This is a Request for Proposal (RFP) for electrical distribution improvement services at the Orlando VA Healthcare System's Lake Baldwin and Lakemont campuses. The Department of Veterans Affairs is seeking a Service-Disabled Veteran-Owned Small Business (SDVOSB) to perform construction services for Project 675-23-801, with a contract value between $5,000,000 and $10,000,000. Key dates include a site visit on March 31, 2025, Request for Information (RFI) due by April 3, 2025, and the Request for Proposal (RFP) due by April 23, 2025 at 1:00 PM EST.

The project involves upgrading specific electrical deficiencies, including replacing tie-breakers, adding disconnecting means, relocating overhead power lines underground, replacing transformers, and providing emergency generator-backed power to certain buildings. Contractors must be registered in the System for Award Management (SAM) and SBA databases, comply with Davis-Bacon wage requirements, and perform at least 15% of the contract work with their own employees. The contract will be awarded on a best-value basis, evaluating factors such as construction methods, specialized experience, project schedule, past performance, and price.

View the file

Other files

File Type Posted
ATTACHMENT - Site Visit SIGN-IN SHEET.pdf PDF
Amendment 36C24825R0042 0001.pdf PDF
RFI Attachment 4 - Prefered GW Medium Voltage ATS Cutsheet PDF.pdf PDF
RFI Attachment 1 - Pad Mounted Transformer Optional Features.pdf PDF
RFI Attachment 5 - Power Pole mentioned for replacement.pdf PDF
RFI Attachment 2 - Four Position Sectionalizing Loadbreak Switches.pdf PDF
RFI Attachment 3 - Existing ATS Prefered For Replacements.jpg JPG image
RFI Attachment 7 - Conflicting ATS Locations.pdf PDF
RFI Attachment 6 - SC Vista Switch.png PNG image
ATTACHMENT 13 - Base Offer Price Breakdown.xlsx XLSX spreadsheet
ATTACHMENT 9 - EMR.pdf PDF
ATTACHMENT 5 - 100 Emergency Analysis Report.pdf PDF
ATTACHMENT 2 - 100 Design Narrative Lake Baldwin Electrical.pdf PDF
ATTACHMENT 1 - 100 Analysis Drawings Lake Baldwin Electrical.pdf PDF
ATTACHMENT 12 - Past Performance Questionnaire.docx DOCX document
ATTACHMENT 10 - Experience Information Sheet.pdf PDF
ATTACHMENT 8 - Contract Progress Schedule.docx DOCX document
ATTACHMENT 3 - 100 Drawings Lake Baldwin Electrical.pdf PDF
ATTACHMENT 6 - 100 Structural Calculations Lake Baldwin Electrical.pdf PDF
ATTACHMENT 11 - Limitation of Subcontracting Certificate.docx DOCX document
ATTACHMENT 7 - DBA Wage Determination 03.14.2025.pdf PDF
ATTACHMENT 4 - 100 Specs Lake Baldwin Electrical.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER

7. ISSUED BY CODE 8. ADDRESS OFFER TO

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014) STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within ____________ calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES NO

a. Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b. An offer guarantee is, is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

1 66

36C24825R0042

X

03-24-2025

TBD

675-23-801

36C248

Department of Veterans Affairs Network Contracting Office 8 (NCO 8) Orlando VA Healthcare System 13800 Veterans Way Orlando FL 32827

Department of Veterans Affairs Network Contracting Office 8 (NCO 8) Orlando VA Healthcare System 13800 Veterans Way Orlando FL 32827

Elizabeth Romero (407) 399-7526

Project Title: Improve Lake Baldwin Electrical Distribution Project Number: 675-23-801 Location: Orlando Healthcare System, Lake Baldwin Campus, 5201 Raymond Street, Orlando, FL 32803 and Lakemont Campus, 2500 S. Lakemont Avenue, Orlando, FL 32814.

Magnitude of Construction: Pursuant to FAR Ref 36.204(g) Between $5,000,000 and $10,000,000.

NAICS 236220: Commercial and Institutional Building Construction; Size Standard of $45M Product Service Code (PSC): Y1DA-Construction of Hospital and Infirmaries.

The services required for project 675-23-801 are to provide construction services in accordance with this solicitation.

This requirement is set aside for U.S. Small Business Administration certified, Service-Disabled Veteran-Owned Small Businesses (SDVOSB). Vendor verification for SDVOSB can be found at SBA.gov.

The VA Medical Centers are SMOKE-FREE facilities. Contractors must have a picture ID in order to enter the campus.

It shall be known that funds are not currently available. No contract award will be made until appropriated funds are made available. All offerors must comply with all solicitation terms and conditions.

AT THE TIME OF PROPOSAL SUBMISSION, interested contractors MUST be actively registered in the following databases.

System for Award Management: https://www.sam.gov U.S. Small Business Administration: https://www.sba.gov Refer to solicitation 36C24825R0042 instruction for the cutoff date for submissions of proposal.

Site Visit: Monday, March 31, 2025 @ 9:00 AM EST, Meeting Location Building 3132 at the Lake Baldwin Campus.

Request for Information (RFI): RFI(s) due Thursday, April 3, 2025 @ 10:00 AM EST.

Request for Proposal (RFP): RFP due Monday, April 23, 2025 @ 1:00 PM EST.

10 270

X X 52.211-10

X 10

VIA EMAIL 1:00 PM EST

04-23-2025

X

14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO 10 U.S.C. 2304(c)( ) 41 U.S.C. 3304(a) ( )

26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY

PHONE: FAX:

28. NEGOTIATED AGREEMENT 29. AWARD Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code)

(Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

(Type or print)

(4 copies unless otherwise specified)

(Type or print) (Type or print)

(Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror)

(To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

SEE SECTION A, PRICE/COST SCHEDULE ON PAGE 6

36C248

Department of Veterans Affairs Network Contracting Office 8 (NCO 8) Orlando VA Healthcare System 2500 Lakemont Ave Orlando FL 32827

Department of Veterans Affairs Financial Services Center

P.O. Box 149971 Austin TX 78714-9971

Elizabeth Romero

VA-VHA-RPOE-2022-36342

Table of Contents

PART I - THE SCHEDULE

SECTION A - SOLICITATION/CONTRACT FORM

A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)

A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION,

ALTERATION, OR REPAIR)– BACK

A.3 PRICE/COST SCHEDULE

ITEM INFORMATION

A.4 DELIVERY SCHEDULE

STATEMENT OF WORK

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

2.1 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE

OF THE WORK (MAY 2014)

2.2 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE

EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

2.3 52.228-1 BID GUARANTEE (SEP 1996)

2.4 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE)

(FEB 2021)

2.5 52.233-2 SERVICE OF PROTEST (SEP 2006)

2.6 52.232-18 AVAILABILITY OF FUNDS (APR 1984)

2.7 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

2.8 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)

2.9 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB

1998)

2.10 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND

VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)

2.11 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)

REPRESENTATIONS AND CERTIFICATIONS

3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2025) ... 18

3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS

AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)

3.3 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)

3.4 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—

CERTIFICATION (NOV 2021)

3.5 52.216-1 TYPE OF CONTRACT (APR 1984)

GENERAL CONDITIONS

4.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND

CERTIFICATIONS (DEC 2014)

4.2 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE,

AND SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB COVERED

ENTITIES (DEC 2023)

4.3 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING

RESPONSIBILITY MATTERS (OCT 2018)

4.4 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK

(APR 1984)

4.5 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION

(FEB 2024)

4.6 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)

4.7 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL

LABOR RELATIONS ACT (DEC 2010)

4.8 52.223-2 REPORTING OF BIOBASED PRODUCTS UNDER SERVICE AND

CONSTRUCTION CONTRACTS (MAY 2024)

4.9 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (OCT 2022)

4.10 52.228-13 ALTERNATIVE PAYMENT PROTECTIONS (JULY 2000)

4.11 52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984)

4.12 SUPPLEMENTAL INSURANCE REQUIREMENTS

4.13 52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984)

4.14 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

4.15 52.232-18 AVAILABILITY OF FUNDS (APR 1984)

4.16 52.242-14 SUSPENSION OF WORK (APR 1984)

4.17 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)

4.18 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED

SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023)

(DEVIATION)

4.19 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—

CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023)

(DEVIATION)

4.20 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV

2018)

4.21 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION

(APR 2019)

4.22 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)

4.23 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019)

4.24 VAAR 852.239-76 INFORMATION AND COMMUNICATION TECHNOLOGY

ACCESSIBILITY (FEB 2023)

4.25 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT

ADMINISTRATION (OCT 2020)

4.26 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) .. 51

4.27 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT

(SEP 2019)

4.28 VAAR 852.246-75 WARRANTY OF CONSTRUCTION—GUARANTEE PERIOD

SERVICES (OCT 2018)

4.29 IT CONTRACT SECURITY

4.30 VAAR 852.201-70 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 2022)

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

LIST OF ATTACHMENTS

INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

36C24825R0025

A.3 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM

NUMBER

DESCRIPTION OF

SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 CONSTRUCTION SERVICES:

Project 675-24-801, Improve Lake Baldwin Electrical Distribution at the Orlando VAHCS Campuses, Orlando, FL.

The contractor shall perform all labor, material, tools, equipment, and supervision necessary for the construction work as further defined per the Statement of Work (SOW).

PRINCIPAL NAICS CODE: 236220

– Commercial and Institution Building Construction

PRODUCT/SERVICE CODE: Y1DA

– Construction of Hospitals and Infirmaries.

1.00 JB

GRAND TOTAL

A.4 DELIVERY SCHEDULE

ITEM NUMBER QUANTITY DELIVERY DATE

0001 SHIP TO: Orlando VA Medical Center, Lake Baldwin Facility, 5201 Raymond Street, Building 519, Orlando, FL 32803.

1.00

STATEMENT OF WORK

CONSTRUCTION

IMPROVE LAKE BALDWIN ELECTRICAL DISTRIBUTION

PROJECT 675-23-801

ORLANDO VA HEALTHCARE SYSTEM,

5201 RAYMOND STREET, ORLANDO, FL 32803

I. DEFINITION AND ACRONYMS:

A. Construction: as defined by the Department of Veterans Affairs (DVA) Is the procurement by the Government, under one (1) contract, with one (1) firm for the construction services on a specific project.

B. Contracting Officer (CO): The services to be performed under this contract are subject to the general supervision, direction, control, and approval of the Contracting Officer.

C. Project Manager (PM)/Contracting Officer’s Representative (COR): The Contracting Officer's representative is responsible for administering contracts under the immediate direction of the Contracting Officer.

D. Contractor: This term, as used herein, refers to the contractor under this contract.

E. Pre-Construction Risk Assessment (PCRA): Used to identify potential risks associated with the renovation, construction, and some maintenance & repair activities and to develop risk mitigation strategies to minimize these risks. Prior to beginning work, this assessment will be completed.

F. Interim Life Safety Measures (ILSM): Measures that are instituted to compensate for significant hazards posed by existing life safety (fire) code deficiencies or construction/renovation activities.

G. Request for Proposal (RFP): This is a solicitation made, often through a bidding process, by an agency or company interested in procurement of a commodity or service to potential suppliers to submit proposals.

H. Florida Department of Environmental Protection (FDEP): Protects, conserves, and manages Florida's natural resources and enforces the State's environmental laws.

I. National Fire Protection Association (NFPA): The world's leading advocate of fire prevention and an authoritative source on public safety, NFPA develops, publishes, and disseminates codes and standards intended to minimize the possibility and effects of fire and other risks.

J. Competent Person (CP): One who is capable of identifying existing and predictable hazards in the surroundings or working conditions which are unsanitary, hazardous, or dangerous to employees, and who has the authorization to take prompt corrective measures to eliminate them.

II. SCOPE OF WORK:

A. General Requirements:

The Department of Veterans Affairs, Orlando Veterans Affairs Healthcare System (OVAHCS), is seeking professional Bid-Build (B/B) services to construct the project titled “Improve Lake Baldwin Electrical Distribution” at the OVAHCS, Lake Baldwin Campus, 5201 Raymond Street, Orlando, FL 32803 and Lakemont Campus, 2500 S. Lakemont Avenue, Orlando, FL 32814.

The Contractor shall furnish all construction services including labor, materials, tools, equipment, and supervision as necessary to construct the project described herein and other specified tasks as further defined in the Statement of Work (SOW). The construction shall be in accordance with the 100% design drawings and specifications for this project. Refer to attachments.

B. Project Overview:

This project is to upgrade specific electrical deficiencies at the Lake Baldwin and Lakemont VA campuses located in Orlando, FL identified in the Facility Condition Assessment. The objective of the project is to rectify these deficiencies by undertaking a series of activities such as repairing, relocating, replacing, and correcting various electrical equipment in accordance with the SOW and Specifications.

C. Specific Project Requirements:

1. Replace the tie-breaker within Building 500’s Switchboards 2 and 3.

A. Switchboards 2 and 3 are tied together through a single 1,600A breaker mounted within

Switchboard 3. The VA facilities personnel have stated that while the switchboards are fed from utility power the tie-breaker functions as expected. However, when the generators are running, the tie-breaker will trip. This is not how the tie-breaker is intended to function and can cause unnecessary outages. For instance, in the event of an outage in Switchboards 2 or 3, while a generator test is ongoing, the tie-breaker may fail to operate correctly, resulting in a substantial power loss to Building 500. Per the as-built drawings, as-built submittals, and field observations the main breakers within Switchboards 2 and 3 and the tie-breaker are kirk-keyed. Each breaker also appears to have a shunt trip. However, it is unclear what exactly was connected to the shunt trip of each breaker. Neither the drawings nor submittals indicated the intended use of the shunt trip functionality. It was also not feasible to trace the wire in the field either. If the shunt trip can be examined during the next planned outage/maintenance event it may be possible to determine if the shunt trip is the source of the nuisance tripping. Notwithstanding, the proposed solution currently is to replace the tie-breaker and provide proper programming, interlocks, and shunting such that the tie-breaker performs properly under both normal and emergency situations.

2. Add a disconnecting means at the Orlando Utilities Commission (OUC) south utility feeder.

A. The south utility-owned multi-way switch does not have any government-accessible means of disconnecting. The switch has hardwired outputs that feed medium voltage switches MV-MWS- NO.3 and MV-ATS-NO.4. In order to disconnect the south utility, the incoming switches at the medium voltage multi-way switch must be opened. There is no way to disconnect the feeder from the Automatic Transfer Switch (ATS). The OUC south utility cabinet is not owned by the government and as such, breakers or switches cannot be added to the existing switch.

B. The proposed solution is to intercept the output feeders at manhole 89, install an additional government-owned multi-way switch, and re-feed both MV-MWS-NO.3 and MV-ATS-NO.4.

This provides the government with the ability to disconnect power from the south at a single location.

C. During the summer of 2023 another project provided a new underground duct bank from the south OUC switch to manhole 89. As-builts of this project have not been provided to the AE team. These as-builts need to be reviewed to confirm the proposed solution is feasible.

3. Replace the transformer in front of Building 3130 and relocate a portion of the overhead power lines crossing the road underground.

A. The transformers and secondary disconnect are both in need of replacement. Both will be replaced in place, like for like. A portion of the transformer secondary travels overhead over a driveway. The overhead lines are not high enough and often get clipped by trucks causing outages. This project will relocate that portion of overhead lines (approximately 200 linear feet) underground. The new underground duct bank will originate at the new transformer MV-XF- ENG, traverse underneath the road, and end the existing power pole directly north of building 3129. The feeder will rise up the pole and be spliced into the existing overhead lines.

B. Building 3129 is currently fed from an overhead wire that is spliced mid-span. This can be seen in Figure 3. This feeder will also need to be replaced and the building re-fed. An additional power pole will be provided to the east of Building 3129 and re-feed Building 3129 via a new overhead power line.

4. Replace the transformer between Building 504 and 502 and provide emergency generator-backed power to Building 504.

A. The existing transformer MV-XF-504 is in poor condition, appears past the end of its useful life, and needs replacement. This transformer will be replaced in place.

B. Additionally, this building will be reworked in such a way as to provide generator-backed power to the entire building. An existing breaker within Switchboard Emergency within the Central

Energy Plant (CEP) will be utilized and an additional underground conduit will be provided from Building 502 to Building 504. An additional transformer will be added to transform the voltage from 480 to 208Y/120V. This transformer will be placed outside building 504 next to MV-XF-

504. An ATS will be added fed from both transformers. Other equipment may be added/modified as well to accommodate the additional feeder and source. Additional documentation is required from the VA concerning this building to finalize a design.

5. Replace the transformer between Building 504 and 502 and provide emergency generator-backed power to Building 504.

A. The ATS feeding the Domiciliary, 519-ATS-K is non-functional and needs to be replaced. The

ATS that feeds panel K is located inside the domiciliary. The ATS is located outside on the west well directly outside the exit door. This will be replaced in place. There is no other work at the domiciliary as part of this project.

B. The alternate feed and generator start signal for 519-ATS-K originates in Building 503. Note:

Building 503 is owned by the state and not the VA. The scope of this project does not include providing a new alternate emergency feeder from a VA-owned building. The existing emergency feeder and generator start signal will be used for this project.

6. Replace the fire pump ATS.

A. The fire pump ATS, 502-ATS-A, is to be replaced as part of this project. The ATS will be replaced in place. The fire pump itself and all associated feeders are existing to remain. The fire pump controller and transfer switch are two separate enclosures. Only the transfer switch will be replaced as part of this project.

7. Replace medium voltage ATSs No. 2, 3, and 4 in place. All incoming and outgoing feeders are to remain the same.

8. Lakemont A. Relocate or Replace ATS in the chiller yard under a covered area.

1. There is an existing ATS located near the chiller within the chiller yard walls. This ATS is not protected from the elements or the chiller spray. This ATS will be relocated and replaced as part of this project. The ATS feeders will be intercepted and re-routed to the new location.

The ATS will be located at the west end (right side of Figure 7, refer to Attachment 3 – Drawings) of the existing canopy-covered equipment outside the chiller yard proper. The canopy will be extended to cover the ATS. There is no other work to the ATS or Lakemont distribution system as part of this project.

9. Furthermore, the following applies to the areas in scope:

A. Electrical Service and Distribution:

1. All existing electrical service and distribution are to remain “as-is” unless noted otherwise.

2. Additions or modifications to any panel or service will be documented.

3. No additional backup, standby, or emergency power will be required unless specifically noted.

B. Branch Wiring:

1. Branch wiring system will be installed in accordance with the 2017 National Electrical Code (NEC). Each branch circuit will utilize a dedicated neutral conductor. All branch circuits shall utilize an equipment grounding conductor in each conduit. The conduit will not be allowed to be used as the sole grounding path.

2. All branch circuiting will be copper conductors in conduit. Minimum conduit size will be 3/4”.

3. Typical branch circuit wiring will be a minimum #12 American Wire Gauge (AWG) copper (CU), installed in Electrical Metallic Tubing (EMT) conduit for power and lighting systems.

Rigid conduits shall be used for all exposed conduit runs where EMT would be subject to physical damage as defined by the National Electrical Code (NEC). Conduits are to be installed concealed, except were installed in electrical rooms, mechanical rooms, or other unfinished areas.

4. All empty conduits shall have a pull string installed in them.

5. All panelboard feeders shall be copper conductors installed in conduits.

6. All electrical equipment shall be bonded with a dedicated equipment grounding conductor.

C. Wiring Devices:

1. Wiring Devices shall be hospital-grade, tamper-resistant duplex receptacles rated for 120V with 5-20 National Electrical Manufacturers Association (NEMA) configuration, nylon type, with finishes determined by the architect. Device faceplates shall be stainless steel.

2. Interior receptacles located within 6 feet of a water source shall be provided with a ground-fault circuit interrupter (GFCI).

3. Wiring devices to be mounted in 4” square x 2-1/8” deep minimum boxes with appropriate gang mud ring.

4. Where wiring devices are surface mounted or in unfinished areas, devices are to be mounted in a 4” square outlet box with matching industrial raised cover plates.

5. Device wall plates to have extra strength laminated adhesive tape labels indicating the source panel and circuit number. Labels are to be white with black letters for “normal” power and red with black letters for “emergency” power.

6. Receptacles shall have the following finish:

a) Normal = White

b) Life Safety / Emergency = Red

c) Receptacle cover plate to be stainless steel.

d) Receptacles to be installed in accordance with the electrical drawings.

D. Lighting and Lighting Control Systems:

1. There is no lighting as part of this project.

E. Fire Alarm System:

1. There are no additions or modifications to the fire alarm system as part of this project.

F. Information Technology Systems:

1. There are no additions or modifications to the IT system as part of this project.

G. Security and Access Control:

1. There are no additions or modifications to the access controls system as part of this project.

III. SCHEDULING, PHASING, AND WORKING HOURS:

A. All work hours SHALL be coordinated with the project’s COR to prevent interference with normal clinic functions. Work that interferes with normal clinic functions which, includes all utility outages, shall be performed during WHEN hours (Weekends, Holidays, Evenings, and Nights) so as not to interfere with normal clinic functions.

B. Performing on-site work during WHEN hours will require approval from the COR. Requests shall be submitted via email at least 72 hours prior to the requested date and at no additional cost to the Government. Approvals are subject to the availability of on-site staff.

C. Length of Project:

1. The project’s construction phase SHALL be completed in no more than 270 calendar days from the

Government issuance of the Notice to Proceed.

2. The Contractor shall submit a Critical Path Method (CPM) schedule for the Construction with estimated dates and itemized cost of work to the Contracting Officer for review and approval before the Notice to proceed.

D. Utility shutdowns/Outages: All shutdowns involving temporary impairment of utilities shall be requested by the

Contractor at least 14 calendar days in advance.

IV. PROJECT CLASSIFICATION:

A. Contractor shall secure the area prior to the commencement of work and follow the Orlando VA Medical Center guidelines and policies for Pre-Construction Risk Assessment (PCRA) and Interim Live Safety Measures (ILSM).

B. Risk Assessment: This project has been classified per the Construction Infection Control Risk Assessment as a Type B, Medium Risk Group, Class II (ILSM Level 1) project.

V. SAFETY REQUIREMENTS:

A. All Contractor personnel are required to have completed an Occupational Safety and Health

Administration (OSHA) approved 10-hour construction worker course prior to working on the site. The On-site general superintendent/supervisor is required to have completed an OSHA-approved 30-hour construction course prior to working on the site. The Contracting Officer (CO) must receive a copy of current certificates identifying the successful completion of the training prior to executing work for the Veterans Administration. In addition, the Contractor shall provide submittals for contract construction or renovation work which include the names, qualifications, and training dates for the Contractor’s Competent Persons (CP), who have been designated to administer the site-specific safety program, as well as the CP for other activities as required by OSHA regulation 29 CFR 1926.32 (such as scaffolds, cranes, excavations, etc.). Contractor’s CP are required to implement and maintain effective safety programs that identify and control hazards that may cause injury or illness to VA patients, staff, visitors, and contractor employees. The VA CP does not take the place of the Contractor’s CP nor acts on their behalf. The VA CP determines if the Contractor is meeting VA standards and contractual requirements for safety and OSHA compliance. When these standards and contract requirements are not being met, the VA COR and/or CP will take immediate action to prevent injury, non-compliance, and/or property damage. The Contractor shall submit an Activity Hazard Analysis (AHA), and an Accident Prevention Plan (APP) as per FAR 52.236-13 prior to commencement of site activities. The Government shall have twenty-one (21) calendar days to review the AHA and APP.

B. The Contractor shall submit documentation validating completion of the OSHA construction safety course for all personnel.

VI. RECORDS MANAGEMENT:

A. Applicability: This clause applies to all Contractors whose employees create, work with, or otherwise handle Federal records, as defined in Section B, Definitions, regardless of the medium in which the record exists.

B. Definitions: “Federal record” as defined in 44 U.S.C. § 3301, includes all recorded information, regardless of form or characteristics, made or received by a Federal agency under Federal law or in connection with the transaction of public business and preserved or appropriate for preservation by that agency or its legitimate successor as evidence of the organization, functions, policies, decisions, procedures, operations, or other activities of the United States Government or because of the informational value of data in them. The term Federal record:

1. Includes VHA records.

2. Does not include personal materials.

3. Applies to records created, received, or maintained by Contractors pursuant to their VHA contract.

4. May include deliverables and documentation associated with deliverables.

C. Requirements:

1. Contractor shall comply with all applicable records management laws and regulations, as well as

National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chapters. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion.

2. In accordance with 36 Code of Federal Regulations (CFR) 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C. chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation.

3. In accordance with 36 CFR 1222.32, the Contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data.

4. VHA and its Contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of VHA or destroyed except in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage, or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, the Contractor must report to VHA. The agency must report promptly to NARA in accordance with 36 CFR 1230.

5. The Contractor shall immediately notify the appropriate Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records, or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the [contract vehicle]. The Contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records, and/or equipment is properly protected. The Contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government’s behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records, and/or equipment is no longer required, it shall be returned to VHA control, or the Contractor must hold it until otherwise directed. Items returned to the Government shall be hand-carried, mailed, emailed, or securely electronically transmitted to the Contracting Officer or address prescribed in the [contract vehicle]. Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Section C. Requirement, Paragraph 4.

6. The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material, and/or records generated under, or relating to, contracts. The Contractor (and any sub-contractor) is required to abide by Government and VHA guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information.

7. The Contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with VHA policy.

8. The Contractor shall not create or maintain any records containing any non-public VHA information that is not specifically tied to or authorized by the contract.

9. The Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected from public disclosure by an exemption to the Freedom of Information Act.

10. The VHA owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S. Government for which VHA shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Any Contractor rights in the data or deliverables must be identified as required by FAR 52.227-11 through FAR 52.227-20.

11. Training: All Contractor employees assigned to this contract who create, work with, or otherwise handle records are required to take VHA-provided records management training. The Contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training.

** VHA training for Contractors is available in Talent Management System (TMS):

Records Management for Records Officers and Liaisons, Item #3873736 **

D. Flow down of requirements to subcontractors:

1. The Contractor shall incorporate the substance of this clause, its terms, and requirements including this paragraph, in all subcontracts under this [contract vehicle], and require written subcontractor acknowledgment of same.

2. Violation by a subcontractor of any provision set forth in this clause will be attributed to the Contractor.

VII. GOVERNMENT FURNISHED INFORMATION:

All available record drawings will be provided upon request to the Contractor. They should not, however, be considered “as-built”. These drawing files are provided without warranty or obligation as to the accuracy or information contained in the files. All information in the files shall be independently verified by the user. Any user shall agree to indemnify and hold the VA harmless from any and all claims, damages, losses, and expenses, including, but not limited to, attorney fees arising out of the use of the Computer Aided Design and Drafting (CADD) drawing files.

VIII. RESOURCES:

A. Office of Construction & Facilities Management: http://www.cfm.va.gov/index.asp

1. VA Office of Health and Safety (OHS): http://www1.va.gov/vasafety/

2. Construction Infection Control Risk Assessment Memorandum

B. Other construction standards and publications that shall be applied to this work include, but are not limited to:

1. National Fire Protection Association (NFPA) Codes & Standards: www.nfpa.org

2. OSHA Rules and Regulations

3. Life Safety Code (NFPA 101) latest edition

4. Applicable sections of the VA Master Construction Specifications will be provided and prepared by the Architect/Engineer, including all the necessary adaptations.

IX. SUBMITTALS

A. Contractor shall submit documentation proof of OSHA construction safety course.

B. General Contractor License and Insurance.

C. Submittal as per Construction Documents and Specifications.

D. Warranties.

X. QUALITY ASSURANCE/QUALITY CONTROL:

A. The Construction Contractor shall develop and execute a QA/QC plan that demonstrates the project plans and specifications have gone through a rigorous, thorough review and coordination effort.

B. Within 2 weeks of receipt of the Notice to Proceed, the Construction Contractor will submit a detailed QA/QC plan describing each QA/QC task that will be taken during the construction phase and the name of the Contractor’s team member responsible for QA/QC.

C. Upon its completion each task shall be initialed and dated by the responsible Contractor’s team member.

http://www.cfm.va.gov/index.asp http://www1.va.gov/vasafety/ http://www.nfpa.org/

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO

BIDDERS/OFFERORS

2.1 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF

THE WORK (MAY 2014)

(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

(End of Provision)

2.2 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE

EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade Goals for female participation for each trade

39.5 % 6.9 %

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction," and (3) its efforts to meet the goals.

The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the—

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is

(End of Provision)

2.3 52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be percent of the bid price or , whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents, or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of Provision)

2.4 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE) (FEB

2021)

(a) Offerors shall obtain from each person acting as an individual surety on a bid guarantee—

(1) A pledge of assets that meets the eligibility, valuation, and security requirements described in the Federal Acquisition Regulation (FAR) 28.203–1; and

(2) Standard Form 28, Affidavit of Individual Surety.

(b) The Offeror shall include with its offer the information required at paragraph (a) of this provision within the timeframe specified in the provision at FAR 52.228–1, Bid Guarantee, or as otherwise established by the Contracting Officer.

(c) The Contracting Officer may release the security interest on the individual surety’s assets in support of a bid guarantee based upon evidence that the offer supported by the individual surety will not result in contract award.

(End of Provision)

2.5 52.233-2 SERVICE OF PROTEST (SEP 2006)

Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:

Elizabeth Romero Contracting Officer

Hand-Carried Address:

Electronic Mail (Email) is the only acceptable authorized method to submit a protest.

Email address: elizabeth.romero@va.gov

Mailing Address: N/A

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the

GAO.

(End of Provision)

2.6 52.232-18 AVAILABILITY OF FUNDS (APR 1984)

Funds are not presently available for this contract. The Government's obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.

(End of Clause)

2.7 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) Site visits may be arranged during normal duty hours by contacting:

Name: Elizabeth Romer Address: 13800 Veterans Way Orlando, FL Telephone: (407) 399-7526

(End of Provision)

2.8 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for— March 31, 2025, at 9:00 AM EST

(c) Participants will meet at—Building 3132 at Lake Baldwin Campus, Orlando FL

(End of Provision)

2.9 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB

1998) This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

http://www.acquisition.gov/far/index.html http://www.va.gov/oal/library/vaar/

(End of Provision)

FAR

Number

Title Date

52.204-7 SYSTEM FOR AWARD MANAGEMENT NOV 2024

52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE

REPORTING

AUG 2020

52.204-22 ALTERNATIVE LINE-ITEM PROPOSAL JAN 2017

52.215-1 INSTRUCTIONS TO OFFERORS—COMPETITIVE

ACQUISITION

NOV 2021

52.236-28 PREPARATION OF PROPOSALS—CONSTRUCTION OCT 1997

852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE

RESOLUTION

OCT 2018

852.239-75 INFORMATION AND COMMUNICATION TECHNOLOGY

ACCESSIBILITY NOTICE

FEB 2023

2.10 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND

VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)

Prime contractors are encouraged to assist service-disabled veteran-owned and veteran-owned small business potential subcontractors in obtaining bonding, when required. Mentor firms are encouraged to assist protégé firms under VA's Mentor-Protégé Program in obtaining acceptable bid, payment, and performance bonds, when required, as a prime contractor under a solicitation or contract and in obtaining any required bonds under subcontracts.

(End of Provision)

2.11 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)

(a) As an alternative to filing a protest with the Contracting Officer, an interested party may file a protest by mail or electronically with: Executive Director, Office of Acquisition and Logistics, Risk Management and Compliance Service (003A2C), Department of Veterans Affairs, 810 Vermont Avenue NW, Washington, DC 20420, or Email:

EDProtests@va.gov.

(b) The protest will not be considered if the interested party has a protest on the same or similar issue(s) pending with the Contracting Officer.

REPRESENTATIONS AND CERTIFICATIONS

3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2025)

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 236220.

(2) The small business size standard is $45 Million.

(3) The small business size standard for a concern that submits an offer, other than on a construction or service acquisition, but proposes to furnish an end item that it did not itself manufacture, process, or produce is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541519, if the acquisition—

(i) Is set aside for small business and has a value above the simplified acquisition threshold;

(ii) Uses the HUBZone price evaluation preference regardless of dollar value, unless the offeror waives the price evaluation preference; or

(iii) Is an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.

(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the provision at 52.204-7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .