This Solicitation Development Form pertains to a Construction Services Agreement (CSA) issued by the City of St. Petersburg, Florida, seeking qualified contractors for building operations and maintenance services across multiple city-wide locations. The solicitation covers four primary work categories: chiller replacement, electrical repair or replacement, generator/ATS repair or replacement, and HVAC repair or replacement. Multiple contractors of varying size and technical expertise may be selected for one or more work categories. A pre-bid meeting is required, and bidders have 90 days after the bid closure to complete the CoSP acceptance period. The contract is structured as a multi-year new agreement with an initial term of three years and one two-year renewal option, providing a total potential contract duration of five years.

The total budget allocation for this solicitation is $7,000,000, funded through the CoSP (Charge Account 0001.130.1341.5320110). The solicitation requires a 35-day public advertisement period and mandates background checks that may vary depending on project location, with additional requirements potentially applicable for Parks & Recreation, Police, and Water Resource Development departments. Standard insurance requirements are specified in Exhibit B (General Conditions for Field Order Contracts, Article G-53), with additional coverages or limit modifications to be determined during project execution between ECID and Risk Management. The bidding process includes technical advisors and committee members from the ECID department, with required attachments including the Scope of Services, General Conditions, Statement of Qualifications, Subcontractor Utilization Form, and Draft Agreement.

View the file

Other files for this state and local contract opportunity

Other files attached to Building Operations and Maintenance, newest first.
File Type Posted
Legal_Ad_Affidavit.pdf PDF
95342-_legal_ad_proof.pdf PDF
95342INV-_Legal_Ad.pdf PDF
95342Receipt-_legal_ad.pdf PDF
Building_Operations_and_Maintenance.pdf PDF
Exhibit_A_-_Scope_of_Services.pdf PDF
Subcontractor_Utilization_Plan_2.10.26.docx DOCX document
Draft_Agreement_00881857_CSA_FIeld_Orders.pdf PDF
Exhibit_B_-_General_Conditions.pdf PDF
Contractor_Responses_Chart.docx DOCX document
Exhibit_C_-_Statement_of_Qualifications.pdf PDF
Light_Construction_Agreement.docx DOCX document
Public_Construction_Bond.docx DOCX document
Subcontractor_Utilization_Plan.docx DOCX document
Performance_&_Payment_Bond_.DOCX DOCX document
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rev: 2/10/26

Solicitation Development Form – Construction CSA RFQ

OpenGov Approvers:

James Jackson, Cristina Pellizetti and Brejesh Prayman

Routing Council Items and Related Questions:

James Jackson, Cristina Pellizetti, Sarah Johnson, Brejesh Prayman, Trina Webb

Contract Type Multi-Year - New Agreement

Multi-Year - Renewal Agreement Contract Terms 3-years with one 2-year renewal

Charge Account 0001.130.1341.5320110 Budget $ 7,000,000

Funding Source / Grant Info, if known CoSP Acceptance Period 90 Days, after bid closes

Background Checks Parks & Rec Police Port WRD – Additional background check requirements are contingent upon the project location

Pre-bid meeting required Yes No

Class Item Commodity Description

914.38 Electrical

914.50 Heating, Ventilating and Air Conditioning (HVAC)

031.13 Chillers, Heat Exchangers and Receivers

285.39 Generators, Stationary Type (Not Automotive)

Insurance Requirements:

See Exhibit B - General Conditions for Field Order Contracts Article G-53 for Standard Limits.

Additional coverages or changes in limits will be determined at the Project between ECID and Risk Management.

ECID will provide the approved Certificate of Insurance to Procurement.

Committee Members Technical Advisors

1. Chair: Brejesh Prayman 1. Kristel Bataku

2. Cristina Pellizetti 2.

3. Catherine Corcoran

4. Kevin Cauler/Jeff Rzewnicki

5. David Ojeda

Attachments

Exhibit A – Scope of Services Contractor Response Chart

Exhibit B – General Conditions Subcontractor Utilization Form

Exhibit C - Statement of Qualifications Draft Agreement

Other

Agreement Title Building Operations and Maintenance

Type of Solicitation Construction Services Agreement (for Procurement’s purposes Contract Purchase Agreement)

For ECID use only? Yes No Public Advertisement Requirement 35 Days