Sol_140L1726Q0018_Amd_0001.pdf

PDF 216 KB Posted

Attached to
RPFO-NCA VAULT TOILET AND REMOVAL
Solicitation number
140L1726Q0018
Issued by

About this file

This is Amendment 0001 to Solicitation 140L1726Q0018, a Request for Quote (RFQ) issued by the Bureau of Land Management (BLM) New Mexico State Office in Santa Fe for vault toilet removal and installation services at the RPFO-NCA location.

The amendment extends the solicitation due date from July 13, 2026, to July 17, 2026, at 9:00 a.m., and posts questions and answers related to the solicitation. The acquisition utilizes the Construction Multiple Award Contract (C-MAC) and is set-aside exclusively for Indian Small Business Economic Enterprises (ISBEEs). The period of performance is August 1, 2026, through September 30, 2026. This is a firm fixed-price acquisition under simplified procedures (Part 13) and construction contracts guidance (Part 36). Contractor responsibilities include all professional services, permits, equipment, labor, tools, materials, and ancillary items necessary to complete vault toilet removal and installation per the Statement of Work. Work must comply with Uniform Building Code, International Building Code, New Mexico State Statutes, OSHA requirements, EPA regulations, ADA compliance, and applicable Davis-Bacon wage rates for Cibola County (NM20260031). Offerors must be actively registered in sam.gov at time of submission, submit completed Standard Form 1442 with pricing, acknowledge all amendments, provide a technical evaluation response, and email quotes to lashondra_hubbard@ios.doi.gov. Quotes remain valid for 60 calendar days, and award will be made on an all-or-none basis. Payment terms include 30-day prompt pay with progress payments through www.ipp.gov. Questions must be submitted within five calendar days of the solicitation posting date.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: is not is required copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7.ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

PAGESOF

Contractor

The hour and date specified for receipt of Offers to sign this document and return

Chau Nguyen

See continuation page

BLM NM-STATE OFC-SANTA FE(NM916)

301 DINOSAUR TRAIL

SANTA FE NM 87508

LXA

140L1726Q0018

06/29/2026

06/29/2026

1 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

140L1726Q0018/0001

The purpose of amendment 0001 is to post questions and answers and extend the solicitation due date to July 17, 2026, at 9:00 a.m. All other terms and conditions remain unchanged.

RPFO-NCA VAULT TOILET AND REMOVAL

Solicitation number 140L1726Q0018 is issued as a request for quote for RPFO-NCA Vault Toilet and Removal project, utilizing the Construction

Multiple Award Contract (C-MAC). This announcement constitutes the only solicitation.

Offers are being requested and a separate written solicitation will not be issued. This acquisition is set-aside for Indian Small

Business Economic Enterprises (ISBEEs) concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at http://www.acquisition.gov/.

A detailed description of the requirement is provided in the attached Statement of Work.

The Contractor shall be responsible for all professional services, permits, equipment, labor, tools, materials, and ancillary items necessary to complete the tasks defined by the

Statement of Work (SOW). The performed tasks shall be based on the project description, other data furnished in SOW, and information covered during a pre-construction/criteria review meeting to be held prior to Contractor mobilization. The SOW sets forth the requirements for a Request for Quote (RFQ) for site specific vault toilet removal and installation. The Contractor shall adhere to the following guidance during construction phase(s) of this project: Uniform Building Code

(UBC), those sections of the Southern Standard

Building Codes not incorporated in the

UBC/International Building Code (IBC) for our respective area, New Mexico State Statutes, New

Mexico Department of Transportation, Occupational Safety and Health Administration

(OSHA) Requirements, Department of

Environmental Protection (DEP) Regulations, Environmental Protection Agency (EPA)

Continued...

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

Regulations, and any related Americans with

Disabilities Act (ADA) Compliance Requirements.

If there is a conflict between these codes, regulations and specifications, the most stringent requirements shall apply at all times. Documents listed by and/or provided by the Government are for reference only and do not relieve the Contractor from adherence with applicable codes not specifically addressed.

The contractor shall also perform the required services in accordance with the SOW, applicable

Construction Wage Rate, and all other contract terms and conditions. All work shall be accomplished in accordance with contract documents and most recent Federal and State regulations.

All clauses from the Construction Multiple

Award Contract (C-MAC) shall apply. Other applicable provisions and clauses are attached.

Quotes must be in accordance with the instructions detailed in this section. Failure to submit quotes according to the instructions provided within the solicitation may result in the respondent¿s quote not being considered for award.

Quoters shall submit the following information in its entirety:

Complete and Signed Standard Form (SF) 1442, including price

Signed Acknowledgment of all amendments

Technical Evaluation Response

Offerors must submit your quote referencing the solicitation number. Quotes must be received via email to lashondra_hubbard@ios.doi.gov no later than the solicitation due date. Quotes shall remain valid for a period of 60 calendar days from the specified offer due date. Late quotations will not be considered for award.

Award will be made on an all or none basis.

Any questions or concerns regarding this solicitation must be received via email to lashondra_hubbard@ios.doi.gov within 5 calendar days after solicitation posting date.

Point of Contact

Lashondra Hubbard

Continued...

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C) lashondra_hubbard@ios.doi.gov

LIST OF CHANGES:

Bids due date : 13-JUL-26 changed to

17-JUL-26

Period of Performance: 08/01/2026 to

09/30/2026

1.Active Registration - www.sam.gov. To be eligible for an award all interested parties must be registered and active in the System for

Award Management (sam.gov) at time an offer or quotation is submitted. Free assistance is available at your local APEX Accelerators -https://www.apexaccelerators.us/#/

2.Invoicing and Payment - www.ipp.gov - 30 day prompt pay with progress payments

3.Part 13 - Simplified Procedures for

Noncommercial Acquisitions

4.Part 36 - Construction and Architect-Engineer

Contracts

5.Davis Bacon Wage Rates Cibola County

(NM20260031)

6.Type of Contract, Firm Fixed Price

7.Basis of Award - Price and Other Factors (see

Section M)

8.Potential offerors are responsible for monitoring this site for the release of this document and subsequent amendments.

Amendment of solicitation/modification of contract
Contract ID code
Amendment/modification number
Effective date
Requisition/purchase requisition number
Project number
Issued by
Code
Administered by
Code
Name and address of contractor
Code
Facility code
Amendment of solicitation number
Dated
Modification of contract/order number
Dated
This item only applies to amendments of solicitations
Accounting and appropriation data
This item applies only to modifications of contracts/orders.
This change order is issued pursuant to:
The above numbered contract/order is modified to reflect the administrative changes
This supplemental agreement is entered into pursuant to authority of:
Other
Important:
Description of amendment/modification
Name and title of signer
Contractor/offeror
Date signed
Name and title of contracting officer
Signature of Contracting Officer
Date signed
Previous edition unusable
Standard form 30 (rev. 11/2016)
Continuation sheet