Sol_140R8121R0002.pdf
PDF 778 KB Posted
- Attached to
- Construction Support Professional Services IDIQ Federal contract opportunity
- Solicitation number
- 140R8121R0002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 140R8121R0002_0003 Q and A and Extension_0003.pdf | ||
| Sol_140R8121R0002_Amd_0003.pdf | ||
| Sol_140R8121R0002_Amd_0002.pdf | ||
| Sol_140R8121R0002_Amd_0001.pdf | ||
| 12. Solicitation_0001.pdf | ||
| 12. Solicitation.pdf | ||
| 12.4. Solicitation - Attachment D - Construction Surveyor.docx | DOCX document | |
| 12.2. Solicitation - Attachment B - Pipeline Inspector.docx | DOCX document | |
| 12.1. Solicitation Pricing Schedule.xlsx | XLSX spreadsheet | |
| 12.3. Solicitation - Attachment C - Materials Technician.docx | DOCX document | |
| 12.7. Solicitation - Attachment G Past Performance Questionnaire.pdf | ||
| 12.6. Solicitation - Attachment F - Hazardous Material Specialist.docx | DOCX document | |
| 12.5. Solicitation - Attachment E - Technical Draftsman.docx | DOCX document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUMIS CHECKED
CODE 18a. PAYMENT WILL BE MADE BY
CODE
FACILITYCODE
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
OFFEROR
R81
Denver CO 80225
Building 67 - Denver Federal Center Acquisition Operations Branch Denver Office Bureau of Reclamation
0009910106 CODE 16. ADMINISTERED BYCODE
X
X
X
541330
SIZE STANDARD:
100.00 % FOR:SET ASIDE:UNRESTRICTED ORR81
RFPIFB
10. THIS ACQUISITION ISCODE
RFQ
14. METHOD OF SOLICITATION
13b. RATING
NAICS:
SMALL BUSINESS
02/08/2021 1700 ET
01/06/2021
3034452515Amanda Somerville (No collect calls)
INFORMATION CALL:
FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBER a. NAME
4. ORDER NUMBER3. AWARD/ 6. SOLICITATION
140R8121R0002
5. SOLICITATION NUMBER
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF
1 178 0040478577OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
MS 84-27810
TELEPHONE NO.
17a. CONTRACTOR/
Denver CO 80225-0007 Denver Federal Center 6th Avenue & Kipling Street Building 56, Dock S6, Rm 1950 Bureau of Reclamation-DO
15. DELIVER TO
Denver CO 80225
MS 84-27810
Building 67 - Denver Federal Center Acquisition Operations Branch Denver Office
9. ISSUED BY
7.
2. CONTRACT NO.
EFFECTIVE DATE
$16.50
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW
ISSUE DATE
DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
11.
SEE SCHEDULEX
12. DISCOUNT TERMS
THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13a.
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
8(A)
Bureau of Reclamation
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
Project Title: Construction Support Professional Services
CONTRACT MINIMUM & MAXIMUM
The IDIQ contract Minimum amount IAW clause52.216-22(b) Indefinite Quantity is $10,000.
The IDIQ contract Maximum amount IAW clause 52.216-22(b) Indefinite Quantity is $11,000,000.
Legacy Doc #: BOR
(Use Reverse and/or Attach Additional Sheets as Necessary)
HEREIN, IS ACCEPTED AS TO ITEMS:
XX
DATED
Edward Marshburn
. YOUR OFFER ON SOLICITATION (BLOCK 5),
INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER
ARE
ARE
31c. DATE SIGNED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)
ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL
SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
26. TOTAL AWARD AMOUNT (For Govt. Use Only)
OFFER
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
ARE NOT ATTACHED.
ARE NOT ATTACHED.
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
30b. NAME AND TITLE OF SIGNER (Type or print)
30a. SIGNATURE OF OFFEROR/CONTRACTOR
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
25. ACCOUNTING AND APPROPRIATION DATA
29. AWARD OF CONTRACT:
REF.
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER
37. CHECK NUMBER
FINALPARTIAL
36. PAYMENT
FINALPARTIAL
35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER33. SHIP NUMBER
COMPLETE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)
42b. RECEIVED AT (Location)
42a. RECEIVED BY (Print)
41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
STANDARD FORM 1449 (REV. 2/2012) BACK
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
Delivery: 06/30/2026
Period of Performance: 07/01/2021 to 06/30/2026
00010 Construction Support Professional Services
Product/Service Code: R499
Product/Service Description: SUPPORT-
PROFESSIONAL: OTHER
32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
178 2 of
140R8120R0003_Professional Services for Construction Support Page 3 of 105
TABLE OF CONTENTS
SECTION A – Solicitation, Offer and Award (SF-1449) 1
SECTION B – Supplies or Services and Prices 6 B.1 Schedule of Services 6
SECTION C -- Descriptions and Specifications 8 C.1 Performance Work Statement 8
SECTION F -- Deliveries or Performance 21 F.1 Clauses Incorporated by Reference 21 F.2 Contract Ordering Period 21 F.3 Task Order Issuance Procedures 21
SECTION G -- Contract Administration Data 22 G.1 Authorities and Delegations 22 G.2 Government Administration Personnel 22 G.3 Contractor’s Administration Personnel 22 G.4 G.5
Guaranteed Minimum and Maximum Amount Electronic Invoicing & Payment Requirements
SECTION H -- Special Contract Requirements (There are no clauses in this section) 24 H.1 Contractor Performance Assessment Reporting System
SECTION I -- Contract Clauses 26 I.1 Clauses Incorporated By Reference 26 I.2 Contract Terms and Conditions – Commercial Items 26 I.3 Contract Terms and Conditions – Commercial Items (Alternate I) 31 I.4 Protecting Federal Employees and the Public from Exposure to Tobacco Smoke in the Federal Workplace – Bureau of Reclamation
I.5 Security Requirements 39 I.6 Contract Terms and Conditions Required to Implement Statutes or Executive
Orders – Commercial Items
I.7 Ordering 55 I.8 Order Limitations 56 I.9 Option to Extend Services 56
I.10
SECTION J
J.1 J.2 J.3 J.4
Notice of Total Small Business Set-Aside
List of Attachments Attachment A – Roofing Inspector PWS Attachment B – Pipeline Inspector PWS Attachment C – Pumping Plant Inspector PWS Attachment D – Roller Compacted Concrete Inspector PWS
SECTION L – Instructions, Conditions and Notices to Offerors 82 L.1 Solicitation Provisions Incorporated by Reference 82 L.2 Instructions to Offerors – Commercial Items 82 L.3 Use and Disclosure of Proposal Information 83 L.4 Notice of World Trade Organization Government Procurement Agreement
Evaluations
L.5 Offeror Representations and Certifications – Commercial Items 85 L.6 Prohibition on Contracting with Entities that Require Certain Internal Confidentially
Agreements or Statements
L.7 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment
140R8120R0003_Professional Services for Construction Support Page 4 of 105
L.8 Type of Contract 99
SECTION M – Evaluation Factors for Award 100 M.1 Evaluation – Commercial Items 100
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
140R8120R0003_Professional Services for Construction Support Page 5 of 105
Section B – Services and Prices
B.1. Price and Cost Schedule of Services:
LABOR DESCRIPTION LEVEL RATE Year 1 Year 2 Year 3 Year 4 Year 5
Civil Construction Inspection
(CI)
I hour
Civil Construction Inspection
II hour
III hour
IV hour
Mechanical Inspection (MI) I hour
Mechanical Inspection (MI) II hour
Mechanical Inspection (MI) III hour
Mechanical Inspection (MI) IV hour
Electrical Inspection (EI) I hour
Electrical Inspection (EI) II hour
Electrical Inspection (EI) III hour
Electrical Inspection (EI) IV hour
Startup/Commissioning of electrical and mechanical systems (SC)
Materials Engineering Testing
(MET)
Construction Management Services (CMS)
140R8120R0003_Professional Services for Construction Support Page 6 of 105
Construction Management
Cost Estimator I hour
Cost Estimator II hour
Cost Estimator III hour
Cost Estimator IV hour
Hazardous Materials Testing/inspection
Drafting/CADD I hour
Drafting/CADD II hour
Drafting/CADD III hour
Drafting/CADD IV hour
Surveying (QA, control, Bathy, topo, high-def scanning)
Geotechnical Sampling/Testing I hour
Geotechnical Sampling/Testing II hour
Geotechnical Sampling/Testing III hour
Geotechnical Sampling/Testing IV hour
Environmental Inspections I hour
Environmental Inspections II hour
Environmental Inspections III hour
140R8120R0003_Professional Services for Construction Support Page 7 of 105
Environmental Inspections IV hour
Coatings Inspector I hour
Coatings Inspector II hour
Coatings Inspector III hour
Coatings Inspector IV hour
Specialized Construction Subject Matter Expert (SME)
Specialized Construction Subject Matter Expert (SME)
(End of Price and Cost Schedule)
140R8120R0003_Professional Services for Construction Support Page 8 of 105
Section C – Descriptions and Specifications
C.1. Performance Work Statement
PERFORMANCE WORK STATEMENT (PWS)
PROFESSIONAL SERVICES FOR CONSTRUCTION SUPPORT
Indefinite Delivery, Indefinite Quantity (IDIQ)
1.0. INTRODUCTION: Bureau of Reclamation (Reclamation) is a water management agency with 600 dams in the 17 western states. Reclamation is best known for construction of dams, power plants, and canals, including Hoover Dam on the Colorado River, Grand Coulee Dam on the Columbia River, and
Folsom Dam on the American River. Reclamation is the largest wholesaler of water in the country and second largest producer of hydroelectric power in the western US.
Reclamation is organized into six regions (Missouri Basin [MB], Arkansas-Rio Grande-Texas-Gulf [ART], Upper Colorado Basin [UCB], Lower Colorado Basin [LCB], Columbia-Pacific Northwest [CPN], and
California-Great Basin [CGB]). Reclamation design and construction offices routinely provide construction support services within the scope of this PWS within these five regions.
A contract may be awarded under this PWS to one or more contractors based on the evaluations of the proposals resulting in the most beneficial and advantageous arrangement for the government. Portions of this PWS may be awarded separately to different contractors. The same portions of this PWS may be awarded to multiple contractors. Awards may not be made to all satisfactory proposals
2.0. SCOPE: Occasionally, workload either exceeds the capacity of geographically assigned staff or requires specialty knowledge and experience Reclamation staff does not possess. Reclamation policy is first to temporarily reassign staff to satisfy temporary requirements. The purpose of the professional services IDIQ is to perform the required work through a task order when other Reclamation staff with the skills, knowledge, and expertise is not available.
2.1. Construction support services performed under this professional services IDIQ contract include technical and professional services to support execution of Reclamation's mission. The types of services may include:
a) construction inspection (civil, mechanical, electrical, environmental, NACE coatings, fire protection/suppression, elevator, HVAC, certified welding inspectors, etc.); equipment startup and commissioning;
b) geotechnical sampling/testing, materials engineering testing; data collection and manipulation;
c) surveying for quality assurance, bathymetric/topographic, high‐definition scanning, and construction control, excludes land/boundary surveyors;
d) specialized construction industry subject matter experts; technical consultation and research;
technical document preparation;
e) cost estimating; construction contract management; scheduling; financial analysis and accounting.
140R8120R0003_Professional Services for Construction Support Page 9 of 105
The position titles and associated minimum requirements which are being sought for inclusion in the
IDIQ described in this PWS are set forth in Attachment 1 ‐ Schedule.
2.2. A detailed PWS will be issued by the government for each Task Order to be placed against IDIQ contract(s) awarded from this PWS. A Task Order may be awarded to one or more IDIQ contractors, if beneficial to the government. The detailed PWS will include the period of performance; place of performance; travel requirements (if necessary); description of the task or tasks to be performed;
deliverables; minimum qualifications for individuals to perform the task, work schedule (if necessary), and other information pertinent to the task.
2.3. The detailed PWS may require individual(s) providing the services to be physically located in the offices requiring the services, at their home office, fabrication and manufacturing sites, or at the construction job sites of the projects which require their services. Contract employees may be required to travel either occasionally or continuously in the performance of a task order. The predominant service area includes the seventeen western United States, but atypically may include other locations as required for client needs.
2.4. Unless the detailed PWS allows additional days, the contractor will be allowed up to 10 business days to respond. The response will include the contractor’s approach for performing the tasks, qualifications for employee(s) who will perform the tasks, price for performing the tasks, and assumptions used in preparing the response to meet all the requirements of the detailed PWS.
Reclamation will evaluate responses on technical merit and consideration of price. Reclamation may accept or reject the response or request further clarification and/or revisions to the response. The contractor shall respond to requests for clarifications or revisions by the close of the next business day. After a task order is issued, the contractor may need to make a substitution. In these instances, the contractor will provide employee qualifications for substitutes or replacements of employees accepted in the proposal. Substitute and replacement employee qualifications will be at least equal or exceed to the qualifications of the employee they are substituting for or replacing or provide consideration. Reclamation will evaluate the qualifications of the substitutes or replacements.
Reclamation must accept the substitute or replacement employee prior to the employee mobilizing and performing the detailed PWS. All costs incurred as a result of the substitution (i.e. travel, labor for transferring task order knowledge, overlapping time on site, recruitment, differential pay, etc.)
will not be an expense to the government.
3.0. PERSONNEL QUALIFICATIONS: The detailed PWS for each Task Order will include minimum qualifications for individuals to perform the tasks. The contractor is to provide personnel with the minimum qualifications for each detailed PWS.
Proposals for the contractor selection (base agreement) must include how the contractor will acquire personnel with the required qualifications for each task order when the contractor does not already employ personnel that would qualify.
3.1. Personnel may be required to pass a security background check to work at a government facility.
Personnel must maintain that clearance for the duration of the Task Order.
3.2. The detailed PWS for each Task Order may include educational requirements for individuals to perform the tasks. Provide personnel with the required education for each detailed PWS.
140R8120R0003_Professional Services for Construction Support Page 10 of 105
3.3. Minimum qualifications may include, but not necessarily limited to experience with:
Comprehension and interpretation of construction plans, specifications, and construction contract language. Performing inspection of construction contractor work and completing daily inspection reports. Personnel must have English language proficiency for Task Orders requiring communications.
3.3.1. Civil Construction Inspection (CI): Experience with heavy civil construction inspection of dams and/or large water containing structures, water conveyance facilities, and pumping plants.
Inspection services would be performed on construction, renovation, decommissioning, and/or demolition of structures, infrastructures, and their environmental systems above or under the earth's surface; evaluation of the earth's physical, natural, and man‐made features. Task orders may require inspection experience with one or more of the following: large concrete placements;
mass concrete; roller compacted concrete (RCC); soil cement; shotcrete; concrete demolition ;
hydro‐ demolition; concrete repairs; construction of structures (steel, metal, concrete, timber, masonry); asphalt placement; site work; construction surveying; zoned filter embankments;
geotextile installation and testing; geomembrane installation and testing; deep excavations;
drilling and boring; slurry walls; foundation preparation, and other civil construction. The detailed
PWS may also require certifications such as American Concrete Institute (ACI) certifications.
3.3.2. Mechanical Inspection (MI): Experience with mechanical equipment inspection on dams, spillways, canals and/or other water conveyance structures, hydroelectric powerplants, water treatment plants, pumping plants, and other structures. Task orders may require inspection experience with installation, maintenance, and/or repair of one or more of the following: pumps;
hydraulic systems; rotors (spring keys, rotor rim, etc.); turbines (runners, wicket gates, linkage system, servomotors, headcovers, bottom ring, bearings and brackets, etc.); gates (high pressure, radial, fixed wheel, etc.); pipe (high pressure, large diameter, penstock, etc.); valves (ring jet, hollow cone, butterfly, ball, gate, globe, etc.); flow meters; welding (connections, weld repairs, etc.); non‐destructive testing for cracks and inclusions; Heating, Ventilation, and Air Conditioning
(HVAC) specialists with experience in retrofitting or new construction for commercial and industrial applications; advise and write reports for Corrective Actions; and other mechanical construction. The detailed PWS may also require certifications such as welding inspector certification from American Welding Society (AWS).
3.3.3. Electrical Inspection (EI): Experience with electrical equipment oversight or inspection on hydroelectric powerplants, water treatment plants, pumping plants, dams, spillways, and/or other structures. Task orders may require inspection experience with installation, maintenance, and/or repair of one or more of the following: hydropower generation equipment including generator windings, installation of stator cores, field‐pole refurbishment and installation, excitation systems and equipment; electric equipment and systems (i.e., station service); large capacity transformers;
switchyards; system control and data acquisition (SCADA); power transmission lines; and other electrical construction. The detailed PWS may also require certifications.
3.3.4. Materials Engineering Testing (MET): Experience with construction materials testing for dams and/or large water containing structures, water conveyance facilities, hydroelectric power plants, and pumping plants. Expertise may include: the ability to determine and advise on a material's essential composition, atomic and molecular configuration, and processing; relate the material’s essential composition to its properties, end use, and performance in engineering, 140R8120R0003_Professional Services for Construction Support Page 11 of 105 architecture, and scientific applications and programs; examine the interaction of materials in their processes and applications, taking into account the associated equipment, systems, components, and their fabrication, design, or use; advise personnel on the application of materials and material solutions to meet certain mechanical, electrical, environmental, and chemical requirements;
and/or test and evaluate substances for new applications. Task orders may require experience with one or more of the following: gradation analysis testing of soils and aggregates, including sieve and hydrometer analysis; water content determination of soils and aggregates; moisture content determination and gradation analysis testing of concrete aggregates; determining in‐place densities and water contents of earth materials; determining laboratory maximum densities and optimum water contents of earth materials (Standard Proctor, Relative Density, etc.), determining chemical properties of cementitious materials and aggregate reactivity mitigation; determining properties of freshly batched concrete including slump, temperature, and air content; preparation of concrete cylinder samples and testing for compressive strength, modulus and Poisson’s ratio, time of set; testing of roller‐ compacted concrete (consistency and density); testing and evaluating the processing and placement of zoned earth embankments; testing methods for concrete repairs;
testing methods for masonry, testing synthetic construction materials such as High Density
Polyethylene (HDPE) pipe and geotextile fabrics; evaluating construction coatings and application specifications and testing; and other construction materials testing.
The detailed PWS may also require certifications such as American Concrete Institute (ACI) certifications for Concrete Field and Laboratory Testing, and familiarity with industry standards such as ACI, ASTM International, American Water Works Association (AWWA), and American
Welding Society (AWS), and Society for Protective Coatings (SSPC), and USBR and United States
Army Corps of Engineers (USACE) Standards. Testing equipment may be provided by Reclamation unless otherwise stated in the detailed PWS.
3.3.5. Construction Management Services (CMS): Experience with heavy civil construction of dams and large water containing structures, water conveyance facilities, and pumping plants. Task orders may require experience with one or more of the following:
a) Construction contract administration including: review and analyze submittals, coordinating responses to Requests for Information (RFI), review and analyze progress payments, analyze Requests for Equitable Adjustment (REAs) for contract modifications.
b) Construction schedule development and/or analysis using Critical Path Method (CPM) under concepts and methods outlined in Association of General Contractors (AGC)
Manual using computer software such as Primavera P6.
c) Developing and review/analyzing time impact analysis.
d) Analysis of construction contract claims.
e) Construction cost estimating.
f) Specification writing in Construction Specifications Institute (CSI) format.
g) Drafting Civil 3D and AutoCAD format.
3.3.6. Startup Commissioning of Electrical and Mechanical Systems (SC): Experience with startup and commissioning process test procedures for mechanical and electrical equipment (hydropower generators, pumping plants, gates and valves, hydraulic and electric operating systems, heating ventilation and air conditioning equipment, large capacity power transformers, switchyards, 140R8120R0003_Professional Services for Construction Support Page 12 of 105 switchgear, and unit control and protection, and power transmission lines, and/or other systems).
Task orders may require procedures to address one or more of the following: interface between system components and be the responsible party for initializing the equipment; operational check‐ out; determining initial set points; direct tests based on approved test procedures and safety procedures; measuring performance as compared to Owner’s Project Requirements (OPR);
evaluate performance deficiencies identified in test reports; through collaboration with entity responsible for system and equipment installation, recommend corrective actions; and other commissioning and startup procedures. The detailed PWS may also require certifications.
3.3.7. Specialized Construction Subject Matter Expert (SME): Subject Matter Experts with expert level experience for specialized construction methods. Examples of SMEs include:
a) Expert level knowledge of and experience with roller‐compacted concrete (RCC), material development, aggregate processing, batch plant set‐up and operations, material handling, placement methods, compaction, quality control, quality assurance, and acceptance for large RCC dams which may have hydraulic heights over 200 vertical feet.
b) Expert level experience with chemical and cement grouting methods and materials expert level experience using a variety of chemical and cement grouting materials, pumps, and other equipment to address a variety of issues such as repair of cracks, filling joints, filling voids, and stopping water leaks. Knowledge of all varieties of grouts available for use and capability of determining the best grouts for each use based on each job condition. Knowledge of appropriate concrete repair and/or completion methods typically associated with grouting operations.
c) Expert level experience with: construction contract claim analysis, cost and pricing, and time impacts; Federal Acquisition Regulations (FAR) as related to construction contracting; and interpretation of court cases as applied to current claims.
d) Expert level knowledge and experience for inspecting, verifying, creating, or completing
As‐Built drawings before/during/after construction or maintenance modifications, and update inaccurate existing drawings.
e) Fire Protection/Suppression Inspector with commercial and industrial knowledge and experience in retrofitting and new construction, able to advise and write reports for
Corrective Actions. Fire protection/suppression inspection involves: the application of theories, principles, practical concepts, processes, and methods of fire prevention and fire phenomena; evaluation of the designs of integrated systems involving suppression, detection, and electrical and electronic alarm systems; design standards and codes for fire protection engineering techniques and practices; assessment and prediction of fire hazards or risks; mitigation of fire damage by proper design, construction, and arrangement of facilities; research, development, and testing of fire protection technologies (e.g., halon and water mist applicators); design, construction, inspection, testing, and operation of fire detection and fire suppression apparatus, appliances, devices, and systems; assessment of fire protection requirements; and develop, interpret, and promote fire safety codes and standards.
140R8120R0003_Professional Services for Construction Support Page 13 of 105
f) Elevator specialists with commercial and industrial knowledge and experience in retrofitting or new construction for commercial and industrial applications, perform inspections, evaluate conditions, recommend and write reports for Corrective Actions.
g) Environmental inspections requiring scientific work involving environmental programs and projects in the areas of: environmental planning; environmental compliance;
identification and cleanup of contamination; and restoring and sustaining environmental conservation. Areas of compliance expertise, such as: air pollution monitoring/control, hazardous waste handling, wastewater, contamination sites, regulatory compliance, and habitat restoration.
h) Surveyors with experience in surveying such instances as bathymetric reservoir surveys, topographic surveys, high‐definition scanning, construction Quality Assurance surveys, establishing construction control points, (excludes land boundary surveys and work that can only be performed by a licensed surveyor in that state).
i) NACE Coatings Inspectors with Level II or III knowledge, certification, and experience with industrial coatings (i.e., penstock, draft tube, scroll case, radial gates, and other infrastructure components coating/re‐coating),and for other industrial applications. The inspector will provide observation, inspection, and quality assurance; perform unsupervised non‐destructive and destructive inspections of liquid and non‐liquid coatings applied to any substrate; and assurance of contractor work activities to ensure compliance with the contract documents.
j) Geotechnical sampling and analysis of physical properties of earthworks and subsurface conditions, petrographic examinations and analysis to determine aggregate suitability for use in concrete, mineral composition of aggregates, hardened concrete properties, assess any internal concrete damage that may have occurred, and determine potential for failure causes. The examination and analysis are to determine the suitability of aggregate sources and conditions of existing concrete structures. This may include consulting on specimen selection, obtaining samples from a site or as provided by
Reclamation personnel and conducting laboratory tests to ASTM International standards, macroscopic and microscopic examinations including scanning electron microscopy, X‐ray Diffraction (XRD) analysis, and X‐ray Fluorescence (SRF) analysis, writing reports, advising Reclamation personnel, and inspecting or peer reviewing the work of others. Electronics specialists having knowledge of and experience with electronic circuits, circuit elements, equipment, systems, and associated phenomena concerned with electromagnetic or acoustical wave energy or electrical information for purposes such as communication, computation, sensing, control, and measurement.
3.4. Knowledge of Reclamation Safety and Health Standards as they apply to construction safety. Particularly including fall protection, Hazardous Energy Control Protection (HECP), Lock
Out Tag Out (LOTO), and Personal Protective Equipment (PPE).
3.5. The detailed PWS may require specific safety training prior to the start of Task Order work.
All safety training will meet RSHS and current Bureau of Reclamation (BOR) and Department of
Interior (DOI) guidelines. The contractor is to provide personnel with the required safety training for each detailed PWS and provide training certification prior to performing tasks on site.
Specific safety training may include one or more of the following on an “as needed” basis:
140R8120R0003_Professional Services for Construction Support Page 14 of 105
a) Hexavalent Chromium safe work practices to avoid exposure
b) Asbestos and Lead awareness
c) Confined Space Entry
d) Respirators Protection
e) Respirator Fitment and medical clearance prior to arrival
f) Fire Extinguisher Training
g) Hazardous Communication, including Safety Data Sheets
h) Bloodborne Pathogens Training
i) Hazardous Energy Training
j) Arc‐flash awareness
k) Fall protection
l) First Aid CPR
m) Excavation
n) Scaffold
o) OSHA 30 Construction training
4.0. PERIOD OF PERFORMANCE (PoP): The base PoP is five years from the time of the award, or approximately through December 31, 2025. Unless the Task Order states otherwise, Task Orders will be issued on a labor‐hour basis or per sample basis.
4.1. Work Schedule: A work schedule may be defined in the detailed PWS for each Task Order. The contractor shall use the work schedule issued for preparing proposals to a detailed PWS. The detailed
PWS may have tasks whose durations are dependent on activities by others (i.e. inspection of construction activities by a construction contractor). Actual work schedules may vary from the work schedules identified in the detailed PWS. Timesheets will be submitted to Contracting Officer’s
Technical Representative (COR) and verified by the on‐site Project Manager on a weekly basis.
4.1.1. Overtime: Overtime is defined as hours in excess of forty (40) hours per work week. If overtime is required for a Task Order it will be included in the detailed PWS. Overtime will be reflected as a separate line item for pricing. Professional services are EXEMPT from FLSA, so any and all hours that exceed a 40-hour week are paid at the regular hourly rate. The Government is not liable for any overtime effort performed by the contractor without prior approval from the
Contracting Officer.
4.1.2. Office Closure: In the event of an unexpected office closure such as for severe weather conditions, contractor personnel shall be directed by the Contracting Officer regarding reporting requirements and procedures. The contractor is responsible for all notification and costs associated with office closure. All non-work due to unexpected office closure will be at no cost to the Government unless expressly authorized by the Contracting Officer.
4.1.3. Holidays: The Federal Government will observe, and normal work functions are closed for the holidays listed below. Task Order work schedules may or may not observe these holidays.
New Year’s Day Labor Day
Martin Luther King Jr. Birthday Columbus Day
President’s Day Veterans Day
140R8120R0003_Professional Services for Construction Support Page 15 of 105
Memorial Day Thanksgiving
Independence Day Christmas
a) Holidays also include any other holiday designated by Federal law, Executive Order or
Presidential Proclamation.
b) When holidays fall on a Saturday, the preceding Friday is observed; when any such day falls on a Sunday, the following Monday is observed. Observance of such days by
Government personnel shall not be cause for additional period of performance or entitlement to compensation except as set forth in the contract.
4.2. Contractors in the Federal Workplace ‐ NONPERSONAL SERVICES:
No Task Order under this award can be set forth for Personal Services. The following rules apply:
i. OVERVIEW: Federal government agencies shall not award personal services contracts unless specifically authorized by statute. No such authority exists for this contract, and the services acquired hereunder are not personal in nature.
ii. A personal services contract is characterized by the employer‐employee relationship it creates between the Government and the contractor's personnel. An employer‐ employee relationship under a service contract occurs when, as a result of the contract's terms or the manner of its administration during performance, contractor personnel are subject to the relatively continuous supervision and control of a Government officer or employee. Therefore, Government employees do not supervise contractors or perform supervisory type functions such as approving leave, providing performance evaluations, approving awards, etc. Contractor employees are not Government personnel and are subject to different laws, rules and regulations than Government personnel. Contractor employees are subject to the work rules of their particular employer, and any restrictions imposed by the contract or detailed PWS. The contract/detailed PWS defines the scope of the contractor employee responsibilities as well as the relationship between the contractor and the government.
iii. ADMINISTRATIVE FUNCTIONS: Contract employees are not allowed administrative leave for such functions as picnics and other office social events, blood drives, luncheons, retirement ceremonies, dedications, town hall meetings, special emphasis programs, etc. They are contracted to perform a function. If they are not performing that function, they are not entitled to pay, and the Government is not billed. Staff meetings are an exception if discussion is pertinent to the job the contractor is currently working. Supervisors may not request contractors to help set up office events or volunteer time for office events unless the event is directly related to the task(s) cited in the contract/detailed PWS.
iv. AWARDS: Contract employees are not eligible to receive monetary awards, such as On‐ The‐
Spot Awards, performance awards, etc, from the Government.
v. CHARITABLE CONTRIBUTIONS: Government personnel may not officially or unofficially solicit contractor employees for charitable contributions either on or off duty. Contractors are not prohibited from voluntarily contributing or purchasing fund‐raiser items.
140R8120R0003_Professional Services for Construction Support Page 16 of 105
vi. COMPENSATORY TIME: Government personnel may not authorize compensatory time for contractors.
vii. CONTRACTOR EMPLOYER RESPONSIBILITIES: Included, but not limited to, are payment of wages; benefits (insurance, vacation); training (unless task related specialized training is not available from contractor's sources); EEO guidance; counseling, behavior/performance problems; other training/guidance/assistance required by their employee.
viii. GOVERNMENT‐OWNED VEHICLES: Contract employees are not normally authorized to operate or ride in a Government‐Owned Vehicle due to liability. A contractor employee may be authorized to ride in a government vehicle only if a “hold harmless” release has been signed, submitted, and approved prior to the event.
ix. GOVERNMENT REPRESENTATION: Contract employees cannot perform tasks that require them to represent the Government in policy or decision making or in government functions such as EEO Committees, Savings Bonds or CFC Campaigns, Boards, etc.
x. HOLIDAYS: Do not include holidays in the total verified on the contractor employer timesheet unless the employee worked that day. If so, annotate "Actually worked holiday" on the timesheet.
xi. INTERVIEWS: Hiring is the sole responsibility of the contractor. The Government may review resumes for technical and professional categories where specific expertise is required. A
Government representative may observe during an interview conducted by the contractor to answer questions concerning the task order requirements.
xii. OVERTIME: Contract employees may work overtime, but the requirement must be stated in or added to the task order so that the customer can verify the overtime is authorized. When authorized, contractors will be paid time and a half when working overtime. Professional services are EXEMPT from FLSA, so any and all hours that exceed a 40‐hour week are paid at the regular hourly rate.
xiii. RAISES: The Government may not initiate cost of living raises for contractors. However, certain criteria do provide for cost of living type increases from the contractor employer, such as increases required by the Service Contract Act. Otherwise, the Government may initiate rate changes only when the contractor‐employee's responsibilities have changed. In these instances, the Government will suggest a new rate of pay and support the request with a revised PWS.
xiv. PRIVATELY OWNED VEHICLES (POV): If the task order requires a contract employee to use their own vehicle for travel, then the contract employee will be reimbursed in accordance with the detailed PWS limited by the Federal Travel Regulations.
xv. SICK LEAVE: Contractor employees are not entitled to sick leave under the Service Contract
Act or the Fair Labor Standards Act.
xvi. SUPERVISION: To be provided by the contractor/employer. This includes monitoring employee performance, affecting necessary employee disciplinary actions, dealing with conduct issues, and awards. Any problems with performance, attendance, personal problems, etc.
should be referred to the contractor through the Contracting Officer.
140R8120R0003_Professional Services for Construction Support Page 17 of 105
xvii. TASK ORDER: If the scope of a task(s) is altered, then a task order modification must be executed by the Contracting Officer before any changed work is assigned.
xviii. TRAINING: The Government does not pay for contractor‐employee training unless the training is unique to the work site and is mandatory to perform the work identified in the task order/detailed PWS. Specialized skill requirements such as proficiency with Excel, PowerPoint, etc., should be identified in the detailed PWS and this training is the responsibility of the contractor to provide related training. Reclamation is a zero‐ tolerance workplace, so the contractor shall ensure its employees have appropriate personnel training to comply with Equal
Employment Opportunity Act requirements, Hatch Act, sexual harassment, safety, and drugs/violence in the workplace. Requests for training by exception must be provided to and approved by the CO prior to the Government conducting or providing training. The contractor shall sign a “hold harmless” release for any training provided by the government. See attached.
xix. TRAVEL: Reclamation may require a contractor to travel. A Travel Autorization form must be submitted to the COR and authorized by the CO before traveling.
xx. Reclamation, through the detailed PWS, may be specific as to mode of transportation, reporting and completion dates and times of travel, rental car or POV. Limitations on food and lodging and POV will be determined in accordance with GSA Federal Travel Regulations.
xxi. GOVERNMENT‐OWNED HOUSING: Contract employees are not normally authorized to stay in government‐owned housing, but if space is available, they may be allowed lodging while space is available and if it is beneficial to the government to do so.
xxii. UNFORESEEN FACILITY CLOSURE: Contract employees are not entitled to administrative leave. If a Government decision to close a facility is made before working hours, the contractor will be notified using normal notification procedures. Contractor employees are not required to perform any services on day(s) of the closure and shall receive no payment for such periods. In the event of a partial day, unforeseen facility closure, the Contractor shall notify contractor‐ employees within one hour of receiving notice of facility closure. Payment of a partial day closure will be made only for the actual time worked. Contractors are authorized pay for time spent on fire/emergency drills as long as it is recorded.
4.3. Price: The prices in the awarded Attachment 1, the Schedule, will be the maximum hourly rates for each professional service and level of service. Price proposals for task orders may discount hourly rates to less than maximum prices in the Schedule. Task order proposals may not have a higher rate than the maximum price in the Schedule.
4.4.3.1. The quote provider may request Reclamation consider a modification to the contract to adjust the maximum prices in the Schedule, up or down, provided the following requirements are met:
a. The request is made after the first anniversary of the contract.
b. A request is made no more often than once every 12 months.
c. An incremental increase of each request is limited to 3.5 percent per annum.
140R8120R0003_Professional Services for Construction Support Page 18 of 105
d. The request includes justification for a rate change in price describing the need for a rate change demonstrating fair and reasonable price and advantages to government.
4.4. A contractor that has a successful proposal that results in an award will provide an ACORD
Certificate of Liability Insurance before starting work.
5.0. GOVERNMENT‐FURNISHED EQUIPMENT (GFE), MATERIALS (GFM), RESOURCES (GFR):
5.1. GFE: None, unless listed in the detailed PWS for an order.
5.2. GFM: The Contactor shall be responsible for providing all required equipment, material and supplies necessary. The government anticipates the following equipment will be required:
Notebook computer and computer software with the capability to transmit electronic reports in the required formats, internet access, cell phone, digital camera, SD cards for photos, and personal protective gear including safety glasses, hearing protection, safety boots, hard hat, harness, and safety vest to accomplish the required tasks. To insure compatibility with
Reclamation’s programs, computer generated deliverables be provided in the following formats:
Microsoft Word 2010 or newer, Microsoft Excel 2010 or newer, most up to date Adobe
Professional (reader and writer).
5.3. GFR: If any Government furnished resources are provided, they will be provided in accordance with applicable standards, regulations and guidance and are limited to those identified in the detailed
PWS for the individual Task Orders. Government facilities and services that may be made available under this contract include but are not limited to office space, general office equipment, specialized equipment, communications services and devices, and reproduction services. For purposes of this contract and the Task Orders issued hereunder, Government furnished resources shall not include
Government Vehicles, nor shall contractor personnel be allowed to ride in Government vehicles without prior authorization.
6.0. REGULATIONS/POLICIES: Federal regulations, policies, and standards of performance and conduct apply. Contractors must fully comply with Reclamation and Safety Health Standards (RSHS), including errata. RSHS is available at: www.usbr.gov/safety/RSHS/rshs.html.
7.0. TRAVEL: The requested construction support services may require contractor travel. Travel costs are reimbursed in accordance with FAR 31.205‐46, which cites the Federal Travel Regulations for determining a “reasonable charge” and is based upon GSA approved travel rates. Required travel using a privately‐ owned vehicle will be reimbursed for mileage as authorized at standard GSA rates or cost of rental car. Per Diem will be allowed as provided for by GSA Federal Travel Regulations as posted on www.gsa.gov. Airline travel will be reimbursed at cost for lowest reasonably accommodating travel.
Travel expenses will not be reimbursed for incidental travel to an office within fifty miles of an individual's home residence or office unless specifically authorized in an individual task order.
8.0. GOVERNMENT VEHICLES: The Contractor shall use or rent their own vehicles whenever possible and practical. Contract employees will not operate any Government vehicle, unless required (such as a fork‐lift) and the contractor must have proof of and maintain certification. If the contractor is required to use a government vehicle as an operator or a passenger, they must sign a “Hold Harmless” release.
This includes Government‐procured rental vehicles. Signed releases are due to the Contracting Officer
140R8120R0003_Professional Services for Construction Support Page 19 of 105 no later than one (1) day before use of a Government vehicle. See attached form. Satisfactory completion of specialized training or certifications may be required. Government vehicles are for official use only.
9.0. SECURITY: Contractor employee(s) must comply with Reclamation security procedures and security training requirements.
9.1. Reclamation reserves the right to perform security checks on Contractor employees. The
Contractor shall be required to supply Reclamation with the legal names and other personal information of employees who will be working under this contract.
9.2. Employment will require passing a background check. The contractor employee may be required to have a government issued Personnel Identification Verification (PIV) card or proximity card before being allowed unsupervised access to specific federally controlled facility or information systems.
Policies, procedures, and detailed instructions for obtaining PIV Cards are available at the
Department of Interior’s DOI ACCESS Home page at https://portal.doi.net/DOIAccess/Pages/default.aspx.
9.3. Reclamation has identified specific security sensitivity designations for information related to
Reclamation facilities. The contractor must comply with requirements, policies, and procedures for that facility and Reclamation as a whole.
9.4. Government furnished information provided to the contract employee, work products, and deliverables are designated Controlled Unclassified Information (CUI), except when both contractor‐ produced and Government‐furnished information related to this contract is designated Public
Information (non‐CUI). The Contractor must not intercept, store, or distribute CUI deliverables.
Deliverables will be given directly to the government Project Manager, COR, and Contracting Officer
(CO) as directed in the detailed PWS for the Task Order.
10.0. TRAINING: The Contractor is responsible for all training for its employees, except when training can only be provided by Reclamation, such as required site‐specific safety training, IT security training, etc. See Section 4.2 vxiii.
11.0. DELIVERABLES: Deliverables for each task order will be defined in the detailed PWS for each task order. These deliverables may include, but are not limited to: weekly timesheets, weekly performance reports, weekly and/or monthly project progress reports, findings, summaries, draft and final reports, work products, etc. All costs associated with the preparation, reproduction, coordination, submissions for review, rewrites, final reports, copies, postage, etc., shall be included in the Task Order proposal price. Note: Deliverables not received and accepted by the COR and CO before invoicing will delay payment. CO and COR contact information will be provided at the time of the award.
12.0. QUALITY: Contractor’s Performance Assessment Report System (CPARS): For requirements over the threshold ($100,000 for services), a CPARS report will be created. This report will be completed by the COR at the end of the performance period. For more information, go to www.cpars.csd.disa.mil/cparsmain.htm.
12.1. Measuring Quality: Quality measurements will be listed in the detailed PWS for each Task Order and may include, and is not limited to, one or more of the following:
140R8120R0003_Professional Services for Construction Support Page 20 of 105
a. Inspectors perform construction inspection and are present during all construction activity
100 percent of the time.
b. Inspection reports are delivered by the close of the next business day 98 percent of the time.
c. Promptly notify the Reclamation Project Manager of any issues; non‐compliance with specifications, drawings, safety and health, standards, etc. within 4 hours of discovery 100 percent of the time.
d. Deliver written reports and/or required documentation by due date 80 percent of the time, and no later than one week after due date 100 percent of the time.
e. Attend and participate in weekly tool box safety meetings with no more than one absence or incident of unavailability.
13.0. IDENTIFICATION OF CONTRACTOR EMPLOYEES: All contract personnel are required to identify themselves as contractors. Whether attending meetings, answering government telephones, or working in other situations where their contractor status is not obvious to third parties, they must make their status known to avoid creating an impression that they are government employees.
(End of the Performance Work Statement)
140R8120R0003_Professional Services for Construction Support Page 21 of 105
Section F – Deliveries or Performance
F.1 Clauses Incorporated by Reference
52.252-2 CLAUSES…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .