J.1-Schedule_of_rates.xlsx
XLSX spreadsheet 186 KB Posted
- Solicitation number
- SOL-669-16-000006
About this file
J.1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_01 _SOL-669-16-000006.pdf | ||
| J.6.B.2_TO_BOQ_-_Revised.xlsx | XLSX spreadsheet | |
| Attachment_J.7.pdf | ||
| Amended_SOL-669-16-000006.pdf | ||
| J.6.A.2_TO_BOQ_-_Revised.xlsx | XLSX spreadsheet | |
| J.6.C.1_TO_003_strip_Map_(_Bulor-Tusu).xlsx | XLSX spreadsheet | |
| J.3_C-Box_Culvert_drwaings.pdf | ||
| J.1A-Unit_Rate_Analysis_Sheet.xlsx | XLSX spreadsheet | |
| J.6.A.1_Task_order_001_Strip_Map.pdf | ||
| J.4_Marking_and_Branding_Plan.pdf | ||
| J.3A-Earthworks_drawings.pdf | ||
| J.3.D_Drwaings_bridges_ _Box_culverts.pdf | ||
| J.2-USAID_Liberia_RISE_PEA-ESMMF_FINAL_(1).pdf | ||
| J.3_B-Pipe_Culverts_Drawings.pdf | ||
| J.5_Technical_Specifications.docx | DOCX document | |
| J.6_Task_Order_Request_for_Proposal.docx | DOCX document | |
| J.6.A.2_TO_001_BOQ_(Bassa-Varmah).xlsx | XLSX spreadsheet | |
| J.6.B.2_TO_002_BOQ_(Waka-Johnny_Tutu).xlsx | XLSX spreadsheet | |
| J.6.C.2_TO_003_BOQ_(Bulor-Tusu).xlsx | XLSX spreadsheet | |
| J.6.B.1_TO_002_strip_map_(Waka-Johnny_Tutu).xlsx | XLSX spreadsheet | |
| Executed_Sol_SOL-669-16-000006.pdf |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bill 1
| Schedule of Rates | |||||||
| Item No | Bill of Quantities | Unit | Unit Rate (US$) | ||||
| Year 1( 2016-2017) | Year 2( 2017-2018) | Year 3( 2018-2019) | Year 4( 2019-2020) | Year 5( 2020-2021) | |||
| 1.0 | Preliminary & General Items | ||||||
| 1.4.2 | Permanent road traffic signs for the completed road | No | $94.13 |
1.8.1 Provision of Key Site Based Personnel
1.8.1b Environmental Compliance/Safety Officer (1 No) Week $375.00
| 1.8.2 | Conducting Materials Tests as instructed by the engineer, inclusive of test report preparation | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.8.2a | Grading & Atterberg Tests | Set | $241.93 | ||||||||||||||||||||||||||||||||||||||||||||||
| 2.0 | Site Preparation and Clearing Works | ||||||||||||||||||||||||||||||||||||||||||||||||
| 2.1 | Setting out of road alignment and cross sections | m | $0.42 | ||||||||||||||||||||||||||||||||||||||||||||||
| 2.2.1a | In Light Vegetation (medium density bush, plantation, shrub or grass) areas except trees and stumps defined in bill item 2.2.2 | SQM | $0.36 | ||||||||||||||||||||||||||||||||||||||||||||||
| 2.2.1b | In Heavy or Dense Vegetation (dense bush, rubber plantation, forests) areas except trees and stumps defined in bill item 2.2.2 | SQM | $0.68 | ||||||||||||||||||||||||||||||||||||||||||||||
| 3.0 | Earthworks and Pavement Works | ||||||||||||||||||||||||||||||||||||||||||||||||
| 3.1 | Earthworks | ||||||||||||||||||||||||||||||||||||||||||||||||
| 3.1.1 | Excavation or Cutting to Spoil on existing road bed including disposal to approved disposal locations | ||||||||||||||||||||||||||||||||||||||||||||||||
| 3.1.1a | Common or Ordinary Soil | CUM | |||||||||||||||||||||||||||||||||||||||||||||||
| 3.1.2 | Backfilling in roadway | ||||||||||||||||||||||||||||||||||||||||||||||||
| 3.1.2b | Using Borrow Material (Ordinary Fill) | CUM | $16.11 | ||||||||||||||||||||||||||||||||||||||||||||||
| 3.2 | Gravel Wearing Course | ||||||||||||||||||||||||||||||||||||||||||||||||
| 3.2.1 | Excavation, loading, haulage, spreading and compaction of approved gravel pavement to Min 95% MDD. | CUM | $14.92 | ||||||||||||||||||||||||||||||||||||||||||||||
| 3.3.1 | Scarification and Reshaping of an existing road section to specified camber including Watering & Compaction to Min 95% MDD | SQM | |||||||||||||||||||||||||||||||||||||||||||||||
| 3.4 | Excavation and Construction of Drains | ||||||||||||||||||||||||||||||||||||||||||||||||
| 3.4.1 | Excavation of new open drains (catch water and mitre drains) to specified cross section dimensions (Refer to drawings) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 3.4.1a | In Soft Material | m | $1.26 | ||||||||||||||||||||||||||||||||||||||||||||||
| 3.4.3 | Supply material and construct scour checks: | ||||||||||||||||||||||||||||||||||||||||||||||||
| 3.4.3c | Using Grouted stones | No | $33.77 | ||||||||||||||||||||||||||||||||||||||||||||||
| 4.0 | Drainage and Structures: Prefabricated Pipe Culvert Works | ||||||||||||||||||||||||||||||||||||||||||||||||
| 4.3 | Provide Material and Construct Reinforced Concrete Pipe Culvert | ||||||||||||||||||||||||||||||||||||||||||||||||
| 4.3.1 | 600mm Diameter | m | $181.65 | ||||||||||||||||||||||||||||||||||||||||||||||
| 4.3.2 | 900mm Diameter | m | $328.53 | ||||||||||||||||||||||||||||||||||||||||||||||
| 4.4 | Provide Material and Cast insitu Concrete in class | ||||||||||||||||||||||||||||||||||||||||||||||||
| 4.4.2 | Class 15 MPA in Bedding & Haunch | CUM | $239.90 | ||||||||||||||||||||||||||||||||||||||||||||||
| 4.4.4 | Class 20 MPA in Culvert End Structures & Reinforced Concrete Bedding | CUM | $254.67 | ||||||||||||||||||||||||||||||||||||||||||||||
| 7.6.5 | Class 30/20 | CUM | Class 30/20 | 7.6.5 | Class 30/20 | 7.6.5 | Class 30/20 | 7.6.5 | Class 30/20 | 7.6.5 | Class 30/20 | 7.6.5 | Class 30/20 | 7.6.5 | Class 30/20 | 7.6.5 | Class 30/20 | 7.6.5 | Class 30/20 | 7.6.5 | Class 30/20 | 7.6.5 | Class 30/20 | 7.6.5 | Class 30/20 | 7.6.5 | Class 30/20 | 7.6.5 | Class 30/20 | 7.6.5 | Class 30/20 | 7.6.5 | Class 30/20 | 7.6.5 | Class 30/20 | 7.6.5 | Class 30/20 | 7.6.5 | Class 30/20 | 7.6.5 | Class 30/20 | 7.6.5 | Class 30/20 | 7.6.5 | Class 30/20 | 7.6.5 | Class 30/20 | 7.6.5 |