The file's text, extracted by GovTribe without its formatting.
Solicitation #: 140L1726Q0018
| 1 |
| Can the superintendent be triple hat or does this need to be separate hats? |
| This is Contractor determined, as long as there is a designated employee onsite with decision making authority. |
| 2 |
| Will the concrete surrounding the old vault toilet stay in place or be removed? |
| Existing concrete must be removed with the removal of the existing vault toilet. |
| 3 |
| Are there any specific working hours, restrictions for access or gates to deal with? |
| The site is open to the public 24/7, so typical business hours would be the hours of contract work, no gates or access limitations. |
| 4 |
| Will these two toilet vault areas, new & old be open to the public during the construction? |
| Yes this is a campground open to the public. This work should not require closure of the campground. |
| 5 |
| Are there any existing utilities, power, water at either location? |
| No known existing buried utilities but it is the contractors responsibility by law to call for 811 locating service. |
| 6 |
| Is it know if there is any cellular or gps service in this area? - |
| Yes |
| 7 |
| Will any fencing be required? |
| Safety fencing only if an excavation is left exposed to public/wildlife over night. |
| 8 |
| Will road closures for delivery or removal be required? |
| Possible within the campground loop, but typically contractors can do the site prep and installation without any closures or traffic control. However, that is for the contractor to determine. |
| 9 |
| Is this design-build? |
| No design-build needed. |
| 10 |
| Will permits be required? |
| No construction permits required since this is a Federal property project, unless the contractor's transport company requires oversized loads, etc. |
| 11 |
| Will sediment or soil erosion drawings be required? |
| Elevation of the vault toilet in the new location must allow for positive drainage and a parking pad and sidewalk that BLM will add later. Floor elevation 6”+ above natural finished grade. |
| 12 |
| Can we have a minimum of 4 business days after receipt of RFI responses? |
| yes |
| 13 |
| Can you identify if any tribe affiliation this project land falls on or under? |
| None, this is on USDI-BLM administered public land within an existing campground. Acoma Pueblo is the closest adjacent tribal interest. |