This document is an EMR (Experience Modification Rate) Form for a pre-award contractor evaluation, designed to be completed and submitted with a proposal for the VA's Lake Baldwin Electrical Distribution improvement project. The form requires bidders to provide detailed safety and performance metrics, including OSHA-related information such as man hours, workplace injury cases, Days Away, Restricted, or Transferred (DART) rates, and OSHA violations for the years 2021-2024.

Key evaluation criteria include submitting OSHA 300 and 300a forms, providing a six-digit NAICS code, identifying the administrator of the company's Safety and Health Program, and reporting the Insurance Experience Modification Rate. Disqualifying factors are four serious OSHA violations, one repeat violation, one willful violation, or an EMR greater than 1.0. The form is part of solicitation 36C24825R0042 for the Department of Veterans Affairs Veterans Health Administration, specifically for Veterans Integrated Service Network 8, and is associated with a project to improve electrical distribution at Lake Baldwin.

View the file

Other files

File Type Posted
ATTACHMENT - Site Visit SIGN-IN SHEET.pdf PDF
Amendment 36C24825R0042 0001.pdf PDF
RFI Attachment 4 - Prefered GW Medium Voltage ATS Cutsheet PDF.pdf PDF
RFI Attachment 1 - Pad Mounted Transformer Optional Features.pdf PDF
RFI Attachment 5 - Power Pole mentioned for replacement.pdf PDF
RFI Attachment 2 - Four Position Sectionalizing Loadbreak Switches.pdf PDF
RFI Attachment 3 - Existing ATS Prefered For Replacements.jpg JPG image
RFI Attachment 7 - Conflicting ATS Locations.pdf PDF
RFI Attachment 6 - SC Vista Switch.png PNG image
ATTACHMENT 13 - Base Offer Price Breakdown.xlsx XLSX spreadsheet
ATTACHMENT 5 - 100 Emergency Analysis Report.pdf PDF
ATTACHMENT 2 - 100 Design Narrative Lake Baldwin Electrical.pdf PDF
Solicitation 36C24825R0042.pdf PDF
ATTACHMENT 1 - 100 Analysis Drawings Lake Baldwin Electrical.pdf PDF
ATTACHMENT 12 - Past Performance Questionnaire.docx DOCX document
ATTACHMENT 10 - Experience Information Sheet.pdf PDF
ATTACHMENT 8 - Contract Progress Schedule.docx DOCX document
ATTACHMENT 3 - 100 Drawings Lake Baldwin Electrical.pdf PDF
ATTACHMENT 6 - 100 Structural Calculations Lake Baldwin Electrical.pdf PDF
ATTACHMENT 11 - Limitation of Subcontracting Certificate.docx DOCX document
ATTACHMENT 7 - DBA Wage Determination 03.14.2025.pdf PDF
ATTACHMENT 4 - 100 Specs Lake Baldwin Electrical.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EMR FORM

FORM FOR BIDDER/OFFEROR TO

COMPLETE & SUBMIT WITH PROPOSAL

Pre-Award Contractor Evaluation Form

Company Name: ______________________________________________

Address: _____________________________________________________

Telephone: ______________________ Fax: ________________________

Email: _______________________________________________________

Contact: ______________________________________________________

1. Utilizing your OSHA 300 Forms, please complete the following information:

Category 2021 2022 2023 2024 Number of man hours (jobsite and office).

Number of cases involving days away from work, restricted activity, or both (Column H and I of OSHA 300).

Days away, restricted, or transferred rate (# of days away, restricted, or transferred cases x 200,000/# of man hours) (DART Rate).

Number of serious, willful, or repeat violations from OSHA within the last 3 years. Please attach explanation for any violations. (Four serious, one repeat, or one willful disqualifies the contractor.)

Please attach copies of the following documents: OSHA 300 and 300a Forms. These forms can be accessed through the OSHA publications search page:

http://www.osha.gov/pls/publications/publication.html.

2. Provide your six-digit North American Industrial Classification System (NAICS) Code for this acquisition: __________________________________

3. Who administers your company’s Safety and Health Program?

4. Company’s Insurance Experience Modification Rate (EMR) for the past 3 years (an EMR of greater than 1.0 disqualifies the contractor): _____________ http://www.osha.gov/pls/publications/publication.html