Solicitation Attach 10 - Bid Schedule Example.xlsx
XLSX spreadsheet 146 KB Posted
- Attached to
- Russell B Long Elevator Modernization Federal contract opportunity
- Solicitation number
- 47PH0524R0078
About this file
This document appears to be a Bid Schedule example template for a federal contract opportunity. The template is divided into major construction divisions and requires the bidder to provide detailed cost breakdowns for material, labor, and equipment for each division. The related federal contract opportunity is for the modernization of elevators at the Russell B. Long Federal Building in Baton Rouge, LA. The solicitation number is 47PH0524R0078, and the estimated construction cost is between $1,000,000 and $5,000,000. The procurement is set aside for small businesses under NAICS code 238290 with a $22 million size standard. The solicitation closing date is May 20, 2024, at 4:00 PM CDT, and a site visit will be held on April 24, 2024. The source selection will use the Best Value trade-off methodology. Interested firms must be registered in SAM.gov.
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Schedule
| Name of bidder here | Page 1 of 2 | ||
| PREPARED BY: | DATE: | BASE | |
| Attachement 2: Bid Schedule |
| Project Number and Name: |
| Building Number and Name: |
| RFP Number: |
| DIVISION | DESCRIPTION | MATERIAL | LABOR | EQUIPMENT | TOTAL |
| Division 01 | General Requirements | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 02 | Existing Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 03 | Concrete | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 04 | Masonry | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 05 | Metals | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 06 | Wood, Plastics and Composites | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 07 | Thermal and Moisture Protection | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 08 | Openings | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 09 | Finishes | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 10 | Specialties | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 11 | Equipment | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 12 | Furnishings | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 13 | Special Construction | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 14 | Conveying Equipment | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 21 | Fire Suppression | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 22 | Plumbing | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 23 | Heating, Ventilation and Air Conditioning | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 25 | Integrated Automation | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 26 | Electrical | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 27 | Communications | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 28 | Electronic Safety and Security | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 31 | Earthwork | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 32 | Exterior Improvements | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 33 | Utilities | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 33 | Utilities | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 34 | Transportation | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 35 | Waterway and marine construction | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 41 | Material Processing and Handling Equipment | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 44 | Pollution and Waste Control Equipment | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 46 | Water and Wastewater Equipment | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 48 | Electrical Power Generation | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - 0 $ - 0 $ - 0 $ - 0
| Subtotal | $ - 0 | ||
| Overhead | % | ||
| Subtotal | $ - 0 | ||
| Profit | % | ||
| Subtotal | $ - 0 | ||
| Bonds | % |
Submitt final Bid Schedule in both spreadsheet and PDF format.
Bid Schedule shall be no less than 2 sheets. Grand Total
Bidders are required to use this Bid Schedule provided by GSA.
BASE Division Details
| Name of bidder here | Page 2 of 2 | ||
| PREPARED BY: | DATE: | BASE | |
| Attachement 2: Bid Schedule |
| Project Number and Name: | |
| Building Number and Name: | |
| RFP Number: | Enter RFP Number Here |
| Offeror shall provide detailed break out of the work in each division to allow GSA to identify the work effort. |
| Offeror shall insert additional line(s) in each division to expand divisions as needed to provide adequate detail. |
| DIVISION | DESCRIPTION | MATERIAL | LABOR | EQUIPMENT | TOTAL |
| Division 01 | General Requirements | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Division 02 Existing Conditions $ - 0 $ - 0 $ - 0 $ - 0
Division 03 Concrete $ - 0 $ - 0 $ - 0 $ - 0
Division 04 Masonry $ - 0 $ - 0 $ - 0 $ - 0
Division 05 Metals $ - 0 $ - 0 $ - 0 $ - 0
Division 06 Wood, Plastics and Composites $ - 0 $ - 0 $ - 0 $ - 0
Division 07 Thermal and Moisture Protection $ - 0 $ - 0 $ - 0 $ - 0
Division 08 Openings $ - 0 $ - 0 $ - 0 $ - 0
Division 09 Finishes $ - 0 $ - 0 $ - 0 $ - 0
Division 10 Specialties $ - 0 $ - 0 $ - 0 $ - 0
Division 11 Equipment $ - 0 $ - 0 $ - 0 $ - 0
Division 12 Furnishings $ - 0 $ - 0 $ - 0 $ - 0
Division 13 Special Construction $ - 0 $ - 0 $ - 0 $ - 0
Division 14 Conveying Equipment $ - 0 $ - 0 $ - 0 $ - 0
Division 21 Fire Suppression $ - 0 $ - 0 $ - 0 $ - 0
Division 22 Plumbing $ - 0 $ - 0 $ - 0 $ - 0
Division 23 Heating, Ventilation and Air Conditioning $ - 0 $ - 0 $ - 0 $ - 0
Division 25 Integrated Automation $ - 0 $ - 0 $ - 0 $ - 0
Division 26 Electrical $ - 0 $ - 0 $ - 0 $ - 0
Division 27 Communications $ - 0 $ - 0 $ - 0 $ - 0
Division 28 Electronic Safety and Security $ - 0 $ - 0 $ - 0 $ - 0
Division 31 Earthwork $ - 0 $ - 0 $ - 0 $ - 0
Division 32 Exterior Improvements $ - 0 $ - 0 $ - 0 $ - 0
Division 33 Utilities $ - 0 $ - 0 $ - 0 $ - 0
Division 33 Utilities $ - 0 $ - 0 $ - 0 $ - 0
Division 34 Transportation $ - 0 $ - 0 $ - 0 $ - 0
Division 35 Waterway and marine construction $ - 0 $ - 0 $ - 0 $ - 0
Division 41 Material Processing and Handling Equipment $ - 0 $ - 0 $ - 0 $ - 0
Division 44 Pollution and Waste Control Equipment $ - 0 $ - 0 $ - 0 $ - 0
Division 46 Water and Wastewater Equipment $ - 0 $ - 0 $ - 0 $ - 0
Division 48 Electrical Power Generation $ - 0 $ - 0 $ - 0 $ - 0
Subtotal $ - 0 $ - 0 $ - 0 $ - 0