Solicitation - N6264926RL004.pdf
PDF 3 MB Posted
- Attached to
- USS MIGUEL KEITH (ESB 5) MTA A0009
- Solicitation number
- N6264926RL004
About this file
This is a Request for Proposal (RFP) for the USS MIGUEL KEITH (ESB-5) Mid-Term Availability (MTA) ship repair and maintenance contract. The solicitation number is N6264926RL004, issued by NAVSUP Fleet Logistics Center Yokosuka (NAVSUP FLCY), with a proposal due date of May 8, 2026 at 11:00 AM Singapore Standard Time. The contract involves repair, maintenance, and alterations to the USS MIGUEL KEITH vessel at either a Thailand or Singapore facility during the period of October 26 to December 10, 2026, with an optional extension through December 26, 2026.
The primary work is organized under two main specifications: Military Sealift Command (MSC) specification SSU SN 27-001 and Ship Repair Facility (SRF) specification SING 003-27. The contract structure includes firm fixed-price line items (CLINs 0001-0004) for base and option work, plus time-and-materials growth CLINs (0005-0006) with a total estimated material value of $1,970,300 and 11,515 allocated labor hours for growth work. Offerors must provide itemized price breakdowns using the Contractor Price Breakdown form and demonstrate fixed labor rates and material handling percentages. Award is restricted to firms with active Master Ship Repair Agreements (MSRA) or Agreements of Boat Repair (ABR) and current System for Awards Management (SAM) registration. The Government will evaluate proposals based on price (lowest total evaluated price) and non-price technical factors including understanding of work package, ability to perform, management control, quality assurance, and past performance. The Government intends to make award based on initial proposals but reserves the right to conduct discussions if necessary.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION
15A. NAME AND
ADDRESS
OF OFFEROR
SOLICITATION, OFFER, AND AWARD 1. This Contract is a Rated Order under the Defense Priorities and Allocations System (DPAS) - Code of Federal Regulations - at 15 CFR 700.
RATING PAGE OF PAGES
2. CONTRACT NUMBER 3. SOLICITATION NUMBER 4. TYPE OF SOLICITATION 5. DATE ISSUED 6. REQUISITION/PURCHASE NUMBER
CODE7. ISSUED BY 8. ADDRESS OFFER TO (If other than item 7)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
9. Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision Number 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR
INFORMATION
CALL:
A. NAME B. TELEPHONE (NO COLLECT CALLS)
AREA CODE NUMBER EXTENSION
C. EMAIL ADDRESS
11. TABLE OF CONTENTS
(X) DESCRIPTION PAGE(S) (X) SECTION PAGE(S)DESCRIPTION
A B C D E F G H
I
J
K
L
M EVALUATION FACTORS FOR AWARD
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
REPRESENTATIONS, CERTIFICATIONS AND OTHER
STATEMENTS OF OFFERORS
PART IV - REPRESENTATIONS AND INSTRUCTIONS
LIST OF ATTACHMENTS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
CONTRACT CLAUSESSOLICITATION/CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/COSTS
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
PACKAGING AND MARKING
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
CONTRACT ADMINISTRATION DATA
SPECIAL CONTRACT REQUIREMENTS
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
OFFER (Must be fully completed by offeror)
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause Number 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS (%)
DATEAMENDMENT NUMBERAMENDMENT NUMBER DATE
CODE FACILITY 16. NAME AND THE TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
15B. TELEPHONE NUMBER
AREA CODE NUMBER EXTENSION
15C. CHECK IF REMITTANCE ADDRESS IS
DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
17. SIGNATURE 18. OFFER DATE
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL OPEN COMPETITION UNDER THE
UNITED STATES CODE AT:
10 U.S.C. 3204(a) ( )41 U.S.C. 3304(a)
24. ADMINISTERED BY (If other than Item 7)
26. NAME OF CONTRACTING OFFICER (Type or print)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is unusable
23. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
25. PAYMENT WILL BE MADE BY
27. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
28. AWARD DATE
CODE
ITEM
STANDARD FORM 33 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.214 (c)
SEALED BID (IFB) INVITATION FOR BID
NEGOTIATED (RFP) REQUEST FOR
PROPOSAL
(Hour) (Date)
PART I - THE SCHEDULE PART II - CONTRACT CLAUSES
Created On:
08 Apr 2026, 04:26 AM Greenwich Mean Time
Section A - Solicitation/Contract Form
USS MIGUEL KEITH (EBS-5) MID-TERM AVAILABILITY
USS MIGUEL KEITH (ESB-5) Mid-Term Availability (MTA)
1. USS MIGUEL KEITH (ESB-5): NAVSUP Fleet Logistics Center Yokosuka (NAVSUP FLCY), Site Singapore has a new requirement in support of the USS MIGUEL KEITH (EB-5). The repair and maintenance package of work items are included as SSU 27-001.
2. PERIOD OF PERFORMANCE: 26 October 2026 - 10 December 2026 (11-26 December 2026 with option)
3. PLACE OF PERFORMANCE: Availability performance shall be in Thailand or Singapore only.
4. Offer: Offerors must provide all information required by this solicitation no later than 8 May 2026 at 11:00 AM Singapore Standard Time.
5. WORK ITEM INFORMATION:
a. Any work item price based on an estimated quantity/scope will be balanced at the completion of the availability via a contract modification.
b. References in the Work Items will be provided to offerors via DoD Safe (a web-based tool that provides users the capability to securely send and receive large files, including files that are too large to be transmitted via email.) Please email request for references to: hipolito.p.ferrer.civ@us.navy.mil, Contract Specialist.
6. Award of a job order resulting from this solicitation is restricted to firms, which possess a current Master Ship Repair Agreement (MSRA)/Agreement of Boat Repair (ABR) and is restricted to firms which have a current updated registration in System for Awards Management. Firms with inactive registration will not be considered for award.
MSRA/ABR Number: _____________________________
Firms who do not possess an MSRA or ABR are ineligible for award unless adequate time exists to permit the Navy to perform an assessment of their MSRA/ABR application and to execute the applicable MSRA/ABR without impacting the vessel's availability dates.
N6264926RL004
Section B - Supplies or Services & Prices or Costs
Additional Information/Notes
NOTE A: FIXED SHIP REPAIR LABOR AND MATERIAL BURDEN RATES FOR GROWTH AND NEW WORK
1. The Contractor's material handling rate will be used for negotiating growth and new work to be performed under this Contract. The labor rate and material handling rate identified in Attachment J-3 (Pricing Workbook). The Contractor agrees that the number of hours included in its price proposal submitted in response to CCOs, and RCCs for SRF Ship, shall include only direct production hours. For these purposes, direct production hours are for skilled labor at the journeyman level expended in direct production including but not limited to the following functions:
Abrasive cleaning/blasting
Fire Watch
Welding
Burning
Brazing
Carpentry
Machinists (inside and outside)
Electrical Work
Electronic Work
Engineering
Design Support
Lagging
Ship-fitting
Boiler-making
Painting
Sheet-metal Work
Pipefitting
Rigging
General Labor
Staging/Scaffolding
Diesel Mechanics
2. The material handling rate proposed by the contractor and identified in Attachment J-3 (Pricing Workbook), includes all costs associated with support functions (whether charged directly or indirectly by the Contractor's accounting systems) provided in support of the direct production functions listed in Note B paragraph 1 above.
Support functions are considered to be included in the Contractor's fully burdened ship repair labor rate for direct production hours.
Labor hours for the below support functions shall not be separately proposed, including in support of subcontractors. Support functions include, and are not limited to, those types listed below:
Testing
Quality Assurance
Execution Planning
Cleaning (except tank cleaning)
Supervision (all types, including, but not limited to supervision of trades, support personnel and subcontractors)
Security
Surveying
Administration
Transportation
Purchasing Staff
Lofting
Other indirect support
Handling & Warehousing
Safety/Environmental
Program Management
3. The labor rate is a fixed hourly rate that includes all wages, (i.e. straight time, overtime, shift differential, holiday time, etc.), overhead, all other indirect costs, general and administrative expenses, Facilities Capital Cost of Money (FCCOM) and profit. The ship repair labor rate represents a blended rate including labor transferred between divisions, subsidiaries, or affiliates of the contractor under a common control.
4. Consumable materials are goods used in the ordinary course of work performance such as office supplies, paper, rags, vehicle or equipment fuel costs, cleaning chemicals, disposable tools, welding rods, paint buckets, paint brushes, protective clothing, etc., that are consumed/used in the process of repair and do not become an integral part of the repaired vessel. Consumable material shall be included in the Contractor's fully burdened ship repair labor rate and not separately priced.
5. Physical materials are good that become incorporated into the repaired vessel in the course of the repair, such as replacement steel, pipes, paint, and fasteners. The material burden rate applies to physical materials but not to consumable materials. The material burden rate will be applied to the actual cost of the physical material. Actual cost does not include handling charges, general and administrative cost, overhead, profit, or any other indirect cost.
6. For contract changes involving subcontractors, subcontractor quotes will be treated as Other Direct Costs (ODCs) and will be subject to the material burden rate identified in Attachment J-3 (Pricing Workbook). Subcontractor quotes must be competitively acquired, and submitted with the contractor's pricing proposal in response to CCOs and RCCs, if applicable, issued by the Contracting Officer. At no time will the proposed total to the performed by prime contractor combined with subcontractor quote, material quote, and applicable handling be allowed to cost more than it would have, had the prime contractor directly provided all material and labor.
If the Contractor intends to subcontract a CCO or RCC for procurement of material only, the Contractor shall notify the Contracting Officer prior to submitting its CCO pricing stating the reason subcontracting the CCO or RCC is the best value to the Government.
The proposed total pricing restriction addressed in the preceding sentence does not apply in any case where the work is required to be performed by Original Equipment Manufacturers (OEMs), or Government directed subcontractors. CCOs or RCCs that are subcontracted for material only (no associated labor required within the CCO or RCC) shall not be subject to the Material Handling Rate. Any material handling rate applied to new work shall be approved by the discretion of the KO, upon receipt of supporting documentation in accordance with FAR 15.404-3.
7. The Contract fixed labor rate and material handling rate identified in Attachment J-3 (Pricing Workbook) shall be used for negotiating growth and new work during the availability and up to three (3) months after the Attachment J-5 (Execution Milestones) "Contract Complete" date.
NOTE B: AVAILABILITY SCHEDULE PERFORMANCE
1. The Contractor shall schedule the performance of all items in the work package, including all Base and Option items, so as to permit a contract scope increase which includes the total contract wide number of labor hours and material dollars to complete growth work as described in TIME and MATERIAL CLIN.
2. The Contractor agrees that these labor hours and materials, if tasked, shall be performed, purchased and installed concurrently with the work items, without impacting, accelerating, or causing delay or disruption to the work required by the base and option work items, to any other Government contract, or to any other work in progress for the Government.
Item Supplies/Service Quantity Unit Unit Price Amount
Complete the Mid-Term Availability (MTA) of USS MIGUEL KEITH (ESB-5) as described in accordance with Military Sealift Command (MSC) specification., SSU SN 27- 001, under Section J, Attachment J-1. This is a total of sub-line items as described in Contractor Price Breakdown sheet, Attachment J-3.
All prices shall be in NET US Dollars inclusive of all applicable charges.
The Contractor shall submit an itemized breakdown of the price for each work item on the form provided in Section J, Attachment j-3.
Pricing Arrangement: Firm Fixed Price
1 Lot
Complete the MTA of USS MIGUEL KEITH (ESB-5) as described in accordance with Ship Repair Facility (SRF) specifications, SING 003-27, under Section J, Attachment J-
1. This is a total of subline items as described in Contractor Price Breakdown sheet, Attachment J-3.
All prices stated shall be in NET US Dollars inclusive of all applicable
Pricing Arrangement: Firm Fixed Price
1 Lot
Option Line Item
Work Item 0506 TALT 15-014 Install CMWD System for USS MIGUEL KEITH (ESB-5) as described in Attachment J-3, Contractor Price Breakdown in accordance with MSC specification, SSU SN 27-001 under Section J, Attachment J- 1.
All prices stated shall be in NET US Dollars inclusive of all applicable charges.
This option may be exercised up to full quantity by the US Governemnt.
Pricing Arrangement: Firm Fixed Price
1 Job
MTA Extension of Services for USS MIGUEL KEITH (ESB-5). This is a service total of subline items as described in Work Item 0030 Continuation of Services described in Attachment J-3, Contractor Price Breakdown in accordance with MSC specification, SSU SN 27-001 under Section J, Attachment J-1.
Option Line Item
All prices stated shall bein NET US Dollars inclusive of all applicable charges.
This option may be exercised up to full quantity by the US Government.
Pricing Arrangement: Firm Fixed Price
15 Days
Growth Work - Time & Materials Not to Exceed (NTE)
CLIN
Labor:
Unit Labor Rate: $/Hr=______:Qty in Hours: = 11,515;
Extended Price $___________ (Hrs x Labor Rate)
Contractor shall not incur any costs on CLIN 0005 without advance prior written approval from the Contracting Officer.
Pricing Arrangement: Time and Materials
Pricing Arrangement: Time and Materials
1 Lot
Growth Work - Time and Materials Not to Exceed (NTE)
CLIN
Growth material/other costs without markup = $1,970,300.00 Qty: 1 Material Handling/Percent Markup % Extended Price $ _____________ ($1,970,300.00 x % markup)
Contractor shall not incur any costs on CLIN 0006 without advance prior written approval from the Contracting Officer.
Pricing Arrangement: Time and Materials
1 Lot
Section C - Description/Specifications/Statement of Work
C-1 GENERAL
The Contractor shall prepare for and accomplish the attached work items as specified herein and in accordance with the Specification Package Military Sealift Command (MSC) as provided herein, test procedures and other detailed data provided by the Government.
The Contractor shall perform planning, document preparation, engineering, procurement, prefabrication and shipyard production work, and/or any other work necessary to prepare for and accomplish the alterations, repairs, maintenance and routine work specified herein. These requirements include, but are not limited to, the following:
(a) Provide the management, procurement, production, testing, quality assurance, technical capability and resources necessary to prepare for and accomplish the repairs and alterations in accordance with the requirements stated herein, the contract work specifications, and the additional work specifications if necessary within the availability time period specified in Section F.
(b) Accomplish planning and scheduling to ensure timely procurement of Contractor Furnished Material/Contractor Furnished Property (CFM/CFP) and receipt, storage, and installation of Government Furnished Material/Government Furnished Property (GFM/GFP) and CFM /CFP.
(c) Apply progress measurement systems to determine the physical progress of completed work for each of the elements in the contractor's scheduling plan, including material and manpower control, engineering, production, tests and trials in accordance with the Contractor's own Technical Proposal, and the work item package. The progressing system shall permit a direct comparison of the physical progress of completed work to the planned performance measurement baseline for each of the elements in the scheduling plan.
(d) Establish management procedure and systems to identify behind schedule conditions and unfavorable schedule variance, using the scheduling plan performance measurement baseline, each of the elements in the baseline, and the progress measurement systems. The applied systems and procedures shall provide timely identification of scheduling problem areas to permit prompt management action to correct unsatisfactory conditions.
(e) Develop a performance milestone schedule/critical path chart to measure scheduled performance. Deviations from the milestone schedule/critical path chart must be submitted to and approved by the Contracting Officer. The Contractor warrants that all work required by Section C of this contract shall be completed within the performance period stated in Section F of the Contract. A performance milestone schedule and critical path chart shall be developed and submitted in accordance with the Work Item Package.
(f) Apply approved quality control procedures as required by this contract and the work item package to ensure procured material and performed production work conforms to the required quality standards.
(g) Apply procedures to ensure that the ship's equipment and systems remain configured to existing baselines with regard to procured material, production work, and software.
(h) Apply stringent configuration control procedures to ensure that configuration baselines are maintained for procured material and production work.
(i) Provide for staging and storing of Long Lead Time Material (LLTM) for use in the availabilities, as required by the Work Item Package.
(j) Comply with all security requirements and measures called for on the DD Form 254, if the form is listed in Section J and attached hereto.
(k) DATA REQUIRED FOR CONTRACT CHANGE ORDER (CCO) or REQUEST FOR CONTRACT CHANGE (RCC) REQUESTS. In the event a growth requirement is validated and fully scoped, the Government may generate a CCO or RCC for which the KO may request a firm-fixed-price proposal from the Contractor.
For all generated CCOs/RCCs, the Contractor shall provide all CCOs/RCCs pricing proposals to the KO within three (3) calendar days of receipt, unless otherwise specified on an individual CCOs/RCCs. A Contractor's CCOs/RCCs price proposal shall remain valid for a minimum of 14 calendar days, unless otherwise specified on an individual CCOs/RCCs. If the Contractor intends to request settlement of a CCOs/RCCs price prior to 14 calendar days, the Contractor shall notify the KO, in writing, prior to submitting the CCOs/RCCs price proposal stating the reason the CCOs/RCCs price proposal must be settled in less than 14 calendar days and propose a revised timeline. The request will be accepted or rejected at the discretion of the KO. The Contractor shall list as part of the CCOs/RCCs price proposal any specific terms and conditions related to completion of the change order to include impact to milestones, sequencing of adjacent work items, and revised completion date(s) for impacted work item(s). Any proposed change to a schedule milestones shall include a proposed revised date. If such items are not included as part of the CCOs/RCCs price proposal (where applicable), the CCOs/RCCs price proposal will not be considered timely received.
The pricing of the CCOs/RCCs proposal shall include at a minimum:
a. Labor hours to be performed by the Contractor ( )$______
b. Subcontractor Quote (If applicable) ( )$ _____
c. Material Quote (If applicable) ($ _______)
Note 1 - Labor Hours: Proposed labor hours to be performed by the Contractor shall be provided broken down by paragraph and/or task, trade and labor hour mix as contained in the J-3 pricing attachment.
Note 2 - Material: Material pricing shall include a list detailing the source, part number, description, unit cost, quantities, total cost and underlying vendor quotes for each line item.
Note 3 - Subcontractor Quotes : Subcontractor quotes shall include labor hours, labor rate, material (part number, description, unit cost, quantity, total cost, and vendor quotes for each line item), and tiered subcontractor quotes (if applicable). The Contractor shall submit documentation establishing the price reasonableness of each subcontractor quote per FAR 15.404-3(b).
Note 4 - Supporting Documentation : The requirements for complete submission of a CCOs/RCCs stated above represents the minimum and price does not limit the Government from requesting additional information. In the event the KO is unable to make a fair and reasonable determination based on the original CCO pricing submission, the Contractor shall comply with FAR 15.402(a)(2) which requires the Contractor provide data the KO needs in order to determine a fair and reasonable price.
Note 5 - Late Submissions : The above documentation must accompany the COs/RCCs to be considered submitted to the KO. The number of days a C Contractor's CCOs/RCCs price proposal remains valid does not begin until the CCOs/RCCs price proposal is considered received by the KO.
If circumstances arise where the Contractor is unable to submit a CCOs/RCCs proposal within the number of days specified in paragraph above, the Contractor shall notify the KO in writing of the specific circumstances and provide a revised date on which a CCOs/RCCs price proposal will be submitted. Additional time required to complete a CCOs/RCCs price proposal may be granted solely at the discretion of the KO. The new timeframe granted solely at the discretion of the KO and which may differ from the Contractor's request, shall be met by the Contractor. Notification of a late CCOs/RCCs price proposal does not exempt the Contractor from meeting its requirement, but may be considered by the Government when conducting a CPARS evaluation and utilized for past performance ratings on future contracts.
Note 6 - Requests for Clarification: If clarification is needed in response to a CCOs/RCCs, the Contractor must submit a Request for Clarification (RFC) within two (2) business days of receipt of the Government's CCOs/RCCs. Once a RFC is submitted, the Contractor, KO and Principle Port Engineer (PPE) and/or Project Manager (PM) will meet the following business day to clarify the scope of work. If, as a result of the meeting, a CCOs /RCCs revision is required, the Contractor's CCOs/RCCs price submission will run from the date of receipt of the revised CCOs/RCCs. If a RFC is received after the two (2) business day deadline, it is at the KO's discretion whether to accept the submission.
(l) DESCOPING OF REQUIREMENTS: The Government reserves the right to change or terminate this contract. CCO/RCC changes to descope work specifications are incorporated into the contract via descope CCOs/RCCs and can either be a partial deletion of paragraph(s) from the work specification or deletion of a work item in its entirety. The Government will rely on the labor rates and prices entered in Attachment J-3 (Pricing Workbook), for negotiating and settling CCOs/RCCs.
1. Pricing of Deletion CCOs/RCCs: The Contractor agrees to descope changes CCOs/RCCs at the same labor rate awarded in Attachment J-3 (Pricing Workbook), as follows:
a. Partial or full work item descoping of CCOs/RCCs from the basic work package will be descoped at the awarded labor rate in the Work Item Index tab of Attachment J-3 (Pricing Workbook).
b. Partial or full work item descoping of CCOs/RCCs from settled growth work or new work will be descoped at the agreed upon labor rate as entered in the Labor tab of Attachment J-3 (Pricing Workbook).
(m)AUTHORIZED CHANGES ONLY BY THE CONTRACTING OFFICER: Except as specified in the paragraph below, no order, statement, or conduct of Government personnel who visit the Contractor's facilities or in any other manner communicates with Contractor personnel during the performance of this contract shall constitute a change under the "Changes" clause of this contract.
The Contractor shall not comply with any order, direction or request of Government personnel unless it is issued in writing and signed by the Contracting Officer, or is pursuant to specific authority otherwise included as a part of this contract.
The Contracting Officer is the only person authorized to approve changes in any of the requirements of this contract and, notwithstanding provisions contained elsewhere in this contract, said authority remains solely the Contracting Officer's. In the event the Contractor effects any change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price and/or schedule to cover any increase in charges incurred as a result thereof. The only exception to this is if the Contractor is ordered to stop work for a safety reason. In the event the Contractor is asked to stop work for safety reasons, the Contractor shall notify the Contracting Officer in writing of the circumstances surrounding the stop work.
If the Contractor believes it has been directed to perform work outside the scope of the contract, it must notify the Contracting Officer immediately.
C-2 TESTING AND QUALITY CONTROL
Provide and maintain an inspection system acceptable to the Government in accordance with the Specification Package Military Sealift Command (MSC) as provided herein and additional requirements contained herein.
A. Nonconforming Material. The Contractor shall establish and maintain a positive system for controlling material which is not in conformance with contractor requirements. The system shall identify and segregate nonconforming material.
B. Subcontractor Control and Evaluation
1. The Contractor shall require subcontractors and suppliers to invoke adequate inspection systems that ensure the required quality of materials, parts, components, and services for end-use in this ship repair. The Government shall be permitted to monitor the Contractor's system for inspecting subcontractors.
2. Contractor is reminded of the requirements associated with subcontracting with contractors that are debarred, suspended or proposed for debarment contained at FAR 52.209-6. As with all FAR requirements, please ensure familiarity with those requirements prior to submitting its offer.
C. Calibration
1. Only calibrated equipment shall be used to perform tests and inspections.
2. Test and measuring equipment shall be within industry standard limits and shall be calibrated against standards traceable to the National Bureau of Standards.
3. Calibrated equipment shall be identified with a label stating date of calibration, due date and certifying agency.
4. Calibrated equipment shall be used for all pressure and weight testing, measurements of electrical waves, balancing operations, tachometers and other indirect measuring devices used for inspection or to record data or dimensions required by specifications.
C-3 MANAGEMENT/STAFFING PLAN
Provide an organization chart of the significant positions who will be assigned for this availability within 10 days after award. The chart shall include the positions in upper management, program managers, negotiators, estimators, scheduling personnel, engineering personnel, key production personnel by trade, and the lead position in the shipyard safety organization, testing organization, and the quality control organization.
C-4 GENERAL TECHNICAL REQUIREMENTS
The following COMSC Instruction is hereby incorporated into this Contract by reference: COMSC Instruction 4700.16 Series, "General Technical Requirements." Copies of this instruction are available at https://flankspeed.sharepoint-mil.us/sites/USFF-MSC via search for "COMSC Instruction
4700.16 Series." In the event that the instruction cannot be found, please reach out to the Contracting Officer:Hipolito.p.ferrer.civ@us.navy.mil.
Requirements This will be a Firm-Fixed-Price with Time and Material Contract Line Item Number (CLIN) award to accomplish work specifications for the USS MIGUEL KEITH (ESB-5) Mid-Term Availability.
Section D - Packaging and Marking
Section E - Inspection and Acceptance
Overall Contract Inspection/Acceptance Locations
Inspection and Acceptance Location
Both Other Instructions: The PPE will be responsible for all acceptance for the MSC requirement.
DoDAAC: N32205 CountryCode: USA
MSCHQ NORFOLK
471 EAST C ST., NORFOLK VA 23511
NORFOLK, VA 23511
UNITED STATES
Kevin Kibbe, Thailand or Singapore Email: kevin.l.kibbe.civ@us.navy.mil Telephone: 1-757-895-9250
Inspection and Acceptance Location
Both Other Instructions: The PM is responsible for all acceptance of SRF requirement.
DoDAAC: N62758 CountryCode: USA
SRF AND JRMC YOKOSUKA
PSC 473 BOX 8, FPO AP 96349
FPO, AP 96349
UNITED STATES
Billy (Will) Swainson, Thailand or Singapore Email: Billy.j.swainson.civ@us.navy.mil Telephone: +65 6751 3678
Option Line Item
Inspection and Acceptance Location
Both Other Instructions: The PPE will be responsible for all MSC requirement.
DoDAAC: N32205 CountryCode: USA
MSCHQ NORFOLK
471 EAST C ST., NORFOLK VA 23511
NORFOLK, VA 23511
UNITED STATES
Kevin Kibbe, Thailand or Singapore Email: kevin.l.kibbe.civ@us.navy.mil Telephone: 1-757-895-9250
Option Line Item
Inspection and Acceptance Location
Both Other Instructions: The PPE will be responsible for all acceptance for the MSC requirement.
DoDAAC: N32205 CountryCode: USA
MSCHQ NORFOLK
471 EAST C ST., NORFOLK VA 23511
NORFOLK, VA 23511
UNITED STATES
Kevin Kibbe, Thailand or Singapore Email: kevin.l.kibbe.civ@us.navy.mil Telephone: 1-757-895-9250
Inspection and Acceptance Location
Both Other Instructions: The PPE will be responsible for all acceptance for the MSC requirement.
DoDAAC: N32205 CountryCode: USA
MSCHQ NORFOLK
471 EAST C ST., NORFOLK VA 23511
NORFOLK, VA 23511
UNITED STATES
Kevin Kibbe, Thailand or Singapore Email: Kevin.l.kibbe.civ@us.navy.mil Telephone: 1-757-895-9250
Inspection and Acceptance Location
Both Other Instructions: The PPE will be responsible for all acceptance for the MSC requirement.
DoDAAC: N32205 CountryCode: USA
MSCHQ NORFOLK
471 EAST C ST., NORFOLK VA 23511
NORFOLK, VA 23511
UNITED STATES
Kevin Kibbe, Thailand or Singapore Email: Kevin.l.kibbe.civ@us.navy.mil Telephone: 1-757-895-9250
Section F - Deliveries or Performance
Overall Contract Delivery Period
Government Origin (Shipping Point)
Line Item Delivery Schedule Quantity Address and POC
Period of Performance From 26 Oct 2026 To 10 Dec 2026
1 Lot
Period of Performance From 26 Oct 2026 To 10 Dec 2026
1 Lot
Option Line Item
Period of Performance From 26 Oct 2026 To 26 Dec 2026
1 Job
Option Line Item
Period of Performance From 11 Dec 2026 To 26 Dec 2026
15 Days
Period of Performance From 26 Oct 2026 To 10 Dec 2026
1 Lot
Period of Performance From 26 Oct 2026 To 10 Dec 2026
1 Lot
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
52.242-15 Stop-Work Order. Aug 1989 52.247-29 F.o.b. Origin. Feb 2006
Section G - Contract Administration Data
G-1.0 Designated Invoice Office
The Contractor shall submit its invoice, as described in "Invoice Information" below, and Material Inspection and Completion Report as part of submission of payment request made using Wide Area Work Flow (WAWF).
In addition, Contractor shall submit its invoice and documents via email to the following:
Mr. Kevin Kibbe, kevin.l.kibbe.civ@us.navy.mil
MSCFE-Singapore-N8@us.navy.mil
Invoice Information
Pursuant to the requirements of FAR 52.232-25 Prompt Payment (JAN 2017), a proper invoice must include the following information:
(a) Name and address of the Contractor;
(b) Invoice date;
(c) Invoice number;
(d) Contract number or other authorization for supplies delivered or services performed (including order number, contract line item number (CLIN) and, if applicable, the contract subline item number (SLIN);
(e) Description, quantity, unit of measure, unit price, and extended price of supplies delivered or services performed;
(f) Shipping and payment terms (e.g., shipment number and date of shipment, prompt payment discount terms) and the accounting classification reference number (ACRN) as identified on the financial accounting data sheets. The bill of lading number and weight of shipment will be shown for shipments on Government bills of lading;
(g) Name and address of Contractor official to whom payment is to be sent (must be the same as that in the contract or in a proper notice of assignment);
(h) Name (where practicable), title, phone number and mailing address of person to be notified in event of a defective invoice; and
(i) Any other information or documentation required by other requirements of the contract (such as evidence of shipment).
G-2.0 Designated Payment Offices: Payment will be made by the following office or as otherwise specified in the contract at each Site.
N50082
ACCOUNTS PAYABLE NAVY ERP
PO BOX 2050
5450 CARLISLE PIKE
MECHANICSBURG, PA 17055-0791
G-3.0 Payment Method:
(a) Payment will be made by Wide Area WorkFlow (WAWF).
(b) If payment by WAWF applies, payment shall be made in accordance with DFARS 252.232-7006 Wide Area Work Flow Payment Instructions, PGI 232.70 Electronic Submission and Processing of Payment Requests and Receiving Reports, and https://piee.eb.mil.
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
252.201-7000 Contracting Officer's Representative. Dec 1991 252.204-7006 Billing Instructions-Cost Vouchers May 2023 252.217-7007 Payments. Dec 1991 252.217-7008 Bonds. Dec 1991 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018 252.232-7008 Assignment of Claims (Overseas). Jun 1997
DFARS Clauses Incorporated by Full Text
252.232-7006 Wide Area WorkFlow Payment Instructions. (Jan 2023)
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) As used in this clause- Definitions.
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as Electronic invoicing.
authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) To access WAWF, the Contractor shall- WAWF access.
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
N6264926RL004
https://piee.eb.mil/
(d) The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice WAWF training.
Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/
(e) Document submissions may be via web entry, Electronic Data Interchange, or File Transfer WAWF methods of document submission.
Protocol.
(f) The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF payment instructions.
WAWF for this contract or task or delivery order:
(1) The Contractor shall submit payment requests using the following document type(s): Document type.
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items-
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
Combo
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
N/A
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
(3) The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF Document routing.
when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC N50082
Issue By DoDAAC N62649
Admin DoDAAC N62649
Inspect By DoDAAC N/A
Ship To Code N62387
Ship From Code N/A
Mark For Code N/A
Service Approver (DoDAAC) N62387
Service Acceptor (DoDAAC) N62387
Accept at Other DoDAAC N/A
LPO DoDAAC N/A
DCAA Auditor DoDAAC HAA120
Other DoDAAC(s) N/A
(4) The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in Payment request.
accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F. Receiving report.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
hipolito.p.ferrer.civ@us.navy.mil
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Section H - Special Contract Requirements
H-1.0 OCCUPATIONAL AND HEALTH STANDARDS FOR SHIPYARD EMPLOYMENT (29 CFR 1915)
The Contractor shall fully comply with 29 Code of Federal Regulations Part 1915, Occupational and Health Standards for Shipyard Employment (29 CFR 1915), as it is effective at the date of contract award, while performing any contract that is awarded from this solicitation. The provisions of 29 CFR 1915 shall apply to the same extent as if the ship repairing, shipbuilding, and shipbreaking employments and related employments to be performed under the contract are wholly accomplished on the navigable waters of the United States. The Contractor shall comply with applicable provisions of the laws and regulations where the ship repairing, shipbuilding, and shipbreaking employment and related employments are performed in addition to complying with the corresponding provisions of 29 CFR 1915 in instances in which those laws and regulations require compliance with more stringent safety standards. The Contractor shall promptly notify the contracting officer if it becomes aware of any law or regulation that is applicable where the ship repairing, shipbuilding, and shipbreaking employment and related employments are performed that precludes compliance with any provision of 29 CFR 1915.
H-2.0 EXTENSION OF COMMERCIAL WARRANTY (NAVSEA) (NOV 1996)
The Contractor shall extend to the Government the full coverage of any standard commercial warranty normally offered in a similar commercial sale, provided that such warranty is available at no additional cost to the Government. The Contractor shall provide a copy of the standard commercial warranty with the item. The standard commercial warranty period shall begin upon the final acceptance of the applicable material or software.
Acceptance of the standard commercial warranty does not waive the Government's rights under the "Inspection" clause, nor does it limit the Government's rights with regard to other terms and conditions of the contract. In the event of a conflict, the terms and conditions of the contract shall take precedence over the standard commercial warranty.
H-3.0 CONTROL OF UNCLASSIFIED INFORMATION (SRF-JRMC Requirements Only)
The Contractor shall not provide Controlled Unclassified Information (CUI) U.S. Navy technical information (engineering drawings, technical manuals, system or equipment photographs or any other U.S. Navy engineering data in any form (orally, paper copy, film or digital file/image) to anyone except SRF-JRMC employees, other Department of Defense (DoD) employees or U.S. DoD Contractors requiring the data for accomplishment of an SRF-JRMC business processes unless the data is marked Distribution Statement "A" (Approved for public release: distribution is unlimited) or has been approved for unrestricted public release by the Commanding Officer of SRF-JRMC or Commander U.S. Naval Forces Japan (COMNAVFORJAPAN) Public Affairs Officer (PAO). The Contractor shall notify SRF-JRMC Code 700 (Code 950 in Sasebo) and request written permission to release CUI outside of SRF-JRMC, DoD Activities or U.S. DoD Contractors that are not involved in the SRF-JRMC business process if the Contractor believes that the release is required to support a SRF-JRMC business or Public Affairs requirement.
H-4.0 Lay Down Space
The Contractor may request the lay down space adjacent to the ship yard in * (location and name of the base) Upon the receipt of approval by the Government, the Contractor may obtain the applicable lay down space. The Contractor shall be responsible for all the cost, but not limited to, for maintaining the facility, utility, safety, and security.
(*) To be determined at the time of contract.
H-5.0 PREVENTION OF THE DISCHARGE OF OIL AND HAZARDOUS SUBSTANCES
(a) Policy. In compliance with Executive Order Number 11752 (38 F.R. 34793), the policy of the Department of the Navy (DON) is to conform to the provisions of the Federal Water Pollution Control Act, as amended (Title 33 U.S.C. 1251 et seq), and the Oil Pollution Act of 1990, as amended (Title 33 U.S.C. 2701 et seq), insofar as these Acts prohibit the discharge of oil, oily mixtures, and hazardous substances, and regardless of whether or not these Acts pertain specifically to the Naval vessel and shore activities. The prescribed clause is intended to implement that policy with respect to the ship(s) being constructed or undergoing repair and overhaul under this contract.
(b) Definitions. For the purpose of this clause, the terms "oil," "oily mixtures," "hazardous substance," and "discharge" shall have the meanings as defined in the Acts referred to in paragraph (a) of this clause and other environmental statutes.
(c) Trials. Prior to commencement of any dock or sea trials hereunder, the contractor shall assure the Administrative Contracting Officer (ACO) by demonstrations, completed test memoranda, or other means reasonably acceptable to the COR that all equipment, the function of which is to prevent the accidental discharge of oil, oily mixtures, or hazardous substances from the ship, that the contractor shall be required by the specifications to install, are fully operable.
(d) Reports. The contractor shall, as soon as it has knowledge of any discharge of oil, oily substance, or hazardous substance from the ship, immediately notify the ACO thereof and shall immediately take all reasonable steps to prevent further discharge. Within 24-hours thereafter, the contractor shall file with the ACO the "Oil or Hazardous Substance Discharge Report."
(e) Liability. The contractor shall not be liable for the costs incurred by the Government for the removal of such oil, oily mixture, or hazardous substance, except that the contractor shall be liable to the Government for all such costs of removal where such discharge was the result of willful negligence or willful misconduct within the privity and knowledge of the contractor.
H-6.0 EMPLOYMENT OF NAVY PERSONNEL RESTRICTED
In performing this contract, the contractor will not use as a consultant or employ (on either a full or part-time basis) any active duty Navy personnel (civilian or military) without the prior approval of the contracting officer. Such approval may be given only in circumstances where it is clear that no laws and no DOD or Navy instructions, regulations, or policies are contravened and no appearance of a conflict of interest will result.
H-7.0 ASBESTOS REMOVAL REQUIREMENTS
(a) During the performance of this contract the contractor and subcontractors may be required to perform work which involves the removal or disturbance of asbestos or asbestos containing products. This clause applies to each instance of asbestos removal or disturbance.
(b) The contractor shall comply with the precautions required in 29 CFR 1910.1001, 29 CFR 1926.58 and 40 CFR Part 61 and all other applicable Federal, State, and Local restrictions. The contractor shall forward a copy of all required notices, licenses and permits to the KO immediately upon issuance or receipt.
(c) The latest change to the Federal, State and Local Regulations in effect at the time of issuance of the contract shall govern. Compliance with these regulations is mandatory and is necessary to protect the employees of the contractor and Naval personnel from exposure to asbestos fibers in excess of the Occupational Safety and Health Administration (OSHA) Action level airborne concentration (currently 0.1 fibers per cubic centimeter (f/cc) of air).
(d) During removal or disturbance, the contractor shall control airborne asbestos concentrations outside the removal boundary to less than 0.1 f/cc at all times.
(e) After removal or disturbance is complete, the areas within the removal boundary shall not be released for re-occupancy until clearance air sampling demonstrates these spaces have concentrations of asbestos less than 0.1 f/cc.
(f) In all respects, the performance of air sampling and analysis shall be performed in accordance with the OSHA Reference Method (Appendix A of 29 CFR 1910.1001), with the following additional specifications:
(1) Aggressive clearance sampling shall be performed on 25 mm cassettes at 2.0 liters per minute for a minimum of four hours.
(2) In performing the clearance sampling, the pump shall be placed within the compartment where the removal or disturbance occurred. When this operation is conducted in a multilevel space, at least one pump shall be placed on each level.
(3) Air sampling shall be performed by a person competent in sampling procedures and overseen by an industrial hygienist certified for comprehensive practice (CIH) by the American Board of Industrial Hygiene.
(4) Laboratory analysis of samples shall be performed by a participant in the American Industrial Hygiene Association (AIHA) Proficiency in Analytical Testing (PAT) Program rated proficient for asbestos and air.
(g) Personal sampling shall be conducted using breathing zone air samples, which are representative of the 8-hour Time-Weighted Average (TWA) exposure of each individual. Samples shall be collected and analyzed using the OSHA Reference Method contained in either 29 CFR 1910.1001 (as amended) or 29 CFR 1926.58 (as amended).
(h) The contractor agrees to indemnify MSC for any fines assessed by Federal, State or Local Agencies, for the contractor's failure to properly follow applicable regulations.
(i) The contractor shall insert this clause in all subcontracts entered into under this contract.
Note: The Contractor shall comply with applicable provisions of the laws and regulations where the ship repairing, shipbuilding, and shipbreaking employment and related employments are performed in addition to complying with the corresponding provisions of 29 CFR 1915 in instances in which those laws and regulations require compliance with more stringent safety standards.
H-8.0 TIME-AND-MATERIALS GROWTH CLIN
(a) This contract will utilize a Time-and-Materials (T&M) Growth CLIN 0005 and 0006 which is funded to accommodate the anticipated growth work that may arise during the performance of the specified Work Items (WIs) under CLIN 0001. The contractor will provide the man-hours and materials at the agreed rates, as listed in CLIN 0005 and 0006, Section B, when authorized by the Contracting Officer in accordance with this clause.
The total authorized growth work may not exceed the total NTE dollar value of the T&M Growth CLIN, however, the mix of labor hours and material provided above may be adjusted so long as the total does not exceed the dollar value of the Growth CLIN.
(b) Labor hours and material in T&M CLIN are not subject to FAR 52.243-1 'Changes - Fixed Price' and are within the scope and pricing of this contract. The utilization of T&M CLIN is at the discretion of the Contracting Officer and subject to the schedule phasing identified in Section B, Note B of this solicitation.
(c) The labor hours and material requirements listed in T&M CLIN in Section B and included in Attachment J-3 (Pricing Workbook), are part of this Contract. Prime Contractor efforts shall be deducted from the labor hours allocated. Subcontractor efforts and materials shall be deducted from the materials allocated. The unauthorized balance of labor hours and materials remaining in the T&M CLINs will be recouped via final contract modification at the end of the availability, when it is evident no additional growth work will be directed. The final contract modification shall be subject to the requirements outlined in Section C, Paragraph l.1.c.iii, 'Deletions of Unused Growth Reservation Embedded in Work Items,' which amounts to a credit to the Government that equals 100% of unused hours, materials and dollars.
(d) GROWTH WORK - Growth is defined as any additional work identified and authorized after contract award and prior to availability completion that is related to a work item included in the original work package defined in CLIN 0001 and as attached under Section J. Any additional work determined by the Contracting Officer as not within the scope of any of the WIs shall be considered NEW WORK and will not be covered by this Growth CLIN.
(1) After any inspection reports detailed in any of the Work Items (WIs) are submitted to the MSC Port Engineer, the contractor will propose solutions, recommendations, material availability, and time impacts to the Period of Performance.
This is the start of the file's text. The full file is on GovTribe.