Solicitation_SBSA_GC_April 2024 - v3.pdf

PDF 512 KB Posted

Attached to
Roof Repairs at the Almeric L. Christian US Courthouse & Federal Office Building located at St. Croix, USVI
Solicitation number
SourcesSought_VI0008ZZ_Roof
Issued by

About this file

This document is a solicitation for a small business set-aside construction contract for roof repairs at the Almeric Christian Federal Building and US Courthouse in St. Croix, US Virgin Islands. The General Services Administration (GSA) is seeking a qualified small business to perform construction services with an estimated price range between $1,000,000 and $5,000,000. The solicitation includes detailed requirements for proposal submission, including technical qualifications, past performance evaluation, and key personnel qualifications.

Key dates include a virtual pre-proposal conference on March 10, 2025, and a physical site visit on March 12, 2025, with proposal submissions due by April 14, 2025 at 4:00 PM EST. The contract will be awarded using a best value tradeoff method, with non-price factors (technical qualifications, past performance, and key personnel qualifications) weighted equally and considered approximately equal in importance to the total evaluated price. Offerors must demonstrate experience with similar construction projects, particularly roof replacements for multi-story office buildings, courthouses, or institutional buildings.

View the file

Other files

File Type Posted
Solicitation_SBSA_GC_April 2024 - v4.pdf PDF
SF30 - Solicitation Amendment 47PC0225R0017_0005.pdf PDF
SF30 - Solicitation Amendment 47PC0225R0017_0004.pdf PDF
RFIs Answers_Questions 17 25 32 42 63 and 71.pdf PDF
SF30 - Solicitation Amendment 47PC0225R0017_0003.pdf PDF
Agreement_SBSA_GC_Dec 2024 - v3.pdf PDF
RFIs Answers_Questions 1-2 7-16 18-24 26-31 33-41 43-62 64-70.pdf PDF
SF30 - Solicitation Amendment 47PC0225R0017_0002.pdf PDF
PBS_Core_Building_Standards_Memorandum 24FEB.25.pdf PDF
Attendance Sheet for Virtual Pre Proposal Conference_2025-3-10.pdf PDF
Agreement_SBSA_GC_Dec 2024 - v2.pdf PDF
RFIs Answers_Questions 3 to 6.pdf PDF
Roof Project Attendance Sheet Site Visit- 20250312.pdf PDF
SF30 - Solicitation Amendment 47PC0225R0017_0001.pdf PDF
2025 03 10 Pre-Proposal Conference Roof Repairs STX.pdf PDF
Solicitation_SBSA_GC_April 2024 - v2.pdf PDF
Attachment - Pricing Sheet 20250303.pdf PDF
Solicitation_SBSA_GC_April 2024.pdf PDF
Attachment A3 - Key Personnel Resume.pdf PDF
Attachment A1 - Experience Summary Table.pdf PDF
Reps and Certs GC May 2024.pdf PDF
WD VI20250001 01-03-2025_20250303.pdf PDF
Attachment - Pricing Sheet .pdf PDF
Attachment A4 - Past Performance Questionnaire.pdf PDF
SF24-16e.pdf PDF
GSA527-21.pdf PDF
Attachment A2 - Project Fact Sheet.pdf PDF
Agreement_SBSA_GC_Dec 2024.pdf PDF
SF1442 - 47PC0225R0017 Form.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GSA Solicitation No. 47PC0225R0017

Construction Contract for: Construction Services for Roof Repairs in Almeric Christian Federal Building and US Courthouse, St Croix, USVI

The Solicitation

Document: C201-SB GC/April 2024 (The Solicitation)

Table of Contents

I. General Information A. The Solicitation and Contract B. List of Solicitation Documents C. Authorized Representatives D. Pre-Proposal Conference E. Estimated Price Range F. FAR 52.228-1 Bid Guarantee G. FAR 52.236-27 Site Visit – Construction H. Receipt of Offers

II. Proposals

A. Proposal Contents B. Proposal Format C. Price Proposal D. Technical Proposal E. Other Information to be Submitted with Proposal F. Requirements of Joint Venture Offerors

III. General Provisions

A. Availability of Funds B. Requests for Clarification or Interpretation C. Notice to Small Business Firms D. Information Concerning the Disclosure of Solicitation Results E. Affirmative Procurement Program F. Notice Concerning Preparation of Proposals G. Bond Requirements H. Contractor Performance Information I. Safeguarding and Dissemination of Controlled Unclassified Information

(CUI) Building Information

J. INFORM

K. Mega Construction Project Program

IV. FAR/GSAR Solicitation Provisions

A. FAR 52.211-1 Availability of Specifications Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR 101-29

B. FAR 52.211-3, Availability of Specifications Not Listed in the GSA Index of Federal Specifications, Standards and Commercial Items Description

C. FAR 52.216-1 Type Of Contract D. FAR 52.222-5 Construction Wage Rate Requirements-Secondary Site of

Work E. FAR 52.222-23 Notice of Requirement for Affirmative Action to Ensure

Equal Employment Opportunity for Construction F. Buy American Requirements G. Buy American Exceptions H. FAR 52.233-2 Service of Protest I. FAR 52.252-1 Solicitation Provisions Incorporated by Reference J. GSAR 552.102 Incorporating Provisions and Clauses by Reference K. GSAR 552.252-5 Authorized Deviations in Provisions (Nov

2021)(DEVIATION FAR 52.252-5)

L. Project Labor Agreement M. Additional Provisions

(i) GSAR 552.236-74, Evaluation of Options (Mar 2019)

(iii) GSAR Clause 552.236-77, Government’s Right to Exercise Options (Mar 2019)

N. Certified Cost or Pricing Data

V. Instructions to Offerors and Clauses A. FAR 52.215-1 Instructions to Offerors – Competitive Acquisition B. FAR 52.219-18 Notice of Competition Limited to 8(a) Eligible Participants C. Security Requirements D. Additional Clauses

VI. Method Of Award

A. Evaluation of Offers B. Determination of Responsibility C. Price Reasonableness/Price Realism D. Unbalanced Price E. Non Price Factors F. Evaluation of Joint Ventures

Notice of Equal Employment Opportunity (EEO) Compliance Plan N/A

Notice of Commercial Package Carriers N/A

I. General Information

I.A. The Solicitation and Contract

(1) This Solicitation is set-aside for Small Businesses, in accordance with FAR 19. This Solicitation sets forth requirements for proposals for a Contract to construct the Project described in the attached Agreement. Proposals conforming to the Solicitation requirements will be evaluated in accordance with the Method of Award set forth herein.

The Government will award the Contract to the selected Offeror, subject to the conditions set forth herein.

(2) Neither the Solicitation nor any part of an Offeror's proposal shall be part of the Contract except to the extent expressly incorporated therein by the Contracting Officer.

(3) The Offeror's proposal submitted in response to this Solicitation shall constitute a firm offer. No contract shall be formed unless and until the Contracting Officer has countersigned the SF 1442 submitted by an Offeror, and delivered to the Contractor a copy of the SF 1442 with original signatures together with the Agreement reflecting the Offeror's proposed prices.

I.B. List of Solicitation Documents The Solicitation Documents are comprised of:

(1) The Solicitation

(2) Offeror Representations and Certifications Form

(3) Standard Form (SF) 1442 – Solicitation Offer and Award

(4) The Agreement and Attachments to the Agreement

(5) The Statement of Work, Specifications, Design Drawings and Specifications

a. Statement of Work (SOW) “STATEMENT OF WORK_Roof Repair GC” - February 18, 2025

b. Design Drawings “GSA USVI Roof Repairs FOR CONSTRUCTION DRAWINGS_20240724” - July 24, 2024

c. Specifications “GSA USVI Christian FB Roof Repairs 100% Design SPECIFICATIONS_20250206” - February 6, 2025

(6) Wage Determination VI20250001 01-03 -2025

I.C. Authorized Representatives

The following individuals are designated as the authorized GSA representatives under this Solicitation:

Authorized Representative Information:

Contracting Officer’s Information

Name: Olga M. Rodríguez

Address: 150 Chardon Street, Rm. 359, Hato Rey, PR 00918

Telephone: 646-285-8179

Email: olga.rodriguez@gsa.gov

Alternate POC Information

Name: Soraya M. Vega-Rosado

Address: 150 Chardon Street, Rm. 359, Hato Rey, PR 00918

Telephone: 212-264-4530

Email: soraya.vegarosado@gsa.gov

I.D. Pre-Proposal Conference

Date: Monday, March 10, 2025 Time: 10:00 a. m. (EST) Location: “Pre-Proposal Conference - Roof Repair Project at Saint Croix” via Google Meet meeting (VIRTUAL MEETING)

Pre-registration is required for all participants to the pre-proposal conference to receive the link for the virtual meeting. Offerors shall submit an email to Soraya M.

Vega-Rosado no later than Friday, March 7, 2025 at 12:00 p. m. (EST) including the names of all the attendees and email addresses.

For further information about the pre proposal conference, please contact:

Name: Soraya M. Vega-Rosado

Address: 150 Chardon Street, Rm. 359, Hato Rey, PR 00918

Telephone: 1-212-264-4530

Email: soraya.vegarosado@gsa.gov

I.E. Estimated Price Range The estimated price range for the Project is between $1,000,000 and $5,000,000.

I.F. FAR 52.228-1 Bid Guarantee (Sep 96)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier’s check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—

(1) To unsuccessful bidders as soon as practicable after the opening of bids;

and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

I.G. FAR 52.236-27 Site Visit – Construction (Feb 95)

(1) The clauses at FAR 52.236-2, Differing Site Conditions, and FAR 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, Offerors are urged and expected to inspect the site where the work will be performed.

https://www.acquisition.gov/far/part-52#FAR_52_236_2 https://www.acquisition.gov/far/part-52#FAR_52_236_3

(2) Site visits will be held at the following date and time:

Date: Wednesday, March 12, 2025 Time: 10:00 a. m. (EST)

(3) Pre-registration is required for all attendees to the pre-proposal Site Visit. The Site Visit shall be limited to not more than three (3) representatives from each Offeror.

Offerors shall submit an email to Michelle Torres Mora no later than Tuesday, March 11, 2025 at 12:00 p. m. (EST) including the names of all the attendees.

Participants must have a valid, Government issued picture identification, driver’s license preferred, to gain access for the pre-proposal Site Visit. Notification of the location of entry, where attendees are required to meet, and all other requirements for the Site Visit will be issued to the Offerors.

For further information about the site visit or access requirements, please contact:

Name: Michelle Torres Mora

Address: Address: 150 Chardon Street, Rm. 359, Hato Rey, PR 00918

Telephone: (347)-610-0412

Email: michelle.torres-mora@gsa.gov

I.H. Receipt of Offers

(1) In order to be considered for award, offers conforming to the requirements of the Solicitation must be received on the following date and at the following email addresses no later than 4:00 pm (EST)

Date: Thursday, April 14, 2025 Email: olga.rodriguez@gsa.gov and soraya.vegarosado@gsa.gov

II. Proposals

II.A. Proposal Contents

Proposals shall consist of the following documents, completed and executed in accordance with this Solicitation:

1. Price Proposal

a. Signed Standard Form 1442 and all amendments acknowledged

b. Attachment - Pricing Sheet

c. The Solicitation

d. The Agreement

e. Any other information required in the Solicitation

2. Technical Proposal

a. Attachment A1 - Experience Summary Table

b. Attachment A2 - Project Fact Sheet

c. Attachment A3 - Key Personnel Resume

d. Attachment A4 - Past Performance Questionnaire

3. Representations and Certifications

4. Standard Form 24, Bid Bond

5. GSA Form 527 – Contractor’s Qualification and Financial Information

6. If applicable, Joint-Venture Agreement and any Mentor-Protégé Agreements

II.B. Proposal Format

1. The Technical and Price proposals must be submitted as separate Portable Document Format (PDF) attachments in an email. The Technical and Price proposals must be received by Thursday, April 14, 2025, 4:00 PM (EST) via e-mail to soraya.vegarosado@gsa.gov and olga.rodriguez@gsa.gov. Paper copy submissions will not be accepted. If you must send your proposal via multiple emails due to file size, all must be received by the proposal due date and time indicated in the solicitation. Offerors shall submit all proposals as separate files. Files shall not contain classified data. The use of hyperlinks in proposals is prohibited.

2. The submission shall be clearly indexed and logically assembled. Each proposal shall be clearly identified. All pages shall be appropriately numbered and identified by the complete company name, date, and RFP number in the header and/or footer. A Table of Contents should be included.

The proposal should clearly demonstrate that the offeror has a thorough understanding of the project. Offerors are responsible for including sufficient details to permit a complete and accurate evaluation of each proposal. Proprietary information shall be clearly marked. Submission of marketing brochures is not acceptable unless provided as supplementary information only.

II.C. Price Proposal

(1) Contents

The Price Proposal shall consist of the SF 1442 form and the “Attachment - Pricing Sheet” file which includes labor, equipment and materials, with prices and/or rates indicated for each price element. Indicate the Base Contract Price, or if no such distinction is made, the Contract Price, in Block 17 of the SF 1442 form, which must be fully executed by the Offeror.

(2) Qualifications, Exclusions and Conditions

If the Offeror communicates in its proposal any qualifications, exclusions, or conditions to the proposed prices not provided for in the Contract Documents, the Contracting Officer may reject the proposal and exclude the Offeror from further discussions.

(3) Project Labor Agreement

N/A

(4) Additional Proposal Requirements

N/A

II.D. Technical Proposal

The Technical Proposal shall include the information requested below for the non-price factors described in Section VI.

The technical evaluation factors and their relative weights are listed below. In accordance with FAR 15.304 (e)(2), technical factors, when combined, are considered approximately equal to cost or price.

The Technical Proposal shall consist of the following:

1. Factor 1: Technical Qualifications (40%)

2. Factor 2: Past Performance (30%)

3. Factor 3: Qualifications of Key Personnel (30%)

The technical proposal must contain all of the necessary information to address the evaluation factors as set forth in the solicitation. The maximum page limit for the technical proposal submission is 20 pages, single sided, single spaced, with a minimum of 11-point Times New Roman font. If more than 20 single sided pages are submitted, only the first 20 single sided pages will be evaluated.

Note: The PBS Past Performance Questionnaire is excluded from the page limitation.

All other pages (including cover page) are included in the page limitation. All pages in the technical proposal must be 8.5 inches by 11 inches. Pages that differ from these page dimensions will not be evaluated.

1) FACTOR 1: TECHNICAL QUALIFICATIONS

The Offeror must submit the required information on the Experience Summary Table (Attachment A1) as well as Project Fact Sheets (Attachment A2) for three (3) projects with similar scope successfully and substantially completed within the past ten (10) years. At a minimum, one (1) of the three (3) projects must have a minimum construction cost of five hundred thousand dollars, $500,000.00. Note: the three projects selected for Attachment A1 shall be the same three projects shown in Attachment A2.

The Offeror must have served as the Prime General Contractor (GC) or Construction Manager as Constructor (CMC) on the submitted projects. Demonstrated experience on similar projects will lead to a higher rating for this Factor. A project will be considered similar based on independent judgment and consensus judgment of the Source Selection Evaluation Board (SSEB) members that the project has enough characteristics in common with the subject project that it can be determined as relevant experience. Projects determined to be not relevant or only partially relevant will receive no or lesser weight, resulting in a lower rating for this Factor. If the offeror provides more than three (3) Similar Projects, the SSEB will only review the first three (3) submitted based on chronology starting with the most recent contract/task order completion date.

Similar projects are described as: Construction projects for multi-story office building, courthouse, or “acceptable institutional buildings” .

Similar projects that shall be considered more favorable:

● Construction projects for roof replacement of sloped metal systems for a multi-story office buildings, courthouse, or “acceptable institutional buildings”

● Buildings that are occupied and operational.

*Acceptable institutional buildings are buildings built for schools, colleges, hospitals, laboratories, municipalities, and airports. Warehouses and industrial buildings are acceptable, but will be rated less favorable.

A single project identical in all aspects to this project may not exist, and therefore the Government will consider the combination of experience demonstrated by the three (3) submitted projects. The combination of experience should include all the key elements of relevant experience identified to receive a higher rating for this Factor. Significantly more weight will be given to individual construction projects meeting all the key elements. A higher score will be given to offerors demonstrating experience on multiple projects over the $500,000.00 minimum. Minimal or negligible relevant experience in one or more key elements may result in a lower rating for this Factor.

Having relevant construction experience helps demonstrate the capability to perform the Work required under this Contract. In assessing the experience level and assigning a rating for this Factor, the Government will consider the similarity of the experience to the Work required under this Contract, including scope, complexity, and magnitude.

Complexity includes schedule constraints, management, and administrative requirements, security requirements, applicable design criteria, coordination requirements, local conditions, as well as technical complexity.

Offerors shall complete all blocks on each form. The Government may interpret a lack of response in any field as a non-responsive proposal, or the uncertainty and associated risk may result in a lower rating for this Factor. The burden of providing complete and accurate information lies with the Offeror; however, this does not preclude the Government from obtaining information from any other source. Limit each Project Fact Sheet, Attachment A2, to no more than three (3) 8 1⁄2" x 11" pages. Each page shall be one-sided, single-spaced, with a minimum 11-point Times New Roman font. If the information submitted exceeds the page limitations, only the first three (3) pages will be evaluated.

Note for Joint-Venture Offerors: If relying on past experience and performance of the individual firms, at least one (1) project must be presented for each Joint-Venture partner. Greater weight will be given to projects that demonstrate prior teaming of the Joint-Venture partners.

2) FACTOR 2: PAST PERFORMANCE

The purpose of this Factor is to review the Offeror's record of past performance on relevant construction projects.

The Offeror shall submit Past Performance Questionnaires (PPQs) included in the Solicitation (Attachment A4), completed by the applicable client, for each project included in its proposal for FACTOR 1: Technical Qualifications (the same three projects included in both Attachment A1 and Attachment A2). Completed PPQs should be submitted with the proposal.

Ensure correct phone numbers and email addresses are provided for the client's point of contact. Offerors should follow up with clients/references to ensure timely submission of questionnaires. If the Offeror is unable to obtain a completed PPQ from a client for a project before the proposed closing date, the Offeror shall complete the first page of the PPQ (Attachment A4) as well as the Client Point of Contact Information and shall submit it with a statement of what attempt was made by the Offeror (e.g., "Sent to Mr. Smith by email on 06/15/2021"). If the client requests, the client may submit a questionnaire directly to the Government's Contracting Officer before the proposed closing date.

Offerors may resubmit questionnaires previously submitted with other proposals or may obtain an updated/new PPQ from a client for any submission. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFP’s.

You may also include performance recognition documents received within the last six

(6) years, such as awards, award fee determinations, customer letters of commendation, and any other forms of performance recognition.

In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the Offeror's proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), previously submitted PPQ information, and any other known sources not provided by the Offeror. While the Government may elect to consider data from a variety of sources, the burden of providing detailed, current, accurate, and complete past performance information rests with the Offeror. GSA will not maintain a database of completed PPQs submitted by Offerors.

3) FACTOR 3: QUALIFICATIONS OF KEY PERSONNEL

This Factor assesses the qualifications of the proposed key personnel in terms of their academic/professional qualifications and their related work experience. The individuals presented must be the individuals who will be assigned to the project.

The Offeror shall submit resumes for each of the key personnel proposed for this project for the positions identified below. Resumes shall include all pertinent information that exhibits the qualifications of the proposed personnel. Resumes for each individual shall summarize the qualifications, professional designation, experience, education, skills, and professional background information. Resumes must list the key personnel's roles/responsibilities for the projects listed. An example resume format is provided as Attachment A3. Submit resumes for the following positions:

● Project Manager

● Project Coordinator (Construction Superintendent)

Expected Qualifications for Key Personnel:

● Project Manager: The Project Manager for this Contract shall have a college degree in an Architecture, Engineering, or Construction discipline. A bachelor’s degree will lead to a higher rating for this Factor. The Project Manager should have at least five (5) years of construction project management experience managing projects relevant to this Contract.

● Project Coordinator (Construction Superintendent): The Project Coordinator must have a minimum of five (5) years of construction experience as a superintendent on projects of similar scope and size. The Project Coordinator should have experience with project management information.

II.E. Other Information to Submit with Proposal

(1) Representations and Certifications

Offerors are reminded their SAM registration status must be “Active”, at the time their offer is submitted, to be considered for award (see 52.204-7). Offerors submitting a proposal in response to this Solicitation shall complete electronic Annual Representations and Certifications in conjunction with required Entity registration in System for Award Management (SAM), accessed via System for Award Management.

Offerors shall also submit with their proposal, the Annual Representations and Certifications (FAR 52.204-8), using the attached Offeror’s Representations and Certifications (C301).

System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in GSA solicitations. Examples include:

● FAR 52.222-25, Affirmative Action Compliance, and

● FAR 52.212-3(d), Offeror Representations and Certifications—Commercial

Products and Commercial Services.

Contracting officers will neither consider the representations when making award decisions nor enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.

(2) Qualifications of Offerors

Offerors submitting a proposal in response to this Solicitation shall submit with their proposal evidence of their financial responsibility and capacity to perform the Contract.

Offerors shall submit this information on GSA Form 527 – Contractor’s Qualifications and Financial Information. Where applicable, point of contact, including names and telephone numbers, are required for all contracts listed.

(3) Proprietary Information Agreement(s) N/A

II.F. Requirements of Joint Venture Offerors

(1) All offers submitted by joint ventures must include a copy of an executed joint venture agreement (with original signatures) which fully discloses the legal identity of each member of the joint venture, the relationship between the members, the form of ownership of each member, and any limitations on liability or authority for each member.

(2) An authorized representative of each member of the joint venture must sign the SF 1442 accompanying an offer regardless of any agency relationship established between the members.

https://www.sam.gov/

(3) In the case of corporations that are joint venture members, the corporation secretary must certify that the corporation is authorized to participate in the joint venture, either by so certifying in the joint venture agreement, or by submitting a separate certification to the Government. The joint venture must also provide a certificate that identifies a principal representative of the joint venture with full authority to bind the joint venture.

(4) Representations and certifications, financial information, and past performance information must be submitted for each member of the joint venture.

III. General Provisions

III.A. Availability of Funds

Issuance of this Solicitation does not warrant that funds are presently available for award of a Contract. Award of the contract shall be subject to the availability of appropriated funds, and the Government shall incur no obligation under this Solicitation in advance of such time as funds are made available to the Contracting Officer for the purpose of contract award.

III.B. Requests for Clarification or Interpretation

Prospective Offerors should submit any RFI no later than Wednesday, March 19, 2025 at 4:00 p. m. (EST). The Government will attempt to answer all requests for clarifications or interpretations of the Solicitation Documents by Wednesday, March 26, 2025.

III.C. Notice to Small Business Firms

A program for the purpose of assisting qualified small business concerns in obtaining certain bid, payment, or performance bonds that are otherwise not obtainable is available through the Small Business Administration (SBA) (Small Business Administration). For information concerning SBA's surety bond guarantee assistance, contact your SBA District Office.

III.D. Information Concerning the Disclosure of Solicitation Results

This acquisition is being conducted under the provisions of FAR Part 15 as a negotiated procurement. In accordance with FAR 3.104 and FAR 15.207, after receipt of proposals, no information regarding the identity of those submitting offers, the number of offers received, or the information contained in such offers will be made available until after award except as provided by FAR 15.503.

III.E. Affirmative Procurement Program

GSA has implemented an Affirmative Procurement Program (APP) intended to maximize the use of recovered materials, environmentally preferable, and bio-based products. Offerors should familiarize themselves with the requirements for using and http://www.sba.gov/ http://www.sba.gov/ reporting on the use of such materials in performance as set forth in the Agreement.

Refer to Clause FAR 52.223-10 encouraging vendors to practice waste reduction.

III.F. Notice Concerning Preparation of Proposals

Offerors are cautioned to carefully read the entire Solicitation and the Agreement to be included in the Contract contemplated by the Solicitation in order to be fully aware of all requirements and clauses in the contemplated Contract. Verify that all blanks requiring information to be supplied in an Offer have been properly filled out, that all pricing and other numerical data is accurately calculated, and that all copies of the Offer contain the same information.

III.G. Bond Requirements

If a bid guarantee is required to be submitted with your offer, any contract awarded will require a performance bond and payment bond as specified in the Agreement. Offerors who utilize individual sureties should note the requirement for a certified, audited, financial statement for each person acting as an individual surety under clause FAR 52.228-1 Bid Guarantee and the requirements of clause FAR 52.228-11 Pledge of Assets.

III.H. Contractor Performance Information

(1) Evaluating Contractor Performance: The General Services Administration is using the Contractor Performance Assessment Reporting System (CPARS) module as the secure, confidential, information management tool to facilitate the performance evaluation process. CPARS enables a comprehensive evaluation by capturing comments from both GSA and the contractor. The website for CPARS is Contractor Performance Assessment Completed CPARS evaluations may then be used by Federal acquisition community for use in making source selection decisions. CPARS assists acquisition officials by serving as the single source for contractor past performance data.

(2) CPARS Registration: Each award requiring an evaluation must be registered in CPARS. The contractor will receive several automated emails. Within thirty days of award, the contractor will receive an email that contains user account information, as well as the applicable contract and order number(s) assigned. Contractors will be granted one user account to access all evaluations.

(3) Contractor CPARS Training: Contractors may sign up for CPARS training. A schedule of classes will be posted to the CPARS training site (CPARS Training) and updated as needed.

(4) Contractor Representative (CR) Role: All evaluations will be sent the Contractor Representative (CR) named on your award. The CR will be able to access CPARS to review and comment on the evaluation. If your CR is not already in the CPARS system, the contracting officer will request the name and email address of the person that will be responsible for the CR role on your award.

http://www.cpars.gov/ http://www.cpars.gov/ https://www.cpars.gov/lc.htm

Once an evaluation is ready to be released the CR will receive an email alerting them the evaluation is ready for their review and comment. The email will indicate the time frame the CR has to respond to the evaluation; however, the CR may return the evaluation earlier than this date.

GSA shall provide for review at a level above the contracting officer (i.e., contracting director) to consider any disagreement between GSA and the contractor regarding GSA’s evaluation of the contractor. Based on the review, the individual at a level above the contracting officer will issue the ultimate conclusion on the performance evaluation.

Copies of the evaluations, contractor responses, and review comments, if any, will be retained as part of the contract file.

III.I. Safeguarding and Dissemination of Controlled Unclassified Information (CUI) Building Information

Certain information contained in the Solicitation Documents may have been designated as Controlled Unclassified Information (CUI) building information. With respect to such information, Offerors shall agree to the terms for receipt of such information, as set forth in the provision “Administrative Matters” in Section III of the Agreement, as a condition of receipt of such information.

III.J. INFORM

N/A

III.K. Mega Construction Project Program

N/A

IV. FAR/GSAR Solicitation Provisions

IV.A. FAR 52.211-1 Availability of Specifications Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-29 (Sep 2023)

(a) The GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101–29, and copies of Federal specifications, standards, and product descriptions can be downloaded from the ASSIST website at https://assist.dla.mil.

(b) If the General Services Administration, Department of Agriculture, or Department of Veterans Affairs issued this solicitation, a copy of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained from the ASSIST website identified in paragraph (a) of this provision.

(End of provision) https://assist.dla.mil

IV.B. FAR 52.211-3 Availability of Specifications Not Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions (JUN 1988)

N/A

IV.C. FAR 52.216-1 Type of Contract (APR 84) The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.

IV.D. FAR 52.222-5 Construction Wage Rate Requirements—Secondary Site of the Work (MAY 14)

(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror’s request for a wage determination for a secondary site of the work.

IV.E. FAR 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction (FEB 1999)

IV.F. Buy American Requirements

FAR 52.225-10 Notice of Buy American Requirement-Construction Materials (MAY 2014)

(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American-Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-9).

(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a https://www.acquisition.gov/far/part-52#FAR_52_225_9 response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers.

(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers.

(1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested-

(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

(End of Provision)

IV.G. Buy American Exceptions

For Buy American exceptions, if any, see the applicable Buy American clause in Section IV of the Agreement.

IV.H. FAR 52.233-2 Service of Protest (SEP 06)

(a) Protests, as defined in section 31.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer https://www.gsa.gov/forms-library/solicitation-offer-and-award-construction-alteration-or-repair

(addressed as follows) by obtaining written and dated acknowledgment of receipt from the Contracting Officer at the address provided in the provision “Receipt of Offers” in Section I (General Information).

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

IV.I. FAR 52.252-1 Solicitation Provisions Incorporated by Reference

(FEB 98)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this address:

Federal Acquisition Regulation

NUMBER TITLE DATE

52.204-22 Alternative Line Item Proposal JAN 17

52.214-34 Submission of Offers in the English Language

APR 91

52.215-16 Facilities Capital Cost of Money JUN 03 52.236-28 Preparation of Proposals -

Construction

OCT 97

IV.J. GSAR Clause 552.102 Incorporating Provisions and Clauses

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.

IV.K. GSAR 552.252-5 Authorized Deviations in Provisions (Nov 2021)(DEVIATION

FAR 52.252-5)

N/A

IV.L. Project Labor Agreement (PLA)

IV.L. Additional Provisions

IV.M. Requiring Certified Cost or Pricing Data [15.403-4]

V. Instructions and Clauses

V.A. FAR 52.215-1 Instructions to Offerors – Competitive Acquisition (NOV 2021)

(a) Definitions. As used in this provision-

Discussions are negotiations that occur after establishment of the competitive range that may, at the Contracting Officer’s discretion, result in the offeror being allowed to revise its proposal.

In writing, "writing," or "written" means any worded or numbered expression that can be read, reproduced, and later communicated, and includes electronically transmitted and stored information.

Proposal modification is a change made to a proposal before the solicitation’s closing date and time, or made in response to an amendment, or made to correct a mistake at any time before award.

Proposal revision is a change to a proposal made after the solicitation closing date, at the request of or as allowed by a Contracting Officer as the result of negotiations.

Time, if stated as a number of days, is calculated using calendar days, unless otherwise specified, and will include Saturdays, Sundays, and legal holidays. However, if the last day falls on a Saturday, Sunday, or legal holiday, then the period shall include the next working day.

(b) Amendments to solicitations. If this solicitation is amended, all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this solicitation by the date and time specified in the amendment(s).

(c) Submission, modification, revision, and withdrawal of proposals. (1) Unless other methods (e.g., electronic commerce or facsimile) are permitted in the solicitation, proposals and modifications to proposals shall be submitted in paper media in sealed envelopes or packages (i) addressed to the office specified in the solicitation, and (ii) showing the time and date specified for receipt, the solicitation number, and the name and address of the offeror. Offerors using commercial carriers should ensure that the proposal is marked on the outermost wrapper with the information in paragraphs (c)(1)(i) and (c)(1)(ii) of this provision.

(2) The first page of the proposal must show–

(i) The solicitation number;

(ii) The name, address, and telephone and facsimile numbers of the offeror (and electronic address if available);

(iii) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;

(iv) Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this solicitation; and

(v) Name, title, and signature of person authorized to sign the proposal.

Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.

(3) Submission, modification, revision, and withdrawal of proposals. (i) Offerors are responsible for submitting proposals, and any modifications or revisions, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that proposal or revision is due.

(ii) (A) Any proposal, modification, or revision received at the Government office designated in the solicitation after the exact time specified for receipt of offers is "late" and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and-

(1) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of proposals; or

(2) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government’s control prior to the time set for receipt of offers; or

(3) It is the only proposal received.

(B) However, a late modification of an otherwise successful proposal that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.

(iii) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the proposal wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.

(iv) If an emergency or unanticipated event interrupts normal Government processes so that proposals cannot be received at the office designated for receipt of proposals by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation, the time specified for receipt of proposals will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.

(v) Proposals may be withdrawn by written notice received at any time before award. Oral proposals in response to oral solicitations may be withdrawn orally. If the solicitation authorizes facsimile proposals, proposals may be withdrawn via facsimile received at any time before award, subject to the conditions specified in the provision at 52.215-5, Facsimile Proposals. Proposals may be withdrawn in person by an offeror or an authorized representative, if the identity of the person requesting withdrawal is established and the person signs a receipt for the proposal before award.

(4) Unless otherwise specified in the solicitation, the offeror may propose to provide any item or combination of items.

(5) Offerors shall submit proposals in response to this solicitation in English, unless otherwise permitted by the solicitation, and in U.S. dollars, unless the provision at FAR 52.225-17, Evaluation of Foreign Currency Offers, is included in the solicitation.

(6) Offerors may submit modifications to their proposals at any time before the solicitation closing date and time, and may submit modifications in response to an amendment, or to correct a mistake at any time before award.

(7) Offerors may submit revised proposals only if requested or allowed by the Contracting Officer.

(8) Proposals may be withdrawn at any time before award. Withdrawals are effective upon receipt of notice by the Contracting Officer.

https://www.acquisition.gov/far/52.215-5#FAR_52_215_5 https://www.acquisition.gov/far/52.225-17#FAR_52_225_17

(d) Offer expiration date. Proposals in response to this solicitation will be valid for the number of days specified on the solicitation cover sheet (unless a different period is proposed by the offeror).

(e) Restriction on disclosure and use of data. Offerors that include in their proposals data that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, shall-

(1) Mark the title page with the following legend:

This proposal includes data that shall not be disclosed outside the Government and shall not be duplicated, used, or disclosed-in whole or in part-for any purpose other than to evaluate this proposal. If, however, a contract is awarded to this offeror as a result of-or in connection with-the submission of this data, the Government shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting contract. This restriction does not limit the Government's right to use information contained in this data if it is obtained from another source without restriction. The data subject to this restriction are contained in sheets [insert numbers or other identification of sheets]; and

(2) Mark each sheet of data it wishes to restrict with the following legend:

Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.

(f) Contract award. (1) The Government intends to award a contract or contracts resulting from this solicitation to the responsible offeror(s) whose proposal(s) represents the best value after evaluation in accordance with the factors and subfactors in the solicitation.

(2) The Government may reject any or all proposals if such action is in the Government’s interest.

(3) The Government may waive informalities and minor irregularities in proposals received.

(4) The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)).

Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be https://www.acquisition.gov/far/15.306#FAR_15_306 conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

(5) The Government reserves the right to make an award on any item for a quantity less than the quantity offered, at the unit cost or prices offered, unless the offeror specifies otherwise in the proposal.

(6) The Government reserves the right to make multiple awards if, after considering the additional administrative costs, it is in the Government’s best interest to do so.

(7) Exchanges with offerors after receipt of a proposal do not constitute a rejection or counteroffer by the Government.

(8) The Government may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items or subline items.

Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more line items is significantly overstated or understated as indicated by the application of cost or price analysis techniques. A proposal may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government.

(9) If a cost realism analysis is performed, cost realism may be considered by the source selection authority in evaluating performance or schedule risk.

(10) A written award or acceptance of proposal mailed or otherwise furnished to the successful offeror within the time specified in the proposal shall result in a binding contract without further action by either party.

(11) If a post-award debriefing is given to requesting offerors, the Government shall disclose the following information, if applicable:

(i) The agency’s evaluation of the significant weak or deficient factors in the debriefed offeror’s offer.

(ii) The overall evaluated cost or price and technical rating of the successful and the debriefed offeror and past performance information on the debriefed offeror.

(iii) The overall ranking of all offerors, when any ranking was developed by the agency during source selection.

(iv) A summary of the rationale for award.

(v) For acquisitions of commercial products, the make and model of the product to be delivered by the successful offeror.

(vi) Reasonable responses to relevant questions posed by the debriefed offeror as to whether source selection procedures set forth in the solicitation, applicable regulations, and other…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .