J.6.C.2_TO_003_BOQ_(Bulor-Tusu).xlsx
XLSX spreadsheet 184 KB Posted
- Solicitation number
- SOL-669-16-000006
About this file
J.6.C.2
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_01 _SOL-669-16-000006.pdf | ||
| J.6.B.2_TO_BOQ_-_Revised.xlsx | XLSX spreadsheet | |
| Attachment_J.7.pdf | ||
| Amended_SOL-669-16-000006.pdf | ||
| J.6.A.2_TO_BOQ_-_Revised.xlsx | XLSX spreadsheet | |
| J.6.C.1_TO_003_strip_Map_(_Bulor-Tusu).xlsx | XLSX spreadsheet | |
| J.3_C-Box_Culvert_drwaings.pdf | ||
| J.1A-Unit_Rate_Analysis_Sheet.xlsx | XLSX spreadsheet | |
| J.1-Schedule_of_rates.xlsx | XLSX spreadsheet | |
| J.6.A.1_Task_order_001_Strip_Map.pdf | ||
| J.4_Marking_and_Branding_Plan.pdf | ||
| J.3A-Earthworks_drawings.pdf | ||
| J.3.D_Drwaings_bridges_ _Box_culverts.pdf | ||
| J.2-USAID_Liberia_RISE_PEA-ESMMF_FINAL_(1).pdf | ||
| J.3_B-Pipe_Culverts_Drawings.pdf | ||
| J.5_Technical_Specifications.docx | DOCX document | |
| J.6_Task_Order_Request_for_Proposal.docx | DOCX document | |
| J.6.A.2_TO_001_BOQ_(Bassa-Varmah).xlsx | XLSX spreadsheet | |
| J.6.B.2_TO_002_BOQ_(Waka-Johnny_Tutu).xlsx | XLSX spreadsheet | |
| J.6.B.1_TO_002_strip_map_(Waka-Johnny_Tutu).xlsx | XLSX spreadsheet | |
| Executed_Sol_SOL-669-16-000006.pdf |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cover Page
Annex: C
Bill of Quantities
| Project Name: Engineering Services for Rural Road Rehabilitation Project | |
| Funded by: | USAID - Liberia |
| Contract Name: | Rehabilitation of Bulor - Tusu and Bulor - Goyala | |
| Contract Reference No: | Lot No: |
| Road Name: | Bulor - Tusu (10.4km) | CH | 15+000 | to | CH | 25+400 |
| Road Name: | Bulor - Goyala (1.8km) | CH | 0+000 | to | CH | 1+800 |
| District : | Quardu Borni | |||||
| County: | Lofa |
Contractor Name:
Bill 1
| Bill of Quantities | |||||
| Item No | Item Description | Unit | Quantity | Unit Rate (US$) | Amount (US$) |
| 1.0 | Preliminary & General Items | ||||
| 1.1 | Contractor's mobilization and establishment of site camp | LS | 1.0 | - 0 | |
| 1.2 | Contractor demobilization and removal of camp site | LS | 1.0 | - 0 | |
| 1.3 | Bill of Quantities | - 0 | |||
| 1.3.1 | Provision of all contractual responsibilities stipulated in section 1.3 of the Specifications | LS | 1.0 | - 0 | |
| 1.3.2 | Occupational Health and Safety, HIV/AIDs and Gender awareness meetings | No | 6.0 | - 0 | |
| 1.4 | Accomodation of traffic | - 0 | |||
| 1.4.1 | Traffic control and management at working locations | LS | 1.0 | - 0 | |
| 1.4.2 | Permanent road traffic signs for the completed road | No | 8.0 | - 0 | |
| 1.5 | Provision, erection, maintenance and removal of project bill sign board as indicated in the drawing or instructed by the Engineer. | No | 1.0 | - 0 | |
| - 0 | |||||
| 1.6 | Provide specified insurances and bonds | LS | 1.0 | - 0 | |
| 1.7 | Construction of temporary detours including their maintenance and restoration | m | 375.0 | - 0 | |
| - 0 | |||||
| 1.8 | Time and Method Related Costs | - 0 | |||
| 1.8.1 | Provision of Key Site Based Personnel | - 0 | |||
| - 0 | |||||
| 1.8.1a | Quality Control/Assurance Officer (1No) | Week | 24.0 | - 0 | |
| 1.8.1b | Environmental Compliance/Safety Officer (1 No) | Week | 24.0 | - 0 | |
| 1.8.1c | Qualified First Aid Assistant (1No) | Week | 24.0 | - 0 | |
| - 0 | |||||
| 1.8.2 | Conducting Materials Tests as instructed by the engineer, inclusive of test report preparation | - 0 | |||
| 1.8.2a | Grading & Atterberg Tests | Set | 18 | - 0 | |
| 1.8.2b | Compaction Tests | Set | 24 | - 0 | |
| 1.8.2c | Concrete Compresive Tests | Set | 8 | - 0 | |
| 1.8.2d | Foundation Bearing Capacity Tests at Bridge & Box Culvert Excavations | Set | 2.0 | - 0 |
Sub Total for Preliminary Items - 0
&"Arial Narrow,Regular"&12ENGINEERING SERVICES FOR RURAL ROAD REHABILITATION PROJECT Contract Name: Rehabilitation of Bulor-Tusu and Bulor - Goyala Road Name: Bulor-Tusu and Bulor - Goyala County: Lofa
&"Arial Narrow,Regular"&9
Bill 2
| Item No | Item Description | Unit | Qty | Unit Rate (US$) | Amount (US$) |
| 2.0 | Site Preparation and Clearing Works | ||||
| 2.1 | Setting out of road alignment and cross sections | m | 12200.0 | - 0 | |
| - 0 | |||||
| 2.2 | Site Clearance | - 0 | |||
| 2.2.1 | Clearing as specified in the drawings and in section 2.2 of the specification but outside the formation width: | - 0 | |||
| 2.2.1a | In Light Vegetation (medium density bush, plantation, shrub or grass) areas except trees and stumps defined in bill item 2.2.2 | SQM | 63750.0 | - 0 | |
| 2.2.1b | In Heavy or Dense Vegetation (dense bush, rubber plantation, forests) areas except trees and stumps defined in bill item 2.2.2 | SQM | 1200.0 | - 0 | |
| 2.2.2 | Removal of large trees and tree stumps: | - 0 | |||
| 2.2.2a | Girth exceeding 1.0 m up to and including 2.0 m | No | 90.0 | - 0 | |
| 2.2.2b | Girth exceeding 2.0 m up to and including 3.0m | No | 10.0 | - 0 | |
| 2.2.2c | Girth exceeding 3.0 m | No | - 0 | ||
| - 0 | |||||
| 2.2.3 | Clearing, Grubbing and Removal of Vegetation & Top Organic Soil from the Road Formation | SQM | 109800.0 | - 0 |
Sub Total for Site Preparation and Clearing Works - 0
Road Name: Bulor-Tusu and Bulor - Goyala County: Lofa
Bill 3
| Item No | Item Description | Unit | Quantity | Unit Rate (US$) | Amount (US$) |
| 3.0 | Earthworks and Pavement Works | ||||
| 3.1 | Earthworks | ||||
| 3.1.1 | Excavation or Cutting to Spoil on existing road bed including disposal to approved disposal locations | ||||
| 3.1.1a | Common or Ordinary Soil | CUM | - 0 | ||
| 3.1.1b | Rock Material | CUM | - 0 | ||
| 3.1.1c | Swamps Locations | CUM | - 0 | ||
| 3.1.2 | Bill of Quantities | - 0 | |||
| 3.1.2a | Using cut material (Cross fill or Cut to Fill) | CUM | 80.0 | - 0 | |
| 3.1.2b | Using Borrow Material (Ordinary Fill) | CUM | 496.6 | - 0 | |
| 3.1.2c | Using rock fill material | CUM | - 0 | ||
| 3.1.3 | Heavy grading of a new road bed/formation section to specified cross-section and camber including Watering & Compaction to Min 95% MDD | SQM | 107325.0 | - 0 | |
| 3.1.4 | Clearing of borrow pit sites for Ordinary Fill Material extraction | SQM | 496.6 | - 0 | |
| 3.1.5 | Removal of all unsuitable materials from the road formation to any depth as instructed by the engineer and disposal to approved locations. | CUM | - 0 | ||
| 3.1.6 | Over-haulage of emarkment fill materials (Beyond 2km haulage distance) | km.m3 | - 0 | ||
| 3.2 | Gravel Wearing Course | - 0 | |||
| 3.2.1 | Excavation, loading, haulage, spreading and compaction of approved gravel pavement to Min 95% MDD. | CUM | 9218.8 | - 0 | |
| 3.2.2 | Clearing of borrow pit sites for gravel extraction | SQM | 9218.8 | - 0 | |
| 3.2.3 | Restoration of borrow pit sites | SQM | 9218.8 | - 0 | |
| 3.2.4 | Over-haulage of gravel (Beyond 5km haulage distance) | km.m3 | - 0 | ||
| 3.3 | Re-shaping or Re-Grading to form Camber | - 0 | |||
| 3.3.1 | Scarification and Reshaping of an existing road section to specified camber including Watering & Compaction to Min 95% MDD | SQM | - 0 | ||
| 3.4 | Excavation and Construction of Drains | - 0 | |||
| 3.4.1 | Excavation of new open drains (catch water and mitre drains) to specified cross section dimensions (Refer to drawings) | - 0 | |||
| 3.4.1a | In Soft Material | m | 1340.0 | - 0 | |
| 3.4.1b | In Rock Material | CUM | - 0 | ||
| 3.4.2 | Cleaning and re-shaping of existing side, catch water and mitre drains | m | - 0 | ||
| 3.4.3 | Supply material and construct scour checks: | - 0 | |||
| 3.4.3a | Using Wooden Sticks | No | - 0 | ||
| 3.4.3b | Using Dry Stones | No | - 0 | ||
| 3.4.3c | Using Grouted stones | No | 449 | - 0 | |
| 3.4.4 | Construction of Banks and Dykes | CUM | - 0 | ||
| 3.4.5 | Construction of Sub-drains using specified graded boulder material | - 0 | |||
| 3.4.5a | Type 1 as specified in the drawings | CUM | - 0 | ||
| 3.4.5b | Type 2 as specified in the drawings | CUM | - 0 | ||
| Sub Total for Earthworks and Gravel Road Pavement Works | - 0 |
Road Name: Bulor-Tusu and Bulor - Goyala County: Lofa
Bill 4
| Item No | Item Description | Unit | Quantity | Unit Rate (US$) | Amount (US$) |
| 4.0 | Drainage and Structures: Prefabricated Pipe Culvert Works |
| 4.1 | Excavation for Pipe Culverts | |||
| 4.1.1 | In soft soils to a trench depth not exceeding 1.5m | CUM | 726.3 | - 0 |
| 4.1.2 | In soft soils to a trench depth exceeding 1.5m | CUM | - 0 | |
| 4.1.3 | In Rock | CUM | - 0 | |
| 4.2 | Bill of Quantities | - 0 | ||
| 4.2.1 | Using Insitu Excavated Material | CUM | - 0 | |
| 4.2.2 | Using Approved Imported Material | CUM | 347.7 | - 0 |
| - 0 | ||||
| 4.3 | Provide Material and Construct Reinforced Concrete Pipe Culvert | - 0 | ||
| 4.3.1 | 600mm Diameter | m | 176.0 | - 0 |
| 4.3.2 | 900mm Diameter | m | 67.0 | - 0 |
| 4.3.3 | 1200mm Diameter | m | - 0 | |
| 4.3.4 | 1500mm Diameter | m | - 0 | |
| - 0 | ||||
| 4.4 | Provide Material and Cast insitu Concrete in class | - 0 | ||
| 4.4.1 | Class 10 MPA for Blinding | CUM | - 0 | |
| 4.4.2 | Class 15 MPA in Bedding & Haunch | CUM | 98.7 | - 0 |
| 4.4.4 | Class 20 MPA in Culvert End Structures & Reinforced Concrete Bedding | CUM | 153.4 | - 0 |
| 4.5 | Provide Material and Construct Cement Bound Masonry Works at End Structures | - 0 | ||
| 4.5.1 | Using cement masonry blocks | CUM | - 0 | |
| 4.5.2 | Using Stones | CUM | - 0 | |
| 4.6 | Provide, place and compact hardcore foundation for pipe structures in very soft spots as instructed by the engineer | CUM | 10.0 | - 0 |
| 4.7 | Construct temporary water diversions in locations of active water courses including their maintenance and removal by: | - 0 | ||
| 4.7.1 | Excavation of diversion channels | CUM | 84.0 | - 0 |
| 4.7.2 | Constructing temporary barriers | CUM | 87.2 | - 0 |
| 4.8 | Provide Material and Construct Stone Pitching to specified thickness: | - 0 | ||
| 4.8.1 | Using Dry (Plain) Stone Pitching | SQM | - 0 | |
| 4.8.2 | Using Grouted Stone Pitching | SQM | 4108.0 | - 0 |
| 4.9 | Provide Material and Construct Rip-Rap Protection to specified thickness | - 0 | ||
| 4.9.1 | Using Dry (Plain) Packed Stone | CUM | - 0 | |
| 4.9.2 | Using Grouted Stone | CUM | - 0 | |
| 4.10 | Provide Material and Construct Stone Masonry Walls | - 0 | ||
| 4.10.1 | Using Dry (Plain) Stone Masonry | CUM | - 0 | |
| 4.10.2 | Using Grouted Stone Masonry | CUM | - 0 | |
| 4.11 | Provide Material and Construct Mass Concrete for Pitching (Paving) | CUM | - 0 | |
| 4.12 | Provide and Construct Stone Filled Gabion Works using Gabion Boxes including the foundation preparation, as per standard drawings and specs | - 0 | ||
| 4.12.1 | In approved Gabion Box quality and specified dimensions | CUM | - 0 | |
| 4.12.2 | In approved Reno Mattress quality and specified dimensions | CUM | - 0 | |
| 4.13 | Supply and Fix Reinforcing Steel in Reinforced Concrete | - 0 | ||
| 4.13.1 | Mild steel bars | Kg | 10015.9 | - 0 |
| 4.13.2 | High yield steel bars | Kg | - 0 | |
| 4.13.3 | Welded steel fabric | Kg | - 0 | |
| 4.14 | Provide Material, Place and fix into position of concrete formwork including its removal after concrete curing | - 0 | ||
| 4.14.1 | Rough finish formwork | SQM | 810.4 | - 0 |
| 4.14.2 | Fair finish formwork | SQM | 810.4 | - 0 |
| - 0 | ||||
| 4.15 | Provide for the desilting of existing pipe culverts including opening of inlets and outlets | - 0 | ||
| 4.15.1 | 600mm & 900mm Diameter | m | - 0 | |
| 4.15.2 | 1200mm & 1500mm Diameter | m | - 0 | |
| - 0 | ||||
| 4.16 | Demolition and disposal of existing pipe structures (RCP & CMP) | - 0 | ||
| 4.16.1 | 600mm & 900mm Diameter | No | 6.0 | - 0 |
| 4.16.2 | 1200mm & 1500mm Diameter | No | - 0 | |
| 4.17 | Demolition and disposal of existing log bridges at pipe structures locations | No | 3.0 | - 0 |
| 4.18 | Excavation of Pipe Culvert Outlets and Inlets at Existing & New Pipe Culvert Locations as instructed by the Engineer | CUM | 781.5 | - 0 |
| Sub Total for Drainage and Structures (Pre-fabricated Pipe Culverts) | - 0 |
Road Name: Bulor-Tusu and Bulor - Goyala County: Lofa
Bill 5
| Item No | Item Description | Unit | Quantity | Unit Rate (US$) | Amount (US$) |
| 5.0 | Miscellaneous Items (Pipe Culverts) | ||||
| 5.1 | Trimming | SQM | - 0 | ||
| 5.1.2 | Establishing Vegetation | - 0 | |||
| 5.1.2a | Establishing Vegetation: Planting and establishing grass from imported sources within country | SQM | - 0 | ||
| 5.1.2b | Establishing Vegetation: Planting and establishing grass using approved bush sods from site area | SQM | - 0 | ||
| 5.1.2c | Planting of trees | No | - 0 | ||
| 5.1.2d | Bill of Quantities | SQM | - 0 | ||
| 5.2 | Construction of Lined drains at specified road sections as shown on the drawings | - 0 | |||
| 5.2.1 | In class 20 MPA (1: 2: 4) concrete | CUM | - 0 | ||
| 5.2.2 | In grouted stone masonry | CUM | - 0 |
Sub Total for Miscellaneous Items - 0
Contract Name: Rehabilitation of John's Town - Bulor Road Name: John's Town - Bulor County: Lofa&14
Box Culvert 16+050
| Item No | Item Description Box Culvert Structure | Unit | Quantity | Unit Rate (US$) | Amount (US$) |
| 7.0 a | Bulor - Tusu, Ch 16+050 (Box Culvert)- Single Cell | ||||
| 7.1 | Construction of Temporary Works & Water Diversions | ||||
| Construct temporary water diversions at Box Culvert locations on active water courses including their maintenance and removal by: | |||||
| 7.1.1 | Excavation of diversion channels | CUM | 19.2 | - 0 | |
| 7.1.2 | Erection of temporary barriers | CUM | - 0 | ||
| 7.1.3 | Construction and removal temporary Log Bridge structures on detour roads | LS | 1.0 | - 0 | |
| 7.2 | Excavation of Foundations for Structures | - 0 | |||
| 7.2.1 | In Common Soils to 1 - 5m depth | CUM | 166.60 | - 0 | |
| 7.2.2 | In Common Soils to 5 - 10m depth | CUM | - 0 | ||
| 7.2.3 | In Rock Material lrrespective of Depth | CUM | - 0 | ||
| 7.2.4 | Preparation of excavated surface to receive permanent works. | SQM | 37.80 | - 0 | |
| 7.2.5 | Disposal of surplus excavated material as directed by the Engineer | CUM | - 0 | ||
| 7.2.6 | Disposal of excavated material; rock | CUM | - 0 | ||
| 7.3 | Backfill to Structures | - 0 | |||
| Provide Material, backfill in layers not exceeding 200mm, water and compact approved backfill to 95% MDD | - 0 | ||||
| 7.3.1 | Using Insitu Excavated Material | CUM | - 0 | ||
| 7.3.2 | Using Approved Imported Material | CUM | 73.00 | - 0 | |
| 7.3.3 | Using imported single size pervious crushed stone backfill behind wing walls and stems including cast in place PVC weep holes as shown on drawings | CUM | 3.3 | - 0 | |
| 7.3.4 | Provide, place and. compact hardcore foundation layer in very soft spots (with low bearing capacity) as instructed by the engineer | CUM | 10.94 | - 0 | |
| 7.4 | Form Work and Shuttering | - 0 | |||
| Provide Material, Place, Fix and Brace into position of concrete formwork and shuttering including its removal after concrete curing | - 0 | ||||
| 7.4.1 | Rough finish formwork | SQM | 42.0 | - 0 | |
| 7.4.2 | Fair finish formwork | SQM | 56.9 | - 0 | |
| 7.5 | Steel Reinforcement Works | - 0 | |||
| Supply and Fix Reinforcing Steel in Reinforced Concrete | - 0 | ||||
| 7.5.1 | Mild steel bars | Kg | 4394.1 | - 0 | |
| 7.5.2 | High yield stress steel bars | Kg | - 0 | ||
| 7.5.3 | Welded steel fabric | Kg | - 0 | ||
| 7.5.4 | Provide and install fixed and expandable bearings | Set | - 0 | ||
| 7.6 | Concrete Works for Structures | - 0 | |||
| Provide Materials, cast In-situ concrete to structures including curing in class | - 0 | ||||
| 7.6.1 | Class 10 (1:4:8) | CUM | - 0 | ||
| 7.6.2 | Class 15/40 | CUM | 8.25 | - 0 | |
| 7.6.3 | Class 20/20 | CUM | - 0 | ||
| 7.6.4 | Class 25/20 | CUM | 0.0 | - 0 | |
| 7.6.5 | Class 30/20 | CUM | 29.30 | - 0 | |
| 7.7 | Railing Aesthetic Treatments & Safety Works | - 0 | |||
| Fabrication and construction of Box culvert guardrails | - 0 | ||||
| 7.7.1 | Provide 75 mm gulvanised pipe for Box culvert guardrails as shown on the drawings and specifications | m | 19.12 | - 0 | |
| 7.7.2 | Painting (3 Coats) to concrete surfaces of box Culvert guard rails, parapet & barriers using the epoxy paint and colours as specified by the engineer | LS | 1.0 | - 0 | |
| 7.8 | River Training Works | - 0 | |||
| Provide all necessary equipment, and labour necessary for river training works as shown on the drawings or instructed by the engineer, in conditions of | - 0 | ||||
| 7.8.1 | Opening by removal of Vegetation & downstream tree logs in water way channel to a minimum of 25m on either side of water channel or as directed by the Engineer | LS | 1.0 | - 0 | |
| 7.8.2 | Excavation and sloping of land mass upstream/downstream of water channel | Cum | - 0 | ||
| 7.8.3 | Excavation & Installation of Gabion works upstream/downstream for river training | Cum | - 0 | ||
| 7.8.4 | Permanent Deposition of Clay Soil/Rock Mass in existing channel to divert flow of water to new design channel | Cum | - 0 | ||
| 7.9 | Demolition of Existing Structures | - 0 | |||
| 7.9.1 | Demolition and disposal of existing pipe structures (RCP & CMP) within vicinity of proposed Box Culvert Location | No | - 0 | ||
| 7.9.2 | Demolition and disposal of existing Log Bridge structures within vicinity of proposed Box Culvert Location | No | 1.0 | - 0 | |
| 7.10 | Maintenance of Existing Structures | - 0 | |||
| 7.10.1 | Provide for the desilting of existing Box Culvert Water Way & Aprons | No | - 0 | ||
| 7.10.2 | Excavation of inlets and outlets at existing Box Culverts as instructed by the engineer | CUM | - 0 | ||
| 7.11 | Erosion Protection Works | - 0 | |||
| 7.11.1 | Provide Material and Construct Stone Pitching to specified thickness: | - 0 | |||
| 7.11.1.1 | Using Dry (Plain) Stone Pitching | SQM | - 0 | ||
| 7.11.1.2 | Using Grouted Stone Pitching | SQM | 80.0 | - 0 | |
| 7.11.2 | Provide Material and Construct Rip-Rap Protection to specified thickness | - 0 | |||
| 7.11.2.1 | Using Dry (Plain) Packed Stone | CUM | - 0 | ||
| 7.11.2.2 | Using Grouted Stone | CUM | - 0 | ||
| 7.11.3 | Provide and Construct Stone Filled Gabion Works including the foundation preparation, as per standard drawings and specification | - 0 | |||
| 7.11.3.1 | In approved Gabion Box quality and specified dimensions | CUM | - 0 | ||
| 7.11.3.2 | In approved Reno Mattress quality and specified dimensions | CUM | - 0 | ||
| 7.12 | Landscaping and Grassing | - 0 | |||
| 7.12.1 | Trimming | SQM | - 0 | ||
| 7.12.2 | Establishing Vegetation: Planting and establishing grass from imported sources within country | SQM | - 0 | ||
| 7.12.3 | Establishing Vegetation: Planting and establishing grass using approved bush sods from site area | SQM | - 0 | ||
| 7.13 | Finishing Works | - 0 | |||
| 7.13.1 | Provide all necessary equipment and labour to clean and dispose away from site, all construction debris in the vicinity of the finished box culvert structure | LS | - 0 | ||
| 7.13.2 | Provide, spread and compact selected gravel backfill to Min 95% MDD on top of box culvert slab and approaches (both sides) to finished road profile. | CUM | 369.2 | - 0 | |
| Sub Total for Box Culvert Structure | - 0 |
&"Arial Narrow,Regular"ENGINEERING SERVICES FOR RURAL ROAD REHABILITATION PROJECT Contract Name: Rehabilitation of Bulor-Tusu and Bulor-Goyala Road Name: Bulor-Tusu and Bulor-Goyala County: Lofa&14
Box culvert 17+175
| Item No | Item Description | Unit | Quantity | Unit Rate (US$) | Amount (US$) |
| 7.0 b | Bulor - Tusu - Ch 17+175 Box Culvert | ||||
| 7.1 | Construction of Temporary Works & Water Diversions | ||||
| Construct temporary water diversions at Box Culvert locations on active water courses including their maintenance and removal by: | |||||
| 7.1.1 | Excavation of diversion channels | CUM | 24.0 | - 0 | |
| 7.1.2 | Erection of temporary barriers | CUM | - 0 | ||
| 7.1.3 | Construction and removal temporary Log Bridge structures on detour roads | LS | 1.0 | - 0 | |
| 7.2 | Excavation of Foundations for Structures | - 0 | |||
| 7.2.1 | In Common Soils to 1 - 5m depth | CUM | 237.53 | - 0 | |
| 7.2.2 | In Common Soils to 5 - 10m depth | CUM | - 0 | ||
| 7.2.3 | In Rock Material lrrespective of Depth | CUM | - 0 | ||
| 7.2.4 | Preparation of excavated surface to receive permanent works. | SQM | 38.53 | - 0 | |
| 7.2.5 | Disposal of surplus excavated material as directed by the Engineer | CUM | - 0 | ||
| 7.2.6 | Disposal of excavated material; rock | CUM | - 0 | ||
| 7.3 | Backfill to Structures | - 0 | |||
| Provide Material, backfill in layers not exceeding 200mm, water and compact approved backfill to 95% MDD | - 0 | ||||
| 7.3.1 | Using Insitu Excavated Material | CUM | - 0 | ||
| 7.3.2 | Using Approved Imported Material | CUM | 110.00 | - 0 | |
| 7.3.3 | Using imported single size pervious crushed stone backfill behind wing walls and stems including cast in place PVC weep holes as shown on drawings | CUM | 6.5 | - 0 | |
| 7.3.4 | Provide, place and. compact hardcore foundation layer in very soft spots (with low bearing capacity) as instructed by the engineer | CUM | 15.00 | - 0 | |
| 7.4 | Form Work and Shuttering | - 0 | |||
| Provide Material, Place, Fix and Brace into position of concrete formwork and shuttering including its removal after concrete curing | - 0 | ||||
| 7.4.1 | Rough finish formwork | SQM | 54.3 | - 0 | |
| 7.4.2 | Fair finish formwork | SQM | 69.2 | - 0 | |
| 7.5 | Steel Reinforcement Works | - 0 | |||
| Supply and Fix Reinforcing Steel in Reinforced Concrete | - 0 | ||||
| 7.5.1 | Mild steel bars | Kg | 4562.5 | - 0 | |
| 7.5.2 | High yield stress steel bars | Kg | - 0 | ||
| 7.5.3 | Welded steel fabric | Kg | - 0 | ||
| 7.5.4 | Provide and install fixed and expandable bearings | Set | - 0 | ||
| 7.6 | Concrete Works for Structures | - 0 | |||
| Provide Materials, cast In-situ concrete to structures including curing in class | - 0 | ||||
| 7.6.1 | Class 10 (1:4:8) | CUM | - 0 | ||
| 7.6.2 | Class 15/40 | CUM | 10.21 | - 0 | |
| 7.6.3 | Class 20/20 | CUM | - 0 | ||
| 7.6.4 | Class 25/20 | CUM | 0.0 | - 0 | |
| 7.6.5 | Class 30/20 | CUM | 37.66 | - 0 | |
| 7.7 | Railing Aesthetic Treatments & Safety Works | - 0 | |||
| Fabrication and construction of Box culvert guardrails | - 0 | ||||
| 7.7.1 | Provide 75 mm gulvanised pipe for Box culvert guardrails as shown on the drawings and specifications | m | 10.4 | - 0 | |
| 7.7.2 | Painting (3 Coats) to concrete surfaces of box Culvert guard rails, parapet & barriers using the epoxy paint and colours as specified by the engineer | LS | 1.0 | - 0 | |
| 7.8 | River Training Works | - 0 | |||
| Provide all necessary equipment, and labour necessary for river training works as shown on the drawings or instructed by the engineer, in conditions of | - 0 | ||||
| 7.8.1 | Opening by removal of Vegetation & downstream tree logs in water way channel to a minimum of 25m on either side of water channel or as directed by the Engineer | LS | 1.0 | - 0 | |
| 7.8.2 | Excavation and sloping of land mass upstream/downstream of water channel | Cum | - 0 | ||
| 7.8.3 | Excavation & Installation of Gabion works upstream/downstream for river training | Cum | - 0 | ||
| 7.8.4 | Permanent Deposition of Clay Soil/Rock Mass in existing channel to divert flow of water to new design channel | Cum | - 0 | ||
| 7.9 | Demolition of Existing Structures | - 0 | |||
| 7.9.1 | Demolition and disposal of existing pipe structures (RCP & CMP) within vicinity of proposed Box Culvert Location | No | - 0 | ||
| 7.9.2 | Demolition and disposal of existing Log Bridge structures within vicinity of proposed Box Culvert Location | No | 1.0 | - 0 | |
| 7.10 | Maintenance of Existing Structures | - 0 | |||
| 7.10.1 | Provide for the desilting of existing Box Culvert Water Way & Aprons | No | - 0 | ||
| 7.10.2 | Excavation of inlets and outlets at existing Box Culverts as instructed by the engineer | CUM | - 0 | ||
| 7.11 | Erosion Protection Works | - 0 | |||
| 7.11.1 | Provide Material and Construct Stone Pitching to specified thickness: | - 0 | |||
| 7.11.1.1 | Using Dry (Plain) Stone Pitching | SQM | - 0 | ||
| 7.11.1.2 | Using Grouted Stone Pitching | SQM | 80.0 | - 0 | |
| 7.11.2 | Provide Material and Construct Rip-Rap Protection to specified thickness | - 0 | |||
| 7.11.2.1 | Using Dry (Plain) Packed Stone | CUM | - 0 | ||
| 7.11.2.2 | Using Grouted Stone | CUM | - 0 | ||
| 7.11.3 | Provide and Construct Stone Filled Gabion Works including the foundation preparation, as per standard drawings and specification | - 0 | |||
| 7.11.3.1 | In approved Gabion Box quality and specified dimensions | CUM | - 0 | ||
| 7.11.3.2 | In approved Reno Mattress quality and specified dimensions | CUM | - 0 | ||
| 7.12 | Landscaping and Grassing | - 0 | |||
| 7.12.1 | Trimming | SQM | - 0 | ||
| 7.12.2 | Establishing Vegetation: Planting and establishing grass from imported sources within country | SQM | - 0 | ||
| 7.12.3 | Establishing Vegetation: Planting and establishing grass using approved bush sods from site area | SQM | - 0 | ||
| 7.13 | Finishing Works | - 0 | |||
| 7.13.1 | Provide all necessary equipment and labour to clean and dispose away from site, all construction debris in the vicinity of the finished box culvert structure | LS | - 0 | ||
| 7.13.2 | Provide, spread and compact selected gravel backfill to Min 95% MDD on top of box culvert slab and approaches (both sides) to finished road profile. | CUM | 400.0 | - 0 | |
| Sub Total for Box Culvert Structure | - 0 |
&"Arial Narrow,Regular"ENGINEERING SERVICES FOR RURAL ROAD REHABILITATION PROJECT Contract Name: Rehabilitation of Bulor-Tusu and Bulor-Goyala Road Name: Bulor-Tusu and Bulor-Goyala County: Lofa&14
Bill 9
| Item No | Item Description | Unit | Unit Rate (US$) |
| 9.0 | Dayworks Activities (Include Overheads & Profit) | ||
| 9.1 | Unskilled Labour | Day | |
| 9.2 | Skilled Labour | Day | |
| 9.3 | Foreperson | Day | |
| 9.4 | Surveyor | Day | |
| 9.5 | Surveying Assistant | Day | |
| 9.6 | Bill of Quantities | Day | |
| Supply of Materials to Site | |||
| 9.7 | Cement in 50 Kg Bags | bag | |
| 9.8 | Reinforcement steel | ||
| 9.8.1 | Mild steel bars | Kg | |
| 9.8.2 | High yield stress steel bars | Kg | |
| 9.8.3 | Welded steel fabric | Kg | |
| 9.9 | Crushed Stone Aggregate | CUM | |
| 9.10 | Sand (Fine or Coarse) | CUM | |
| 9.11 | Hard Wood Timber to quality specified by the engineer | ||
| 9.11.1 | 12' x 1' | m | |
| 9.11.2 | 12' x 2' | m | |
| 9.11.3 | 4' x 2' | m | |
| 9.11.4 | 4' x 6' | m | |
| 9.11.5 | 2' x 2' | m | |
| 9.12 | Plywood | ||
| 9.13 | Diesel (Fuel) | Gal | |
| 9.14 | Petrol (Gas) | Gal | |
| Plant and Equipment (Dry) based on 8Hr Day | |||
| 9.15 | Concrete mixer | Day | |
| 9.16 | Concrete vibrator | Day | |
| 9.17 | Power saw | Day | |
| 9.18 | Water Pump | Day | |
| 9.19 | Steel Wheel (Dead Weight) Roller | Day | |
| 9.20 | Plate compactor | Day | |
| 9.21 | Vibratory Pedestrian roller (1- 2 tonnes) roller | Day | |
| 9.22 | Self propelled (5-8 tonnes) Vibratory roller | Day | |
| 9.23 | 4WD Supervision Vehicle | Day | |
| 9.24 | Grader (mInimum 135 Horse Power) | Day | |
| 9.25 | Crawler Dozer with Ripper | ||
| 9.25.1 | Cat D7 or Dozer with Equivalent 200 Horse Power | Day | |
| 9.25.2 | Cat D6 or Dozer with Equivalent 120 Horse Power | Day | |
| 9.26 | Crawler Hydraulic Excavator | ||
| 9.26.1 | Hydraulic Excavator (Tracked) 10-20 t | Day | |
| 9.26.2 | Hydraulic Excavator (Tracked) 20-30 t | Day | |
| 9.27 | Wheel/Front End Loader (1.5 tonne bucket) | Day | |
| 9.28 | JCB Wheel Loader/Back Hoe | Day | |
| 9.29 | Water bowser | ||
| 9.29.1 | 5000 Ltr | Day | |
| 9.29.2 | 2000 Ltr | Day | |
| 9.30 | Dump Truck | Day | |
| 9.30.1 | 4 - 6 cu.m size | Day | |
| 9.30.2 | 7 - 8 cu.m size | Day | |
| 9.30.3 | 9 - 12 cu.m size | Day | |
| 9.31 | Crane Mounted Truck (1.5 tonne) | Day |
Road Name: Bulor-Tusu and Bulor - Goyala County: Lofa
Bill Summary
| Bill No | Bill Description | Amount (US$) |
| Summary of Bill Items | ||
| 1.0 | Preliminary & General Items | - 0 |
| 2.0 | Site Preparation and Clearing Works | - 0 |
| 3.0 | Earthworks and Pavement Works | - 0 |
| 4.0 | Drainage and Structures: Prefabricated Pipe Culvert Works | - 0 |
| 5.0 | Miscellaneous Items (Pipe Culverts) | - 0 |
| 6.0 | Drainage and Structures: Cast in Place U-Culvert Works | |
| 7.0 a | Box Culvert Structure - 16+050 | - 0 |
| 7.0 b | Box Culvert Structure - 17+175 | - 0 |
| 8.0 | Bridge Structures | |
| 9.0 | Day Works Activities |
Total Transfered to the Grand Summary Sheet - 0
Road Name: Bulor-Tusu and Bulor - Goyala County: Lofa