ATTACHMENT 10 - Experience Information Sheet.pdf

PDF 797 KB Posted

Attached to
Y1DA--PROJECT 675-23-801, Bid-Build (BB) Improve Lake Baldwin Electrical Distribution
Solicitation number
36C24825R0042
Issued by

About this file

The document is an Experience Information Sheet template designed for contractors to provide detailed project history and performance information for a federal contract opportunity. The three-page form requires comprehensive documentation of a previous contract, including contractor information, contract details, project scope, performance challenges, contract dates, completion status, and financial information. Specific sections require offerors to describe their roles and responsibilities, explain project relevance to the current procurement, document any difficulties encountered, outline performance periods, and disclose contract termination status or price modifications. This template is part of Solicitation 36C24825R0042 for the Department of Veterans Affairs, specifically for a project to improve electrical distribution at Lake Baldwin, and is intended to help evaluators assess a contractor's past performance and capability.

View the file

Other files

File Type Posted
ATTACHMENT - Site Visit SIGN-IN SHEET.pdf PDF
Amendment 36C24825R0042 0001.pdf PDF
RFI Attachment 4 - Prefered GW Medium Voltage ATS Cutsheet PDF.pdf PDF
RFI Attachment 1 - Pad Mounted Transformer Optional Features.pdf PDF
RFI Attachment 5 - Power Pole mentioned for replacement.pdf PDF
RFI Attachment 2 - Four Position Sectionalizing Loadbreak Switches.pdf PDF
RFI Attachment 3 - Existing ATS Prefered For Replacements.jpg JPG image
RFI Attachment 7 - Conflicting ATS Locations.pdf PDF
RFI Attachment 6 - SC Vista Switch.png PNG image
ATTACHMENT 13 - Base Offer Price Breakdown.xlsx XLSX spreadsheet
ATTACHMENT 9 - EMR.pdf PDF
ATTACHMENT 5 - 100 Emergency Analysis Report.pdf PDF
ATTACHMENT 2 - 100 Design Narrative Lake Baldwin Electrical.pdf PDF
Solicitation 36C24825R0042.pdf PDF
ATTACHMENT 1 - 100 Analysis Drawings Lake Baldwin Electrical.pdf PDF
ATTACHMENT 12 - Past Performance Questionnaire.docx DOCX document
ATTACHMENT 8 - Contract Progress Schedule.docx DOCX document
ATTACHMENT 3 - 100 Drawings Lake Baldwin Electrical.pdf PDF
ATTACHMENT 6 - 100 Structural Calculations Lake Baldwin Electrical.pdf PDF
ATTACHMENT 11 - Limitation of Subcontracting Certificate.docx DOCX document
ATTACHMENT 7 - DBA Wage Determination 03.14.2025.pdf PDF
ATTACHMENT 4 - 100 Specs Lake Baldwin Electrical.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXPERIENCE INFORMATION SHEET

PROJECT NO. [ ] Page 1

a. Contractor Information of awarded contract (Firm Name, Address, DUNS Number and Cage Code, Phone number, POC Name, POC email, Company email)

b. Contract and/or Task Order Number and Award Date (mm/dd/yyyy)

c. Project Title/Name and Location

d. Work Performed as: Prime Contractor, Subcontractor, Joint Venture, Other (explain)

e. Percent (%) of project work performed by your company

f. If you work as subcontractor, who was the prime?

(Firm Name, Address, DUNS Number and Cage Code, Phone number, POC Name, POC email, Company email)

g. Government Agency/Company which awarded contract to offeror, and Contact Information, such Contracting Officer/Procurement Official/Point of Contract (Name, Title, Email, Phone Number).

PROJECT NO. [ ] Page 2

h. Description of project’s scope of work and the offeror’s specific roles and responsibilities in the project:

Describe work performed in sufficient detail to permit evaluation of project relevancy to this procurement. Detail how work performed is relevant to the effort required by the solicitation? Use continuation sheet for additional information, if necessary

ATTACHMENT G {3 PAGES}

PROJECT NO. [ ] Page 3

i. Describe any difficulties and/or obstacles encountered during performance; steps taken toward resolution

j. Describe unforeseen conditions and how each were resolved

k. Performance Period, including contract start date (mm/dd/yyyy), and original completion date, if not completed, projected date (mm/dd/yyyy) contract start date: original completion date, if not completed, projected completion date (mm/dd/yyyy)

l. Actual Completion Date (mm/dd/yyyy), and if not completed, why?

Actual Completion Date:

If not completed, Why?

m. Project is 50% or more complete? YES [ ] No [ ]. If “No” explain percentage of completion, if not 50% completed for any reason, rating may be lower.

n. The Offerors shall indicate if any of the contracts listed were terminated and the type and reasons for the termination.

o. Original Contract Price (Award Amount), Final Contract Price (to include all modifications, if applicable), Explain Differences.

Original Contract Price: Final Contract Price:

Explain Differences: