J.6.B.1_TO_002_strip_map_(Waka-Johnny_Tutu).xlsx

XLSX spreadsheet 650 KB Posted

Attached to
The purpose of this contract is to provide construction services for road and general vertical infrastructure works throughout Liberia.
Solicitation number
SOL-669-16-000006
Issued by

About this file

J.6.B.1

View the file

Other files

File Type Posted
Amendment_01 _SOL-669-16-000006.pdf PDF
J.6.B.2_TO_BOQ_-_Revised.xlsx XLSX spreadsheet
Attachment_J.7.pdf PDF
Amended_SOL-669-16-000006.pdf PDF
J.6.A.2_TO_BOQ_-_Revised.xlsx XLSX spreadsheet
J.6.C.1_TO_003_strip_Map_(_Bulor-Tusu).xlsx XLSX spreadsheet
J.3_C-Box_Culvert_drwaings.pdf PDF
J.1A-Unit_Rate_Analysis_Sheet.xlsx XLSX spreadsheet
J.1-Schedule_of_rates.xlsx XLSX spreadsheet
J.6.A.1_Task_order_001_Strip_Map.pdf PDF
J.4_Marking_and_Branding_Plan.pdf PDF
J.3A-Earthworks_drawings.pdf PDF
J.3.D_Drwaings_bridges_ _Box_culverts.pdf PDF
J.2-USAID_Liberia_RISE_PEA-ESMMF_FINAL_(1).pdf PDF
J.3_B-Pipe_Culverts_Drawings.pdf PDF
J.5_Technical_Specifications.docx DOCX document
J.6_Task_Order_Request_for_Proposal.docx DOCX document
J.6.A.2_TO_001_BOQ_(Bassa-Varmah).xlsx XLSX spreadsheet
J.6.B.2_TO_002_BOQ_(Waka-Johnny_Tutu).xlsx XLSX spreadsheet
J.6.C.2_TO_003_BOQ_(Bulor-Tusu).xlsx XLSX spreadsheet
Executed_Sol_SOL-669-16-000006.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0+000-1+000

ROAD NAME:WAKA TOWN-JOHNNY TUTU TOWNCOUNTY: GRAND BASSADISTRICT: NUMBER 2PAGE:1
STRIP MAP
BridgeSCH.SchoolL
Village
CulvertGravel Pit
Mitre Drain
Box CulvertCatch-water DrainR
Roadway
0+0000+1000+2000+3000+4000+5000+6000+7000+8000+9001+000
0+0000+1000+2000+3000+4000+5000+6000+7000+8000+9001+000Section QuantityCumm. Quantity
Key itemDescriptionUnit
Sub grade soilsSoil TypeNGNGCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLNGNGNGNGSSSS
Geometric alignmentExisting Centreline LevelmADL99.197.695.493.591.890.589.788.989.891.194.797.8100.5103.1107.2111.5114.1115.3116.9118.6119.3119.2119.7117.7112.8109.1106.2104.6102.6101.0100.299.599.7101.0102.6101.298.997.295.793.9
Designed Centreline LevelmADL99.497.995.893.992.290.990.089.290.291.595.198.1100.8103.4107.5111.8114.4115.7117.2118.9119.7119.6120.1118.0113.2109.5106.5105.0102.9101.3100.699.9100.1101.4102.9101.699.297.596.194.3
Average Gradient%-6%-9%-8%-7%-5%-4%-3%4%5%15%12%11%10%17%17%11%5%6%7%3%-0%2%-8%-20%-15%-12%-6%-8%-6%-3%-3%1%5%6%-6%-9%-7%-6%-7%-6%
Planned cross sectionC1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1
Site ClearanceClearing & Stripping within formation widthSQM22522522522522522522522522522522522522522522522522522522522522522522522522522522522522522522522522522522522522522522522590009000
Light - Medium clearing outside formation widthSQM9615015015015015015015015015015015015015015015015015015015015015015015015015015015015015015015047464746
Heavy Clearing outside formation widthSQM150150150150150150900900
EarthworksRemoval of unsuitable MaterialCUM
Cut to fillCUM
Cut to spoilCUM24.7424.7424.7424.7424.7424.7424.7424.7424.7435.1935.1935.1935.1935.19398.61398.61
Borrow to Fill (Embankment)CUM
Formation - Heavy Grading / ShappingSQM
ReshapingSQM22522522522522522522522522522522522522522522522522522522522522522522522522522522522522522522522522522522522522522522522590009000
Mitre/Turn-out/Other drainsm10
Line drainsCUM
GravelCompacted Thicknessm0.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.15
Gravel borrowpitCUM00
VolumeCUM18.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.75750750
Drainages StructuresLocationkm.1750.77
600 mm diameter (Length)m
900 mm diameter(Length)m1261818
1200 mm diameter(Length)m00
1500 mm diameter(Length)m00
U-Culvert00
Box/Bridge Culvert00
Drift/Causeway00
Structure Inlet TypeWWWW00
Structure Outlet TypeWWWW00
Erosion ProtectionScour ChecksNo.s386522161610162356163632335353152152
Grouted stoneSQM48368484
Gabion00
Grass PlantingSQM00
FurnitureRoad signsNo.1122
Guard railsNo.00
Drainage StructuresStructures Inlet & Outlet TypesInsitu Soil TypeMethod of Work (Earthworks)Cross-Section TypeDrain TypesAbbreviationsNote
BR: BridgeWW: Flared Winged WallsR: RockyCFCut to FillA1:Embarkment Fill With Even CamberE1Catch Water DrainSQM :Square MetresPlease read and refer to Contract BoQs,
DR: Drift/Vented DriftDI: Drop InletsNG: Gravelly /Natural Gravel/LateriteRSHRe-shapingA2:Embarkment Fill With SuperelevationE2Culvert Outlet Channel for Active StreamCUM :Cubic MetresDrawings, Attached Schedules and
RCP: Reinforced Pipe CulvertSI: Shallow InletsSS: SandyBFBorrow to Fill/EmbankmentB1, B3:Even Camber Road Cross Sections (V-Ditch & Free Fall on One Side)E3Culvert Outlet Channel for Releif Culverts & Mitre Drainsm :Linear MetresSpecifications for Proper Interpretation
BC: Box CulvertCL: ClayeyCSCut to SpoilC1, C2:Even Camber Road Cross Sections (V-Ditch on Both Sides)L1Trapezoidal Concrete Lined Channel/DrainmADL :Metres Above Datum Leveland use of this Strip Map
UC: U-CulvertRS: Red SoilHGHeavy Grading.D1, D3:Superelevation Road Cross Sections (V-Ditch on Both Sides)L2Trapezoidal Grouted Stone Lined Channel/DrainNo :Number
L / R: Left / RightBC: Black Cotton SoilS1, S2:V-Ditch Side Drains, 1000mm & 800mm Respectively
PROJECT TITLE:FUNDING AGENCY:CLIENT ORGANISATION:DESIGN CONSULTANT:
Engineering Services for Rural Roads Rehabilitation ProjectUnited States Agency for International Development (USAID) - LiberiaMinistry of Public Works, LiberiaCDM Smith International

Existing 0 25 50 75 100 125 150 175 200 225 250 275 300 325 350 375 400 425 450 475 500 525 550 575 600 625 650 675 700 725 750 775 800 825 850 875 900 925 950 975 1000 99.054000000000002 97.564999999999998 95.400999999999996 93.515000000000001 91.837999999999994 90.539000000000001 89.66 88.855000000000004 89.828000000000003 91.102999999999994 94.713999999999999 97.760999999999996 100.48099999999999 103.057 107.17099999999999 111.45099999999999 114.071 115.31399999999999 116.886 118.57299999999999 119.315 119.193 119.748 117.684 112.834 109.149 106.155 104.60599999999999 102.568 100.983 100.21299999999999 99.515999999999991 99.722999999999999 101.00699999999999 102.586 101.211 98.872 97.177999999999997 95.733000000000004 93.92 92.521000000000001 Design 0 25 50 75 100 125 150 175 200 225 250 275 300 325 350 375 400 425 450 475 500 525 550 575 600 625 650 675 700 725 750 775 800 825 850 875 900 925 950 975 1000 99.414000000000001 97.924999999999997 95.760999999999996 93.875 92.197999999999993 90.899000000000001 90.02 89.215000000000003 90.188000000000002 91.462999999999994 95.073999999999998 98.120999999999995 100.84099999999999 103.417 107.53099999999999 111.81099999999999 114.431 115.67399999999999 117.246 118.93299999999999 119.675 119.553 120.108 118.044 113.194 109.509 106.515 104.96599999999999 102.928 101.343 100.57299999999999 99.875999999999991 100.083 101.36699999999999 102.946 101.571 99.231999999999999 97.537999999999997 96.093000000000004 94.28 92.881 1+000-2+000

ROAD NAME:WAKA TOWN-JOHNNY TUTU TOWNCOUNTY: GRAND BASSADISTRICT: NUMBER 2PAGE:2
STRIP MAP
BridgeSCH.SchoolL
Village
CulvertGravel Pit
Mitre Drain
Box CulvertCatch-water DrainR
Roadway
1+0001+1001+2001+3001+4001+5001+6001+7001+8001+9002+000
1+0001+1001+2001+3001+4001+5001+6001+7001+8001+9002+000Section QuantityCumm. Quantity
Key itemDescriptionUnit
Sub grade soilsSoil TypeSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSCLCLCLCLCLCLCLCLCLCLCLNGNGNGNGNGNGNGNGNGNGNGNGNGNG
Geometric alignmentExisting Centreline LevelmADL92.52191.14290.02288.45587.33486.49987.0788.24290.38591.83992.37492.80493.40794.27495.94598.099100.538104.031107.887111.25113.253113.906111.768111.979114.921118.54121.064123.421127.172129.284130.421129.815129.249125.977123.825122.175121.474121.719121.133121.674
Designed Centreline LevelmADL92.8891.5090.3888.8287.6986.8687.4388.6090.7592.2094.1893.1693.7794.6396.3198.46100.90104.39108.25111.61113.61114.27112.13112.34115.28118.90121.42123.78127.53129.64130.78130.18129.61126.34124.19122.54121.83122.08121.49122.03
Average Gradient%-6%-4%-6%-4%-3%2%5%9%6%2%2%2%3%7%9%10%14%16%14%8%3%-9%1%12%15%10%9%15%8%5%-2%-2%-13%-9%-7%-3%1%-2%2%8%
Planned cross sectionC1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1
Site ClearanceClearing & Stripping within formation widthSQM225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225900018000
Light - Medium clearing outside formation widthSQM04746
Heavy Clearing outside formation widthSQM15015015015015015015015015015015015015015015015015015015015015015015015015015015015015015015015015015015015015015015015060006900
EarthworksRemoval of unsuitable MaterialCUM00
Cut to fillCUM00
Cut to spoilCUM28.4828.4828.4828.4828.4828.4832.7732.7732.7732.77301.96700.57
Borrow to Fill (Embankment)CUM00
Formation - Heavy Grading / ShappingSQM22522522522522522522522522522522522522522531503150
ReshapingSQM225225225225225225225225225225225225225225225225225225225225225225225225225225585014850
Mitre/Turn-out/Other drainsm10102020
Line drainsCUM
GravelCompacted Thicknessm0.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.15
Gravel borrowpitCUM750075007500
VolumeCUM18.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.757501500
Drainages StructuresLocationkm1.0851.251.5081.8481.9
600 mm diameter (Length)m00
900 mm diameter(Length)m666663048
1200 mm diameter(Length)m00
1500 mm diameter(Length)m00
U-Culvert00
Box/Bridge Culvert00
Drift/Causeway00
Structure Inlet TypeWWWWWWWWWW00
Structure Outlet TypeWWWWWWWWWW00
Erosion ProtectionScour ChecksNo.s33835810681610862856115267
Grouted stoneSQM3636363636180264
Gabion00
Grass PlantingSQM00
FurnitureRoad signsNo.02
Guard railsNo.00
Drainage StructuresStructures Inlet & Outlet TypesInsitu Soil TypeMethod of Work (Earthworks)Cross-Section TypeDrain TypesAbbreviationsNote
BR: BridgeWW: Flared Winged WallsR: RockyCFCut to FillA1:Embarkment Fill With Even CamberE1Catch Water DrainSQM :Square MetresPlease read and refer to Contract BoQs,
DR: Drift/Vented DriftDI: Drop InletsNG: Gravelly /Natural Gravel/LateriteRSHRe-shapingA2:Embarkment Fill With SuperelevationE2Culvert Outlet Channel for Active StreamCUM :Cubic MetresDrawings, Attached Schedules and
RCP: Reinforced Pipe CulvertSI: Shallow InletsSS: SandyBFBorrow to Fill/EmbankmentB1, B3:Even Camber Road Cross Sections (V-Ditch & Free Fall on One Side)E3Culvert Outlet Channel for Releif Culverts & Mitre Drainsm :Linear MetresSpecifications for Proper Interpretation
BC: Box CulvertCL: ClayeyCSCut to SpoilC1, C2:Even Camber Road Cross Sections (V-Ditch on Both Sides)L1Trapezoidal Concrete Lined Channel/DrainmADL :Metres Above Datum Leveland use of this Strip Map
UC: U-CulvertRS: Red SoilHGHeavy Grading.D1, D3:Superelevation Road Cross Sections (V-Ditch on Both Sides)L2Trapezoidal Grouted Stone Lined Channel/DrainNo :Number
L / R: Left / RightBC: Black Cotton SoilS1, S2:V-Ditch Side Drains, 1000mm & 800mm Respectively
PROJECT TITLE:FUNDING AGENCY:CLIENT ORGANISATION:DESIGN CONSULTANT:
Engineering Services for Rural Roads Rehabilitation ProjectUnited States Agency for International Development (USAID) - LiberiaMinistry of Public Works, LiberiaCDM Smith International

0.36 0.36 0.36 0.36 0.36 0.36 0.36 0.36 0.36 0.36 1.81 0.36 0.36 0.36 0.36 0.36 0.36 0.36 0.36

Existing 1000 1025 1050 1075 1100 1125 1150 1175 1200 1225 1250 1275 1300 1325 1350 1375 1400 1425 1450 1475 1500 1525 1550 1575 1600 1625 1650 1675 1700 1725 1750 1775 1800 1825 1850 1875 1900 1925 1950 1975 2000 92.521000000000001 91.141999999999996 90.021999999999991 88.454999999999998 87.334000000000003 86.498999999999995 87.07 88.242000000000004 90.385000000000005 91.838999999999999 92.373999999999995 92.804000000000002 93.406999999999996 94.274000000000001 95.944999999999993 98.099000000000004 100.538 104.03099999999999 107.887 111.25 113.253 113.90599999999999 111.768 111.979 114.92099999999999 118.54 121.06399999999999 123.42099999999999 127.172 129.28399999999999 130.42099999999999 129.815 129.249 125.977 123.825 122.175 121.474 121.71899999999999 121.133 121.67399999999999 123.56 Design 1000 1025 1050 1075 1100 1125 1150 1175 1200 1225 1250 1275 1300 1325 1350 1375 1400 1425 1450 1475 1500 1525 1550 1575 1600 1625 1650 1675 1700 1725 1750 1775 1800 1825 1850 1875 1900 1925 1950 1975 2000 92.881 91.501999999999995 90.381999999999991 88.814999999999998 87.694000000000003 86.858999999999995 87.429999999999993 88.602000000000004 90.745000000000005 92.198999999999998 94.183999999999997 93.164000000000001 93.766999999999996 94.634 96.304999999999993 98.459000000000003 100.898 104.39099999999999 108.247 111.61 113.613 114.26599999999999 112.128 112.339 115.28099999999999 118.9 121.42399999999999 123.78099999999999 127.532 129.64400000000001 130.78100000000001 130.17500000000001 129.60900000000001 126.337 124.185 122.535 121.834 122.07899999999999 121.49299999999999 122.03399999999999 123.92 2+000-3+000

ROAD NAME:WAKA TOWN-JOHNNY TUTU TOWNCOUNTY: GRAND BASSADISTRICT: NUMBER 2PAGE:3
STRIP MAP
BridgeSCH.SchoolL
Village
CulvertGravel Pit
Mitre Drain
Box CulvertCatch-water DrainR
Roadway
2+0002+1002+2002+3002+4002+5002+6002+7002+8002+9003+000
2+0002+1002+2002+3002+4002+5002+6002+7002+8002+9003+000Section QuantityCumm. Quantity
Key itemDescriptionUnit
Sub grade soilsSoil TypeNGCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCL
Geometric alignmentExisting Centreline LevelmADL123.56124.8125.416125.443124.428125.153127.438130.292131.978130.274126.665123.224122.153122.564125.736128.671127.85125.218124.895124.685122.416120.293120.878123.237125.128126.019125.218123.817121.872120.758119.86118.894117.236114.518112.877111.375110.795110.661109.158109.146
Designed Centreline LevelmADL123.92125.16125.78125.80124.79125.51127.80130.65132.34130.63127.03123.58122.51122.92126.10129.03128.21125.58125.26125.05122.78120.65121.24123.60125.49126.38125.58124.18122.23121.12120.22119.25117.60114.88113.24111.74111.16111.02109.52109.51
Average Gradient%5%2%0%-4%3%9%11%7%-7%-15%-14%-4%2%13%12%-3%-11%-1%-1%-9%-9%2%9%8%4%-3%-6%-8%-4%-4%-4%-7%-11%-7%-6%-2%-1%-6%-0%-3%
Planned cross sectionC1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1
Site ClearanceClearing & Stripping within formation widthSQM225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225900027000
Light - Medium clearing outside formation widthSQM6015015015015015015015011105856
Heavy Clearing outside formation widthSQM15075757575757515015015015015015015015015015015015015015015015015015015090354010440
EarthworksRemoval of unsuitable MaterialCUM00
Cut to fillCUM00
Cut to spoilCUM0700.57
Borrow to Fill (Embankment)CUM00
Formation - Heavy Grading / ShappingSQM03150
ReshapingSQM225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225900023850
Mitre/Turn-out/Other drainsm020
Line drainsCUM00
GravelCompacted Thicknessm0.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.15
Gravel borrowpitCUM07500
VolumeCUM18.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.757502250
Drainages StructuresLocationkm2.0552.2562.3752.482.8372.8962.99
600 mm diameter (Length)m00
900 mm diameter(Length)m6666663684
1200 mm diameter(Length)m00
1500 mm diameter(Length)m666
U-Culvert00
Box/Bridge Culvert00
Drift/Causeway00
Structure Inlet TypeWWWWWWWWWWWWWW00
Structure Outlet TypeWWWWWWWWWWWWWW00
Erosion ProtectionScour ChecksNo.s281655161688836516533133400
Grouted stoneSQM36363636363636252516
Gabion00
Grass PlantingSQM00
FurnitureRoad signsNo.111146
Guard railsNo.00
Drainage StructuresStructures Inlet & Outlet TypesInsitu Soil TypeMethod of Work (Earthworks)Cross-Section TypeDrain TypesAbbreviationsNote
BR: BridgeWW: Flared Winged WallsR: RockyCFCut to FillA1:Embarkment Fill With Even CamberE1Catch Water DrainSQM :Square MetresPlease read and refer to Contract BoQs,
DR: Drift/Vented DriftDI: Drop InletsNG: Gravelly /Natural Gravel/LateriteRSHRe-shapingA2:Embarkment Fill With SuperelevationE2Culvert Outlet Channel for Active StreamCUM :Cubic MetresDrawings, Attached Schedules and
RCP: Reinforced Pipe CulvertSI: Shallow InletsSS: SandyBFBorrow to Fill/EmbankmentB1, B3:Even Camber Road Cross Sections (V-Ditch & Free Fall on One Side)E3Culvert Outlet Channel for Releif Culverts & Mitre Drainsm :Linear MetresSpecifications for Proper Interpretation
BC: Box CulvertCL: ClayeyCSCut to SpoilC1, C2:Even Camber Road Cross Sections (V-Ditch on Both Sides)L1Trapezoidal Concrete Lined Channel/DrainmADL :Metres Above Datum Leveland use of this Strip Map
UC: U-CulvertRS: Red SoilHGHeavy Grading.D1, D3:Superelevation Road Cross Sections (V-Ditch on Both Sides)L2Trapezoidal Grouted Stone Lined Channel/DrainNo :Number
L / R: Left / RightBC: Black Cotton SoilS1, S2:V-Ditch Side Drains, 1000mm & 800mm Respectively
PROJECT TITLE:FUNDING AGENCY:CLIENT ORGANISATION:DESIGN CONSULTANT:
Engineering Services for Rural Roads Rehabilitation ProjectUnited States Agency for International Development (USAID) - LiberiaMinistry of Public Works, LiberiaCDM Smith International

Existing 2000 2025 2050 2075 2100 2125 2150 2175 2200 2225 2250 2275 2300 2325 2350 2375 2400 2425 2450 2475 2500 2525 2550 2575 2600 2625 2650 2675 2700 2725 2750 2775 2800 2825 2850 2875 2900 2925 2950 2975 3000 123.56 124.8 125.416 125.443 124.428 125.15299999999999 127.438 130.292 131.97800000000001 130.274 126.66500000000001 123.224 122.15299999999999 122.56399999999999 125.736 128.67099999999999 127.85 125.218 124.895 124.685 122.416 120.29299999999999 120.878 123.23699999999999 125.128 126.01899999999999 125.218 123.81699999999999 121.872 120.758 119.86 118.89399999999999 117.236 114.518 112.877 111.375 110.795 110.661 109.158 109.146 108.283 Design 2000 2025 2050 2075 2100 2125 2150 2175 2200 2225 2250 2275 2300 2325 2350 2375 2400 2425 2450 2475 2500 2525 2550 2575 2600 2625 2650 2675 2700 2725 2750 2775 2800 2825 2850 2875 2900 2925 2950 2975 3000 123.92 125.16 125.776 125.803 124.788 125.51299999999999 127.798 130.65200000000002 132.33800000000002 130.63400000000001 127.02500000000001 123.584 122.51299999999999 122.92399999999999 126.096 129.03100000000001 128.21 125.578 125.255 125.045 122.776 120.65299999999999 121.238 123.59699999999999 125.488 126.37899999999999 125.578 124.17699999999999 122.232 121.11799999999999 120.22 119.25399999999999 117.596 114.878 113.23699999999999 111.735 111.155 111.021 109.518 109.506 108.643 3+000-4+000

ROAD NAME:WAKA TOWN-JOHNNY TUTU TOWNCOUNTY: GRAND BASSADISTRICT: NUMBER 2PAGE:4
STRIP MAP
BridgeSCH.SchoolL
Village
CulvertGravel Pit
Mitre Drain
Box CulvertCatch-water DrainR
Roadway
3+0003+1003+2003+3003+4003+5003+6003+7003+8003+9004+000
3+0003+1003+2003+3003+4003+5003+6003+7003+8003+9004+000Section QuantityCumm. Quantity
Key itemDescriptionUnit
Sub grade soilsSoil TypeRSRSRSRSRSRSCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLNGNGNGNGNGNG
Geometric alignmentExisting Centreline LevelmADL108.28107.32106.82106.88107.73110.05114.28116.96118.91121.34122.80123.59124.02123.43122.26122.66123.88125.23124.51124.23125.39128.27131.88131.53127.60127.10124.28123.69121.49120.09118.85118.08119.07120.33121.40121.88122.65123.75124.44125.12
Designed Centreline LevelmADL108.64107.68107.18107.24108.09110.41114.64117.32119.27121.70123.16123.95124.38123.79122.62123.02124.24125.59124.87124.59125.75128.63132.24131.89127.96127.46124.64124.05121.85120.45119.21118.44119.43120.69121.76122.24123.01124.11124.80125.48
Average Gradient%-4%-2%0%3%9%17%11%8%10%6%3%2%-2%-5%2%5%5%-3%-1%5%12%15%-1%-16%-2%-11%-2%-9%-6%-5%-3%4%5%4%2%3%4%3%3%0%
Planned cross sectionAAACCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCC
Site ClearanceClearing & Stripping within formation widthSQM225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225900036000
Light - Medium clearing outside formation widthSQM1501501501501501509006756
Heavy Clearing outside formation widthSQM60150150150150150150150150150150150150150150150150150150150150150150150351013950
EarthworksRemoval of unsuitable MaterialCUM00
Cut to fillCUM00
Cut to spoilCUM0700.57
Borrow to Fill (Embankment)CUM00
Formation - Heavy Grading / ShappingSQM2252252256753825
ReshapingSQM225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225832532175
Mitre/Turn-out/Other drainsm10102040
Line drainsCUM00
GravelCompacted Thicknessm0.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.15
Gravel borrowpitCUM3000300010500
VolumeCUM18.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.757503000
Drainages StructuresLocationkm3.33.4183.5943.6593.7253.72
600 mm diameter (Length)m00
900 mm diameter(Length)m66666636120
1200 mm diameter(Length)m00
1500 mm diameter(Length)m06
U-Culvert00
Box/Bridge Culvert00
Drift/Causeway00
Structure Inlet TypeDIDIDIDIWWDI00
Structure Outlet TypeWWWWWWWWWWWW00
Erosion ProtectionScour ChecksNo.s816610322221616832298498
Grouted stoneSQM363636363636216732
Gabion00
Grass PlantingSQM00
FurnitureRoad signsNo.1128
Guard railsNo.00
Drainage StructuresStructures Inlet & Outlet TypesInsitu Soil TypeMethod of Work (Earthworks)Cross-Section TypeDrain TypesAbbreviationsNote
BR: BridgeWW: Flared Winged WallsR: RockyCFCut to FillA1:Embarkment Fill With Even CamberE1Catch Water DrainSQM :Square MetresPlease read and refer to Contract BoQs,
DR: Drift/Vented DriftDI: Drop InletsNG: Gravelly /Natural Gravel/LateriteRSHRe-shapingA2:Embarkment Fill With SuperelevationE2Culvert Outlet Channel for Active StreamCUM :Cubic MetresDrawings, Attached Schedules and
RCP: Reinforced Pipe CulvertSI: Shallow InletsSS: SandyBFBorrow to Fill/EmbankmentB1, B3:Even Camber Road Cross Sections (V-Ditch & Free Fall on One Side)E3Culvert Outlet Channel for Releif Culverts & Mitre Drainsm :Linear MetresSpecifications for Proper Interpretation
BC: Box CulvertCL: ClayeyCSCut to SpoilC1, C2:Even Camber Road Cross Sections (V-Ditch on Both Sides)L1Trapezoidal Concrete Lined Channel/DrainmADL :Metres Above Datum Leveland use of this Strip Map
UC: U-CulvertRS: Red SoilHGHeavy Grading.D1, D3:Superelevation Road Cross Sections (V-Ditch on Both Sides)L2Trapezoidal Grouted Stone Lined Channel/DrainNo :Number
L / R: Left / RightBC: Black Cotton SoilS1, S2:V-Ditch Side Drains, 1000mm & 800mm Respectively
PROJECT TITLE:FUNDING AGENCY:CLIENT ORGANISATION:DESIGN CONSULTANT:
Engineering Services for Rural Roads Rehabilitation ProjectUnited States Agency for International Development (USAID) - LiberiaMinistry of Public Works, LiberiaCDM Smith International

Existing 3000 3025 3050 3075 3100 3125 3150 3175 3200 3225 3250 3275 3300 3325 3350 3375 3400 3425 3450 3475 3500 3525 3550 3575 3600 3625 3650 3675 3700 3725 3750 3775 3800 3825 3850 3875 3900 3925 3950 3975 4000 108.283 107.319 106.81699999999999 106.88 107.726 110.047 114.27799999999999 116.96 118.905 121.342 122.801 123.59 124.01899999999999 123.425 122.25699999999999 122.657 123.884 125.232 124.51 124.22799999999999 125.39 128.274 131.88399999999999 131.52699999999999 127.6 127.096 124.28 123.685 121.491 120.093 118.84699999999999 118.083 119.065 120.325 121.402 121.884 122.64700000000001 123.747 124.441 125.123 125.146 Design 3000 3025 3050 3075 3100 3125 3150 3175 3200 3225 3250 3275 3300 3325 3350 3375 3400 3425 3450 3475 3500 3525 3550 3575 3600 3625 3650 3675 3700 3725 3750 3775 3800 3825 3850 3875 3900 3925 3950 3975 4000 108.643 107.679 107.17699999999999 107.24 108.086 110.407 114.63799999999999 117.32 119.265 121.702 123.161 123.95 124.37899999999999 123.785 122.61699999999999 123.017 124.244 125.592 124.87 124.58799999999999 125.75 128.63400000000001 132.244 131.887 127.96 127.456 124.64 124.045 121.851 120.453 119.20699999999999 118.443 119.425 120.685 121.762 122.244 123.00700000000001 124.107 124.801 125.483 125.506 4+000-5+000

ROAD NAME:WAKA TOWN-JOHNNY TUTU TOWNCOUNTY: GRAND BASSADISTRICT: NUMBER 2PAGE:5
STRIP MAP
BridgeSCH.SchoolL
Village
CulvertGravel Pit
Mitre Drain
Box CulvertCatch-water DrainR
Roadway
4+0004+1004+2004+3004+4004+5004+6004+7004+8004+9005+000
4+0004+1004+2004+3004+4004+5004+6004+7004+8004+9005+000Section QuantityCumm. Quantity
Key itemDescriptionUnit
Sub grade soilsSoil TypeNGNGNGNGNGNGNGNGNGNGNGNGNGNGNGNGNGNGNGNGNGNGNGCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCL
Geometric alignmentExisting Centreline LevelmADL125.15124.39124.94125.87129.30129.82129.68129.95130.31131.88135.35135.48135.37136.07136.87136.30136.35136.61136.36136.28134.98133.76134.21132.87130.25128.86127.45126.86126.52126.39126.01126.50126.50125.00124.35123.68123.33123.11122.81121.69
Designed Centreline LevelmADL125.51124.75125.30126.23129.66130.18130.04130.31130.67132.24135.71135.84135.73136.43137.23136.66136.71136.97136.72136.64135.34134.12134.57133.23130.61129.22127.81127.22126.88126.75126.37126.86126.86125.36124.71124.04123.69123.47123.17122.05
Average Gradient%-3%2%4%14%2%-1%1%1%6%14%1%-0%3%3%-2%0%1%-1%-0%-5%-5%2%-5%-11%-6%-6%-2%-1%-1%-1%2%0%-6%-3%-3%-1%-1%-1%-4%4%
Planned cross sectionC1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1AAAAC1C1C1
Site ClearanceClearing & Stripping within formation widthSQM225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225900045000
Light - Medium clearing outside formation widthSQM06756
Heavy Clearing outside formation widthSQM150150150150150150150150150150150150150150150150150150150150150150150150150150150150150150150150150150150150150150150150600019950
EarthworksRemoval of unsuitable MaterialCUM
Cut to fillCUM
Cut to spoilCUM0700.57
Borrow to Fill (Embankment)CUM
Formation - Heavy Grading / ShappingSQM03825
ReshapingSQM225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225900041175
Mitre/Turn-out/Other drainsm101010101010101080120
Line drainsCUM
GravelCompacted Thicknessm0.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.15
Gravel borrowpitCUM010500
VolumeCUM18.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.757503750
Drainages StructuresLocationkm4.324.7024.92
600 mm diameter (Length)m00
900 mm diameter(Length)m66618138
1200 mm diameter(Length)m00
1500 mm diameter(Length)m06
U-Culvert00
Box/Bridge Culvert00
Drift/Causeway00
Structure Inlet TypeDIDIDI00
Structure Outlet TypeWWWWWW00
Erosion ProtectionScour ChecksNo.s32221633334532
Grouted stoneSQM363636108840
Gabion00
Grass PlantingSQM00
FurnitureRoad signsNo.08
Guard railsNo.00
Drainage StructuresStructures Inlet & Outlet TypesInsitu Soil TypeMethod of Work (Earthworks)Cross-Section TypeDrain TypesAbbreviationsNote
BR: BridgeWW: Flared Winged WallsR: RockyCFCut to FillA1:Embarkment Fill With Even CamberE1Catch Water DrainSQM :Square MetresPlease read and refer to Contract BoQs,
DR: Drift/Vented DriftDI: Drop InletsNG: Gravelly /Natural Gravel/LateriteRSHRe-shapingA2:Embarkment Fill With SuperelevationE2Culvert Outlet Channel for Active StreamCUM :Cubic MetresDrawings, Attached Schedules and
RCP: Reinforced Pipe CulvertSI: Shallow InletsSS: SandyBFBorrow to Fill/EmbankmentB1, B3:Even Camber Road Cross Sections (V-Ditch & Free Fall on One Side)E3Culvert Outlet Channel for Releif Culverts & Mitre Drainsm :Linear MetresSpecifications for Proper Interpretation
BC: Box CulvertCL: ClayeyCSCut to SpoilC1, C2:Even Camber Road Cross Sections (V-Ditch on Both Sides)L1Trapezoidal Concrete Lined Channel/DrainmADL :Metres Above Datum Leveland use of this Strip Map
UC: U-CulvertRS: Red SoilHGHeavy Grading.D1, D3:Superelevation Road Cross Sections (V-Ditch on Both Sides)L2Trapezoidal Grouted Stone Lined Channel/DrainNo :Number
L / R: Left / RightBC: Black Cotton SoilS1, S2:V-Ditch Side Drains, 1000mm & 800mm Respectively
PROJECT TITLE:FUNDING AGENCY:CLIENT ORGANISATION:DESIGN CONSULTANT:
Engineering Services for Rural Roads Rehabilitation ProjectUnited States Agency for International Development (USAID) - LiberiaMinistry of Public Works, LiberiaCDM Smith International

Existing 4000 4025 4050 4075 4100 4125 4150 4175 4200 4225 4250 4275 4300 4325 4350 4375 4400 4425 4450 4475 4500 4525 4550 4575 4600 4625 4650 4675 4700 4725 4750 4775 4800 4825 4850 4875 4900 4925 4950 4975 5000 125.146 124.393 124.937 125.87 129.303 129.821 129.68100000000001 129.94900000000001 130.30500000000001 131.88 135.351 135.48099999999999 135.37200000000001 136.06700000000001 136.87100000000001 136.29599999999999 136.345 136.607 136.36199999999999 136.27500000000001 134.98099999999999 133.756 134.20500000000001 132.87299999999999 130.249 128.85599999999999 127.44499999999999 126.863 126.52200000000001 126.387 126.01300000000001 126.498 126.503 124.997 124.34699999999999 123.678 123.328 123.10599999999999 122.81 121.69199999999999 122.663 Design 4000 4025 4050 4075 4100 4125 4150 4175 4200 4225 4250 4275 4300 4325 4350 4375 4400 4425 4450 4475 4500 4525 4550 4575 4600 4625 4650 4675 4700 4725 4750 4775 4800 4825 4850 4875 4900 4925 4950 4975 5000 125.506 124.753 125.297 126.23 129.66300000000001 130.18100000000001 130.04100000000003 130.30900000000003 130.66500000000002 132.24 135.71100000000001 135.84100000000001 135.73200000000003 136.42700000000002 137.23100000000002 136.65600000000001 136.70500000000001 136.96700000000001 136.72200000000001 136.63500000000002 135.34100000000001 134.11600000000001 134.56500000000003 133.233 130.60900000000001 129.21600000000001 127.80499999999999 127.223 126.88200000000001 126.747 126.373 126.858 126.863 125.357 124.70699999999999 124.038 123.688 123.46599999999999 123.17 122.05199999999999 123.023 5+000-6+000

ROAD NAME:WAKA TOWN-JOHNNY TUTU TOWNCOUNTY: GRAND BASSADISTRICT: NUMBER 2PAGE:6
STRIP MAP
BridgeSCH.SchoolL
Village
CulvertGravel Pit
Mitre Drain
Box CulvertCatch-water DrainR
Roadway
5+0005+1005+2005+3005+4005+5005+6005+7005+8005+9006+000
5+0005+1005+2005+3005+4005+5005+6005+7005+8005+9006+000Section QuantityCumm. Quantity
Key itemDescriptionUnit0
Sub grade soilsSoil TypeCLCLCLCLCLCLCLCLCLCLCLCLNGNGNGNGNGNGSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS0
Geometric alignmentExisting Centreline LevelmADL122.66123.52125.16126.29126.22125.28124.63124.25123.67123.49122.24121.56123.54126.24127.36128.05130.38132.43133.28134.53135.47135.84136.01134.98134.99136.74137.20136.60136.28136.07135.48135.04134.71133.63134.34134.82129.72126.85126.49125.55
Designed Centreline LevelmADL123.02123.88125.52126.65126.58125.64124.99124.61124.03123.85122.60121.92123.90126.60127.72128.41130.74132.79133.64134.89135.83136.20136.37135.34135.35137.10137.56136.96136.64136.43135.84135.40135.07133.99134.70135.18130.08127.21126.85125.91
Average Gradient%3%7%5%-0%-4%-3%-2%-2%-1%-5%-3%8%11%4%3%9%8%3%5%4%1%1%-4%0%7%2%-2%-1%-1%-2%-2%-1%-4%3%2%-21%-12%-1%-4%-13%
Planned cross sectionC1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1
Site ClearanceClearing & Stripping within formation widthSQM225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225900054000
Light - Medium clearing outside formation widthSQM06756
Heavy Clearing outside formation widthSQM150150150150150150150150150150150150150150150150150150150150150150150150150150150150150150150150150150510025050
EarthworksRemoval of unsuitable MaterialCUM00
Cut to fillCUM00
Cut to spoilCUM0700.57
Borrow to Fill (Embankment)CUM00
Formation - Heavy Grading / ShappingSQM2252254050
ReshapingSQM225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225225877549950
Mitre/Turn-out/Other drainsm0120
Line drainsCUM
GravelCompacted Thicknessm0.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.150.15
Gravel borrowpitCUM010500
VolumeCUM18.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.7518.757504500
Drainages StructuresLocationkm5.2295.5355.6335.7725.8855.975
600 mm diameter (Length)m00
900 mm diameter(Length)m126666642180
1200 mm diameter(Length)m00
1500 mm diameter(Length)m06
U-Culvert00
Box/Bridge Culvert00
Drift/Causeway00
Structure Inlet TypeWWWWWWWWWWWW00
Structure Outlet TypeWWWWWWWWWWWW00
Erosion ProtectionScour ChecksNo.s5226168621663595
Grouted stoneSQM4836363636362281068
Gabion00
Grass PlantingSQM00
FurnitureRoad signsNo.11210
Guard railsNo.00
Drainage StructuresStructures Inlet & Outlet TypesInsitu Soil TypeMethod of Work (Earthworks)Cross-Section TypeDrain TypesAbbreviationsNote
BR: BridgeWW: Flared Winged WallsR: RockyCFCut to FillA1:Embarkment Fill With Even CamberE1Catch Water DrainSQM :Square MetresPlease read and refer to Contract BoQs,
DR: Drift/Vented DriftDI: Drop InletsNG: Gravelly /Natural Gravel/LateriteRSHRe-shapingA2:Embarkment Fill With SuperelevationE2Culvert Outlet Channel for Active StreamCUM :Cubic MetresDrawings, Attached Schedules and
RCP: Reinforced Pipe CulvertSI: Shallow InletsSS: SandyBFBorrow to Fill/EmbankmentB1, B3:Even Camber Road Cross Sections (V-Ditch & Free Fall on One Side)E3Culvert Outlet Channel for Releif Culverts & Mitre Drainsm :Linear MetresSpecifications for Proper Interpretation
BC: Box CulvertCL: ClayeyCSCut to SpoilC1, C2:Even Camber Road Cross Sections (V-Ditch on Both Sides)L1Trapezoidal Concrete Lined Channel/DrainmADL :Metres Above Datum Leveland use of this Strip Map
UC: U-CulvertRS: Red SoilHGHeavy Grading.D1, D3:Superelevation Road Cross Sections (V-Ditch on Both Sides)L2Trapezoidal Grouted Stone Lined Channel/DrainNo :Number
L / R: Left / RightBC: Black Cotton SoilS1, S2:V-Ditch Side Drains, 1000mm & 800mm Respectively
PROJECT TITLE:FUNDING AGENCY:CLIENT ORGANISATION:DESIGN CONSULTANT:
Engineering Services for Rural Roads Rehabilitation ProjectUnited States Agency for International Development (USAID) - LiberiaMinistry of Public Works, LiberiaCDM Smith International

Existing 5000 5025 5050 5075 5100 5125 5150 5175 5200 5225 5250 5275 5300 5325 5350 5375 5400 5425 5450 5475 5500 5525 5550 5575 5600 5625 5650 5675 5700 5725 5750 5775 5800 5825 5850 5875 5900 5925 5950 5975 6000 122.663 123.517 125.155 126.291 126.224 125.283 124.627 124.248 123.667 123.492 122.244 121.557 123.54300000000001 126.244 127.35899999999999 128.04599999999999 130.375 132.434 133.28299999999999 134.53399999999999 135.46700000000001 135.83699999999999 136.00899999999999 134.98400000000001 134.99100000000001 136.74 137.20400000000001 136.59899999999999 136.279 136.072 135.476 135.03700000000001 134.71 133.625 134.34 134.82400000000001 129.72399999999999 126.85299999999999 126.486 125.55200000000001 122.31399999999999 Design 5000 5025 5050 5075 5100 5125 5150 5175 5200 5225 5250 5275 5300 5325 5350 5375 5400 5425 5450 5475 5500 5525 5550 5575 5600 5625 5650 5675 5700 5725 5750 5775 5800 5825 5850 5875 5900 5925 5950 5975 6000 123.023 123.877 125.515 126.651 126.584 125.643 124.98699999999999 124.608 124.027 123.852 122.604 121.917 123.90300000000001 126.604 127.71899999999999 128.40600000000001 130.73500000000001 132.79400000000001 133.643 134.89400000000001 135.82700000000003 136.197 136.369 135.34400000000002 135.35100000000003 137.10000000000002 137.56400000000002 136.959 136.63900000000001 136.43200000000002 135.83600000000001 135.39700000000002 135.07000000000002 133.98500000000001 134.70000000000002 135.18400000000003 130.084 127.21299999999999 126.846 125.91200000000001 122.67399999999999 6+000-7+000

ROAD NAME:WAKA TOWN-JOHNNY TUTU TOWNCOUNTY: GRAND BASSADISTRICT: NUMBER 2PAGE:7
STRIP MAP
BridgeSCH.SchoolL
Village
CulvertGravel Pit
Mitre Drain
Box CulvertCatch-water DrainR
Roadway
6+0006+1006+2006+3006+4006+5006+6006+7006+8006+9007+000
6+0006+1006+2006+3006+4006+5006+6006+7006+8006+9007+000Section QuantityCumm. Quantity
Key itemDescriptionUnit
Sub grade soilsSoil TypeSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS
Geometric alignmentExisting Centreline LevelmADL122.3122.4122.4119.2119.6120.4122.7123.7124.2123.1121.1119.8119.4118.6117.2113.9113.3113.2113.5114.2115.5116.2116.4115.9115.0115.5116.4118.5120.1120.5118.8117.5117.2117.6117.4117.7116.0115.3114.8113.4