J.3.A
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_01 _SOL-669-16-000006.pdf | ||
| J.6.B.2_TO_BOQ_-_Revised.xlsx | XLSX spreadsheet | |
| Attachment_J.7.pdf | ||
| Amended_SOL-669-16-000006.pdf | ||
| J.6.A.2_TO_BOQ_-_Revised.xlsx | XLSX spreadsheet | |
| J.6.C.1_TO_003_strip_Map_(_Bulor-Tusu).xlsx | XLSX spreadsheet | |
| J.3_C-Box_Culvert_drwaings.pdf | ||
| J.1A-Unit_Rate_Analysis_Sheet.xlsx | XLSX spreadsheet | |
| J.1-Schedule_of_rates.xlsx | XLSX spreadsheet | |
| J.6.A.1_Task_order_001_Strip_Map.pdf | ||
| J.4_Marking_and_Branding_Plan.pdf | ||
| J.3.D_Drwaings_bridges_ _Box_culverts.pdf | ||
| J.2-USAID_Liberia_RISE_PEA-ESMMF_FINAL_(1).pdf | ||
| J.3_B-Pipe_Culverts_Drawings.pdf | ||
| J.5_Technical_Specifications.docx | DOCX document | |
| J.6_Task_Order_Request_for_Proposal.docx | DOCX document | |
| J.6.A.2_TO_001_BOQ_(Bassa-Varmah).xlsx | XLSX spreadsheet | |
| J.6.B.2_TO_002_BOQ_(Waka-Johnny_Tutu).xlsx | XLSX spreadsheet | |
| J.6.C.2_TO_003_BOQ_(Bulor-Tusu).xlsx | XLSX spreadsheet | |
| J.6.B.1_TO_002_strip_map_(Waka-Johnny_Tutu).xlsx | XLSX spreadsheet | |
| Executed_Sol_SOL-669-16-000006.pdf |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TYPICAL CROSS SECTION, PAVEMENT
& LONGITUDINAL DRAINAGE DRAWINGS
Scale:Sheet No:
Revision No:
Drawn by:
Approved by:
Drawing Title & Detail:
Designed by:
Checked by:
Road Name: & Location
Date:
Client:
Drawing No: Date:
Ministry of Public Works, GOL.
Funded by: USAID Liberia
Ministry of Public Works, Liberia.
Do Not Scale __ of __
GENERAL NOTES
Engineering Services for Rural Road Rehabilitation Project
Junction Layout Plan for Access RCP Culverts
CENTRE LINE OF MAIN ROAD
JUNCTION LAYOUT TYPE 2
Access CulvertStop Sign (Where Provided for)
Minor Road
Main Road
CENTRE LINE OF MAIN ROAD
JUNCTION LAYOUT TYPE 1
Access CulvertStop Sign (Where Provided for)
Minor Road
Main Road
CENTRE LINE OF MAIN ROAD
JUNCTION LAYOUT
Access CulvertStop Sign (Where Provided for)
Minor Road
Main Road
CENTRE LINE OF MAIN ROAD
JUNCTION LAYOUT
Stop Sign (Where Provided for) Minor Road Main Road
JUNCTION LAYOUT TYPE 4JUNCTION LAYOUT TYPE 3
JUNCTION LAYOUTS SHOWING POSITION OF ACCESS CULVERTS
EW001
7 %7 %
Revision No:
Drawn by:
Approved by:
Drawing Title & Detail:
Designed by:
Checked by:
Road Name: & Location
Date:
Client:
Drawing No: Date:
Ministry of Public Works, GOL.
Funded by: USAID Liberia
Ministry of Public Works, Liberia.
Do Not Scale __ of __
GENERAL NOTES
Engineering Services for Rural Road Rehabilitation Project
Laterite thickness, t = 150mm
Wc
W
Ws Ws
Conversion Factor: 1 ft = 0.3048m = 304.8mm
Feeder Road Traffic Band Wc Ws W = Wc + 2Ws Min H (mm) n b a d t
2 - 20 - 50 VPD 5000 1000 7000 500 1 1000 150
3 - <20 VPD 4500 1000 6500 400 1 800 150
ROAD FORMATION OR RESHAPING WITH LINED DRAINS ON EVEN GROUND
CROSSECTION E1
1. All dimension are in millimeters unless otherwise specified
2. Selection of typical cross section shall be specified by the design engineer
3. Dimensions of typical cross section may vary due to site condition
4. Wc and W shall be determined depending on design class of the road.
5. Preferably ( 1:n ) is ( 1:2 )
6. Abbreviations Rw - Right of Way (Usually 15m) Fw - Road Formation Width Wc - Wearing Course Width Ws - Shoulder Width d - Side Drain Width 1:n Rise:Horizontal run t - Gravel/Laterite thickness (Compacted)
Varies
50mm PVC Pipe Drain at 5m intervals
CL
DETAIL L: LINED TRAPEZOIDAL CONCRETE CHANNEL
H
H H 100 100
1 100
Max 1:1, Min 3:1
Varies
Detail L
Cement Stabilised Backfill.
(1:4 Cement: Soil Mix)
Road Formation & Reshaping Cross Sections With Lined Drains
EW016
1 - Over 50 VPD 5500 - 6000 1000 7500 - 8000 500 1 1000 150
Revision No:
Drawn by:
Approved by:
Drawing Title & Detail:
Designed by:
Checked by:
Road Name: & Location
Date:
Client:
Drawing No: Date:
Ministry of Public Works, GOL.
Funded by: USAID Liberia
Ministry of Public Works, Liberia.
Do Not Scale __ of __
GENERAL NOTES
Engineering Services for Rural Road Rehabilitation Project
Laterite thickness, t = 150mm
Wc
W
Ws Ws
Conversion Factor: 1 ft = 0.3048m = 304.8mm
Feeder Road Traffic Band Wc Ws W = Wc + 2Ws Min H (mm) n b a d t
2 - 20 - 50 VPD 5000 1000 7000 500 1 1000 150
3 - <20 VPD 4500 1000 6500 400 1 800 150
ROAD FORMATION/RESHAPING WITH LINED DRAINS ON SLOPING GROUND
ROAD FORMATION/RESHAPING ON SLOPING GROUND: CROSSECTION E2
1. All dimension are in millimeters unless otherwise specified
2. Selection of typical cross section shall be specified by the design engineer
3. Dimensions of typical cross section may vary due to site condition
4. Wc and W shall be determined depending on design class of the road.
5. Preferably ( 1:n ) is ( 1:2 )
6. Abbreviations Rw - Right of Way (Usually 15m) Fw - Road Formation Width Wc - Wearing Course Width Ws - Shoulder Width d - Side Drain Width 1:n Rise:Horizontal run t - Gravel/Laterite thickness (Compacted)
Note: All commencing surfaces must be scarified to atleast 150mm and moistened prior to shaping, and the same procedure repeated prior to placement of gravel wearing course.
Varies
50mm PVC Pipe Drain at 5m intervals
CL
DETAIL L: LINED TRAPEZOIDAL CONCRETE CHANNEL
H
H H 100 100
1 100
Max 1:1, Min 3:1
Detail L
Cement Stabilised Backfill.
(1:4 Cement: Soil Mix)
EW015
Revision No:
Drawn by:
Approved by:
Drawing Title & Detail:
Designed by:
Checked by:
Road Name: & Location
Date:
Client:
Drawing No: Date:
Ministry of Public Works, GOL.
Funded by: USAID Liberia
Ministry of Public Works, Liberia.
Do Not Scale __ of __
GENERAL NOTES
Engineering Services for Rural Road Rehabilitation Project
Ws Wc Ws
W
Conversion Factor: 1 ft = 0.3048m = 304.8mm
Feeder Road Traffic Band Wc Ws W = Wc + 2Ws Hf Rw Fw n t
1 - Over 50 VPD 5500 - 6000 500 6500 - 7000 Varies Varies Varies 2 200
2 - 20 - 50 VPD 5500 500 6500 Varies Varies Varies 2 200
3 - <20 VPD 5000 500 6000 Varies Varies Varies 2 200
1. All dimension are in millimeters unless otherwise specified
2. Selection of typical cross section shall be specified by the design engineer
3. Dimensions of typical cross section may vary due to site condition
4. Wc and W shall be determined depending on design class of the road.
5. Preferably ( 1:n ) is ( 1:2 )
6. Abbreviations Rw - Right of Way (Usually 15m) Fw - Road Formation Width Wc - Wearing Course Width Ws - Shoulder Width W - Shoulder to Shoulder Width d - Side Drain Width 1:n Rise:Horizontal run t - Gravel/Laterite thickness (Compacted) Hf - Height of Embarkment Fill
Embarkment Fill BoQ Item 3.1.2
Wearing Course BoQ Item 3.2.1
1 : n
Fw
Existing Road Surface Before Site Clearance.
However Removal/Stripping of Unsuitable Material do be done Prior to Commencement of Filling Works.
The Site clearance is paid under Bill Item 2.2
Earth Works: Embarkment Filling Cross sections
Laterite thickness, t = 200mm
Note;
1. The existing road bed surface has to be stripped of any vegetation, organic material and any unsuitable material, and thereafter compacted to the specified density, prior to commencement of embarkment filling.
2. Embarkment filling has to be done in form of several compacted layers not exceeding 200mm thickness, and each layer should be appropriately moistened and compacted to the specified density or compaction.
Average Fill Height, Hf
EMBANKMENT FILLING WITH EVEN CAMBER
CROSSECTION A1
EW007
7 %
1 : n max 1 : 1 and min. 3 : 1
Scale:Sheet No:
Revision No:
Drawn by:
Approved by:
Drawing Title & Detail:
Designed by:
Checked by:
Road Name: & Location
Date:
Client:
Drawing No: Date:
Ministry of Public Works, GOL.
Funded by: USAID Liberia
Ministry of Public Works, Liberia.
Do Not Scale __ of __
GENERAL NOTES
Engineering Services for Rural Road Rehabilitation Project
7 %
1 : n max 1 :1 and min. 3 :1 d
W
Wc Ws
W
Ws b
Conversion Factor: 1 ft = 0.3048m = 304.8mm
Feeder Road Traffic Band Wc Ws W = Wc + 2Ws H n b a d t
1 - Over 50 VPD 5500 - 6000 500 6500 - 7000 500 2 1000 150
2 - 20 - 50 VPD 5000 500 6000 500 2 1000 150
3 - <20 VPD 4500 250 5000 400 2 800 150
Earth Works: Superelevation Cross Sections
Laterite thickness, t = 150mm
Laterite thickness, t = 150mm
Road Centre Line
Road Centre Line
Ws d ab WcWs a
H = Min 3000
H =Min 300
ROAD FORMATION or RESHAPING WITH SUPERELEVATION
CROSSECTION D1
CROSSECTION D2
1. All dimension are in millimeters unless otherwise specified
2. Selection of typical cross section shall be specified by the design engineer
3. Dimensions of typical cross section may vary due to site condition
4. Wc and W shall be determined depending on design class of the road.
5. Preferably ( 1:n ) is ( 1:2 )
6. Abbreviations Rw - Right of Way (Usually 15m) Fw - Road Formation Width Wc - Wearing Course Width Ws - Shoulder Width W - Shoulder to Shoulder Width d - Side Drain Width 1:n Rise:Horizontal run t - Gravel/Laterite thickness (Compacted)
Existing Ground /Commencing Surface
Ordinary Fill, BoQ Item 3.1.2
Existing Ground /Commencing Surface
Ordinary Fill, BoQ Item 3.1.2
Wearing Course BoQ Item 3.2.1
Wearing Course BoQ Item 3.2.1
Note: All commencing surfaces must be scarified to atleast 150mm and moistened prior to shaping, and the same procedure repeated prior to placement of gravel wearing course.
EW013
Natural ground profile with freefall of runoff
1 : n max 1:1 and min. 3:1
Scale:Sheet No:
Revision No:
Drawn by:
Approved by:
Drawing Title & Detail:
Designed by:
Checked by:
Road Name: & Location
Date:
Client:
Drawing No: Date:
Ministry of Public Works, GOL.
Funded by: USAID Liberia
Ministry of Public Works, Liberia.
Do Not Scale __ of __
GENERAL NOTES
Engineering Services for Rural Road Rehabilitation Project
7 %7 %
Natural ground profile with freefall of runoff
1 : n max 1:1 and min. 3:1
W
Ws d d ba aW
Ws Wc
Wc
Laterite thickness, t = 150mm
Laterite thickness, t = 150mm
Conversion Factor: 1 ft = 0.3048m = 304.8mm
Feeder Road Traffic Band Wc Ws W = Wc + 2Ws H n b a d t
1 - Over 50 VPD 5500 - 6000 500 6500 - 7000 500 2 1000 150
2 - 20 - 50 VPD 5000 500 6000 500 2 1000 150
3 - <20 VPD 4500 250 5000 400 2 800 150
H
Ws
Ws
H
ROAD FORMATION or RESHAPING CROSS SECTIONS
CROSSECTION B1
CROSSECTION B2
1. All dimension are in millimeters unless otherwise specified
2. Selection of typical cross section shall be specified by the design engineer
3. Dimensions of typical cross section may vary due to site condition
4. Wc and W shall be determined depending on design class of the road.
5. Preferably ( 1:n ) is ( 1:2 )
6. Abbreviations Rw - Right of Way (Usually 15m) Fw - Road Formation Width Wc - Wearing Course Width Ws - Shoulder Width d - Side Drain Width 1:n Rise:Horizontal run t - Gravel/Laterite thickness (Compacted)
Note: All commencing surfaces must be scarified to at least 150mm and moistened prior to shaping, and the same procedure repeated prior to placement of gravel wearing course. Road Formation or Reshaping Cross Sections
EW009
max 1:1 and min. 3:1
Scale:Sheet No:
Revision No:
Drawn by:
Approved by:
Drawing Title & Detail:
Designed by:
Checked by:
Road Name: & Location
Date:
Client:
Drawing No: Date:
Ministry of Public Works, GOL.
Funded by: USAID Liberia
Ministry of Public Works, Liberia.
Do Not Scale __ of __
GENERAL NOTES
Engineering Services for Rural Road Rehabilitation Project
Laterite thickness, t = 150mm
7 %7 %
1 : n max 1:1 and min. 3:1
Wc
W
Ws b a Wc ba
W
Laterite thickness, t = 150mm
Ws
Ws dd
Ws
Conversion Factor: 1 ft = 0.3048m = 304.8mm
Feeder Road Traffic Band Wc Ws W = Wc + 2Ws H n b a d t
1 - Over 50 VPD 5500 - 6000 500 6500 - 7000 500 2 1000 150
2 - 20 - 50 VPD 5000 500 6000 500 2 1000 150
3 - <20 VPD 4500 250 5000 400 2 800 150
H
H
ROAD FORMATION or RESHAPING CROSS SECTIONS
CROSS SECTION C1
CROSS SECTION C2
1. All dimension are in millimeters unless otherwise specified
2. Selection of typical cross section shall be specified by the design engineer
3. Dimensions of typical cross section may vary due to site condition
4. Wc and W shall be determined depending on design class of the road.
5. Preferably ( 1:n ) is ( 1:2 )
6. Abbreviations Rw - Right of Way (Usually 15m) Fw - Road Formation Width Wc - Wearing Course Width Ws - Shoulder Width d - Side Drain Width 1:n Rise:Horizontal run t - Gravel/Laterite thickness (Compacted)
Note: All commencing surfaces must be scarified to at least 150mm and moistened prior to shaping, and the same procedure repeated prior to placement of gravel wearing course.
Road Formation or Reshaping Cross
EW011
CUT TO CART AWAY FOLLOWED BY ROAD FORMATION ON EVEN GROUND
Back Sloping Width, Bw1Back Sloping Width, Bw2
7 %7 %
1 : n dd
STAGE 2: HEAVY GRADING/ROAD FORMATION (BoQ ITEM 3.1.3)
7 %7 %
1 : n
Laterite thickness, t = 150mm
Wc
W
Ws Ws dd
STAGE 3: GRAVELLING (BoQ ITEM 3.2.1) - CROSS SECTION E1
Road Formation Width (Ditch to Ditch)
W 500
Road Formation Width (Ditch to Ditch)
Existing/Natural Ground Road Surface
Residual Surface After Excavation in Cut
Excavation in Cut (BoQ Item 3.1.1)
Slope 3:1 Min or 1:1 Max
Commencing Road Surface Shaped & Compacted Road Bed (BoQ Item 3.1.3)
STAGE 1: EXCAVATION IN CUT (BoQ ITEM 3.1.1)
Scale:Sheet No:
Revision No:
Drawn by:
Approved by:
Drawing Title & Detail:
Designed by:
Checked by:
Road Name: & Location
Date:
Client:
Drawing No: Date:
Ministry of Public Works, GOL.
Funded by: USAID Liberia
Ministry of Public Works, Liberia.
Do Not Scale __ of __
GENERAL NOTES
Engineering Services for Rural Road Rehabilitation Project
1. All dimension are in millimeters unless otherwise specified
2. Selection of typical cross section shall be specified by the design engineer
3. Dimensions of typical cross section may vary due to site condition
4. Wc and W shall be determined depending on design class of the road.
5. Preferably ( 1:n ) is ( 1:2 )
6. Abbreviations Rw - Right of Way (Usually 15m) Fw - Road Formation Width Wc - Wearing Course Width Ws - Shoulder Width d - Side Drain Width 1:n Rise:Horizontal run t - Gravel/Laterite thickness (Compacted) Bw - Backsloping width
Heavy Earthworks (Cut to Cart Away & Heavy Grading)
EW015
CROSS FILL & ROAD FORMATION IN CUT SECTION ON SLOPING GROUND
Back Sloping Width, Bw1
7 %7 % d
STAGE 2: HEAVY GRADING/ROAD FORMATION (BoQ ITEM 3.1.3)
7 %7 %
Laterite thickness, t = 150mm
Wc Ws d
STAGE 3: GRAVELLING (BoQ ITEM 3.2.1) - CROSS SECTION E1
Existing/Natural Ground Road Surface
Residual Surface After Cross Fill (Item 3.1.2a )
Excavation Area
Slope 3:1 Min or 1:1 Max
Commencing Road Surface Shaped & Compacted Road Bed (BoQ Item 3.1.3)
STAGE 1: CROSS FILL (BoQ ITEM 3.1.2a)
Scale:Sheet No:
Revision No:
Drawn by:
Approved by:
Drawing Title & Detail:
Designed by:
Checked by:
Road Name: & Location
Date:
Client:
Drawing No: Date:
Ministry of Public Works, GOL.
Funded by: USAID Liberia
Ministry of Public Works, Liberia.
Do Not Scale __ of __
GENERAL NOTES
Engineering Services for Rural Road Rehabilitation Project
1. All dimension are in millimeters unless otherwise specified
2. Selection of typical cross section shall be specified by the design engineer
3. Dimensions of typical cross section may vary due to site condition
4. Wc and W shall be determined depending on design class of the road.
5. Preferably ( 1:n ) is ( 1:2 )
6. Abbreviations Rw - Right of Way (Usually 15m) Fw - Road Formation Width Wc - Wearing Course Width Ws - Shoulder Width d - Side Drain Width 1:n Rise:Horizontal run t - Gravel/Laterite thickness (Compacted) Bw - Backsloping Width
Road Formation Width
Road Formation Width
W
W
Ws (widened)
Fill Area Using Cut Material (BoQ Item 3.1.2a)
Shaped & Compacted Laterite (BoQ Item 3.2.1)
Slope 3:1 Min or 1:1 Max
Slope 3:1 Min or 1:1 Max
Minimum Average Cut Height is 300mm, Otherwise Works at the Section are Paid under Heavy Grading
Slope 1:n
Heavy Earthworks (Cross Fill & Heavy Shaping)
EW005
Benched Surface
Revision No:
Drawn by:
Approved by:
Drawing Title & Detail:
Designed by:
Checked by:
Road Name: & Location
Date:
Client:
Drawing No: Date:
Ministry of Public Works, GOL.
Funded by: USAID Liberia
Ministry of Public Works, Liberia.
Do Not Scale __ of __
GENERAL NOTES
Engineering Services for Rural Road Rehabilitation Project
Ws
Conversion Factor: 1 ft = 0.3048m = 304.8mm
Feeder Road Traffic Band Wc Ws W = Wc + 2Ws Rw Fw n t
1 - Over 50 VPD 5500 - 6000 500 6500 - 7000 Varies Varies 2 200
2 - 20 - 50 VPD 5500 500 6500 Varies Varies 2 200
3 - <20 VPD 5000 500 6000 Varies Varies 2 200
1. All dimension are in millimeters unless otherwise specified
2. Selection of typical cross section shall be specified by the design engineer
3. Dimensions of typical cross section may vary due to site condition
4. Wc and W shall be determined depending on design class of the road.
5. Preferably ( 1:n ) is ( 1:2 )
6. Abbreviations Rw - Right of Way (Usually 15m) Fw - Road Formation Width Wc - Wearing Course Width Ws - Shoulder Width W - Shoulder to Shoulder Width d - Side Drain Width 1:n Rise:Horizontal run t - Gravel/Laterite thickness (Compacted) Hf - Height of Embarkment Fill
Embarkment Fill BoQ Item 3.1.2
Wearing Course BoQ Item 3.2.1
1 : n
Fw
Earth Works: Embarkment Filling with Superelevation (Cross Sections)
Laterite thickness, t = 200mm
Note;
1. The existing road bed survafe has to be stripped of any vegetation, organic material and any unsuitable material, and thereafter compacted to the specified density, prior to commencement of embarkment filling.
2. Embarkment filling has to be done in form of several compacted layers not exceeding 200mm thickness, and each layer should be appropriately moistened and compacted to the specified density or compaction.
EMBANKMENT FILLING WITH SUPERELEVATION
CROSSECTION A2
Ws
W
Existing Road Surface Before Site Clearance.
However Removal/Stripping of Unsuitable Material do be done Prior to Commencement of Filling Works.
The Site clearance is paid under Bill Item 2.2
EW008
max 1 : 1 and min. 3 :1
Scale:Sheet No:
Revision No:
Drawn by:
Approved by:
Drawing Title & Detail:
Designed by:
Checked by:
Road Name: & Location
Date:
Client:
Drawing No: Date:
Ministry of Public Works, GOL.
Funded by: USAID Liberia
Ministry of Public Works, Liberia.
Do Not Scale __ of __
GENERAL NOTES
Engineering Services for Rural Road Rehabilitation Project
7 %
1 : n max 1 :1 and min. 3 :1 d
W
W b
Conversion Factor: 1 ft = 0.3048m = 304.8mm
Feeder Road Traffic Band W H n b a d t
1 - Over 50 VPD 6500 - 7000 500 2 1000 150
2 - 20 - 50 VPD 6000 500 2 1000 150
3 - <20 VPD 5000 400 2 800 150
Earth Works: Superelevation Cross Sections
Road Centre Line
Road Centre Line d ab a
H = Min 3000
H =Min 300
ROAD FORMATION or RESHAPING WITH SUPERELEVATION ON INSITU GRAVEL/LATERITE
CROSSECTION D3
CROSSECTION D4
1. All dimension are in millimeters unless otherwise specified
2. Selection of typical cross section shall be specified by the design engineer
3. Dimensions of typical cross section may vary due to site condition
4. Wc and W shall be determined depending on design class of the road.
5. Preferably ( 1:n ) is ( 1:2 )
6. Abbreviations Rw - Right of Way (Usually 15m) Fw - Road Formation Width Wc - Wearing Course Width Ws - Shoulder Width W - Shoulder to Shoulder Width d - Side Drain Width 1:n Rise:Horizontal run t - Gravel/Laterite thickness (Compacted)
Existing Ground /Commencing Surface
Laterite Fill, BoQ Item 3.2.1
Existing Ground /Commencing Surface
Laterite Fill, BoQ Item 3.2.1
Note: All commencing surfaces must be scarified to atleast 150mm and moistened prior to shaping, and the same procedure repeated prior to placement of gravel wearing course.
EW014
Natural ground profile with freefall of runoff
1 : n max 1:1 and min. 3:1
Scale:Sheet No:
Revision No:
Drawn by:
Approved by:
Drawing Title & Detail:
Designed by:
Checked by:
Road Name: & Location
Date:
Client:
Drawing No: Date:
Ministry of Public Works, GOL.
Funded by: USAID Liberia
Ministry of Public Works, Liberia.
Do Not Scale __ of __
GENERAL NOTES
Engineering Services for Rural Road Rehabilitation Project
7 %7 %
Natural ground profile with freefall of runoff
1 : n max 1:1 and min. 3:1
Wd d ba aW
Conversion Factor: 1 ft = 0.3048m = 304.8mm
Feeder Road Traffic Band W H n b a d t
1 - Over 50 VPD 6500 - 7000 500 2 1000 150
2 - 20 - 50 VPD 6000 500 2 1000 150
3 - <20 VPD 5000 400 2 800 150
H
H
ROAD FORMATION or RESHAPING ON INSITU GRAVEL/LATERITE
CROSSECTION B3
CROSSECTION B4
1. All dimension are in millimeters unless otherwise specified
2. Selection of typical cross section shall be specified by the design engineer
3. Dimensions of typical cross section may vary due to site condition
4. Wc and W shall be determined depending on design class of the road.
5. Preferably ( 1:n ) is ( 1:2 )
6. Abbreviations Rw - Right of Way (Usually 15m) Fw - Road Formation Width Wc - Wearing Course Width Ws - Shoulder Width d - Side Drain Width 1:n Rise:Horizontal run t - Gravel/Laterite thickness (Compacted)
Note: All commencing surfaces must be scarified to at least 150mm and moistened prior to shaping, and the same procedure repeated prior to placement of gravel wearing course. Road Formation or Reshaping Cross
EW010
max 1:1 and min. 3:1
Scale:Sheet No:
Revision No:
Drawn by:
Approved by:
Drawing Title & Detail:
Designed by:
Checked by:
Road Name: & Location
Date:
Client:
Drawing No: Date:
Ministry of Public Works, GOL.
Funded by: USAID Liberia
Ministry of Public Works, Liberia.
Do Not Scale __ of __
GENERAL NOTES
Engineering Services for Rural Road Rehabilitation Project
7 %7 %
1 : n max 1:1 and min. 3:1
W b a ba
W dd
Conversion Factor: 1 ft = 0.3048m = 304.8mm
Feeder Road Traffic Band W H n b a d t
1 - Over 50 VPD 6500 - 7000 500 2 1000 150
2 - 20 - 50 VPD 6000 500 2 1000 150
3 - <20 VPD 5000 400 2 800 150
H
H
ROAD FORMATION OR RESHAPING CROSS SECTIONS
CROSS SECTION C3
CROSS SECTION C4
1. All dimension are in millimeters unless otherwise specified
2. Selection of typical cross section shall be specified by the design engineer
3. Dimensions of typical cross section may vary due to site condition
4. Wc and W shall be determined depending on design class of the road.
5. Preferably ( 1:n ) is ( 1:2 )
6. Abbreviations Rw - Right of Way (Usually 15m) Fw - Road Formation Width Wc - Wearing Course Width Ws - Shoulder Width d - Side Drain Width 1:n Rise:Horizontal run t - Gravel/Laterite thickness (Compacted)
Note: All commencing surfaces must be scarified to at least 150mm and moistened prior to shaping, and the same procedure repeated prior to placement of gravel wearing course. Road Formation or Reshaping Cross
EW012
Drawn by:
Approved by:
Drawing Title & Detail:
Designed by:
Checked by:
Road Name: & Location
Date:
Client:
Drawing No: Date:
Ministry of Public Works, GOL.
Funded by: USAID Liberia
Ministry of Public Works, Liberia.
Do Not Scale __ of __
GENERAL NOTES
Engineering Services for Rural Road Rehabilitation Project
Mi n 5
Min 1000
CULVERT OUTLET CHANNEL IN ACTIVE STREAMS
DRAIN TYPE E 2
Slope 1: 2
Min 500
Min 3000 from Road Side Drain
Slope 1:1
TYPICAL CATCH WATER DRAIN ON SLOPING GROUND
DRAIN TYPE E 1
Mi n 5
Min 500
CULVERT OUTLET CHANNEL FOR RELIEF CULVERTS & MITRE DRAINS
DRAIN TYPE E3
Slope 1: 1
Drainage Detail: Earth Water Drains
Excavated Material
500 1000
400 800
ROAD SIDE DRAINS
DRAIN TYPE S1
ROAD SIDE DRAINS
DRAIN TYPE S2
TYPICAL EARTH DRAINS TYPES & DETAILS
ED001
DB10@200 C/C
DB10@150 C/C
CL
SECTION THROUGH LINED TRAPEZOIDAL CONCRETE
CHANNEL (REINFORCEMENT DETAIL)
H
H H 100 100
CONSTRUCTION JOINT DETAIL IN LINED
TRAPEZOIDAL CONCRETE DRAIN
DB10@200 C/C TIE BAR - DB12@500 C/C
1000mm Long
Class 20 Concrete
TYPICAL REINFORCEMENT STEEL ARRANGEMENT FOR
LINED CHANNEL DRAIN (REINFORCEMENT DETAIL)
DB10 Steel as detailed in structural drawing detail
Expansion Joints at 22,500 Spacing
Expansion Joint
50mm Mass Concrete Blinding
50mm PVC Pipe Drain at 5m intervals
CL
DETAIL L: LINED TRAPEZOIDAL CONCRETE CHANNEL
DRAIN TYPE L1
H
H H 100 100
1 100
Cement Stabilised Backfill.
(1:4 Cement: Soil Mix)
Scale:Sheet No:
Revision No:
Drawn by:
Approved by:
Drawing Title & Detail:
Designed by:
Checked by:
Road Name: & Location
Date:
Client:
Drawing No: Date:
Ministry of Public Works, GOL.
Funded by: USAID Liberia
Ministry of Public Works, Liberia.
Do Not Scale __ of __
GENERAL NOTES
Engineering Services for Rural Road Rehabilitation Project
Drainage Detail: Lined Water Drains
1. All dimension are in millimeters unless otherwise specified
2. H for Lined Drains Varies from Min 400mm - 600mm but the decision on the H depth to use rests entirely with the engineer. The engineer will advise on the appropriate H in the form of a site instruction.
However as a guide H is a function of the Slope of the water channel, Flow Rate Q and roughness.
Flatter channels will tend to have bigger H size than Steeper Channels.
50mm PVC Pipe Drain at 5m intervals
CL
DETAIL L: LINED TRAPEZOIDAL GROUTED STONE
CHANNEL DRAIN TYPE L2
H
H H 100 100
1 200
Cement Stabilised Backfill.
(1:4 Cement: Soil Mix)
TYPICAL LINED DRAINS TYPES & DETAILS
50mm PVC Pipe Drain at 5m intervals
CL
DETAIL L: LINED TRAPEZOIDAL GROUTED STONE
CHANNEL DRAIN TYPE L3
H
H H 100 100
Cement Stabilised Backfill.
(1:4 Cement: Soil Mix)
LD001
Drawn by:
Approved by:
Drawing Title & Detail:
Designed by:
Checked by:
Road Name: & Location
Date:
Client:
Drawing No: Date:
Ministry of Public Works, GOL.
Funded by: USAID Liberia
Ministry of Public Works, Liberia.
Do Not Scale __ of __
GENERAL NOTES
Engineering Services for Rural Road Rehabilitation Project
Erosion Control: Scour Check Details
1. All dimension are in millimeters unless otherwise specified
TYPICAL EROSION CONTROL SCOUR CHECKS
400125250125
PLAN OF WOODEN SCOUR CHECKS
CROSS SECTION C-C:
PLAN OF WOODEN SCOUR CHECKS CROSS SECTION D-D:
PLAN OF GROUTED STONE SCOUR CHECKS
PLAN OF GROUTED STONE SCOUR CHECKS
D C
300 300
Existing Side Drain Profile
Scour Check Spacing
LONGITUDINAL CROSS SECTION
THROUGH WOODEN STICK SCOUR CHECKS
PERSPECTIVE VIEW AFTER
SCOUR CHECK CONSTRUCTION
Scour Check Spacing
Scour Check Spacing
EP001
Revision No:
Drawn by:
Approved by:
Drawing Title & Detail:
Designed by:
Checked by:
Road Name: & Location
Date:
Client:
Drawing No: Date:
Ministry of Public Works, GOL.
Funded by: USAID Liberia
Ministry of Public Works, Liberia.
Do Not Scale __ of __
GENERAL NOTES
Engineering Services for Rural Road Rehabilitation Project
Laterite thickness, t = 150mm
Wc
W
Ws Ws
Conversion Factor: 1 ft = 0.3048m = 304.8mm
Feeder Road Traffic Band Wc Ws W = Wc + 2Ws Min H (mm) n b a d t
2 - 20 - 50 VPD 5000 1000 7000 500 1 1000 150
3 - <20 VPD 4500 1000 6500 400 1 800 150
ROAD FORMATION/RESHAPING WITH LINED DRAINS ON SLOPING GROUND
ROAD FORMATION/RESHAPING ON SLOPING GROUND: CROSSECTION E2
1. All dimension are in millimeters unless otherwise specified
2. Selection of typical cross section shall be specified by the design engineer
3. Dimensions of typical cross section may vary due to site condition
4. Wc and W shall be determined depending on design class of the road.
5. Preferably ( 1:n ) is ( 1:2 )
6. Abbreviations Rw - Right of Way (Usually 15m) Fw - Road Formation Width Wc - Wearing Course Width Ws - Shoulder Width d - Side Drain Width 1:n Rise:Horizontal run t - Gravel/Laterite thickness (Compacted)
Note: All commencing surfaces must be scarified to atleast 150mm and moistened prior to shaping, and the same procedure repeated prior to placement of gravel wearing course.
Varies
50mm PVC Pipe Drain at 5m intervals
CL
DETAIL L: LINED TRAPEZOIDAL CONCRETE CHANNEL
H
H H 100 100
1 100
Max 1:1, Min 3:1
Detail L
Cement Stabilised Backfill.
(1:4 Cement: Soil Mix)
EW015
Road Formation/Reshaping with Lined Drains on Sloping Ground
CUT TO CART AWAY FOLLOWED BY ROAD FORMATION ON EVEN GROUND
Back Sloping Width, Bw1Back Sloping Width, Bw2
7 %7 %
1 : n dd
STAGE 2: HEAVY GRADING/ROAD FORMATION (BoQ ITEM 3.1.3)
7 %7 %
1 : n
Laterite thickness, t = 150mm
Wc
W
Ws Ws dd
STAGE 3: GRAVELLING (BoQ ITEM 3.2.1) - CROSS SECTION E1
Road Formation Width (Ditch to Ditch)
W 500
Road Formation Width (Ditch to Ditch)
Existing/Natural Ground Road Surface
Residual Surface After Excavation in Cut
Excavation in Cut (BoQ Item 3.1.1)
Slope 3:1 Min or 1:1 Max
Commencing Road Surface Shaped & Compacted Road Bed (BoQ Item 3.1.3)
STAGE 1: EXCAVATION IN CUT (BoQ ITEM 3.1.1)
Scale:Sheet No:
Revision No:
Drawn by:
Approved by:
Drawing Title & Detail:
Designed by:
Checked by:
Road Name: & Location
Date:
Client:
Drawing No: Date:
Ministry of Public Works, GOL.
Funded by: USAID Liberia
Ministry of Public Works, Liberia.
Do Not Scale __ of __
GENERAL NOTES
Engineering Services for Rural Road Rehabilitation Project
1. All dimension are in millimeters unless otherwise specified
2. Selection of typical cross section shall be specified by the design engineer
3. Dimensions of typical cross section may vary due to site condition
4. Wc and W shall be determined depending on design class of the road.
5. Preferably ( 1:n ) is ( 1:2 )
6. Abbreviations Rw - Right of Way (Usually 15m) Fw - Road Formation Width Wc - Wearing Course Width Ws - Shoulder Width d - Side Drain Width 1:n Rise:Horizontal run t - Gravel/Laterite thickness (Compacted) Bw - Backsloping width
Heavy Earthworks (Cut to Cart Away & Heavy Grading)
EW017
| General Drawings-Model 23.pdf |
| General Drawings-Model 24.pdf |
| Method of Measurement-Model 1.pdf |
| Method of Measurement-Model 2.pdf |
| Method of Measurement-Model 3.pdf |
| Road Cross Sections-Model 4.pdf |
| Road Cross Sections-Model 5.pdf |
| Road Cross Sections-Model 6.pdf |
| Road Cross Sections-Model 7.pdf |
| Road Cross Sections-Model 8.pdf |
| Road Cross Sections-Model 9.pdf |
| Road Cross Sections-Model 10.pdf |
| Road Cross Sections-Model 11.pdf |
| Road Cross Sections-Model 12.pdf |
| Road Cross Sections-Model 13.pdf |
| Road Cross Sections-Model 14.pdf |
| Road Cross Sections-Model 15.pdf |
| Road Cross Sections-Model 16.pdf |
| Road Cross Sections-Model 17.pdf |
| Road Cross Sections-Model 18.pdf |
| Road Cross Sections-Model EW015.pdf |
| Road Cross Sections-Model EW017.pdf |
File details come from the government source that posted it. Updated .