Attachment - Pricing Sheet 20250303.pdf
PDF 86 KB Posted
- Attached to
- Roof Repairs at the Almeric L. Christian US Courthouse & Federal Office Building located at St. Croix, USVI
- Solicitation number
- SourcesSought_VI0008ZZ_Roof
About this file
This is a pricing sheet template for roof repairs at the Almeric L. Christian Federal Building & U.S. Courthouse, requiring contractors to submit itemized LEMSO (Labor, Equipment, Material, Subcontractor, and Other) cost breakdowns across multiple construction divisions.
The pricing sheet is structured with four Contract Line Item Numbers (CLINs): CLIN 0001 (Base Services) covers removal and replacement of existing metal roofing, insulation, ladder installation, and metal gutters/downspouts; CLIN 0002 (Option 1) involves TPO membrane roof systems replacement on flat roof areas; CLIN 0003 (Option 2) covers TPO membrane roof systems replacement over the Parking Garage; and CLIN 0004 (Option 3) addresses metal roof system replacement on the Water Treatment Building. Each CLIN requires detailed cost breakdowns across nine divisions (General Requirements, Existing Conditions, Metals, Wood/Plastics/Composites, Thermal/Moisture Protection, Openings, Finishes, Plumbing, and Electrical), plus indirect costs including payroll taxes, material taxes, overhead, profit, bonds, and insurance. The template follows AIA MASTERSPEC format as required by GSA.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ROOF REPAIRS AT ALMERIC L. CHRISTIAN FEDERAL BUILDING & U.S. COURTHOUSE
PRICING SHEET
The Contractor will submit an itemized LEMSO breakdown to include all materials and activities required for the complete performance of the work described in the SOW.
CLIN DESCRIPTION
Itemized Breakdown of Material, Labor, and
Equipment by Division
QTY UNIT
UNIT LABOR
COST
TOTAL
LABOR COST
UNIT
MATERIAL
COST
TOTAL
MATERIAL
COST
UNIT
EQUIPMENT
COST
TOTAL
EQUIPMENT
COST
TOTAL COST
Division 1 - General Requirements Division 2 - Existing Conditions Division 5 - Metals Division 6 - Wood, Plastics and Composites Division 7 - Thermal and Moisture Protection Division 8 - Openings Division 9 - Finishes Division 22 - Plumbing Division 26 - Electrical
TOTAL-DIRECT COSTS
Pay Roll Taxes/Fringe Material Taxes
TOTAL-DIRECT/INDIRECT COSTS
Overhead Profit
TOTAL PRICE
P&P Bonds
Insurances
FINAL BID PRICE (BASE)
Division 1 - General Requirements Division 2 - Existing Conditions Division 5 - Metals Division 6 - Wood, Plastics and Composites Division 7 - Thermal and Moisture Protection Division 8 - Openings Division 9 - Finishes Division 22 - Plumbing Division 26 - Electrical
TOTAL-DIRECT COSTS
Pay Roll Taxes/Fringe Material Taxes
TOTAL-DIRECT/INDIRECT COSTS
Overhead Profit
TOTAL PRICE
P&P Bonds Insurances
FINAL BID PRICE (OPTION 1)
Division 1 - General Requirements Division 2 - Existing Conditions Division 5 - Metals Division 6 - Wood, Plastics and Composites Division 7 - Thermal and Moisture Protection Division 8 - Openings Division 9 - Finishes Division 22 - Plumbing Division 26 - Electrical
TOTAL-DIRECT COSTS
Pay Roll Taxes/Fringe Material Taxes
TOTAL-DIRECT/INDIRECT COSTS
Overhead Profit
TOTAL PRICE
P&P Bonds Insurances
FINAL BID PRICE (OPTION 2)
Division 1 - General Requirements Division 2 - Existing Conditions Division 5 - Metals Division 6 - Wood, Plastics and Composites Division 7 - Thermal and Moisture Protection Division 8 - Openings Division 9 - Finishes Division 22 - Plumbing Division 26 - Electrical
TOTAL-DIRECT COSTS
Pay Roll Taxes/Fringe Material Taxes
TOTAL-DIRECT/INDIRECT COSTS
Overhead Profit
TOTAL PRICE
P&P Bonds Insurances
FINAL BID PRICE (OPTION 3)
Option 2 'Involves the removal and replacement of TPO membrane roof systems over the Parking
Garage
Option 3 Involves the removal and replacement of the existing metal roof system on the Water
Treatment Building.
* Note: GSA has adopted the AIA MASTERSPEC as the standard specifications to be used on all GSA projects. Itemized breakdown using this format.
Base Services Removal and replacement of the existing metal roofing and insulation.
Removal and installation of new ladder and replacement of metal gutters, downspouts and others as per
SOW.
Option 1 Involves the removal and replacement of TPO membrane roof systems on flat roof areas.
File details come from the government source that posted it. Updated .