J.6.A.2_TO_001_BOQ_(Bassa-Varmah).xlsx

XLSX spreadsheet 204 KB Posted

Attached to
The purpose of this contract is to provide construction services for road and general vertical infrastructure works throughout Liberia.
Solicitation number
SOL-669-16-000006
Issued by

About this file

J.6.A.2

View the file

Other files

File Type Posted
Amendment_01 _SOL-669-16-000006.pdf PDF
J.6.B.2_TO_BOQ_-_Revised.xlsx XLSX spreadsheet
Attachment_J.7.pdf PDF
Amended_SOL-669-16-000006.pdf PDF
J.6.A.2_TO_BOQ_-_Revised.xlsx XLSX spreadsheet
J.6.C.1_TO_003_strip_Map_(_Bulor-Tusu).xlsx XLSX spreadsheet
J.3_C-Box_Culvert_drwaings.pdf PDF
J.1A-Unit_Rate_Analysis_Sheet.xlsx XLSX spreadsheet
J.1-Schedule_of_rates.xlsx XLSX spreadsheet
J.6.A.1_Task_order_001_Strip_Map.pdf PDF
J.4_Marking_and_Branding_Plan.pdf PDF
J.3A-Earthworks_drawings.pdf PDF
J.3.D_Drwaings_bridges_ _Box_culverts.pdf PDF
J.2-USAID_Liberia_RISE_PEA-ESMMF_FINAL_(1).pdf PDF
J.3_B-Pipe_Culverts_Drawings.pdf PDF
J.5_Technical_Specifications.docx DOCX document
J.6_Task_Order_Request_for_Proposal.docx DOCX document
J.6.B.2_TO_002_BOQ_(Waka-Johnny_Tutu).xlsx XLSX spreadsheet
J.6.C.2_TO_003_BOQ_(Bulor-Tusu).xlsx XLSX spreadsheet
J.6.B.1_TO_002_strip_map_(Waka-Johnny_Tutu).xlsx XLSX spreadsheet
Executed_Sol_SOL-669-16-000006.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cover Page

Bills of Quantities
Project Name: Engineering Services for Rural Road Rehabilitation Project
Funded by:USAID - Liberia
Contract Name:Rehabilitation of Compound 1-Little Bassa-Varmah Road Section
Contract Reference No:Lot No:
Road Name:Compound 1-Varmah-Edina RoadCH0+000toCH35+000
District :District 1
County:Grand Bassa

Contractor Name:

Bill 1

Item NoDescriptionUnitRev QtyUnit Rate (US$)Amount (US$)
1.0Preliminary & General Items
1.1Contractor's mobilization and establishment of site campLS1$0.00

1.2 Contractor demobilization and removal of camp site LS 1 $0.00

1.3Occupational Health and Safety, HIV/AIDs and Gender awareness meetings
1.3.1Provision of all contractual responsibilities stipulated in section 1.3 of the SpecificationsLS1$0.00
1.3.2Occupational Health and Safety, HIV/AIDs and Gender awareness meetingsNo10$0.00
1.4Accomodation of traffic
1.4.1Permanent road traffic signs for the completed roadNo20$0.00

1.5 Provision, erection, maintenance and removal of project bill sign board as indicated in the drawing or instructed by the Engineer. No 3 $0.00

1.6 Provide specified insurances and bonds LS 1 $0.00

1.7 Construction of temporary detours including their maintenance and restoration m 560 $0.00

1.8Time and Method Related Costs
1.8.1Provision of Key Site Based Personnel
1.8.1aQuality Control/Assurance Officer (1No)Week45$0.00
1.8.1bEnvironmental Compliance/Safety Officer (1 No)Week45$0.00
1.8.1cQualified First Aid Assistant (1No)Week45$0.00
1.8.2Conducting Materials Tests as instructed by the engineer, inclusive of test report preparation
1.8.2aGrading & Atterberg TestsSet30$0.00
1.8.2bCompaction TestsSet100$0.00
1.8.2cConcrete Compresive TestsSet25$0.00
1.8.2dFoundation Bearing Capacity Tests at Bridge & Box Culvert ExcavationsSet20$0.00

Sub Total for Preliminary Items $0.00

&"Arial Narrow,Regular"&12ENGINEERING SERVICES FOR RURAL ROADS REHABILITATION PROJECT Contract Name: Rehabilitation of Compound 1-Little Bassa-Varmah Road Road Name: Compound 1-Little Bassa-Varmah County: Grand Bassa

&"Arial Narrow,Regular"&9

Bill 2

Item NoDescriptionUnitRev QTYRate (USD)Amount (USD)
2.0Site Preparation and Clearing Works
2.1Setting out of road alignment and cross sectionsm35,000$0.00
$0.00
2.2Site Clearance$0.00
2.2.1Clearing as specified in the drawings and in section 2.2 of the specification but outside the formation width:$0.00
2.2.1aIn Light Vegetation (medium density bush, plantation, shrub or grass) areas except trees and stumps defined in bill item 2.2.2SQM68,000$0.00
2.2.1bIn Heavy or Dense Vegetation (dense bush, rubber plantation, forests) areas except trees and stumps defined in bill item 2.2.2SQM54,000$0.00
2.2.2Removal of large trees and tree stumps:
2.2.2aGirth exceeding 1.0 m [3.28ft] up to and including 2.0 m [6.6ft]No20$0.00
2.2.2bGirth exceeding 2.0 m [6.6ft] up to and including 3.0m [9.8ft]No- 0$0.00
2.2.2cGirth exceeding 3.0 m [9.8ft]No- 0$0.00
2.2.3Clearing, Grubbing and Removal of Vegetation & Top Organic Soil from the Road FormationSQM26,000$0.00

Sub Total for Site Preparation and Clearing Works $0.00

Bill 3

Item NoDescriptionUnitQuantityRev QTYRate (USD)Amount (USD)
3.0Earthworks and Pavement Works
3.1Earthworks
3.1.1Excavation or Cutting to Spoil on existing road bed including disposal to approved disposal locations
3.1.1aCommon or Ordinary SoilCUM255255$0.00
3.1.1bRock MaterialCUM- 020$0.00
3.1.1cSwamps LocationsCUM- 046$0.00
3.1.2Earthworks in Embankments or Filling to required road levels and cross sections including shaping, watering & compaction to Min 95% MDD$0.00
3.1.2aUsing cut material (Cross fill or Cut to Fill)CUM- 0- 0$0.00
3.1.2bUsing Borrow Material (Ordinary Fill)CUM2,7038,500$0.00
3.1.2cUsing rock fill materialCUM- 0- 0$0.00
3.1.3Heavy grading of a new road bed/formation section to specified cross-section and camber including Watering & Compaction to Min 95% MDD inclusive of backslopingSQM99,675139,545$0.00
3.1.4Clearing & Reinstatement of borrow pit sites for Ordinary Fill Material extractionSQM- 02,500$0.00
3.1.5Removal of all unsuitable materials from the road formation to any depth as instructed by the engineer and disposal to approved locations.CUM- 0- 0$0.00
3.1.6Over-haulage of ordinary fill material (Beyond 2km haulage distance)km.m3- 0- 0$0.00
3.2Gravel Wearing Course
3.2.1Excavation, loading, haulage, spreading and compaction of approved gravel pavement to Min 95% MDD.CUM10,60031,500$0.00
3.2.2Clearing of borrow pit sites for gravel extractionSQM35,00035,000$0.00
3.2.3Restoration of borrow pit sitesSQM35,00035,000$0.00
3.2.4Over-haulage of gravel (Beyond 5km haulage distance)km.m35,0005,000$0.00
$0.00
3.3Re-shaping or Re-Grading to form Camber$0.00
3.3.1Scarification and Reshaping of an existing road section to specified camber including Watering & Compaction to Min 95% MDD and inclusive of backsloping.SQM77,62550,000$0.00
3.4Excavation and Construction of Drains
3.4.1Excavation of new open drains (catch water and mitre drains) to specified cross section dimensions (Refer to drawings)
3.4.1aIn Soft Materialm1,9202,496$0.00
3.4.1bIn Rock MaterialCUM- 0- 0$0.00
3.4.2Cleaning and re-shaping of existing side, catch water and mitre drainsm- 0- 0$0.00
3.4.3Supply material and construct scour checks:$0.00
3.4.3aUsing Wooden SticksNo- 0- 0$0.00
3.4.3bUsing Dry StonesNo- 0- 0$0.00
3.4.3cUsing Grouted stonesNo131300$0.00
3.4.4Construction of Banks and DykesCUM- 0$0.00
3.4.5Construction of Sub-drains using specified graded boulder material- 0$0.00
3.4.5aType 1 as specified in the drawingsCUM- 0$0.00
3.4.5bType 2 as specified in the drawingsCUM- 0$0.00
Sub Total for Earthworks and Gravel Road Pavement Works$0.00

Bill 4

Item NoDescriptionUnitQuantityRev QtyRate (USD)Amount (USD)
4.0Drainage and Structures: Prefabricated Pipe Culvert Works
4.1Excavation for Pipe Culverts
4.1.1In soft soils to a trench depth not exceeding 1.5mCUM
4.1.2In soft soils to a trench depth exceeding 1.5mCUM1,1241,573$0.00
4.1.3In RockCUM- 0$0.00
4.2Backfill to Pipe Culverts.
4.2.1Using Insitu Excavated MaterialCUM- 0500$0.00
4.2.2Using Approved Imported MaterialCUM564290$0.00
4.3Provide Material and Construct Reinforced Concrete Pipe Culvert
4.3.1600mm Diameterm130490$0.00
4.3.2900mm Diameterm20084$0.00
4.3.31200mm Diameterm612$0.00
4.3.41500mm Diameterm66$0.00
4.4Provide Material and Cast insitu Concrete in class
4.4.1Class 10 MPA for BlindingCUM
4.4.2Class 15 MPA in Bedding & HaunchCUM166233$0.00
4.4.3Class 20 MPA in Culvert End Structures & Reinforced Concrete BeddingCUM288540$0.00
4.5Provide Material and Construct Cement Bound Masonry Works at End Structures
4.5.1Using Cement/Sand BlocksCUM- 0- 0$0.00
4.5.2Using StonesCUM- 0- 0$0.00
4.6Provide, place and compact hardcore foundation for pipe structures in very soft spots as instructed by the engineerCUM1740$0.00
4.7Construct temporary water diversions in locations of active water courses including their maintenance and removal by:$0.00
4.7.1Excavation of diversion channelsCUM- 056$0.00
4.7.2Constructing temporary dykes and earth barriersCUM- 0$0.00
4.8Provide Material and Construct Stone Pitching to specified thickness:
4.8.1Using Dry (Plain) Stone PitchingSQM- 0$0.00
4.8.2Using Grouted Stone PitchingSQM- 0- 0$0.00
4.9Provide Material and Construct Rip-Rap Protection to specified thickness
4.9.1Using Dry (Plain) Packed StoneCUM
4.9.2Using Grouted StoneCUM1,3061,350$0.00
4.10Provide Material and Construct Stone Masonry Walls
4.10.1Using Dry (Plain) Stone MasonryCUM- 0$0.00
4.10.2Using Grouted Stone MasonryCUM- 0$0.00
4.11Provide Material and Construct Mass Concrete for Pitching (Paving)CUM- 0$0.00
4.12Provide and Construct Stone Filled Gabion Works including the foundation preparation, as per standard drawings and specs
4.12.1In approved Gabion Box quality and specified dimensionsCUM- 0$0.00
4.12.2In approved Reno Mattress quality and specified dimensionsCUM- 0$0.00
4.13Supply and Fix Reinforcing Steel in Reinforced Concrete
4.13.1Mild steel barsKg23,91033,474$0.00
4.13.2High yield steel barsKg- 0- 0$0.00
4.13.3Welded steel fabricKg- 0$0.00
4.14Provide Material, Place and fix into position of concrete formwork including its removal after concrete curing- 0
4.14.1Rough finish formworkSQM- 01,600$0.00
4.14.2Fair finish formworkSQM2,9611,036$0.00
4.15Provide for the desilting of existing pipe culverts including opening of inlets and outlets
4.15.1600mm & 900mm Diameterm- 0- 0$0.00
4.15.21200mm & 1500mm Diameterm- 0- 0$0.00
4.16Demolition and disposal of existing pipe structures (RCP & CMP)$0.00
4.16.1600mm & 900mm DiameterNo210$0.00
4.16.21200mm & 1500mm DiameterNo- 0- 0$0.00
4.17Demolition and disposal of existing log bridges at pipe structures locationsNo- 0- 0$0.00
4.18Excavation of Pipe Culvert Outlets and Inlets at Existing & New Pipe Culvert Locations as instructed by the EngineerCUM- 0100$0.00

Sub Total for Drainage and Structures (Pre-fabricated Pipe Culverts) $0.00

Bill 5

Item NoDescriptionUnitQuantityRev QTYRate (USD)Amount (USD)
5.0Miscellaneous Items (Pipe Culverts)
5.1Landscaping & Grassing
5.1.1Hand TrimmingSQM$0.00
5.1.2Establishing Vegetation
5.1.2aEstablishing Vegetation: Planting and establishing grass from imported sources within countrySQM$0.00
5.1.2bEstablishing Vegetation: Planting and establishing grass using approved bush sods from site areaSQM$0.00
5.1.2cPlanting of treesNo$0.00
5.1.2dPlanting of ShrubSQM$0.00
5.2Construction of Lined drains at specified road sections as shown on the drawingsCUM$0.00
5.2.1In class 20 MPA (1: 2: 4) concreteCUM$0.00
5.2.2In grouted stone masonryCUM0.0300.0$0.00

Sub Total for Miscellaneous Items $0.00

Bill 6

Item NoDescriptionUnitQuantityREV QTYRate (USD)Amount (USD)
6.0

This Bill No. 6 has been left out intentionally

Sub Total for Miscellaneous Items $0.00

Bill 7a BC (Ch9+300)

Item NoDescriptionUnitQuantityRate (USD)Amount (USD)
7.0 aCompound 1 - Little Bassa - Varmah, Ch 9+300 Box Culvert
7.1Temporary Works & Water Diversions
Construct temporary water diversions at Box Culvert locations on active water courses including their maintenance and removal by:
7.1.1Excavation of diversion channelsCUM97$0.00
7.1.2Erection of temporary barriersCUM- 0$0.00
Construction and removal temporary Log Bridge structures on detour roadsLS1$0.00
7.2Excavation for Structures Foundations
7.2.1In Common Soils to 1 - 5m depthCUM350$0.00
7.2.2In Common Soils to 5 - 10m depthCUM30$0.00
7.2.3In Rock Material lrrespective of DepthCUM- 0$0.00
7.2.4Preparation of excavated surface to receive permanent works.SQM86$0.00
7.2.5Disposal of surplus excavated material as directed by the EngineerCUM- 0$0.00
7.2.6Disposal of excavated material; rockCUM- 0$0.00
7.3Backfill to Box Culvert Structures
Provide Material, backfill in layers not exceeding 200mm, water and compact approved backfill to 95% MDD$0.00
7.3.1Using Insitu Excavated MaterialCUM95$0.00
7.3.2Using Approved Imported MaterialCUM100$0.00
7.3.3Using imported single size pervious crushed stone backfill behind wing walls and stems including cast in place PVC weep holes as shown on drawingsCUM12$0.00
7.3.4Provide, place and. compact hardcore foundation layer in very soft spots (with low bearing capacity) as instructed by the engineerCUM39$0.00
7.4Form Work
7.4.1Provide Material, Place, Fix and Brace into position of concrete formwork and shuttering including its removal after concrete curing
7.4.2Rough finish formworkSQM163$0.00
7.4.3Fair finish formworkSQM82$0.00
7.5Steel Reinforcement
7.5.1Supply and Fix Reinforcing Steel in Reinforced Concrete
7.5.2Mild steel barsKg10,469$0.00
7.5.3High yield stress steel barsKg- 0$0.00
7.5.4Welded steel fabricKg- 0$0.00
7.5.5Provide and install fixed and expandable bearingsSet3$0.00
7.6Concrete Works
7.6.1Provide Materials, Cast In-situ concrete to structures including curing in class
7.6.2Class 10 (1:4:8)CUM- 0$0.00
7.6.3Class 15/40CUM23$0.00
7.6.4Class 20/20CUM- 0$0.00
7.6.5Class 25/20CUM- 0$0.00
7.6.6Class 30/20CUM110$0.00
7.7Railing Aesthetic Treatments & Safety Works
7.7.1Fabrication and construction of Box culvert guardrails
7.7.2Provide 75mm gulvanised pipe for Box culvert guardrails as shown on the drawings and specificationsm- 0$0.00
7.7.3Painting (3 Coats) to concrete surfaces of box Culvert guard rails, parapet & barriers using the epoxy paint and colours as specified by the engineerLS- 0$0.00
$0.00
7.8River Training Works$0.00
7.8.1Provide all necessary equipment, and labour necessary for river training works as shown on the drawings or instructed by the engineer, in conditions of- 0$0.00
7.8.2Opening by removal of Vegetation & downstream tree logs in water way channel to a minimum of 25m on either side of water channel or as directed by the EngineerLS1$0.00
7.8.3Excavation and sloping of land mass upstream/downstream of water channelCum- 0$0.00
7.8.4Excavation & Installation of Gabion works upstream/downstream for river trainingCum- 0$0.00
Permanent Deposition of Clay Soil/Rock Mass in existing channel to divert flow of water to new design channelCum- 0$0.00
7.9Demolition of Existing Structures
7.9.1Demolition and disposal of existing pipe structures (RCP & CMP) within vicinity of proposed Box Culvert LocationNo- 0$0.00
7.9.2Demolition and disposal of existing Log Bridge structures within vicinity of proposed Box Culvert LocationNo1$0.00
7.10.Maintenance Works to Existing Box Culverts
7.10.1Provide for the desilting of existing Box Culvert Water Way & ApronsNo- 0$0.00
7.10.2Excavation of inlets and outlets at existing Box Culverts as instructed by the engineerCUM- 0$0.00
7.11Erosion Protection Works
7.11.1Provide Material and Construct Stone Pitching to specified thickness:
7.11.1.1Using Dry (Plain) Stone PitchingSQM- 0$0.00
7.11.1.2Using Grouted Stone PitchingSQM100$0.00
7.11.2Provide Material and Construct Rip-Rap Protection to specified thickness
7.11.2.1Using Dry (Plain) Packed StoneCUM- 0$0.00
7.11.2.2Using Grouted StoneCUM21$0.00
7.11.3Provide and Construct Stone Filled Gabion Works including the foundation preparation, as per standard drawings and specification
7.11.3.1In approved Gabion Box quality and specified dimensionsCUM- 0$0.00
7.11.3.2In approved Reno Mattress quality and specified dimensionsCUM- 0$0.00
7.12Landscaping and Grassing
7.12.1TrimmingSQM- 0$0.00
7.12.2Establishing Vegetation: Planting and establishing grass from imported sources within countrySQM- 0$0.00
7.12.3Establishing Vegetation: Planting and establishing grass using approved bush sods from site areaSQM
7.13Finishing Works
7.13.1Provide all necessary equipment and labour to clean and dispose away from site, all construction debris in the vicinity of the finished box culvert structureLS1$0.00
7.13.2Provide, spread and compact selected gravel backfill to Min 95% MDD on top of box culvert slab and approaches (both sides) to finished road profile.CUM500$0.00

Sub Total for Box Culvert Structure $0.00

Bill 7b BR (Ch0+388)

Item NoDescriptionUnitQuantityREV QTYRate (USD)Amount (USD)
7.0YEAH RIVER BRIDGE, GRAND BASSA COUNTY,

CH 0 + 388 -CH 0 + 412

7.1Construction of Temporary Works & Water Diversions
Construct temporary water diversions at Bridge locations on active water courses including their maintenance and removal by:
7.1.1Excavation of diversion channelsCUM209300$0.00
7.1.2Erection of temporary barriersCUM20980$0.00
7.1.3Construction and removal of temporary Log Bridge structures on detour roadsLS11$0.00
7.2Excavation of Foundations for Structures
7.2.1In Common Soils to 1 - 5m depthCUM442350$0.00
7.2.2In Common Soils to 5 - 10m depthCUM$0.00
7.2.3In Rock Material lrrespective of DepthCUM$0.00
7.2.4Preparation of excavated surface to receive permanent works.SQM250250$0.00
7.2.5Disposal of surplus excavated material as directed by the EngineerCUM236236$0.00
7.2.6Disposal of excavated material; rockCUM- 0$0.00
7.3Backfill to Structures
Provide Material, backfill in layers not exceeding 200mm, water and compact approved backfill to 95% MDD
7.3.1Using Insitu Excavated MaterialCUM10375$0.00
7.3.2Using Approved Imported MaterialCUM103200$0.00
7.3.3Using imported single size pervious crushed stone backfill behind wing walls and stems including cast in place PVC weep holes as shown on drawingsCUM4848$0.00
7.3.4Provide, place and. compact hardcore foundation layer in very soft spots (with low bearing capacity) as instructed by the engineerCUM1726$0.00
7.4Form Work and Shuttering
Provide Material, Place, Fix and Brace into position of concrete formwork and shuttering including its removal after concrete curing
7.4.1Rough finish formworkSQM116100$0.00
7.4.2Fair finish formworkSQM406300$0.00
7.5Steel Reinforcement Works
Supply and Fix Reinforcing Steel in Reinforced Concrete
7.5.1Mild steel barsKg26,73820,000$0.00
7.5.2High yield stress steel barsKg- 0- 0$0.00
7.5.3Welded steel fabricKg- 0- 0$0.00
7.5.4Provide and install fixed and expandable bearingsSet88$0.00
7.6Concrete Works for Structures
Provide Materials, cast In-situ concrete to structures including curing in class
7.6.1Class 10 (1:4:8)CUM43030$0.00
7.6.2Class 15/40CUM- 0- 0$0.00
7.6.3Class 20/20CUM- 0- 0$0.00
7.6.4Class 25/20CUM- 060$0.00
7.6.5Class 30/20CUM- 0150$0.00
7.7Railing Aesthetic Treatments & Safety Works
Fabrication and construction of Bridge Guardrails
7.7.1Provide 75 mm gulvanised pipe for Approch Slab of the Bridge Structure guardrails as shown on the drawings and specificationsm1515$0.00
7.7.2Painting (3 Coats) to concrete surfaces of Bridge guard rails, parapet & barriers using the epoxy paint and colours as specified by the engineerLS11$0.00
7.8River Training Works
Provide all necessary equipment, and labour necessary for river training works as shown on the drawings or instructed by the engineer, in conditions of
7.8.1Opening by removal of Vegetation & downstream tree logs in water way channel to a minimum of 25m on either side of water channel or as directed by the EngineerLS11$0.00
7.8.2Excavation and sloping of land mass upstream/downstream of water channelCum
7.8.3Excavation & Installation of Gabion works upstream/downstream for river trainingCum3740$0.00
7.8.4Permanent Deposition of Clay Soil/Rock Mass in existing channel to divert flow of water to new design channelCum- 0$0.00
$0.00
7.9Demolition of Existing Structures
7.9.1Demolition and disposal of existing bridge structures (Billy Bridge ) at RMTC in Bassa CountyNo11$0.00
7.9.2Demolition and disposal of existing Log Bridge structures within vicinity of proposed Box bridgeLocationNo- 0- 0$0.00
7.10Maintenance of Existing Structures
7.10.1Provide for the desilting of existing Box bridgeWater Way & ApronsNo
7.10.2Excavation of inlets and outlets at existing Box Culverts as instructed by the engineerCUM165165$0.00
7.11Erosion Protection Works
7.11.1Provide Material and Construct Stone Pitching to specified thickness:
7.11.1.1Using Dry (Plain) Stone PitchingSQM
7.11.1.2Using Grouted Stone PitchingSQM3880$0.00
7.11.2Provide Material and Construct Rip-Rap Protection to specified thickness
7.11.2.1Using Dry (Plain) Packed StoneCUM- 0$0.00
7.11.2.2Using Grouted StoneCUM30$0.00
7.11.3Provide and Construct Stone Filled Gabion Works including the foundation preparation, as per standard drawings and specification$0.00
7.11.3.1In approved Gabion Box quality and specified dimensionsCUM- 0$0.00
7.11.3.2In approved Reno Mattress quality and specified dimensionsCUM- 0$0.00
7.12Landscaping and Grassing
7.12.1TrimmingSQM- 0$0.00
7.12.2Establishing Vegetation: Planting and establishing grass from imported sources within countrySQM- 0$0.00
7.12.3Establishing Vegetation: Planting and establishing grass using approved bush sods from site areaSQM90- 0$0.00
7.13Finishing Works
7.13.1Provide all necessary equipment and labour to clean and dispose away from site, all construction debris in the vicinity of the finished bridge structureLS11$0.00
7.13.2Provide, spread and compact selected gravel backfill to Min 95% MDD on top of bridge slab and approaches (both sides) to finished road profile.CUM58300$0.00

Sub Total for Reinforced Concrete Bridge Structure $0.00

Bill 8

Item NoDescriptionUnitQuantityRate (USD)Amount (USD)
8.0

This Bill No. 8 has been left out intentionally

Sub Total for Miscellaneous Items

Bill 9

Item NoDescriptionUnitUnit Rate (US$)
9.0Dayworks Activities (Include Overheads & Profit)
9.1Unskilled LabourDay
9.2Skilled LabourDay
9.3ForepersonDay
9.4SurveyorDay
9.5Surveying AssistantDay
9.6Civil EngineerDay
Supply of Materials to Site
9.7Cement in 50 Kg Bagsbags
9.8Reinforcement steel
9.8.1Mild steel barsKg
9.8.2High yield stress steel barsKg
9.8.3Welded steel fabricKg
9.9Crushed Stone AggregateCUM
9.10Sand (Fine or Coarse)CUM
9.11Hard Wood Timber to quality specified by the engineer
9.11.112' x 1'm
9.11.212' x 2'm
9.11.34' x 2'm
9.11.44' x 6'm
9.11.52' x 2'm
9.12Plywood
9.13Diesel (Fuel)Gal
9.14Petrol (Gas)Gal
Plant and Equipment (Dry) based on 8Hr Day
9.15Concrete mixerDays
9.16Concrete vibratorDays
9.17Power sawDays
9.18Water PumpDays
9.19Steel Wheel (Dead Weight) RollerDays
9.20Plate compactorDays
9.21Vibratory Pedestrian roller (1- 2 tonnes) rollerDays
9.22Self propelled (5-8 tonnes) Vibratory rollerDays
9.234WD Supervision VehicleDays
9.24Grader (mInimum 135 Horse Power)Days
9.25Crawler Dozer with Ripper
9.25.1Cat D7 or Dozer with Equivalent 200 Horse PowerDays
9.25.2Cat D6 or Dozer with Equivalent 120 Horse PowerDays
9.26Crawler Hydraulic Excavator
9.26.1Hydraulic Excavator (Tracked) 10-20 tDays
9.26.2Hydraulic Excavator (Tracked) 20-30 tDays
9.27Wheel/Front End Loader (1.5 tonne bucket)Days
9.28JCB Wheel Loader/Back HoeDays
9.29Water bowser
9.29.15000 LtrDays
9.29.22000 LtrDays
9.30Dump Truck
9.30.14 - 6 cu.m sizeDays
9.30.27 - 8 cu.m sizeDays
9.30.39 - 12 cu.m sizeDays
9.31Crane Mounted Truck (1.5 tonne)Days

Bill Summary

Bill NoBill DescriptionAmount (US$)
Summary of Bill Items
1.0Preliminary & General Items$0.00
2.0Site Preparation and Clearing Works$0.00
3.0Earthworks and Pavement Works$0.00
4.0Drainage and Structures: Prefabricated Pipe Culvert Works$0.00
5.0Miscellaneous Items (Pipe Culverts)$0.00
6.0Drainage and Structures: Cast in Place U-Culvert Works$0.00
7.0Box Culvert Structures$0.00
8.0Bridge Works$0.00
9.0Day Works Activities

Total Transfered to the Grand Summary Sheet $0.00

File details come from the government source that posted it. Updated .