J.6.C.2_TO_003_BOQ_(Bulor-Tusu).xlsx

XLSX spreadsheet 184 KB Posted

Attached to
The purpose of this contract is to provide construction services for road and general vertical infrastructure works throughout Liberia.
Solicitation number
SOL-669-16-000006
Issued by

About this file

J.6.C.2

View the file

Other files

File Type Posted
Amendment_01 _SOL-669-16-000006.pdf PDF
J.6.B.2_TO_BOQ_-_Revised.xlsx XLSX spreadsheet
Attachment_J.7.pdf PDF
Amended_SOL-669-16-000006.pdf PDF
J.6.A.2_TO_BOQ_-_Revised.xlsx XLSX spreadsheet
J.6.C.1_TO_003_strip_Map_(_Bulor-Tusu).xlsx XLSX spreadsheet
J.3_C-Box_Culvert_drwaings.pdf PDF
J.1A-Unit_Rate_Analysis_Sheet.xlsx XLSX spreadsheet
J.1-Schedule_of_rates.xlsx XLSX spreadsheet
J.6.A.1_Task_order_001_Strip_Map.pdf PDF
J.4_Marking_and_Branding_Plan.pdf PDF
J.3A-Earthworks_drawings.pdf PDF
J.3.D_Drwaings_bridges_ _Box_culverts.pdf PDF
J.2-USAID_Liberia_RISE_PEA-ESMMF_FINAL_(1).pdf PDF
J.3_B-Pipe_Culverts_Drawings.pdf PDF
J.5_Technical_Specifications.docx DOCX document
J.6_Task_Order_Request_for_Proposal.docx DOCX document
J.6.A.2_TO_001_BOQ_(Bassa-Varmah).xlsx XLSX spreadsheet
J.6.B.2_TO_002_BOQ_(Waka-Johnny_Tutu).xlsx XLSX spreadsheet
J.6.B.1_TO_002_strip_map_(Waka-Johnny_Tutu).xlsx XLSX spreadsheet
Executed_Sol_SOL-669-16-000006.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cover Page

Annex: C

Bill of Quantities

Project Name: Engineering Services for Rural Road Rehabilitation Project
Funded by:USAID - Liberia
Contract Name:Rehabilitation of Bulor - Tusu and Bulor - Goyala
Contract Reference No:Lot No:
Road Name:Bulor - Tusu (10.4km)CH15+000toCH25+400
Road Name:Bulor - Goyala (1.8km)CH0+000toCH1+800
District :Quardu Borni
County:Lofa

Contractor Name:

Bill 1

Bill of Quantities
Item NoItem DescriptionUnitQuantityUnit Rate (US$)Amount (US$)
1.0Preliminary & General Items
1.1Contractor's mobilization and establishment of site campLS1.0- 0
1.2Contractor demobilization and removal of camp siteLS1.0- 0
1.3Bill of Quantities- 0
1.3.1Provision of all contractual responsibilities stipulated in section 1.3 of the SpecificationsLS1.0- 0
1.3.2Occupational Health and Safety, HIV/AIDs and Gender awareness meetingsNo6.0- 0
1.4Accomodation of traffic- 0
1.4.1Traffic control and management at working locationsLS1.0- 0
1.4.2Permanent road traffic signs for the completed roadNo8.0- 0
1.5Provision, erection, maintenance and removal of project bill sign board as indicated in the drawing or instructed by the Engineer.No1.0- 0
- 0
1.6Provide specified insurances and bondsLS1.0- 0
1.7Construction of temporary detours including their maintenance and restorationm375.0- 0
- 0
1.8Time and Method Related Costs- 0
1.8.1Provision of Key Site Based Personnel- 0
- 0
1.8.1aQuality Control/Assurance Officer (1No)Week24.0- 0
1.8.1bEnvironmental Compliance/Safety Officer (1 No)Week24.0- 0
1.8.1cQualified First Aid Assistant (1No)Week24.0- 0
- 0
1.8.2Conducting Materials Tests as instructed by the engineer, inclusive of test report preparation- 0
1.8.2aGrading & Atterberg TestsSet18- 0
1.8.2bCompaction TestsSet24- 0
1.8.2cConcrete Compresive TestsSet8- 0
1.8.2dFoundation Bearing Capacity Tests at Bridge & Box Culvert ExcavationsSet2.0- 0

Sub Total for Preliminary Items - 0

&"Arial Narrow,Regular"&12ENGINEERING SERVICES FOR RURAL ROAD REHABILITATION PROJECT Contract Name: Rehabilitation of Bulor-Tusu and Bulor - Goyala Road Name: Bulor-Tusu and Bulor - Goyala County: Lofa

&"Arial Narrow,Regular"&9

Bill 2

Item NoItem DescriptionUnitQtyUnit Rate (US$)Amount (US$)
2.0Site Preparation and Clearing Works
2.1Setting out of road alignment and cross sectionsm12200.0- 0
- 0
2.2Site Clearance- 0
2.2.1Clearing as specified in the drawings and in section 2.2 of the specification but outside the formation width:- 0
2.2.1aIn Light Vegetation (medium density bush, plantation, shrub or grass) areas except trees and stumps defined in bill item 2.2.2SQM63750.0- 0
2.2.1bIn Heavy or Dense Vegetation (dense bush, rubber plantation, forests) areas except trees and stumps defined in bill item 2.2.2SQM1200.0- 0
2.2.2Removal of large trees and tree stumps:- 0
2.2.2aGirth exceeding 1.0 m up to and including 2.0 mNo90.0- 0
2.2.2bGirth exceeding 2.0 m up to and including 3.0mNo10.0- 0
2.2.2cGirth exceeding 3.0 mNo- 0
- 0
2.2.3Clearing, Grubbing and Removal of Vegetation & Top Organic Soil from the Road FormationSQM109800.0- 0

Sub Total for Site Preparation and Clearing Works - 0

Road Name: Bulor-Tusu and Bulor - Goyala County: Lofa

Bill 3

Item NoItem DescriptionUnitQuantityUnit Rate (US$)Amount (US$)
3.0Earthworks and Pavement Works
3.1Earthworks
3.1.1Excavation or Cutting to Spoil on existing road bed including disposal to approved disposal locations
3.1.1aCommon or Ordinary SoilCUM- 0
3.1.1bRock MaterialCUM- 0
3.1.1cSwamps LocationsCUM- 0
3.1.2Bill of Quantities- 0
3.1.2aUsing cut material (Cross fill or Cut to Fill)CUM80.0- 0
3.1.2bUsing Borrow Material (Ordinary Fill)CUM496.6- 0
3.1.2cUsing rock fill materialCUM- 0
3.1.3Heavy grading of a new road bed/formation section to specified cross-section and camber including Watering & Compaction to Min 95% MDDSQM107325.0- 0
3.1.4Clearing of borrow pit sites for Ordinary Fill Material extractionSQM496.6- 0
3.1.5Removal of all unsuitable materials from the road formation to any depth as instructed by the engineer and disposal to approved locations.CUM- 0
3.1.6Over-haulage of emarkment fill materials (Beyond 2km haulage distance)km.m3- 0
3.2Gravel Wearing Course- 0
3.2.1Excavation, loading, haulage, spreading and compaction of approved gravel pavement to Min 95% MDD.CUM9218.8- 0
3.2.2Clearing of borrow pit sites for gravel extractionSQM9218.8- 0
3.2.3Restoration of borrow pit sitesSQM9218.8- 0
3.2.4Over-haulage of gravel (Beyond 5km haulage distance)km.m3- 0
3.3Re-shaping or Re-Grading to form Camber- 0
3.3.1Scarification and Reshaping of an existing road section to specified camber including Watering & Compaction to Min 95% MDDSQM- 0
3.4Excavation and Construction of Drains- 0
3.4.1Excavation of new open drains (catch water and mitre drains) to specified cross section dimensions (Refer to drawings)- 0
3.4.1aIn Soft Materialm1340.0- 0
3.4.1bIn Rock MaterialCUM- 0
3.4.2Cleaning and re-shaping of existing side, catch water and mitre drainsm- 0
3.4.3Supply material and construct scour checks:- 0
3.4.3aUsing Wooden SticksNo- 0
3.4.3bUsing Dry StonesNo- 0
3.4.3cUsing Grouted stonesNo449- 0
3.4.4Construction of Banks and DykesCUM- 0
3.4.5Construction of Sub-drains using specified graded boulder material- 0
3.4.5aType 1 as specified in the drawingsCUM- 0
3.4.5bType 2 as specified in the drawingsCUM- 0
Sub Total for Earthworks and Gravel Road Pavement Works- 0

Road Name: Bulor-Tusu and Bulor - Goyala County: Lofa

Bill 4

Item NoItem DescriptionUnitQuantityUnit Rate (US$)Amount (US$)
4.0Drainage and Structures: Prefabricated Pipe Culvert Works
4.1Excavation for Pipe Culverts
4.1.1In soft soils to a trench depth not exceeding 1.5mCUM726.3- 0
4.1.2In soft soils to a trench depth exceeding 1.5mCUM- 0
4.1.3In RockCUM- 0
4.2Bill of Quantities- 0
4.2.1Using Insitu Excavated MaterialCUM- 0
4.2.2Using Approved Imported MaterialCUM347.7- 0
- 0
4.3Provide Material and Construct Reinforced Concrete Pipe Culvert- 0
4.3.1600mm Diameterm176.0- 0
4.3.2900mm Diameterm67.0- 0
4.3.31200mm Diameterm- 0
4.3.41500mm Diameterm- 0
- 0
4.4Provide Material and Cast insitu Concrete in class- 0
4.4.1Class 10 MPA for BlindingCUM- 0
4.4.2Class 15 MPA in Bedding & HaunchCUM98.7- 0
4.4.4Class 20 MPA in Culvert End Structures & Reinforced Concrete BeddingCUM153.4- 0
4.5Provide Material and Construct Cement Bound Masonry Works at End Structures- 0
4.5.1Using cement masonry blocksCUM- 0
4.5.2Using StonesCUM- 0
4.6Provide, place and compact hardcore foundation for pipe structures in very soft spots as instructed by the engineerCUM10.0- 0
4.7Construct temporary water diversions in locations of active water courses including their maintenance and removal by:- 0
4.7.1Excavation of diversion channelsCUM84.0- 0
4.7.2Constructing temporary barriersCUM87.2- 0
4.8Provide Material and Construct Stone Pitching to specified thickness:- 0
4.8.1Using Dry (Plain) Stone PitchingSQM- 0
4.8.2Using Grouted Stone PitchingSQM4108.0- 0
4.9Provide Material and Construct Rip-Rap Protection to specified thickness- 0
4.9.1Using Dry (Plain) Packed StoneCUM- 0
4.9.2Using Grouted StoneCUM- 0
4.10Provide Material and Construct Stone Masonry Walls- 0
4.10.1Using Dry (Plain) Stone MasonryCUM- 0
4.10.2Using Grouted Stone MasonryCUM- 0
4.11Provide Material and Construct Mass Concrete for Pitching (Paving)CUM- 0
4.12Provide and Construct Stone Filled Gabion Works using Gabion Boxes including the foundation preparation, as per standard drawings and specs- 0
4.12.1In approved Gabion Box quality and specified dimensionsCUM- 0
4.12.2In approved Reno Mattress quality and specified dimensionsCUM- 0
4.13Supply and Fix Reinforcing Steel in Reinforced Concrete- 0
4.13.1Mild steel barsKg10015.9- 0
4.13.2High yield steel barsKg- 0
4.13.3Welded steel fabricKg- 0
4.14Provide Material, Place and fix into position of concrete formwork including its removal after concrete curing- 0
4.14.1Rough finish formworkSQM810.4- 0
4.14.2Fair finish formworkSQM810.4- 0
- 0
4.15Provide for the desilting of existing pipe culverts including opening of inlets and outlets- 0
4.15.1600mm & 900mm Diameterm- 0
4.15.21200mm & 1500mm Diameterm- 0
- 0
4.16Demolition and disposal of existing pipe structures (RCP & CMP)- 0
4.16.1600mm & 900mm DiameterNo6.0- 0
4.16.21200mm & 1500mm DiameterNo- 0
4.17Demolition and disposal of existing log bridges at pipe structures locationsNo3.0- 0
4.18Excavation of Pipe Culvert Outlets and Inlets at Existing & New Pipe Culvert Locations as instructed by the EngineerCUM781.5- 0
Sub Total for Drainage and Structures (Pre-fabricated Pipe Culverts)- 0

Road Name: Bulor-Tusu and Bulor - Goyala County: Lofa

Bill 5

Item NoItem DescriptionUnitQuantityUnit Rate (US$)Amount (US$)
5.0Miscellaneous Items (Pipe Culverts)
5.1TrimmingSQM- 0
5.1.2Establishing Vegetation- 0
5.1.2aEstablishing Vegetation: Planting and establishing grass from imported sources within countrySQM- 0
5.1.2bEstablishing Vegetation: Planting and establishing grass using approved bush sods from site areaSQM- 0
5.1.2cPlanting of treesNo- 0
5.1.2dBill of QuantitiesSQM- 0
5.2Construction of Lined drains at specified road sections as shown on the drawings- 0
5.2.1In class 20 MPA (1: 2: 4) concreteCUM- 0
5.2.2In grouted stone masonryCUM- 0

Sub Total for Miscellaneous Items - 0

Contract Name: Rehabilitation of John's Town - Bulor Road Name: John's Town - Bulor County: Lofa&14

Box Culvert 16+050

Item NoItem Description Box Culvert StructureUnitQuantityUnit Rate (US$)Amount (US$)
7.0 aBulor - Tusu, Ch 16+050 (Box Culvert)- Single Cell
7.1Construction of Temporary Works & Water Diversions
Construct temporary water diversions at Box Culvert locations on active water courses including their maintenance and removal by:
7.1.1Excavation of diversion channelsCUM19.2- 0
7.1.2Erection of temporary barriersCUM- 0
7.1.3Construction and removal temporary Log Bridge structures on detour roadsLS1.0- 0
7.2Excavation of Foundations for Structures- 0
7.2.1In Common Soils to 1 - 5m depthCUM166.60- 0
7.2.2In Common Soils to 5 - 10m depthCUM- 0
7.2.3In Rock Material lrrespective of DepthCUM- 0
7.2.4Preparation of excavated surface to receive permanent works.SQM37.80- 0
7.2.5Disposal of surplus excavated material as directed by the EngineerCUM- 0
7.2.6Disposal of excavated material; rockCUM- 0
7.3Backfill to Structures- 0
Provide Material, backfill in layers not exceeding 200mm, water and compact approved backfill to 95% MDD- 0
7.3.1Using Insitu Excavated MaterialCUM- 0
7.3.2Using Approved Imported MaterialCUM73.00- 0
7.3.3Using imported single size pervious crushed stone backfill behind wing walls and stems including cast in place PVC weep holes as shown on drawingsCUM3.3- 0
7.3.4Provide, place and. compact hardcore foundation layer in very soft spots (with low bearing capacity) as instructed by the engineerCUM10.94- 0
7.4Form Work and Shuttering- 0
Provide Material, Place, Fix and Brace into position of concrete formwork and shuttering including its removal after concrete curing- 0
7.4.1Rough finish formworkSQM42.0- 0
7.4.2Fair finish formworkSQM56.9- 0
7.5Steel Reinforcement Works- 0
Supply and Fix Reinforcing Steel in Reinforced Concrete- 0
7.5.1Mild steel barsKg4394.1- 0
7.5.2High yield stress steel barsKg- 0
7.5.3Welded steel fabricKg- 0
7.5.4Provide and install fixed and expandable bearingsSet- 0
7.6Concrete Works for Structures- 0
Provide Materials, cast In-situ concrete to structures including curing in class- 0
7.6.1Class 10 (1:4:8)CUM- 0
7.6.2Class 15/40CUM8.25- 0
7.6.3Class 20/20CUM- 0
7.6.4Class 25/20CUM0.0- 0
7.6.5Class 30/20CUM29.30- 0
7.7Railing Aesthetic Treatments & Safety Works- 0
Fabrication and construction of Box culvert guardrails- 0
7.7.1Provide 75 mm gulvanised pipe for Box culvert guardrails as shown on the drawings and specificationsm19.12- 0
7.7.2Painting (3 Coats) to concrete surfaces of box Culvert guard rails, parapet & barriers using the epoxy paint and colours as specified by the engineerLS1.0- 0
7.8River Training Works- 0
Provide all necessary equipment, and labour necessary for river training works as shown on the drawings or instructed by the engineer, in conditions of- 0
7.8.1Opening by removal of Vegetation & downstream tree logs in water way channel to a minimum of 25m on either side of water channel or as directed by the EngineerLS1.0- 0
7.8.2Excavation and sloping of land mass upstream/downstream of water channelCum- 0
7.8.3Excavation & Installation of Gabion works upstream/downstream for river trainingCum- 0
7.8.4Permanent Deposition of Clay Soil/Rock Mass in existing channel to divert flow of water to new design channelCum- 0
7.9Demolition of Existing Structures- 0
7.9.1Demolition and disposal of existing pipe structures (RCP & CMP) within vicinity of proposed Box Culvert LocationNo- 0
7.9.2Demolition and disposal of existing Log Bridge structures within vicinity of proposed Box Culvert LocationNo1.0- 0
7.10Maintenance of Existing Structures- 0
7.10.1Provide for the desilting of existing Box Culvert Water Way & ApronsNo- 0
7.10.2Excavation of inlets and outlets at existing Box Culverts as instructed by the engineerCUM- 0
7.11Erosion Protection Works- 0
7.11.1Provide Material and Construct Stone Pitching to specified thickness:- 0
7.11.1.1Using Dry (Plain) Stone PitchingSQM- 0
7.11.1.2Using Grouted Stone PitchingSQM80.0- 0
7.11.2Provide Material and Construct Rip-Rap Protection to specified thickness- 0
7.11.2.1Using Dry (Plain) Packed StoneCUM- 0
7.11.2.2Using Grouted StoneCUM- 0
7.11.3Provide and Construct Stone Filled Gabion Works including the foundation preparation, as per standard drawings and specification- 0
7.11.3.1In approved Gabion Box quality and specified dimensionsCUM- 0
7.11.3.2In approved Reno Mattress quality and specified dimensionsCUM- 0
7.12Landscaping and Grassing- 0
7.12.1TrimmingSQM- 0
7.12.2Establishing Vegetation: Planting and establishing grass from imported sources within countrySQM- 0
7.12.3Establishing Vegetation: Planting and establishing grass using approved bush sods from site areaSQM- 0
7.13Finishing Works- 0
7.13.1Provide all necessary equipment and labour to clean and dispose away from site, all construction debris in the vicinity of the finished box culvert structureLS- 0
7.13.2Provide, spread and compact selected gravel backfill to Min 95% MDD on top of box culvert slab and approaches (both sides) to finished road profile.CUM369.2- 0
Sub Total for Box Culvert Structure- 0

&"Arial Narrow,Regular"ENGINEERING SERVICES FOR RURAL ROAD REHABILITATION PROJECT Contract Name: Rehabilitation of Bulor-Tusu and Bulor-Goyala Road Name: Bulor-Tusu and Bulor-Goyala County: Lofa&14

Box culvert 17+175

Item NoItem DescriptionUnitQuantityUnit Rate (US$)Amount (US$)
7.0 bBulor - Tusu - Ch 17+175 Box Culvert
7.1Construction of Temporary Works & Water Diversions
Construct temporary water diversions at Box Culvert locations on active water courses including their maintenance and removal by:
7.1.1Excavation of diversion channelsCUM24.0- 0
7.1.2Erection of temporary barriersCUM- 0
7.1.3Construction and removal temporary Log Bridge structures on detour roadsLS1.0- 0
7.2Excavation of Foundations for Structures- 0
7.2.1In Common Soils to 1 - 5m depthCUM237.53- 0
7.2.2In Common Soils to 5 - 10m depthCUM- 0
7.2.3In Rock Material lrrespective of DepthCUM- 0
7.2.4Preparation of excavated surface to receive permanent works.SQM38.53- 0
7.2.5Disposal of surplus excavated material as directed by the EngineerCUM- 0
7.2.6Disposal of excavated material; rockCUM- 0
7.3Backfill to Structures- 0
Provide Material, backfill in layers not exceeding 200mm, water and compact approved backfill to 95% MDD- 0
7.3.1Using Insitu Excavated MaterialCUM- 0
7.3.2Using Approved Imported MaterialCUM110.00- 0
7.3.3Using imported single size pervious crushed stone backfill behind wing walls and stems including cast in place PVC weep holes as shown on drawingsCUM6.5- 0
7.3.4Provide, place and. compact hardcore foundation layer in very soft spots (with low bearing capacity) as instructed by the engineerCUM15.00- 0
7.4Form Work and Shuttering- 0
Provide Material, Place, Fix and Brace into position of concrete formwork and shuttering including its removal after concrete curing- 0
7.4.1Rough finish formworkSQM54.3- 0
7.4.2Fair finish formworkSQM69.2- 0
7.5Steel Reinforcement Works- 0
Supply and Fix Reinforcing Steel in Reinforced Concrete- 0
7.5.1Mild steel barsKg4562.5- 0
7.5.2High yield stress steel barsKg- 0
7.5.3Welded steel fabricKg- 0
7.5.4Provide and install fixed and expandable bearingsSet- 0
7.6Concrete Works for Structures- 0
Provide Materials, cast In-situ concrete to structures including curing in class- 0
7.6.1Class 10 (1:4:8)CUM- 0
7.6.2Class 15/40CUM10.21- 0
7.6.3Class 20/20CUM- 0
7.6.4Class 25/20CUM0.0- 0
7.6.5Class 30/20CUM37.66- 0
7.7Railing Aesthetic Treatments & Safety Works- 0
Fabrication and construction of Box culvert guardrails- 0
7.7.1Provide 75 mm gulvanised pipe for Box culvert guardrails as shown on the drawings and specificationsm10.4- 0
7.7.2Painting (3 Coats) to concrete surfaces of box Culvert guard rails, parapet & barriers using the epoxy paint and colours as specified by the engineerLS1.0- 0
7.8River Training Works- 0
Provide all necessary equipment, and labour necessary for river training works as shown on the drawings or instructed by the engineer, in conditions of- 0
7.8.1Opening by removal of Vegetation & downstream tree logs in water way channel to a minimum of 25m on either side of water channel or as directed by the EngineerLS1.0- 0
7.8.2Excavation and sloping of land mass upstream/downstream of water channelCum- 0
7.8.3Excavation & Installation of Gabion works upstream/downstream for river trainingCum- 0
7.8.4Permanent Deposition of Clay Soil/Rock Mass in existing channel to divert flow of water to new design channelCum- 0
7.9Demolition of Existing Structures- 0
7.9.1Demolition and disposal of existing pipe structures (RCP & CMP) within vicinity of proposed Box Culvert LocationNo- 0
7.9.2Demolition and disposal of existing Log Bridge structures within vicinity of proposed Box Culvert LocationNo1.0- 0
7.10Maintenance of Existing Structures- 0
7.10.1Provide for the desilting of existing Box Culvert Water Way & ApronsNo- 0
7.10.2Excavation of inlets and outlets at existing Box Culverts as instructed by the engineerCUM- 0
7.11Erosion Protection Works- 0
7.11.1Provide Material and Construct Stone Pitching to specified thickness:- 0
7.11.1.1Using Dry (Plain) Stone PitchingSQM- 0
7.11.1.2Using Grouted Stone PitchingSQM80.0- 0
7.11.2Provide Material and Construct Rip-Rap Protection to specified thickness- 0
7.11.2.1Using Dry (Plain) Packed StoneCUM- 0
7.11.2.2Using Grouted StoneCUM- 0
7.11.3Provide and Construct Stone Filled Gabion Works including the foundation preparation, as per standard drawings and specification- 0
7.11.3.1In approved Gabion Box quality and specified dimensionsCUM- 0
7.11.3.2In approved Reno Mattress quality and specified dimensionsCUM- 0
7.12Landscaping and Grassing- 0
7.12.1TrimmingSQM- 0
7.12.2Establishing Vegetation: Planting and establishing grass from imported sources within countrySQM- 0
7.12.3Establishing Vegetation: Planting and establishing grass using approved bush sods from site areaSQM- 0
7.13Finishing Works- 0
7.13.1Provide all necessary equipment and labour to clean and dispose away from site, all construction debris in the vicinity of the finished box culvert structureLS- 0
7.13.2Provide, spread and compact selected gravel backfill to Min 95% MDD on top of box culvert slab and approaches (both sides) to finished road profile.CUM400.0- 0
Sub Total for Box Culvert Structure- 0

&"Arial Narrow,Regular"ENGINEERING SERVICES FOR RURAL ROAD REHABILITATION PROJECT Contract Name: Rehabilitation of Bulor-Tusu and Bulor-Goyala Road Name: Bulor-Tusu and Bulor-Goyala County: Lofa&14

Bill 9

Item NoItem DescriptionUnitUnit Rate (US$)
9.0Dayworks Activities (Include Overheads & Profit)
9.1Unskilled LabourDay
9.2Skilled LabourDay
9.3ForepersonDay
9.4SurveyorDay
9.5Surveying AssistantDay
9.6Bill of QuantitiesDay
Supply of Materials to Site
9.7Cement in 50 Kg Bagsbag
9.8Reinforcement steel
9.8.1Mild steel barsKg
9.8.2High yield stress steel barsKg
9.8.3Welded steel fabricKg
9.9Crushed Stone AggregateCUM
9.10Sand (Fine or Coarse)CUM
9.11Hard Wood Timber to quality specified by the engineer
9.11.112' x 1'm
9.11.212' x 2'm
9.11.34' x 2'm
9.11.44' x 6'm
9.11.52' x 2'm
9.12Plywood
9.13Diesel (Fuel)Gal
9.14Petrol (Gas)Gal
Plant and Equipment (Dry) based on 8Hr Day
9.15Concrete mixerDay
9.16Concrete vibratorDay
9.17Power sawDay
9.18Water PumpDay
9.19Steel Wheel (Dead Weight) RollerDay
9.20Plate compactorDay
9.21Vibratory Pedestrian roller (1- 2 tonnes) rollerDay
9.22Self propelled (5-8 tonnes) Vibratory rollerDay
9.234WD Supervision VehicleDay
9.24Grader (mInimum 135 Horse Power)Day
9.25Crawler Dozer with Ripper
9.25.1Cat D7 or Dozer with Equivalent 200 Horse PowerDay
9.25.2Cat D6 or Dozer with Equivalent 120 Horse PowerDay
9.26Crawler Hydraulic Excavator
9.26.1Hydraulic Excavator (Tracked) 10-20 tDay
9.26.2Hydraulic Excavator (Tracked) 20-30 tDay
9.27Wheel/Front End Loader (1.5 tonne bucket)Day
9.28JCB Wheel Loader/Back HoeDay
9.29Water bowser
9.29.15000 LtrDay
9.29.22000 LtrDay
9.30Dump TruckDay
9.30.14 - 6 cu.m sizeDay
9.30.27 - 8 cu.m sizeDay
9.30.39 - 12 cu.m sizeDay
9.31Crane Mounted Truck (1.5 tonne)Day

Road Name: Bulor-Tusu and Bulor - Goyala County: Lofa

Bill Summary

Bill NoBill DescriptionAmount (US$)
Summary of Bill Items
1.0Preliminary & General Items- 0
2.0Site Preparation and Clearing Works- 0
3.0Earthworks and Pavement Works- 0
4.0Drainage and Structures: Prefabricated Pipe Culvert Works- 0
5.0Miscellaneous Items (Pipe Culverts)- 0
6.0Drainage and Structures: Cast in Place U-Culvert Works
7.0 aBox Culvert Structure - 16+050- 0
7.0 bBox Culvert Structure - 17+175- 0
8.0Bridge Structures
9.0Day Works Activities

Total Transfered to the Grand Summary Sheet - 0

Road Name: Bulor-Tusu and Bulor - Goyala County: Lofa