RFIs Answers_Questions 3 to 6.pdf
PDF 56 KB Posted
- Attached to
- Roof Repairs at the Almeric L. Christian US Courthouse & Federal Office Building located at St. Croix, USVI
- Solicitation number
- SourcesSought_VI0008ZZ_Roof
About this file
This document is a Request for Information (RFI) responses for Solicitation 47PC0225R0017, addressing construction services for roof repairs at the Almeric Christian Federal Building and US Courthouse in St. Croix, USVI. The RFI responses cover six key questions, including insurance requirements, bid alternates, and evaluation criteria. Key details include: the construction project has an estimated price range between $1,000,000 and $5,000,000, and the award will not be based solely on price but on a best value determination considering technical qualifications (40%), past performance (30%), and key personnel qualifications (30%). Resumes are required as part of the proposal submission, and an updated set of drawings will be issued with Solicitation Amendment 0001.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Responses for RFIs for solicitation 47PC0225R0017 Construction Services for Roof Repairs in Almeric Christian Federal Building and US Courthouse, St Croix, USVI
RFI Question Answer
Will GSA consider amending the insurance requirements as follows:
a. Workers Compensation / Employers Liability - $1,000,000
b. Commercial General Liability - $1,000,000 each occurrence
c. Auto - $1,000,000 combined per accident (including bodily injury and property damage)
No. The Insurance Requirements are as described in the Agreement document, pages 10 to 11, section "III.F. Insurance Requirements": "
The drawings indicate 6 bid alternates however the Statement of Work and Pricing Sheet only include 3. Assuming it is 3, will an updated set of drawings be issues accurately reflecting this?
Yes. An updated set of drawings is incorporated with Solicitation Amendment 0001.
Being that award is based on low price, please confirm if resumes are required with proposal?
The award is not based on price only. The Solicitation document states on page 28, section VI.A. Evaluation of Offers, "(1) The Government will award a contract resulting from this Solicitation to the responsible Offeror whose offer conforming to the Solicitation will be the best value to the Government, Total Evaluated Price and other factors considered. In addition to Total Evaluated Price, the following non-price factors shall be used to evaluate offers: Factor 1:
Technical Qualifications (40%), Factor 2: Past Performance (30%), Factor 3:
Qualifications Of Key Personnel (30%)" ... "(2) Non-Price Factors, when combined, are significantly more important than/significantly less important than/equal in importance to Total Evaluated Price." Therefore, resumes are required as per Factor 3: Qualification of Key Personnel".
6 What is approx. value of construction?
As stated in the Solicitation document on page 6, section "I.E. Estimated Price Range": "The estimated price range for the Project is between $1,000,000 and $5,000,000."
File details come from the government source that posted it. Updated .