2G

2G

0A 2G

2G159

2G158

2G167A.1

2G

7A .2

2G

7B

2G180

2G190

2G197

2G193

2G186

2G

2G192

2G

2G

2G187

2G188

2G189

2G

2G157

2G118

2G-C09

2G-C06A

2G

2G

7.

2G167

2G164

2G150

2G149

2G136

2G105

2G

2G

2G143

2G -C

2G -C

2G

2G196

2G199

2G

2G182

2G181

2G183.2

2G178.1

2G

2G111

2G176

2G175

2G114

2G

2G

2G

2G128 2G129

CR

CR

2G142

FEC

FEC

HVC

2G

7.

HVC

DP

DP

2AI102-F2

2AI102-G2

2A I1

-G

2A

I1

-G

FE

C

H

VC

H

VC

FE

C

FEW

FEC

HVC

H

VC

STP

FEW

EC

2G183A

2G183A

HVC

HVC

EXTERIOR

OPEN TO

BELOW

SHAFT

SHG14

RFI 01631

LINEN

2G148B

LINEN

2G148C

UP

DN

UP

UP

XD

13.2

CORR

2G-C02

SHAFT

SHG13

DRESS

2G114

STORAGE

ECHO

2G137

PAT

HOLD

2G113

DRESS

2G111

MRI

WAITING

2G110

XD

2G

9B

STAIR

2F152

2G227

2G

7A

2G

7B

2G

9A

2G137

2G-C06C

2G

2G

-C

2G103

CR

2G210.2 2G210.1

HVC HVC

SHAFT

SHG11

SHAFT

SHG12

2A I1

-G

AI

2- A4

CR

H

VC

H

VC

FEC

FE

C

FEW

RFI 01631

SERVICE

BAY

2G227

TELECOM

2G229A

PHYSICIST

2G105

2G107

HK

2G106

CLEAN STORAGE

2G230

SERVICE

BAY

2G227

CARD

RECEPT

2G101C

NUC

MED

RECEPTION

2G101A

TELECOM

2G229A

EMER

ELEC

2G227B

NORM

ELEC

2G227A

PHYSICIST

2G105

RECEPTION

2G101B

MDS

STORAGE

2G107

MALE

2G100B

SECURITY

2G229B

HK

2G106

COPY/WORK

2G103

FEMALE

2G100A

126SF 85SF

311SF

325SF

48SF

122SF 74SF

318SF

134SF 143SF

591SF

93SF

199SF

80SF

49SF

63SF

59SF

455SF

145SF

43SF

60SF

48SF

123SF108SF

104SF

464SF

114SF

48SF

63SF

184SF

65SF

47SF

131SF

131SF304SF

230SF

77SF

234SF

269SF

52SF

221SF

52SF

51SF 53SF

472SF

191SF

396SF

396SF

52SF

28SF

50SF

146SF

378SF

120SF 63SF

49SF

70SF

96SF47SF64SF

77SF

77SF

231SF 218SF

199SF211SF 75SF

189SF

45SF

17SF

155SF 232SF

41SF

48SF

31SF

224SF 232SF

51SF

147SF

49SF

49SF

233SF

129SF

184SF

420SF

1176SF

388SF

116SF

38SF

179SF

49SF

46SF

41SF

52SF

19SF

2G310

2G310A 2F247 2F245

2G221

2G223

2G218

2G217

2G219

2G310B2G308

2G306

2G215

2G217A

2G234

2G220

2G218A

2G224

2G222

2G222A

2G178

2G176

2G158 2G156 2G154 2G152 2G111

2G150

2G162 2G160

2G110

2G110C2G110B

2G108 2G110A

2G106

2A202

2A204

2G102 2G100A

2G100.2 2G100

2G104

2G100.1

2G100.3

2G120

2G122

2G124

2G126

2G128

2G130

2G129

2G127

2G1252G132

2G1212G1232G131

2G138 2G140

2G170

2G172

2G136 2G134

2G174

220SF

2G125.1

2G171

2G173

2G175

2G212

2G210

2G208

2G206

2G204

2G200

2G202

2G231A

2G211

2G213

2G233 2G231

2G302 2G209

2G207

2G205

2G201

2G300

2G304

2G203

2G301

2G303

2G305

2G307

2G309

NUCLEAR

MED

2G151

ROOM

2G153

480SF

49SF

2G214

2G216

2G

2G151.2

2G -C

HVC

2G

2G

1.

DRESS

2G152

44SF

CONTROL

715SF

723SF

2G-C06B.12G-C06B.22G-C06A.1

2F-C03.1

2F-C03.2

2F-C03.3

2G216A

981SF

349SF

248SF

364 SF

476SF

241SF

645SF

729SF

643SF

754SF

769SF

699SF

454SF

2G114

2G112A

60SF

OFFICE

485SF

2G112

UNOCCUPIED

446SF

CORR

2F-C07B2

461 SF

CORR

2F-C03B

456 SF CORR

2F-C01B

665 SF

CORR

2G-C06B

1298SF

2STG03

CORR

2G-C06C

318SF

USED BY

NO

SERVICE

USED BY

NO

SERVICE

Q D2 D1

E2 E1

F2 F1

G2 G1

A2

A4

A5

A1

A6

B1

C1 C2

B2

H

J1 J2

L

K

M1 M2 M3

P

N1 N2

A7

D3

E3

F3

R1

R4

R2 R3

A3

PLAN

NORTH

DATE

LOCATION

CHECKED DRAWN

PROJECT TITLE PROJECT NUMBER

DOCUMENT SET PACKAGE

DRAWING NUMBERAPPROVED: PROJECT DIRECTOR

DRAWING TITLEARCHITECT/ENGINEERS:CONSULTANTS:

REVISIONS: DATE

B

A

D

C

E

VA FORM 08-6231

O N

E

EI

G H

T

IN

C H

O

N E

FO

O

T O

N E

Q U

AR

TE

R

IN

C H

O

N E

FO

O

T O

N E

H

AL

F

IN

C H

O

N E

FO

O

T

TH

R

EE

Q U

AR

TE

R S

IN

C

H

O N

E

FO

O T

TH

R

EE

IN

C H

ES

O N

E

FO

O T

O N

E

IN

C H

F

O R

TY

F

EE

T

(1

0'

6"

6"

0'

0'

123456

F

B

A

D

C

E

F

O N

E

SI

XT

EE

N

TH

IN

C

H

O N

E

FO

O T

O N

E

AN

D O

N E

H

AL

F

IN

C H

ES

O N

E

FO

O T

6"

BUILDING NUMBER

2AI102-G2

BLDG 2 SECOND FLOOR PLAN - AREA G2

ML AG/DMKFebruary 29, 2012

02629-HS2-401SLVHCS REPLACEMENT MEDICAL

CENTER PROJECT

NEW ORLEANS, LOUISIANA

SCHRENK & PETERSON CONSULTING ENGINEERS / CIVIL

KORDA/NEMETH ENGINEERING / STRUCTURAL

BR+A CONSULTING ENGINEERS / MECH, ELECT, PLUMBING, LOW VOLTAGE

ARCHITECTURAL ENGINEERING / PLUMBING

SCALES ASSOCIATES / FIRE PROTECTION

DESMAN ASSOCIATES / PARKING

CODE CONSULTANTS, INC. / CODE CONSULTANT

THE SEXTANT GROUP / AV & ACOUSTICAL

HAMMER DESIGN ASSOCIATES / FOOD SERVICE

PYBURN & ODOM / ABATEMENT

TATA & HOWARD / TANK CONSULTANT

Department of Veterans Affairs

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

WP_08

CONSTRUCTION DOCUMENTS 1

FULLY SPRINKLERED

I.S.C. GROUP, INC. / IRRIGATION

DAN EUSER WATER ARCHITECTURE, INC. / WATER FEATURE

SCALE: 1/8" = 1'-0"

BLDG 2 SECOND FLOOR PLAN - AREA G1 & G2

16 BULL 015B - VE 08/30/2013

19 BULL 015C - VE 10/15/2013

DIAGNOSTIC AND TREATMENT BUILDING

REVISED STAIRWELL NUMBER 06/10/2020

SERVICE BAY USE UPDATE 08/24/2020

PIV OFFICE MOVED FROM 2G112 TO 1G107 04/22/2022

DNUP

DN

UP

DNUPDN

UP

DN

UP

DN

DN

DN

DN

DN

DN

DN

DN

DN

G

F

E

C

B

A.5 02

A

AA.2

AA

XA

Y20

5.3

7.6

8.1

9.7

10.4

02 9

3.7

3.3

8.3

13.2

16.1

6.1

I-2D228

I-2G227

I-2F-STF-4.1

I-2D-STD-5.2I-2

D

-S

TD

-5 .1

I-2F227

D

I-2G228

I-2E228

2AS711

D3

SHD03

STD-05

SHE06

I-2F-STF-4.2

R24A

D24A J_4

P26A

P26A

P26A P26A

P24

A14

P24

P26AB

A14

P24

D26AB

P24P24

P24

J_4

J_4

P26A

P26A

P26A

J_4

J_4

J_4 J_4

D26B

P24

P24 A14

A14

T28

D26B

A14

J_4

R24A

P24

J_4

J_4

P24

P24

P26A

J_4

J_4

J_4

J_4

J_4

P24AB

D24B

A14

D26B

P24

A_4

D26AB

ELEV

FP-03

ELEV

FP-04

ELEV

FP-05

ELEV

FS-06

ELEV

FS-07

SHF17

ELEV

FS-08

STF-04

2F153

STF-02

STD-01

ELEV

DS-02

ELEV

DS-01

SH

D

B

ELEV

DP-09

ELEV

DP-10

SHF10

SH

F1

SH

F1

SH

F1

2F152

STG-03

SHF08

P24B

SHE07

D24B

H

VEST

STD-05-2i

A14

P24

SHG

SHF16

OPEN TO

LEVEL 02

SERVICE BAY

OPEN TO

LEVEL 02

SERVICE BAY

EXTERIOR -

OPEN TO BELOW

EXTERIOR -

OPEN TO BELOW

OPEN TO

LEVEL 02

SERVICE BAY

EXTERIOR -

OPEN TO BELOW

EXTERIOR -

OPEN TO BELOW

EXTERIOR -

OPEN TO BELOW

EXTERIOR -

OPEN TO BELOW

OPEN TO

LEVEL 02

SERVICE BAY

OPEN TO

LEVEL 02

SERVICE BAY

ELEV

DS-11

PIT

ELEV

DS-12

PIT

I-2G227A

T28

T28

OPEN TO

LEVEL 01

BELOW

P26B

P24P24

P24P24

2.7

5"

5"

5"

5'

9"

10"

1' - 1"

1'

1"

9"

9"

4'

6" 7'

0"

8' - 7"

3' - 9"

7' - 4"

3'

8"

1.5

SHG14

02 09040608

01030507

Q D

D

E2 E1

F2 F1

G

G 1 A2A4

A5 A1A6

B1C

C

B2

HJ1

J2

L

K

M

M

M

P

N

N

A7

D

E3

F3

R

R

R

R

A3

PLAN

N

O R

TH

D

ATE

LO

C

ATIO

N

C H

EC

KED

D R

AW

N

PR

O

JEC

T TITLE

PR

O

JEC

T N

U M

BER

D O

C U

M

EN

T SET PAC

KAG

E

D R

AW

IN

G N

U M

BER

APPR

O

VED

: PR

O

JEC

T D

IR

EC

TO

R

D R

AW

IN

G

TITLE

AR

C

H

ITEC

T/EN

G

IN

EER

S:

C

O N

SU

LTAN

TS:

R

EVISIO

N S:

D

ATE

B AD CE

VA FO

R

M 08-6231

ONE EIGHT INCH = ONE FOOT ONE QUARTER INCH = ONE FOOT ONE HALF INCH = ONE FOOT THREE QUARTERS INCH = ONE FOOT THREE INCHES = ONE FOOT ONE INCH = FORTY FEET (1" = 40')

0 4 8 16 0 4 8 0 4 06" 2 6" 0 0' 15' 30' 0' 40' 80'

F

B AD CEF

ONE SIXTEENTH INCH = ONE FOOT

0 4 8 32

ONE AND ONE HALF INCHES = ONE FOOT

06" 116

BU

ILD

IN

G

N U

M

BER

N

EW

O R

LEAN

S, LO

U

ISIAN

A

2AI102i

BLD

G

2 - SEC

O

N D

FLO

O

R

IN

TER

STITIAL PLAN

M L

AG

/D

M K

February 29, 2012

629-H

S2-401

SLVH

C S R

EPLAC

EM

EN

T M

ED

IC

AL

C

EN

TER

PR

O

JEC

T

SC

H

R

EN

K & PETER

SO

N C

O N

SU

LTIN

G

EN

G

IN

EER

S / C

IVIL

KO

R D

A/N

EM

ETH

EN

G

IN

EER

IN

G

/ STR

U C

TU

R

AL

BR

+A C O

N

SU

LTIN

G

EN

G

IN

EER

S / M

EC

H

, ELEC

T, PLU

M

BIN

G

, LO

W

VO

LTAG

E

AR

C H

ITEC

TU

R

AL EN

G

IN

EER

IN

G

/ PLU

M

BIN

G

SC

ALES ASSO

C

IATES / FIR

E PR

O

TEC

TIO

N

D

ESM

AN

ASSO

C

IATES / PAR

KIN

G

C O

D E C

O N

SU

LTAN

TS, IN

C

. / C O

D E C

O N

SU

LTAN

T

TH

E SEXTAN

T G

R O

U

P / AV & AC

O U

STIC

AL

H

AM

M

ER

D

ESIG

N

ASSO

C

IATES / FO

O D

SER

VIC

E

PYBU

R N

& O D

O M

/ ABATEM

EN

T

TATA & H

O W

AR

D

/ TAN

K C

O N

SU

LTAN

T D ep artm en t o f V eteran s A ffairs

O

FFIC

E O F

C O

N

STR

U C

TIO

N

AN

D

FAC

ILITIES

M

AN

AG

EM

EN

T

W P_08

C O

N

STR

U C

TIO

N

D O

C U

M

EN

TS 1

FU

LLY SPR

IN

KLER

ED

I.S.C . G

R O

U

P, IN

C

. / IR

R

IG

ATIO

N

D

AN

EU

SER

W

ATER

AR

C

H

ITEC

TU

R

E, IN

C

. / W

ATER

FEATU

R

E

SCALE: 1/16" = 1'-0"

BLDG 2 SECOND INTERSTITIAL FLOOR PLAN1

PLAN

NORTH

KEY

BU

LL 015B - VE

08/30/2013

R F

I 03028: F ireproofing above deleted interstitial R

F I 03308 S

H G

D eleted all levels

RFI 05095: Wall shifts to encapsulate the Pipe Hangers

Shaft wall removed via

CO-07C

RFI 06600: 2-Hour Rated Wall, P22, added around shaft in deck due to truss location

RFI 04534: slab edge change, reference item 2

RFI 05095.1: All beams exposed in Service Bays need to be fireproofed

RFI 07653: Leave depression as shown

RFI 04661

Ensure that the rods are in the interstitial or in the wall cavity

A_4P24B

R COT

D24BP24B

D24B

I-2G227A RFI 07712: Wall moved to slab edge and Door I-2G227A moved

RFI 07712: Wall no longer at this location

RFI 07759: Wall Deleted

RFI 07834: Wall Deleted

RFI 07834: Wall Deleted

RFI 07834: Wall Deleted

RFI 07834: Wall Deleted

RFI 07816.2: Laminate Shaft board and 2 Layers of GWB to bottom of beam and continue 2 hour rating to deck, See Detail 2 in RFI Sketch

P24

RFI 07816.2

RFI 07926: Move North and West walls of P24 Shaft to underside of beam and Fireproof beams

RFI 07632.2: Build a 2 Hour Shaft wall to separate Level 2 and Level 2i at Blast wall vestibule location

RFI 07632.2: Build a 2 Hour Shaft wall to separate Level 2 and Level 2i at Blast wall vestibule location

RFI 08095: Add 2 Layers of GWB around W Beams and finish ends to close 2 Hr Rating Gap at Shaft Walls

RFI 08155: Add Framing, Shaft Board, and GWB around Beam to create 2 Hour Rating for Stair Shaft

RFI 08421: Rap exposed beam in Interstitial to create a 2 Hour Rating at beam

P24B

RFI 08452: Add 2 Hour Rated Wall around column to close slab opening

RFI 08452

RFI 07695.1/07695.2:

Engineering judgment to maintain fire rating

02-L1 100' - 0"

02-L2 119' - 0"

02-L3 138' - 0"

02-L4 157' - 0"

02-L5 176' - 0"

02-L6 195' - 0"

02-L1i 111' - 8"

02-L2i 130' - 8"

02-L3i 149' - 8"

02-L5i 187' - 8"

02 E 02 D 02 C 02 B02 H 02

F.9

A.5 02

AA

AA.2

R2AS201

7'

4"

7'

4"

7'

4"

7'

4"

7'

4"

02-L4i 168' - 8"

R2AS302

_______________ 02

R2AS302

A

R2AS302

_______________ 02 F

MP-1A

13' - 8"8' - 4"15' - 6"17' - 6"33' - 0"33' - 0"33' - 0"33' - 0"22' - 10"34' - 0"

2'

1/

2"

XA

A

AA.2

AA

PRESCRIPTIVE CMU

BLAST PRESSURE AREA: G

PRESCRIPTIVE CMU

BLAST PRESSURE AREA: G

D4

R0AS522

C2

R0AS524

B4

R0AS522

E5

R0AS524

D4

R0AS522

D4

R0AS522

(EXTC-2 FIELD W/

EXTC-1 ACCENTS)

E2

R0AS521

E2

R0AS521

E- G

1-

ST

G -0

E- G

1- C

A

IG

-0

IG

-0

IG

-0

IG

-0

IG

-0

IG

-0

IG

-0

IG

-0

IG

-0

IG

-0

IG

-0

IG

-0

IG

-0

IG

-0

IG

-0

IG

-0

IG

-0

IG

-0

IG

-0

IG

-0

IG

-0

IG

-0

IG

-0

IG

-0

IG

-0

IG

-0

IG

-0

IG

-0

IG

-0

IG

-0

IG

-0

IG

-0

IG

-0

IG

-0

IG

-0

IG

-0

IG

-0

SHEAR JOINT

SHEAR JOINT

LIGHT

FIXTURE

1'

6"

E5

R0AS524

SAFETY RAIL

SYSTEM

M

IN

1'

8"

T.

O

. R A

IL

4'

8"

4'

0"

4'

0"

EQEQ EQEQ

QUENCH

VENT

F6

R0AS525

SIM

G2

F2

E2

D2

G1

F1

E1

D1

PLAN

NORTH

DATE

LOCATION

CHECKED DRAWN

PROJECT TITLE PROJECT NUMBER

DOCUMENT SET PACKAGE

DRAWING NUMBERAPPROVED: PROJECT DIRECTOR

DRAWING TITLEARCHITECT/ENGINEERS:CONSULTANTS:

REVISIONS: DATE

B

A

D

C

E

VA FORM 08-6231

O N

E

EI

G H

T

IN

C H

O

N E

FO

O

T O

N E

Q U

AR

T E

R

IN

C H

O

N E

FO

O

T O

N E

H

AL

F I N

C H

O

N E

FO

O

T

TH

R

EE

Q U

A R

TE

R S

IN

C

H

O N

E

FO

O T

TH

R

EE

IN

C H

ES

O N

E

FO

O T

O N

E

IN

C H

F

O R

TY

F

EE

T

( 1

0'

6"

6"

0'

0'

123456

F

B

A

D

C

E

F

O N

E

SI

XT

EE

N

TH

IN

C

H

O N

E

FO

O T

O N

E

AN

D O

N E

H

AL

F

IN

C H

E S

O N

E

FO

O T

6"

BUILDING NUMBER

R2AS211

BLDG. 02 - EXTERIOR ELEVATIONS

DV JGJanuary 23, 2013

02629-HS2-401SLVHCS REPLACEMENT MEDICAL

CENTER PROJECT

NEW ORLEANS, LOUISIANA

SCHRENK & PETERSON CONSULTING ENGINEERS / CIVIL

KORDA/NEMETH ENGINEERING / STRUCTURAL

BR+A CONSULTING ENGINEERS / MECH, ELECT, PLUMBING, LOW VOLTAGE

ARCHITECTURAL ENGINEERING / PLUMBING

SCALES ASSOCIATES / FIRE PROTECTION

DESMAN ASSOCIATES / PARKING

CODE CONSULTANTS, INC. / CODE CONSULTANT

THE SEXTANT GROUP / AV & ACOUSTICAL

HAMMER DESIGN ASSOCIATES / FOOD SERVICE

PYBURN & ODOM / ABATEMENT

TATA & HOWARD / TANK CONSULTANT

Department of Veterans Affairs

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

EWP_06

CONSTRUCTION DOCUMENTS 1

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"

ELEVATION SOUTH AREA G.23

MATERIAL TYPES

GLAZING TYPES

SYMBOLS LEGEND

INSULATED LAMINATED

VISION

METAL PANEL (MP-2 EXTC-1)

PRECAST

EXTERIOR MATERIALS LEGEND

DIMENSION NOTES

1. ALL DIMENSION STRINGS FROM C/L OF JT. TO C/L OF JT.

EXCEPT AT ENDS OF EXTERIOR WALL & U.N.O.

2. REFER TO PLANS FOR CW. VERT. FRAMING LOCATIONS.

REFER TO ELEVATIONS FOR FRIT PATTERN EXTENT

3. REFER TO PLANS FOR WINDOW LOCATIONS IN METAL

PANEL & PRECAST SYSTEMS. REFER TO ELEVATIONS FOR

LOCATIONS OF JOINTS IN THESE SYSTEMS.

4. REFER TO PLANS FOR MP SYSTEM LOCATIONS WITH

C.M.U BACKUP.

INSULATED LAMINATED SPANDREL

MECHANICAL LOUVER. SEE NOTE FOR

ACTIVE LOUVER DIM. REFER TO F2/R0AS540

FOR TYPICAL DETAILS AT LOUVERS

O.D OVERFLOW DRAIN (SECONDARY)

O.S OVER FLOW SCUPPER

M.E.P. FP PENETRATIONS THROUGH

ENCLOSURE

LIGHTING OVER EXIT

PRECAST (PC) REPEATING JOINT

PATTERN TYPE INDICATOR. SEE SHEET

OAS5__ FOR PATTERN TYPES

TYPICAL DETAILS LEGEND

X

STUCCO / E.I.F.S (SEE NOTE ON ELEV.)

METAL PANEL (MP-1A EXTC-1)

IG-01 INSULATED LAMINATED VISION

IG-01-T INSUL. LAMINATED VISION TEMPERED

IG-01T-IB INSUL. LAMINATED VISION SAFETY W/

INTERIOR VISION CONTROL GLASS UNIT

IG-01DT-IB SAME AS IG-01T-IB, EXCEPT LAMINATED

GLASS ON INT. AND EXT. SIDE OF I.G.U

SG-01 INSUL. LAM. SPANDREL MED. GRAY

SG-01-T INSUL. LAM. SPANDREL TEMPERED

SG-02 INSUL. LAMINATED SPANDREL WHITE

SG-03 INSUL. LAMINATED SPANDREL BLACK

SLG-01 SAFETY IMPACT LAMINATED GLAZING

LGS-1 LAMINATED GLASS SPANDREL

DETAIL MARK REFER TO SHEET

B-#

IC-#

OC-#

P-#

AREAS OF SOLID REINFORCED

CMU WALL

METAL PANEL (MP-2 EXTC-2)

METAL PANEL (MP-1 EXTC-2)

R0AS520

R0AS521

R0AS522

R0AS524

BASE

INSIDE CORNERS

OUTSIDE CORNERS

PARAPETS

6 BULLETIN 010C 01/23/2013

9 BULLETIN 010F 05/07/2013

12 BULLETIN 10J 12/20/2013

15 BULL 041 3/5/2015

RFI 04764: Detail

C2/0AS524

RFI 05435.2: Termination hood to follow detail

6/0MH504

RFI 06140:

Review drawing

2EL101-G2

for fixture location and count.

02-L2 119' - 0"

02-L3 138' - 0"

02-L4 157' - 0"

02-L5 176' - 0"

02-L6 195' - 0"

02-L1i 111' - 8"

02-L2i 130' - 8"

02-L3i 149' - 8"

02-L5i 187' - 8"

7'

4"

7'

4"

7'

4"

7'

4"

7'

4"

13.2

02-L4i 168' - 8"

R2AS302

AACDD

ABA

CAAB

ACDADAD

H

H

G

DBACG

H

T H

IS

D

IM

F

R O

M B

O T

O

F P

N L

T Y

P

T Y

P P

C -1

P N

L H

T

J

J

J

J

J

PCPCPCPC

T .O

P

A R

A P

E T

/2

SG

-0

IG

-0 1-

T

SG

-0

IG

-0 1-

T

IG

-0

SG

-0

SG

-0

IG

-0

IG

-0

SG

-0

IG

-0

IG

-0

SG

-0

SG

-0

F C F D D

DDFF

D C D

CDFF

C

DF

EQ 2XEQ EQ EQ 2XEQ

E5

R0AS576

O.D.

A F

F

T Y

P

B L D

G

PRESCRIPTIVE CMU

BLAST PRESSURE AREA: F

B4

R0AS522

E2

R0AS524

B3

R0AS520

D2

R02AS582

F4

R0AS520

10' - 6" 22' - 6" 33' - 0"

02-L1 100' - 0"

02-L2 119' - 0"

02-L3 138' - 0"

02-L4 157' - 0"

02-L5 176' - 0"

02-L6 195' - 0"

02-L1i 111' - 8"

02-L2i 130' - 8"

02-L3i 149' - 8"

02-L5i 187' - 8"

R2AS213

_______________1

R2AS217

02-L4i 168' - 8"

REMOVABLE

PANEL

REMOVABLE

PANEL

REMOVABLE

PANEL

T .O

P

A R

A P

E T

/2

33' - 0"

BLAST PRESSURE

AREA: E

BLAST PRESSURE

AREA: E

5' - 6"

E2

R0AS521E2

R0AS521

C2

R0AS524

B2

R0AS520

F6

R0AS521

IG-01-TIG-01-TIG-01-TIG-01-TIG-01-T

IG-01

IG-01

/2

IG-01

5' - 6" 5' - 6"

5' - 6" 5' - 6"

IG-01

"2

5' - 6" 11' - 0" 5' - 6" 5' - 6"

IG-01

IG-01

9' - 0"

9' - 0"

9' - 0"

IG-01

IG-01

5' - 6"

IG-01

02-L1 100' - 0"

02-L2 119' - 0"

02-L3 138' - 0"

02-L4 157' - 0"

02-L5 176' - 0"

02-L6 195' - 0"

02-L1i 111' - 8"

02-L2i 130' - 8"

02-L3i 149' - 8"

02-L5i 187' - 8"

02 H

02-L4i 168' - 8"

" T

.O P

A R

A P

E T

/2

6' - 1 1/2"

B2

R0AS522

E5

R0AS524

JOINTS IN MP

PER TYP MP

DEFLECTION

JOINT DETAILS

02-L1 100' - 0"

02-L2 119' - 0"

02-L3 138' - 0"

02-L4 157' - 0"

02-L5 176' - 0"

02-L6 195' - 0"

02-L1i 111' - 8"

02-L2i 130' - 8"

02-L3i 149' - 8"

02-L5i 187' - 8"

16.1

02-L4i 168' - 8"

PCPCPCPC

T .O

P

A R

A P

E T

/2

T Y

P

PRESCRIPTIVE CMU

BLAST PRESSURE AREA: H

E2

R0AS524

HDBAG

DBH

HDDAG

ABBH

AAH

F

F

B

D

F

D

F G

G

G

SG

-0

SG

-0

SG

-0

SG

-0

IG

-0 1-

T

IG

-0

IG

-0

IG

-0

1B4

R0AS522

B4

R0AS522

B3

R0AS520

F4

R0AS520

33' - 0" 3' - 9"

SINGLE PNL

G2

F2

E2

D2

G1

F1

E1

D1

PLAN

NORTH

DATE

LOCATION

CHECKED DRAWN

PROJECT TITLE PROJECT NUMBER

DOCUMENT SET PACKAGE

DRAWING NUMBERAPPROVED: PROJECT DIRECTOR

DRAWING TITLEARCHITECT/ENGINEERS:CONSULTANTS:

REVISIONS: DATE

B

A

D

C

E

VA FORM 08-6231

O N

E

EI

G H

T

IN

C H

O

N E

FO

O

T O

N E

Q U

AR

T E

R

IN

C H

O

N E

FO

O

T O

N E

H

AL

F I N

C H

O

N E

FO

O

T

TH

R

EE

Q U

A R

TE

R S

IN

C

H

O N

E

FO

O T

TH

R

EE

IN

C H

ES

O N

E

FO

O T

O N

E

IN

C H

F

O R

TY

F

EE

T

( 1

0'

6"

6"

0'

0'

123456

F

B

A

D

C

E

F

O N

E

SI

XT

EE

N

TH

IN

C

H

O N

E

FO

O T

O N

E

AN

D O

N E

H

AL

F

IN

C H

E S

O N

E

FO

O T

6"

BUILDING NUMBER

NEW ORLEANS, LOUISIANA

R2AS212

BLDG. 02 - EXTERIOR ELEVATIONS

DV JGJanuary 23, 2013

02629-HS2-401SLVHCS REPLACEMENT MEDICAL

CENTER PROJECT

SCHRENK & PETERSON CONSULTING ENGINEERS / CIVIL

KORDA/NEMETH ENGINEERING / STRUCTURAL

BR+A CONSULTING ENGINEERS / MECH, ELECT, PLUMBING, LOW VOLTAGE

ARCHITECTURAL ENGINEERING / PLUMBING

SCALES ASSOCIATES / FIRE PROTECTION

DESMAN ASSOCIATES / PARKING

CODE CONSULTANTS, INC. / CODE CONSULTANT

THE SEXTANT GROUP / AV & ACOUSTICAL

HAMMER DESIGN ASSOCIATES / FOOD SERVICE

PYBURN & ODOM / ABATEMENT

TATA & HOWARD / TANK CONSULTANT

Department of

Veterans Affairs

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

EWP_06

CONSTRUCTION DOCUMENTS 1

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"

ELEVATION WEST AREA G.1ELEVATION WEST AREA G.1ELEVATION WEST AREA G.1ELEVATION WEST AREA G.13333

SCALE: 1/8" = 1'-0"

ELEVATION WEST AREA FGELEVATION WEST AREA FGELEVATION WEST AREA FGELEVATION WEST AREA FG4444 4SCALE: 1/8" = 1'-0"

ELEVATION NORTH AREA G.3ELEVATION NORTH AREA G.3ELEVATION NORTH AREA G.3ELEVATION NORTH AREA G.32222

SCALE: 1/8" = 1'-0"

ELEVATION WEST AREA G.2ELEVATION WEST AREA G.2ELEVATION WEST AREA G.2ELEVATION WEST AREA G.21111

MATERIAL TYPESMATERIAL TYPESMATERIAL TYPESMATERIAL TYPES

GLAZING TYPESGLAZING TYPESGLAZING TYPESGLAZING TYPES

SYMBOLS LEGENDSYMBOLS LEGENDSYMBOLS LEGENDSYMBOLS LEGEND

INSULATED LAMINATED

VISION

METAL PANEL (MP-2 EXTC-1)

PRECAST

EXTERIOR MATERIALS LEGEND

DIMENSION NOTES

1. ALL DIMENSION STRINGS FROM C/L OF JT. TO C/L OF JT.

EXCEPT AT ENDS OF EXTERIOR WALL & U.N.O.

2. REFER TO PLANS FOR CW. VERT. FRAMING LOCATIONS.

REFER TO ELEVATIONS FOR FRIT PATTERN EXTENT

3. REFER TO PLANS FOR WINDOW LOCATIONS IN METAL

PANEL & PRECAST SYSTEMS. REFER TO ELEVATIONS FOR

LOCATIONS OF JOINTS IN THESE SYSTEMS.

4. REFER TO PLANS FOR MP SYSTEM LOCATIONS WITH

C.M.U BACKUP.

INSULATED LAMINATED SPANDREL

MECHANICAL LOUVER. SEE NOTE FOR

ACTIVE LOUVER DIM. REFER TO F2/R0AS540

FOR TYPICAL DETAILS AT LOUVERS

O.D OVERFLOW DRAIN (SECONDARY)

O.S OVER FLOW SCUPPER

M.E.P. FP PENETRATIONS THROUGH

ENCLOSURE

LIGHTING OVER EXIT

PRECAST (PC) REPEATING JOINT

PATTERN TYPE INDICATOR. SEE SHEET

OAS5__ FOR PATTERN TYPES

TYPICAL DETAILS LEGEND

X

STUCCO / E.I.F.S (SEE NOTE ON ELEV.)

METAL PANEL (MP-1A EXTC-1)

IG-01 INSULATED LAMINATED VISION

IG-01-T INSUL. LAMINATED VISION TEMPERED

IG-01T-IB INSUL. LAMINATED VISION SAFETY W/

INTERIOR VISION CONTROL GLASS UNIT

IG-01DT-IB SAME AS IG-01T-IB, EXCEPT LAMINATED

GLASS ON INT. AND EXT. SIDE OF I.G.U

SG-01 INSUL. LAM. SPANDREL MED. GRAY

SG-01-T INSUL. LAM. SPANDREL TEMPERED

SG-02 INSUL. LAMINATED SPANDREL WHITE

SG-03 INSUL. LAMINATED SPANDREL BLACK

SLG-01 SAFETY IMPACT LAMINATED GLAZING

LGS-1 LAMINATED GLASS SPANDREL

DETAIL MARK REFER TO SHEET

B-#

IC-#

OC-#

P-#

AREAS OF SOLID REINFORCED

CMU WALL

METAL PANEL (MP-2 EXTC-2)

METAL PANEL (MP-1 EXTC-2)

R0AS520

R0AS521

R0AS522

R0AS524

BASE

INSIDE CORNERS

OUTSIDE CORNERS

PARAPETS

MP-1MP-1MP-1MP-1

(EXTC-2)

MP-1AMP-1AMP-1AMP-1A

(EXTC-2)

6 BULLETIN 010C 01/23/2013

9 BULLETIN 010F 05/07/2013

11 BULLETIN 010H 07/03/2013

12 BULLETIN 10J 12/20/2013

RFI 1628

NOTE:

REMOVE SILL EXTENSIONS FROM

WINOWS THIS VIEW ABOVE L-02.

EXTENSIONS TO BE REPLACED BY

ALTERNATE SILL MATERIAL IN EWP08

RFI 01628

Combine Panels

RFI 01628

Combine Panels

RFI 01628

Align Joint with Opening

RFI 01262

Modify Panel Joint

RFI 01262

Modify Panel Joint

RFI 01262

Modify Joint Layout

RFI

01517 Remove False Joint

RFI 01517

Remove False Joint

RFI 1633.1:

Prescriptive

CMU

required

RFI 2782: Clarifies misc steel requirements, placement, & metal decking at studs

02-L2

119' - 0"

02-L3

138' - 0"

02-L4

157' - 0"

02-L5

176' - 0"

02-L6

195' - 0"

02-L1i

111' - 8"

02-L2i

130' - 8"

02-L3i

149' - 8"

02-L5i

187' - 8"

02 E02 D

C 02 B

XA

02 H

F.9

A.5

AA

AA.2

R2AS201

02-L4i

168' - 8"

A

144"X96" INTAKE

02 F

MP-1AMP-1AMP-1AMP-1A

33' - 0"

BLAST PRESSURE AREA - E

BLAST PRESSURE AREA - E

F6

R0AS540

T .O

P

A R

A P

E T

/2

R0AS573

D2

R0AS573

B5z

R0AS573

B5z

R0AS573

B3

R0AS573

B3

SAFETY

RAIL SYSTEM

T .O

R

A

IL

M

IN

MP-1AMP-1AMP-1AMP-1A

MP-1AMP-1AMP-1AMP-1A

PRESCRIPTIVE CMU

BLAST PRESSURE AREA: F

BLAST PRESSURE

AREA: E

D4

R0AS522

E5

R0AS524

D4

R0AS522

E5

R0AS524

E5

R0AS524

C2

R0AS524

B2

R0AS520

D4

R0AS522

/2

E2

R0AS521

E2

R0AS521

E2

R0AS521

E2

R0AS521

B2

R0AS520

B4

R0AS520

E2

R0AS521

E2

R0AS521

B2

R0AS520

B4

R0AS522

D2

R0AS522

(EXTC-1 FIELD W/

EXTC-2 ACCENTS)

(EXTC-1 FIELD W/

EXTC-2 ACCENTS)

(EXTC-1 FIELD W/

EXTC-2 ACCENTS)

33' - 0"17' - 6"15' - 6"8' - 4"13' - 8"11' - 0" 33' - 0" 33' - 0" 34' - 0"22' - 10"

IG-01IG-01

IG-01IG-01

IG-01 IG-01

F2

R0AS579

SHEAR JOINT

D2

R0AS579

MP-2MP-2MP-2MP-2

(EXTC-1 FIELD W/

EXTC-2 ACCENTS)

IG-01 IG-01

IG

-0

1- T

SG

-0

1T

IG

-0

IG

-0

IG

-0

IG

-0

IG

-0

1- T

IG

-0

1- T

IG

-0

1- T

IG

-0

1-

TIG

-0 1-

T

IG

-0

1- T

IG

-0

1- T

IG

-0

1- T

SG

-0

1T

IG

-0

1- T

IG

-0

1-

TIG

-0

1- T

IG

-0

1- T

IG

-0

1- T

SG

-0

1T

SG

-0

1T

SG

-0

1T

IG

-0

1- T

IG

-0

1- T

SG

-0

1T

IG

-0

1- T

IG

-0

1- T

IG

-0

1- T

IG

-0

1- T

IG

-0

1- T

IG

-0

1- T

IG

-0

1- T

IG

-0

1- T

IG

-0

1- T

IG

-0

1- T

IG

-0

1- T

IG-01

IG-01IG-01IG-01

IG-01IG-01IG-01IG-01IG-01IG-01IG-01

IG-01

88"x24" ARCHITECTURAL

LOUVER

1' - 6"7' - 0"

G2

F2

E2

D2

G1

F1

E1

D1

PLAN

NORTH

DATE

LOCATION

CHECKED DRAWN

PROJECT TITLE PROJECT NUMBER

DOCUMENT SET PACKAGE

DRAWING NUMBERAPPROVED: PROJECT DIRECTOR

DRAWING TITLEARCHITECT/ENGINEERS:CONSULTANTS:

REVISIONS: DATE

B

A

D

C

E

VA FORM 08-6231

O N

E

EI

G H

T

IN

C H

O

N E

FO

O

T O

N E

Q U

AR

T E

R

IN

C H

O

N E

FO

O

T O

N E

H

AL

F I N

C H

O

N E

FO

O

T

TH

R

EE

Q U

A R

TE

R S

IN

C

H

O N

E

FO

O T

TH

R

EE

IN

C H

ES

O N

E

FO

O T

O N

E

IN

C H

F

O R

TY

F

EE

T

( 1

0'

6"

6"

0'

0'

123456

F

B

A

D

C

E

F

O N

E

SI

XT

EE

N

TH

IN

C

H

O N

E

FO

O T

O N

E

AN

D O

N E

H

AL

F

IN

C H

E S

O N

E

FO

O T

6"

BUILDING NUMBER

NEW ORLEANS, LOUISIANA

R2AS213

BLDG. 02 - EXTERIOR ELEVATIONS

DV JGJanuary 23, 2013

02629-HS2-401SLVHCS REPLACEMENT MEDICAL

CENTER PROJECT

SCHRENK & PETERSON CONSULTING ENGINEERS / CIVIL

KORDA/NEMETH ENGINEERING / STRUCTURAL

BR+A CONSULTING ENGINEERS / MECH, ELECT, PLUMBING, LOW VOLTAGE

ARCHITECTURAL ENGINEERING / PLUMBING

SCALES ASSOCIATES / FIRE PROTECTION

DESMAN ASSOCIATES / PARKING

CODE CONSULTANTS, INC. / CODE CONSULTANT

THE SEXTANT GROUP / AV & ACOUSTICAL

HAMMER DESIGN ASSOCIATES / FOOD SERVICE

PYBURN & ODOM / ABATEMENT

TATA & HOWARD / TANK CONSULTANT

Department of

Veterans Affairs

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

EWP_06

CONSTRUCTION DOCUMENTS 1

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"

ELEVATION/SECTION NORTH AREA GELEVATION/SECTION NORTH AREA GELEVATION/SECTION NORTH AREA GELEVATION/SECTION NORTH AREA G1111

MATERIAL TYPESMATERIAL TYPESMATERIAL TYPESMATERIAL TYPES

GLAZING TYPESGLAZING TYPESGLAZING TYPESGLAZING TYPES

SYMBOLS LEGENDSYMBOLS LEGENDSYMBOLS LEGENDSYMBOLS LEGEND

INSULATED LAMINATED

VISION

METAL PANEL (MP-2 EXTC-1)

PRECAST

EXTERIOR MATERIALS LEGEND

DIMENSION NOTES

1. ALL DIMENSION STRINGS FROM C/L OF JT. TO C/L OF JT.

EXCEPT AT ENDS OF EXTERIOR WALL & U.N.O.

2. REFER TO PLANS FOR CW. VERT. FRAMING LOCATIONS.

REFER TO ELEVATIONS FOR FRIT PATTERN EXTENT

3. REFER TO PLANS FOR WINDOW LOCATIONS IN METAL

PANEL & PRECAST SYSTEMS. REFER TO ELEVATIONS FOR

LOCATIONS OF JOINTS IN THESE SYSTEMS.

4. REFER TO PLANS FOR MP SYSTEM LOCATIONS WITH

C.M.U BACKUP.

INSULATED LAMINATED SPANDREL

MECHANICAL LOUVER. SEE NOTE FOR

ACTIVE LOUVER DIM. REFER TO F2/R0AS540

FOR TYPICAL DETAILS AT LOUVERS

O.D OVERFLOW DRAIN (SECONDARY)

O.S OVER FLOW SCUPPER

M.E.P. FP PENETRATIONS THROUGH

ENCLOSURE

LIGHTING OVER EXIT

PRECAST (PC) REPEATING JOINT

PATTERN TYPE INDICATOR. SEE SHEET

OAS5__ FOR PATTERN TYPES

TYPICAL DETAILS LEGEND

X

STUCCO / E.I.F.S (SEE NOTE ON ELEV.)

METAL PANEL (MP-1A EXTC-1)

IG-01 INSULATED LAMINATED VISION

IG-01-T INSUL. LAMINATED VISION TEMPERED

IG-01T-IB INSUL. LAMINATED VISION SAFETY W/

INTERIOR VISION CONTROL GLASS UNIT

IG-01DT-IB SAME AS IG-01T-IB, EXCEPT LAMINATED

GLASS ON INT. AND EXT. SIDE OF I.G.U

SG-01 INSUL. LAM. SPANDREL MED. GRAY

SG-01-T INSUL. LAM. SPANDREL TEMPERED

SG-02 INSUL. LAMINATED SPANDREL WHITE

SG-03 INSUL. LAMINATED SPANDREL BLACK

SLG-01 SAFETY IMPACT LAMINATED GLAZING

LGS-1 LAMINATED GLASS SPANDREL

DETAIL MARK REFER TO SHEET

B-#

IC-#

OC-#

P-#

AREAS OF SOLID REINFORCED

CMU WALL

METAL PANEL (MP-2 EXTC-2)

METAL PANEL (MP-1 EXTC-2)

R0AS520

R0AS521

R0AS522

R0AS524

BASE

INSIDE CORNERS

OUTSIDE CORNERS

PARAPETS

6 BULLETIN 010C 01/23/2013

9 BULLETIN 010F 05/07/2013

12 BULLETIN 10J 12/20/2013

RELOCATED FROM

AREA D2

OPERABLE WINDOW

PER F6/R0AS517

IG-01

1'-6"

RFI 06109: Locate window 1'-6" (to East jamb) from column line C. Shift dark panel over to keep window in light colored panel.

RFI 01633: Clarifies no CMU in this location

RFI 2782: Clarifies misc steel requirements, placement, and metal decking at studs

RFI 2783: added misc steel at soffit and clarified misc steel requirements at head of CW

RFI 2784: added misc steel at soffit and clarified misc steel requirements at head of CW

RFI 03140: Clarification of glass type.

RFI 02964: Louver and louver steel modifications

RFI 02964: Louver and louver steel modifications

RFI 03522: Louver Support Steel to be Painted

RFI 03522: Louver Support Steel to be Painted

RFI 5884.1: Revises to C2/R0AS524 RFI 5884.1: Revises to C2/R0AS524

RFI 06996: Switches short window with Area G courtyard window

RFI 07012: Added false control joint in metal panel to allow work in both courtyards