About this file

J.1

View the file

Other files

File Type Posted
Amendment_01 _SOL-669-16-000006.pdf PDF
J.6.B.2_TO_BOQ_-_Revised.xlsx XLSX spreadsheet
Attachment_J.7.pdf PDF
Amended_SOL-669-16-000006.pdf PDF
J.6.A.2_TO_BOQ_-_Revised.xlsx XLSX spreadsheet
J.6.C.1_TO_003_strip_Map_(_Bulor-Tusu).xlsx XLSX spreadsheet
J.3_C-Box_Culvert_drwaings.pdf PDF
J.1A-Unit_Rate_Analysis_Sheet.xlsx XLSX spreadsheet
J.6.A.1_Task_order_001_Strip_Map.pdf PDF
J.4_Marking_and_Branding_Plan.pdf PDF
J.3A-Earthworks_drawings.pdf PDF
J.3.D_Drwaings_bridges_ _Box_culverts.pdf PDF
J.2-USAID_Liberia_RISE_PEA-ESMMF_FINAL_(1).pdf PDF
J.3_B-Pipe_Culverts_Drawings.pdf PDF
J.5_Technical_Specifications.docx DOCX document
J.6_Task_Order_Request_for_Proposal.docx DOCX document
J.6.A.2_TO_001_BOQ_(Bassa-Varmah).xlsx XLSX spreadsheet
J.6.B.2_TO_002_BOQ_(Waka-Johnny_Tutu).xlsx XLSX spreadsheet
J.6.C.2_TO_003_BOQ_(Bulor-Tusu).xlsx XLSX spreadsheet
J.6.B.1_TO_002_strip_map_(Waka-Johnny_Tutu).xlsx XLSX spreadsheet
Executed_Sol_SOL-669-16-000006.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bill 1

Schedule of Rates
Item NoBill of QuantitiesUnitUnit Rate (US$)
Year 1( 2016-2017)Year 2( 2017-2018)Year 3( 2018-2019)Year 4( 2019-2020)Year 5( 2020-2021)
1.0Preliminary & General Items
1.4.2Permanent road traffic signs for the completed roadNo$94.13

1.8.1 Provision of Key Site Based Personnel

1.8.1b Environmental Compliance/Safety Officer (1 No) Week $375.00

1.8.2Conducting Materials Tests as instructed by the engineer, inclusive of test report preparation
1.8.2aGrading & Atterberg TestsSet$241.93
2.0Site Preparation and Clearing Works
2.1Setting out of road alignment and cross sectionsm$0.42
2.2.1aIn Light Vegetation (medium density bush, plantation, shrub or grass) areas except trees and stumps defined in bill item 2.2.2SQM$0.36
2.2.1bIn Heavy or Dense Vegetation (dense bush, rubber plantation, forests) areas except trees and stumps defined in bill item 2.2.2SQM$0.68
3.0Earthworks and Pavement Works
3.1Earthworks
3.1.1Excavation or Cutting to Spoil on existing road bed including disposal to approved disposal locations
3.1.1aCommon or Ordinary SoilCUM
3.1.2Backfilling in roadway
3.1.2bUsing Borrow Material (Ordinary Fill)CUM$16.11
3.2Gravel Wearing Course
3.2.1Excavation, loading, haulage, spreading and compaction of approved gravel pavement to Min 95% MDD.CUM$14.92
3.3.1Scarification and Reshaping of an existing road section to specified camber including Watering & Compaction to Min 95% MDDSQM
3.4Excavation and Construction of Drains
3.4.1Excavation of new open drains (catch water and mitre drains) to specified cross section dimensions (Refer to drawings)
3.4.1aIn Soft Materialm$1.26
3.4.3Supply material and construct scour checks:
3.4.3cUsing Grouted stonesNo$33.77
4.0Drainage and Structures: Prefabricated Pipe Culvert Works
4.3Provide Material and Construct Reinforced Concrete Pipe Culvert
4.3.1600mm Diameterm$181.65
4.3.2900mm Diameterm$328.53
4.4Provide Material and Cast insitu Concrete in class
4.4.2Class 15 MPA in Bedding & HaunchCUM$239.90
4.4.4Class 20 MPA in Culvert End Structures & Reinforced Concrete BeddingCUM$254.67
7.6.5Class 30/20CUMClass 30/207.6.5Class 30/207.6.5Class 30/207.6.5Class 30/207.6.5Class 30/207.6.5Class 30/207.6.5Class 30/207.6.5Class 30/207.6.5Class 30/207.6.5Class 30/207.6.5Class 30/207.6.5Class 30/207.6.5Class 30/207.6.5Class 30/207.6.5Class 30/207.6.5Class 30/207.6.5Class 30/207.6.5Class 30/207.6.5Class 30/207.6.5Class 30/207.6.5Class 30/207.6.5Class 30/207.6.5Class 30/207.6.5