This document is a Waste Diversion Plan for the FY24 National Judiciary Elevator Program project. The plan outlines the anticipated waste diversion targets for materials such as asphalt, brick, concrete, drywall, metals, and wood, with a 50% diversion rate target for each material. It provides a table for converting waste volumes to weights and instructions for reporting the actual diverted and landfilled weights during project closeout. The related federal contract opportunity is a solicitation for the modernization of two existing passenger elevators and one service elevator at the Russell B. Long Federal Building in Baton Rouge, Louisiana, with options for modernizing additional elevators. The estimated construction cost magnitude is between $1,000,000 and $5,000,000, and the procurement is a 100% Small Business Set-aside. The solicitation closing date is May 20, 2024, at 4:00 PM CDT, and a site visit is scheduled for April 24, 2024.
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Waste Diversion Plan
| Project Waste Management Plan | Submittal Type: | Waste Diversion Plan (Anticipated): | Waste Diversion Report (Final) : | ||||
| Updated 10/25/2023 | The general info in these gray cells replicates onto the Report tabs. | ||||||
| Project Name: | FY24 National Judiciary Elevator Program | Project Manager: | Corey Linen | Kahua Project # : | 25866 | ||
| Project Short Description: | Modernize existing Elevators | PM email or phone: | gBUILD Project # : | ||||
| Building Number: | LA0097BT | Service Center / Field Office: | Baton Rouge | Budget Activity: | (list all applicable) | RWA/PA # : |
Anticipated Waste Diversion Plan To be filled out and submitted Pre-Construction, with final Construction Documents (PM or contractor populates this pink section) Actual Waste Diversion Report To be submitted during Project Close-Out (Reports tab figures auto-populate this green section)
| Material* | |||||
| (see weight conversion factors below) | Diversion Method | Target Diversion Rate for each material, by weight | |||
| (Change to actual target(s) as needed) | Diverted (lbs) | Landfilled (lbs) | Total C&D material weight (Diverted + Landfilled) (lbs) | Diversion |
Rate
| Reuse* | Recycle or Compost | Donation | ||||||
| Asphalt | 50% | 0 | 0 | 0 | n/a | |||
| Brick, Masonry, and Tile | 50% | 0 | 0 | 0 | n/a | |||
| Cardboard | 50% | 0 | 0 | 0 | n/a | |||
| Carpet, including Padding | 50% | 0 | 0 | 0 | n/a | |||
| Ceiling tile | 50% | 0 | 0 | 0 | n/a | |||
| Concrete | 50% | 0 | 0 | 0 | n/a | |||
| Drywall/ sheetrock (unpainted) | 50% | 0 | 0 | 0 | n/a | |||
| Metals | 50% | 0 | 0 | 0 | n/a | |||
| Painted wood, drywall, or plywood | 50% | 0 | 0 | 0 | n/a | |||
| Reusable items | 50% | 0 | 0 | 0 | n/a | |||
| Roofing | 50% | 0 | 0 | 0 | n/a | |||
| Soil, Rock, Land Clearing Debris | 50% | 0 | 0 | 0 | n/a | |||
| Wood (unpainted) | 50% | 0 | 0 | 0 | n/a | |||
| Other: ____________________ | 50% | 0 | 0 | 0 | n/a | |||
| Other: ____________________ | 50% | 0 | 0 | 0 | n/a | |||
| Other: ____________________ | 50% | 0 | 0 | 0 | n/a | |||
| Total**: | 0 | 0 | 0 | n/a |
| Reuse is encouraged. Please list any items such as cabinets, doors, shelves, bricks, framing lumber, siding, fill material, misc. millwork, etc. planned for reuse. | |||
| Item | Reuse Onsite | Reuse Offsite | Off-Site Recipient or Salvage/ Deconstruction Company |
| Volume-to-Weight Conversion Factor Reference Table |
| If a hauler reports materials by volume, this table enables conversion to weight, for reporting actual diversion and disposal. |
| Asphalt paving: 1 cubic yard = 773 lbs | Dirt or sand: 1 cubic yard = 929 lbs |
| Asphalt or composite roof shingles: 1 cubic yard = 731 lbs | Fiberglass insulation, loose: 1 cubic yard = 17 lbs |
| Brick, laid flat: 1 flat square foot = 20 lbs | Mixed (composite) C&D material: 1 cubic yard = 417 lbs |
| Brick, loose: 1 cubic yard = 3,200 lbs. (1 cubic foot = 120 lbs) | Sheetrock (drywall), loose: 1 cubic yard = 393.5 lbs |
| Ceramic tile, scrap, loose: 1 cubic yard = 1,214 lbs | Rock, crushed: 1 cubic yard = 2,570 lbs |
| Concrete: 1 cubic yard = 860 lbs | Wood: 1 cubic yard = 169 lbs |
| *Only non-hazardous materials need to be included in this document. C&D mandates governing GSA exclude hazardous materials such as asbestos or lead-containing paint. |
| **At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics. |