This technical drawing is a detailed site plan for electrical infrastructure improvements, specifically showing power pole, conduit, and conductor modifications for the Lake Baldwin Electrical Distribution project. The diagram depicts several key elements:
The plan includes provisions for a new power pole installation, concrete encased ductbank with (4) 4"C power conduits and (2) 4"C spare conduits with pull string, and multiple connection points including MV-XF-ENG, MV-DISC-ENG, and MV-MWS-SOUTH. The drawing shows six sets of 6"C concrete encased PVC-schedule 40 conduit between Manhole 89 and MV-MWS-SOUTH, with specific installation requirements such as 12" center-to-center conduit separation and a minimum 36" below-grade depth. Existing overhead conductors are noted to remain in place, and the plan includes routing details for power infrastructure connecting multiple building locations (BLD 3125, BLD 3130, BLD 3133, BLD 3136).
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .