Exhibit_C_-_Statement_of_Qualifications.pdf
PDF 138 KB Posted
- Attached to
- Building Operations and Maintenance State and local contract opportunity
- Solicitation number
- RFQ- 26 - 292
- Issued by
- Pinellas County, Florida
About this file
This is a Statement of Qualifications (SOQ) requirements document for a Construction Services Agreement for Building Operations and Maintenance issued by the City of St. Petersburg, Florida. The City is soliciting qualified contractors to provide continuing services across multiple work categories: Chiller Replacement, Electrical Repair or Replacement, Generator/ATS Repair or Replacement, and HVAC Repair or Replacement. Projects will be located at various City-wide locations, and one or multiple qualified contractors may be selected for each work category. The solicitation encourages firms of varying size, ability, and technical expertise to submit proposals, with contractors able to apply for all work categories in which they are qualified.
Contractors must submit a comprehensive SOQ limited to 30 pages (excluding cover pages and section dividers) that includes the following components: a transmittal letter signed by an authorized representative (maximum two pages); table of contents; project team composition and organization (maximum ten pages); key personnel identification with resumes limited to one page per individual; five reference projects completed within the preceding five years, each exceeding $250,000 in cost; firm-specific qualifications; three client references; disclosure of any contractual failures, licensing violations, or litigation; Business Enterprise Outreach and Utilization details addressing SBE, MBE, and WBE engagement; and copies of current applicable Florida licenses. The proposed project manager must have a minimum of five years of applicable experience and must remain with the project throughout the contract term without replacement or substitution without prior written City approval.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| 95342Receipt-_legal_ad.pdf | ||
| Legal_Ad_Affidavit.pdf | ||
| 95342-_legal_ad_proof.pdf | ||
| 95342INV-_Legal_Ad.pdf | ||
| Building_Operations_and_Maintenance.pdf | ||
| Contractor_Responses_Chart.docx | DOCX document | |
| Exhibit_A_-_Scope_of_Services.pdf | ||
| Subcontractor_Utilization_Plan_2.10.26.docx | DOCX document | |
| Draft_Agreement_00881857_CSA_FIeld_Orders.pdf | ||
| Exhibit_B_-_General_Conditions.pdf | ||
| Light_Construction_Agreement.docx | DOCX document | |
| Public_Construction_Bond.docx | DOCX document | |
| Subcontractor_Utilization_Plan.docx | DOCX document | |
| Solicitation_Development_Form_-_INTERNAL_USE_ONLY.pdf | ||
| Performance_&_Payment_Bond_.DOCX | DOCX document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rev: 2/10/26 Page 1 of 3
Exhibit C - Statement of Qualifications Requirements Construction Services Agreement
Building Operations and Maintenance City of St. Petersburg, Florida
The Request for Qualifications shall include the following information in the order listed. Upload all responses as one PDF labeled “Statement of Qualifications Requirements”. Page size shall be limited to 8 ½ x 11.
The Proposal shall be limited to 30 pages. Proposals in excess of 30 pages may be deemed non-responsive by the Procurement and Supply Management Director. A cover page or section divider pages are not included in the total page count.
A. Submittal Requirements
Section
Transmittal Letter Table of Contents Project Team Key Personnel Reference Projects Firm Specific Qualifications References Contractual Failures Business Enterprise Outreach and Utilization Licenses Maximum Number of Pages for SOQ Responses - 30
B. Transmittal Letter
Contractors must submit a transmittal letter (maximum two pages) on the firm’s letterhead. It must be signed by a representative of the Contractor who is authorized to sign such material and to commit the Contractor to the obligations contained in the offer. The transmittal letter must include the name, title, address, phone number and e-mail address for the Contractor’s contact, and must specify the firm’s signatory to any contract documents executed with the City. The transmittal letter may include other information deemed relevant by the Contractor.
C. Table Of Contents
Include a Table of Contents.
D. Project Team
In this section the Contractor must describe the composition, organization and management of the project team (maximum ten pages) including:
1. Identifying all major sub-contractors and their responsibilities,
2. Demonstrating the firm’s ability to work cooperatively with multiple clients and sub-contractors, and
Rev: 2/10/26 Page 2 of 3
3. Identifying key individuals who would be assigned to the project and their roles and responsibilities.
E. Key Personnel
1. Identify all key personnel (and their firm affiliations) on the project team and describe their specific responsibilities throughout the project.
2. Describe the Contractor’s approach to managing such key personnel.
3. Indicate the commitment of all key personnel in terms of an estimated percentage of available time for each throughout the project.
4. The proposed project manager and the proposed substitute shall each have a minimum of five (5) years of applicable experience and shall remain with the projects throughout the term of the City’s base agreement. The project manager shall not be replaced or substituted without the prior written approval of the City. The key project manager or their approved substitutes shall be available for all meetings. Experience included on the resume must be limited to projects completed within the past five (5) years.
5. Provide resumes for all key personnel in the SOQ. Limit resumes to one page per individual and include: (a) academic and professional qualifications, (b) professional registration (as applicable), (c) experience as it relates to the project and to the individual’s specified role on the project, (d) number of years with current firm and total number of years of experience, (e) primary office location.
F. Reference Projects
Describe the performance history and experience of the project team on similar projects.
Provide a separate summary of experience for each Work Category (see Scope of Services for details), as applicable.
The information should demonstrate the firm’s ability to work cooperatively with third parties, including other Contractors or City Departments who may be performing construction. Submit five (5) reference projects completed within the five (5) years preceding the advertisement for this Solicitation that demonstrate relevant experience. Each of the five (5) projects must have a cost in excess of $250,000. Each project description shall contain the following information:
1. Name of owner.
2. Owner reference and contact information.
3. Role of Contractor and relevant scope performed.
4. Contract value for the relevant scope.
5. Year started and year completed.
6. Description of the project showing relevance to this project.
7. Names of firms and key personnel who participated in similar project (s) and are included in this SOQ, along with a clear description of the roles and responsibilities of each.
8. Provide a summary table to cross reference the project team (firms and key personnel) with participation in the reference projects.
Contractors are also encouraged to provide details or references related to past or ongoing continuing services agreements with other Agencies or Owners which are relevant to this Solicitation.
Rev: 2/10/26 Page 3 of 3
G. Firm Specific Qualifications
The Contractor should identify the key strengths of the firm. Highlight capabilities and areas of specialization provided by the firm.
H. References
Provide a list of three (3) client contact persons for whom the Contractor has recently provided services similar in nature to the services identified in this RFQ.
I. Contractual Failures
Describe any alleged, significant prior or ongoing contract failures, licensing or permit violations, claims on bonds, any civil or criminal litigation or investigation pending (including wage theft complaints filed) which involves the firm or in which the firm has been judged guilty or liable.
J. Business Enterprise Outreach and Utilization
Proposers must indicate if the company is a SBE, MBE, WBE, combination; and describe how the company plans to utilize the various business enterprise programs in the company’s fulfilment of the contract. At a minimum, proposers must address the following:
A. A detailed description of your organization’s efforts to identify and contact City of St.
Petersburg SBEs, MBEs, and WBEs to inform them of opportunities to work as subcontractors for this proposal.
i. Attending relevant opportunities offered by the City’s Office of Supplier
Development including outreach events and matchmaking sessions.
ii. Documentation of planned or prior outreach efforts
B. Planned efforts such as mentoring, training, and other capacity building programs for SBEs, MBEs, and WBEs.
C. Detailed description of your organization’s process for ensuring small businesses have enough time and information to provide your firm with bids.
i. Description of how your firm considers SBEs, MBEs, and WBEs in the development of proposal and bid packages.
ii. Explanation of how your firm ensures SBEs, MBEs, and WBEs understand the bid and specifications and are able to learn ways to improve.
D. Provide past performance in utilizing SBEs, WBEs, and WBEs on past projects within the last five (5) years.
E. Provide a detailed Subcontractor Utilization Form.
K. Licenses
Provide copies of Contractor's and individual’s current applicable Florida License.
| A. Submittal Requirements |
| G. Firm Specific Qualifications |
| H. References |
| I. Contractual Failures |
| J. Business Enterprise Outreach and Utilization |
| K. Licenses |
File details come from the government source that posted it. Updated .