Attachment - Pricing Sheet .pdf

PDF 80 KB Posted

Attached to
Roof Repairs at the Almeric L. Christian US Courthouse & Federal Office Building located at St. Croix, USVI
Solicitation number
SourcesSought_VI0008ZZ_Roof
Issued by

About this file

This is a pricing sheet template for roof repairs at the Almeric L. Christian Federal Building & U.S. Courthouse that breaks down costs across four Contract Line Item Numbers (CLINs). The sheet requires contractors to provide detailed itemized breakdowns of labor, material, and equipment costs by division.

The CLINs cover distinct scopes of work: CLIN 0001 (Base Services) involves removing and replacing existing metal roofing, insulation, ladder installation, and metal gutters/downspouts; CLIN 0002 covers TPO membrane roof system replacement on flat roof areas; CLIN 0003 addresses TPO membrane roof system replacement over the Parking Garage; and CLIN 0004 involves replacing the metal roof system on the Water Treatment Building. For each CLIN, contractors must provide costs broken down across 12 categories including General Requirements, Existing Conditions, Metals, Wood/Plastics/Composites, Thermal/Moisture Protection, Openings, Finishes, Plumbing, Electrical, Insurances, P&P Bonds, and Profit.

View the file

Other files

File Type Posted
Solicitation_SBSA_GC_April 2024 - v4.pdf PDF
SF30 - Solicitation Amendment 47PC0225R0017_0005.pdf PDF
Solicitation_SBSA_GC_April 2024 - v3.pdf PDF
SF30 - Solicitation Amendment 47PC0225R0017_0004.pdf PDF
RFIs Answers_Questions 17 25 32 42 63 and 71.pdf PDF
SF30 - Solicitation Amendment 47PC0225R0017_0003.pdf PDF
Agreement_SBSA_GC_Dec 2024 - v3.pdf PDF
RFIs Answers_Questions 1-2 7-16 18-24 26-31 33-41 43-62 64-70.pdf PDF
SF30 - Solicitation Amendment 47PC0225R0017_0002.pdf PDF
PBS_Core_Building_Standards_Memorandum 24FEB.25.pdf PDF
Attendance Sheet for Virtual Pre Proposal Conference_2025-3-10.pdf PDF
Agreement_SBSA_GC_Dec 2024 - v2.pdf PDF
RFIs Answers_Questions 3 to 6.pdf PDF
Roof Project Attendance Sheet Site Visit- 20250312.pdf PDF
SF30 - Solicitation Amendment 47PC0225R0017_0001.pdf PDF
2025 03 10 Pre-Proposal Conference Roof Repairs STX.pdf PDF
Solicitation_SBSA_GC_April 2024 - v2.pdf PDF
Attachment - Pricing Sheet 20250303.pdf PDF
Solicitation_SBSA_GC_April 2024.pdf PDF
Attachment A3 - Key Personnel Resume.pdf PDF
Attachment A1 - Experience Summary Table.pdf PDF
Reps and Certs GC May 2024.pdf PDF
WD VI20250001 01-03-2025_20250303.pdf PDF
Attachment A4 - Past Performance Questionnaire.pdf PDF
SF24-16e.pdf PDF
GSA527-21.pdf PDF
Attachment A2 - Project Fact Sheet.pdf PDF
Agreement_SBSA_GC_Dec 2024.pdf PDF
SF1442 - 47PC0225R0017 Form.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ROOF REPAIRS AT ALMERIC L. CHRISTIAN FEDERAL BUILDING & U.S. COURTHOUSE

CLIN DESCRIPTION QTY UNIT TOTAL COST

Option 1

Option 2

Option 3

Itemized Breakdown of Material, Labor, and Equipment by Division

UNIT LABOR

COST

TOTAL LABOR

COST

UNIT

MATERIAL

TOTAL

MATERIAL

UNIT

EQUIPMENT

TOTAL

EQUIPMENT

PRICING SHEET

Totals

Involves the removal and replacement of TPO membrane roof systems on flat roof areas.

Totals

'Involves the removal and replacement of TPO membrane roof systems over the Parking

Garage

Totals

Involves the removal and replacement of the existing metal roof system on the Water Treatment

Building.

Totals

The Contractor will submit an itemized LEMSO breakdown to include all materials and activities required for the complete performance of the work described in the SOW.

Division 1 - General Requirements Division 2 - Existing Conditions Division 5 - Metals Division 6 - Wood, Plastics and Composites Division 7 - Thermal and Moisture Protection Division 8 - Openings Division 9 - Finishes Division 22 - Plumbing Division 26 - Electrical Insurances P&P Bonds Profit

Division 1 - General Requirements Division 2 - Existing Conditions Division 5 - Metals Division 6 - Wood, Plastics and Composites Division 7 - Thermal and Moisture Protection Division 8 - Openings Division 9 - Finishes Division 22 - Plumbing Division 26 - Electrical Insurances P&P Bonds Profit

Division 1 - General Requirements Division 2 - Existing Conditions Division 5 - Metals Division 6 - Wood, Plastics and Composites Division 7 - Thermal and Moisture Protection Division 8 - Openings Division 9 - Finishes Division 22 - Plumbing Division 26 - Electrical Insurances P&P Bonds Profit

Division 1 - General Requirements Division 2 - Existing Conditions Division 5 - Metals Division 6 - Wood, Plastics and Composites Division 7 - Thermal and Moisture Protection Division 8 - Openings Division 9 - Finishes Division 22 - Plumbing Division 26 - Electrical Insurances P&P Bonds Profit

Base Services Removal and replacement of the existing metal roofing and insulation.

Removal and installation of new ladder and replacement of metal gutters, downspouts and others as per

SOW.