Attachment - Pricing Sheet .pdf
PDF 80 KB Posted
- Attached to
- Roof Repairs at the Almeric L. Christian US Courthouse & Federal Office Building located at St. Croix, USVI
- Solicitation number
- SourcesSought_VI0008ZZ_Roof
About this file
This is a pricing sheet template for roof repairs at the Almeric L. Christian Federal Building & U.S. Courthouse that breaks down costs across four Contract Line Item Numbers (CLINs). The sheet requires contractors to provide detailed itemized breakdowns of labor, material, and equipment costs by division.
The CLINs cover distinct scopes of work: CLIN 0001 (Base Services) involves removing and replacing existing metal roofing, insulation, ladder installation, and metal gutters/downspouts; CLIN 0002 covers TPO membrane roof system replacement on flat roof areas; CLIN 0003 addresses TPO membrane roof system replacement over the Parking Garage; and CLIN 0004 involves replacing the metal roof system on the Water Treatment Building. For each CLIN, contractors must provide costs broken down across 12 categories including General Requirements, Existing Conditions, Metals, Wood/Plastics/Composites, Thermal/Moisture Protection, Openings, Finishes, Plumbing, Electrical, Insurances, P&P Bonds, and Profit.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ROOF REPAIRS AT ALMERIC L. CHRISTIAN FEDERAL BUILDING & U.S. COURTHOUSE
CLIN DESCRIPTION QTY UNIT TOTAL COST
Option 1
Option 2
Option 3
Itemized Breakdown of Material, Labor, and Equipment by Division
UNIT LABOR
COST
TOTAL LABOR
COST
UNIT
MATERIAL
TOTAL
MATERIAL
UNIT
EQUIPMENT
TOTAL
EQUIPMENT
PRICING SHEET
Totals
Involves the removal and replacement of TPO membrane roof systems on flat roof areas.
Totals
'Involves the removal and replacement of TPO membrane roof systems over the Parking
Garage
Totals
Involves the removal and replacement of the existing metal roof system on the Water Treatment
Building.
Totals
The Contractor will submit an itemized LEMSO breakdown to include all materials and activities required for the complete performance of the work described in the SOW.
Division 1 - General Requirements Division 2 - Existing Conditions Division 5 - Metals Division 6 - Wood, Plastics and Composites Division 7 - Thermal and Moisture Protection Division 8 - Openings Division 9 - Finishes Division 22 - Plumbing Division 26 - Electrical Insurances P&P Bonds Profit
Division 1 - General Requirements Division 2 - Existing Conditions Division 5 - Metals Division 6 - Wood, Plastics and Composites Division 7 - Thermal and Moisture Protection Division 8 - Openings Division 9 - Finishes Division 22 - Plumbing Division 26 - Electrical Insurances P&P Bonds Profit
Division 1 - General Requirements Division 2 - Existing Conditions Division 5 - Metals Division 6 - Wood, Plastics and Composites Division 7 - Thermal and Moisture Protection Division 8 - Openings Division 9 - Finishes Division 22 - Plumbing Division 26 - Electrical Insurances P&P Bonds Profit
Division 1 - General Requirements Division 2 - Existing Conditions Division 5 - Metals Division 6 - Wood, Plastics and Composites Division 7 - Thermal and Moisture Protection Division 8 - Openings Division 9 - Finishes Division 22 - Plumbing Division 26 - Electrical Insurances P&P Bonds Profit
Base Services Removal and replacement of the existing metal roofing and insulation.
Removal and installation of new ladder and replacement of metal gutters, downspouts and others as per
SOW.