The attachment is a Base Offer Price Breakdown template for a VA construction project, specifically Project 675-23-801 to improve Lake Baldwin's electrical distribution. The Excel spreadsheet provides a detailed cost breakdown across 34 construction divisions, including categories such as General Requirements, Existing Conditions, Concrete, Masonry, Electrical, and Utilities. The template requires offerors to input labor and material costs for each division, with provisions to calculate overhead, profit, and bonding percentages.

The related federal contract opportunity is Solicitation 36C24825R0042 issued by the Department of Veterans Affairs Veterans Health Administration, located in Veterans Integrated Service Network 8. The solicitation seeks proposals for a Bid-Build (BB) project to improve electrical distribution at Lake Baldwin. Proposals must be submitted via email to Elizabeth Romero (elizabeth.romero@va.gov) by the deadline specified on the SF 1442 or as modified by solicitation amendments. The template is designed to facilitate a comprehensive price analysis for the government's review of the proposed project costs.

View the file

Other files

File Type Posted
ATTACHMENT - Site Visit SIGN-IN SHEET.pdf PDF
Amendment 36C24825R0042 0001.pdf PDF
RFI Attachment 4 - Prefered GW Medium Voltage ATS Cutsheet PDF.pdf PDF
RFI Attachment 1 - Pad Mounted Transformer Optional Features.pdf PDF
RFI Attachment 5 - Power Pole mentioned for replacement.pdf PDF
RFI Attachment 2 - Four Position Sectionalizing Loadbreak Switches.pdf PDF
RFI Attachment 3 - Existing ATS Prefered For Replacements.jpg JPG image
RFI Attachment 7 - Conflicting ATS Locations.pdf PDF
RFI Attachment 6 - SC Vista Switch.png PNG image
ATTACHMENT 9 - EMR.pdf PDF
ATTACHMENT 5 - 100 Emergency Analysis Report.pdf PDF
ATTACHMENT 2 - 100 Design Narrative Lake Baldwin Electrical.pdf PDF
Solicitation 36C24825R0042.pdf PDF
ATTACHMENT 1 - 100 Analysis Drawings Lake Baldwin Electrical.pdf PDF
ATTACHMENT 12 - Past Performance Questionnaire.docx DOCX document
ATTACHMENT 10 - Experience Information Sheet.pdf PDF
ATTACHMENT 8 - Contract Progress Schedule.docx DOCX document
ATTACHMENT 3 - 100 Drawings Lake Baldwin Electrical.pdf PDF
ATTACHMENT 6 - 100 Structural Calculations Lake Baldwin Electrical.pdf PDF
ATTACHMENT 11 - Limitation of Subcontracting Certificate.docx DOCX document
ATTACHMENT 7 - DBA Wage Determination 03.14.2025.pdf PDF
ATTACHMENT 4 - 100 Specs Lake Baldwin Electrical.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer Base Offer Cost Breakdown

Project Number:

Edward L Roy: VA assigned project #

Date:
Project Title
Edward L Roy: VA assigned Project TitleProject Location
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements$ - 0$ - 0$ - 0
Division 2Existing Conditions- 0- 0- 0
Division 3Concrete- 0- 0- 0
Division 4Masonry- 0- 0- 0
Division 5Metals- 0- 0- 0
Division 6Wood and Plastic- 0- 0- 0
Division 7Thermal & Moisture Protect- 0- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %0.00%
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %0.00%

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0

Offerors shall provide additional price breakdown to avoiding lump sum, etc. This price offer breakdown is the overall base offer price for Government price analysis