This is a Request for Quotation (RFQ) for commercial construction services to repair electrical systems at NOAA's Western Regional Center in Seattle, Washington.

The solicitation seeks firm-fixed-price quotations for electrical repair work across six line items (CLINs), with CLIN 0006 designated as optional. The work includes panel repairs in Room 109, demolition and remediation of unsafe electrical equipment in the northeast, southeast, and southwest stairwells and hangar entries, repairs to center wind tunnel electrical systems, and installation of a generator manual transfer switch for a critical freezer (optional). All work must comply with the National Electric Code, International Building Code, and applicable Washington State standards. The contractor must provide all labor, equipment, and materials unless otherwise specified. Quotations are due by 12:00 PM Mountain Daylight Time on August 12, 2026, with work to be completed within six months from notice to proceed. The project location is 7600 Sand Point Way NE, Seattle, Washington 98115. A mandatory site visit is scheduled for Friday, July 24, 2026, from 9:00 AM to 11:00 AM Pacific Daylight Time. Evaluation criteria emphasize technical approach and capability (including asbestos-containing materials certification), relevant experience with electrical repairs, and past performance references from the past two years, with price considered but non-price factors weighted more heavily. The Government anticipates award to a responsible offeror whose offer provides the best value. Prevailing wage requirements apply per the Davis-Bacon Act, with applicable wage rates specified for Washington State King County construction work. Payment terms are Net 30, and the contract is not a small business set-aside.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATION

(THIS IS NOT AN ORDER)

THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE

15. DATE OF QUOTATION

16. SIGNER

a. NAME (Type or print)

c. TITLE (Type or print)

b. TELEPHONE

AREA CODE

NUMBER

STANDARD FORM 18 (REV. 6/1995)

Prescribed by GSA-FAR (48 CFR) 53.215-1(a)

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition not usable

8. TO:

b. COMPANYa. NAME

c. STREET ADDRESS

d. CITY e. STATE f. ZIP CODE

9. DESTINATION

a. NAME OF CONSIGNEE

b. STREET ADDRESS

d. STATE e. ZIP CODE

7. DELIVERY

FOB DESTINATION

OTHER

(See Schedule)

10. PLEASE FURNISH QUOTATIONS TO THE

ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS (Date)

IMPORTANT: This is a request for information and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or service. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotation must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State and local taxes)

ITEM NUMBER

(a)

SUPPLIES/SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

12. DISCOUNT FOR PROMPT PAYMENT

a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS

NUMBER PERCENTAGE

NOTE: Additional provisions and representations are are not attached.

13. NAME AND ADDRESS OF QUOTER

a. NAME OF QUOTER

b. STREET ADDRESS

c. COUNTY

d. CITY e. STATE f. ZIP CODE

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

PAGE OF PAGES

1. REQUEST NUMBER 2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NUMBER 4. CERT. FOR NAT. DEF.

UNDER BDSA REG. 2

AND/OR DMS REG. 1

RATING

5a. ISSUED BY 6. DELIVER BY (Date)

NAME TELEPHONE NUMBER

AREA CODE NUMBER

c. CITY

5b. FOR INFORMATION CALL (NO COLLECT CALLS)

7600 SAND POINT WAY NE

/R/PMEL

WAD-OAR

325 BROADWAY, SOU6

BOULDER CO 80305

1305M326Q0317

JAMIE ROSALES

PACIFIC MARINE ENVIRO LAB

98115-6349

07/16/2026

08/12/2026 1200 MD

SEATTLE

WA

1 65

1305M326Q0317 BASE

Section II - Supplies or Services and Price/Costs Section III - Description/Specifications Section IX - Contract Clauses Section X - List of Attachments Section XII - Instructions, Conditions, and Notices

Section II - Supplies or Services and Price/Costs

CLIN List

Item Number Description Quantity Unit Unit Price Amount

Commercial construction services, to provide all labor, equipment and materials (unless otherwise provided herein) necessary for NOAA Western Regional Center Electrical Repairs Services in Seattle, WA, in accordance with the Statement of Work. Panel Repairs Room 109.

Award Type: Firm-fixed-price Product/Service Code: N061

Commercial construction services, to provide all labor, equipment and materials (unless otherwise provided herein) necessary for NOAA Western Regional Center Electrical Repairs Services in Seattle, WA, in accordance with the Statement of Work. NE Stairwell and Hangar Entry.

Award Type: Firm-fixed-price Product/Service Code: N061

Commercial construction services, to provide all labor, equipment and materials (unless otherwise provided herein) necessary for NOAA Western Regional Center Electrical Repairs Services in Seattle, WA, in accordance with the Statement of Work. Center Wind Tunnel.

Award Type: Firm-fixed-price Product/Service Code: N061

Commercial construction services, to provide all labor, equipment and materials (unless otherwise provided herein) necessary for NOAA Western Regional Center Electrical Repairs Services in Seattle, WA, in accordance with the Statement of Work. SE Stairwell and Hangar Entry.

Award Type: Firm-fixed-price Product/Service Code: N061

Commercial construction services, to provide all labor, equipment and materials (unless otherwise provided herein) necessary for NOAA Western Regional Center Electrical

Item Number Description Quantity Unit Unit Price Amount

Repairs Services in Seattle, WA, in accordance with the Statement of Work. SW Stairwell and Hangar Entry.

Award Type: Firm-fixed-price Product/Service Code: N061

Commercial construction services, to provide all labor, equipment and materials (unless otherwise provided herein) necessary for NOAA Western Regional Center Electrical Repairs Services in Seattle, WA, in accordance with the Statement of Work. NE Hangar Entry

- Optional CLIN Award Type: Firm-fixed-price Product/Service Code: N061

Section III - Description/Specifications

STATEMENT OF WORK SOW

WRC H32 Electrical Repairs

Table of Contents

PART 1: INFORMATION 3

1.1. BACKGROUND 3

1.2. PURPOSE 3

1.3. PROJECT IDENTIFICATION 3

1.4. CONTRACTING OFFICER (CO) 3

1.5. TECHNICAL POINT OF CONTACT (TPOC) 4

1.6. REFERENCES 4

1.7. GENERAL PROVISIONS 4

1.8. ACCESS TO THE WORKSITE 8

1.9. REQUIRED DELIVERABLES 11

1.10. WORK PLANS 12

1.10.1. Work Plan– General 12

1.11. QUALITY ASSURANCE 12

1.12. FINAL ACCEPTANCE AND INSPECTION 12

1.12.1. As-Built Drawings 12

1.12.2. Final Test and Inspection 12

PART 2: BASE REQUIREMENTS 13

PART 3: GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES 16

3.1. GENERAL 16

PART 4: CONTRACTOR FURNISHED ITEMS AND SERVICES 16

4.1. GENERAL 16

TECHNICAL EXHIBIT 1: REQUIREMENTS SUMMARY 17 Located on bottom of SOW TECHNICAL EXHIBIT 2: SOW PICTURES - Attachement 1

TECHNICAL EXHIBIT 3: H32 ELECTRICAL STUDY – MCKINSTRY CO. 2021 - Attachement 2

TECHNICAL EXHIBIT 4: UPDATED H32 ELECTRICAL ONE-LINE DIAGRAM WITH CLINS - Attachement 3 TECHNICAL EXHIBIT 5: ARCHIVE H32 ELECTRICAL DRAWINGS - Attachement 4 TECHNICAL EXHIBIT 6: HANGAR HAZARDOUS MATERIAL REPORT – Attachement 5 TECHNICAL EXHIBIT 7: Asbestos-Containing Materials Certification Attachement 6

PART 1: INFORMATION

1.1. BACKGROUND

NOAA’s Western Regional Center (WRC) is located on the shores of Lake Washington at 7600 Sand Point Way NE, Seattle, Washington. Originally a Navy base, the site was acquired and developed by NOAA in the early 1980’s. The WRC supports approximately 1,000 government personnel in nine buildings containing approximately 618,200 square feet on a campus of approximately 104 acres. The WRC was developed as a major consolidated NOAA owned facility intended to support all NOAA activities in Seattle. WRC tenants include all Line Offices (LOs), National Weather Service (NWS), National Marine file:///G:/Shared%20drives/SAP%20Boulder%20-%20AGO%20-%20CorpSrv/Jamie's%20Files/01%20New%20Awards/FY%202026/145027-26-0030%20Hangar%2032%20Electrical%20Repairs/1.%20Acquisition%20Planning/3%20SOW%20145027-26-0030.docx%23_Toc234581092 file:///G:/Shared%20drives/SAP%20Boulder%20-%20AGO%20-%20CorpSrv/Jamie's%20Files/01%20New%20Awards/FY%202026/145027-26-0030%20Hangar%2032%20Electrical%20Repairs/1.%20Acquisition%20Planning/3%20SOW%20145027-26-0030.docx%23_Toc234581093 file:///G:/Shared%20drives/SAP%20Boulder%20-%20AGO%20-%20CorpSrv/Jamie's%20Files/01%20New%20Awards/FY%202026/145027-26-0030%20Hangar%2032%20Electrical%20Repairs/1.%20Acquisition%20Planning/3%20SOW%20145027-26-0030.docx%23_Toc234581094 file:///G:/Shared%20drives/SAP%20Boulder%20-%20AGO%20-%20CorpSrv/Jamie's%20Files/01%20New%20Awards/FY%202026/145027-26-0030%20Hangar%2032%20Electrical%20Repairs/1.%20Acquisition%20Planning/3%20SOW%20145027-26-0030.docx%23_Toc234581095 file:///G:/Shared%20drives/SAP%20Boulder%20-%20AGO%20-%20CorpSrv/Jamie's%20Files/01%20New%20Awards/FY%202026/145027-26-0030%20Hangar%2032%20Electrical%20Repairs/1.%20Acquisition%20Planning/3%20SOW%20145027-26-0030.docx%23_Toc234581096 file:///G:/Shared%20drives/SAP%20Boulder%20-%20AGO%20-%20CorpSrv/Jamie's%20Files/01%20New%20Awards/FY%202026/145027-26-0030%20Hangar%2032%20Electrical%20Repairs/1.%20Acquisition%20Planning/3%20SOW%20145027-26-0030.docx%23_Toc234581097 file:///G:/Shared%20drives/SAP%20Boulder%20-%20AGO%20-%20CorpSrv/Jamie's%20Files/01%20New%20Awards/FY%202026/145027-26-0030%20Hangar%2032%20Electrical%20Repairs/1.%20Acquisition%20Planning/3%20SOW%20145027-26-0030.docx%23_Toc234581098 file:///G:/Shared%20drives/SAP%20Boulder%20-%20AGO%20-%20CorpSrv/Jamie's%20Files/01%20New%20Awards/FY%202026/145027-26-0030%20Hangar%2032%20Electrical%20Repairs/1.%20Acquisition%20Planning/3%20SOW%20145027-26-0030.docx%23_Toc234581099 file:///G:/Shared%20drives/SAP%20Boulder%20-%20AGO%20-%20CorpSrv/Jamie's%20Files/01%20New%20Awards/FY%202026/145027-26-0030%20Hangar%2032%20Electrical%20Repairs/1.%20Acquisition%20Planning/3%20SOW%20145027-26-0030.docx%23_Toc234581100 file:///G:/Shared%20drives/SAP%20Boulder%20-%20AGO%20-%20CorpSrv/Jamie's%20Files/01%20New%20Awards/FY%202026/145027-26-0030%20Hangar%2032%20Electrical%20Repairs/1.%20Acquisition%20Planning/3%20SOW%20145027-26-0030.docx%23_Toc234581101 file:///G:/Shared%20drives/SAP%20Boulder%20-%20AGO%20-%20CorpSrv/Jamie's%20Files/01%20New%20Awards/FY%202026/145027-26-0030%20Hangar%2032%20Electrical%20Repairs/1.%20Acquisition%20Planning/3%20SOW%20145027-26-0030.docx%23_Toc234581102 file:///G:/Shared%20drives/SAP%20Boulder%20-%20AGO%20-%20CorpSrv/Jamie's%20Files/01%20New%20Awards/FY%202026/145027-26-0030%20Hangar%2032%20Electrical%20Repairs/1.%20Acquisition%20Planning/3%20SOW%20145027-26-0030.docx%23_Toc234581103 file:///G:/Shared%20drives/SAP%20Boulder%20-%20AGO%20-%20CorpSrv/Jamie's%20Files/01%20New%20Awards/FY%202026/145027-26-0030%20Hangar%2032%20Electrical%20Repairs/1.%20Acquisition%20Planning/3%20SOW%20145027-26-0030.docx%23_Toc234581104 file:///G:/Shared%20drives/SAP%20Boulder%20-%20AGO%20-%20CorpSrv/Jamie's%20Files/01%20New%20Awards/FY%202026/145027-26-0030%20Hangar%2032%20Electrical%20Repairs/1.%20Acquisition%20Planning/3%20SOW%20145027-26-0030.docx%23_Toc234581105 file:///G:/Shared%20drives/SAP%20Boulder%20-%20AGO%20-%20CorpSrv/Jamie's%20Files/01%20New%20Awards/FY%202026/145027-26-0030%20Hangar%2032%20Electrical%20Repairs/1.%20Acquisition%20Planning/3%20SOW%20145027-26-0030.docx%23_Toc234581106 file:///G:/Shared%20drives/SAP%20Boulder%20-%20AGO%20-%20CorpSrv/Jamie's%20Files/01%20New%20Awards/FY%202026/145027-26-0030%20Hangar%2032%20Electrical%20Repairs/1.%20Acquisition%20Planning/3%20SOW%20145027-26-0030.docx%23_Toc234581107 file:///G:/Shared%20drives/SAP%20Boulder%20-%20AGO%20-%20CorpSrv/Jamie's%20Files/01%20New%20Awards/FY%202026/145027-26-0030%20Hangar%2032%20Electrical%20Repairs/1.%20Acquisition%20Planning/3%20SOW%20145027-26-0030.docx%23_Toc234581108 file:///G:/Shared%20drives/SAP%20Boulder%20-%20AGO%20-%20CorpSrv/Jamie's%20Files/01%20New%20Awards/FY%202026/145027-26-0030%20Hangar%2032%20Electrical%20Repairs/1.%20Acquisition%20Planning/3%20SOW%20145027-26-0030.docx%23_Toc234581109 file:///G:/Shared%20drives/SAP%20Boulder%20-%20AGO%20-%20CorpSrv/Jamie's%20Files/01%20New%20Awards/FY%202026/145027-26-0030%20Hangar%2032%20Electrical%20Repairs/1.%20Acquisition%20Planning/3%20SOW%20145027-26-0030.docx%23_Toc234581110 file:///G:/Shared%20drives/SAP%20Boulder%20-%20AGO%20-%20CorpSrv/Jamie's%20Files/01%20New%20Awards/FY%202026/145027-26-0030%20Hangar%2032%20Electrical%20Repairs/1.%20Acquisition%20Planning/3%20SOW%20145027-26-0030.docx%23_Toc234581111 file:///G:/Shared%20drives/SAP%20Boulder%20-%20AGO%20-%20CorpSrv/Jamie's%20Files/01%20New%20Awards/FY%202026/145027-26-0030%20Hangar%2032%20Electrical%20Repairs/1.%20Acquisition%20Planning/3%20SOW%20145027-26-0030.docx%23_Toc234581112 file:///G:/Shared%20drives/SAP%20Boulder%20-%20AGO%20-%20CorpSrv/Jamie's%20Files/01%20New%20Awards/FY%202026/145027-26-0030%20Hangar%2032%20Electrical%20Repairs/1.%20Acquisition%20Planning/3%20SOW%20145027-26-0030.docx%23_Toc234581113

Fisheries Service (NMFS), National Ocean Service (NOS), Oceanic and Atmospheric Research (OAR), National Environmental Satellite Data Information Service (NESDIS), and NOAA Marine and Aviation Operations (NMAO), and regional administrative functions.

1.2. PURPOSE

To remove old electrical panels and correct electrical safety issues identified in the McKinstry NOAA Hangar 32 Remediation Electrical Facility Assessment.

1.3. PROJECT IDENTIFICATION

Project Name: WRC H32 Electrical Repairs

Project Location: NOAA Western Regional Center (WRC) 7600 Sand Point Way N.E.

Seattle, Washington 98115

Building Category: Risk Category II per UFC 3-301-01

1.4. CONTRACTING OFFICER (CO)

The CO is: Jamie Rosales

The COR or delegate monitors all technical aspects of the contract and assists in contract administration: Will be provided at the time of award.

The COR is authorized to perform the following functions:

- Ensure that the contractor performs the technical requirements of the contract;

- perform inspections necessary in connection with contract performance;

- maintain written and oral communications with the contractor concerning technical aspects of the contract;

- issue written interpretations of technical requirements, including Government drawings, designs, specifications;

- monitor contractor's performance and notify the Contracting Officer and contractor of any deficiencies; and

- coordinate availability of government furnished property, and provide site entry and badging of contractor personnel.

The COR is not authorized to change any of the terms and conditions of the resulting order.

1.5. TECHNICAL POINT OF CONTACT (TPOC)

The TPOC is: Will be provided at the time of award.

1.6. REFERENCES

- Occupational Safety and Health Standards (OSHA) safety requirements.

- Unified Facilities Criteria (UFC) 1-200-01; which recognizes the International model codes: IBC, IECC; IMC; IPC; IFC; and NEC.

- Applicable local, state and federal codes and standards

- International Building Code (IBC)

- National Electric Code (NEC)

1.7. GENERAL PROVISIONS

The following general provisions shall be adhered to by the contractor.

1.7.1. Post Award Conference/Periodic Progress Meetings

The contractor agrees to attend any post award conference convened by the contracting activity or contract administration office. The Contracting Officer (CO), COR, and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the CO will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. The contractor shall provide meeting minutes from each meeting within three (3) business days and obtain the Government’s concurrence on the accuracy of the minutes. These meetings shall be at no additional cost to the government.

1.7.2. Contract Manager

The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the contract manager is absent shall be designated in writing to the CO and COR with the proposal or within three (3) business days of award. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract.

1.7.3. Quote

All labor, travel, project management, and administrative work shall be included in the Contractor’s quote.

1.7.4. Cost Proposals

Contractor shall incorporate. Proposals shall specifically break out Labor and Materials for each scope of work (CLIN) and associated major construction activities for both the Prime Contractor, Consultants, and Subcontractors.

1.7.5. Type of Order

The Government anticipates the award of a Firm Fixed Price (FFP) Contract.

1.7.6. Period of Performance

The Period of Performance (POP) is 6 months from Notice to Proceed.

1.7.7. Schedules

The Contractor shall provide a detailed schedule, maintain that schedule throughout the award period, and provide any updates to the COR and CO at least semi-weekly or when changes are made. COR and CO must approve any changes to the agreed upon schedule.

1.7.8. Processing and Identification of Contractor Employees

Prior to commencing work under this contract, the contractor shall submit or have their employee submit the required security forms and number of copies as informed by the COR. The contractor, when notified that the Government rejected the suitability assessment forms shall either have the rejected forms made compliant and resubmitted or withdraw the employee from consideration from working under this contract.

All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.

Contractor personnel will be required to obtain and wear badges in the performance of this task while on-site at a NOAA facility.

One day in advance of any mobilization on site, and as subsequent changes occur, the Contractor will submit to the COR:

a. A complete list of all employees, representatives, and subcontractor personnel on site. The list will include the name, age, and address of the individual.

b. A complete list and description of all vehicles and heavy equipment. The vehicle and equipment list shall include make, model, year built, and identifying markings.

1.7.9. Code Requirements

The Contractor shall perform all work in accordance with any applicable standards, codes, and/or regulations. The Contractor shall notify the COR of any non-compliance in the Statement of Work (SOW) documents to applicable codes and regulations prior to the commencement of work.

Changes in work after commencement of work due to code requirements of the enforcing agencies shall be performed by the Contractor at no additional cost to the Government.

Where the requirements of various codes conflict with each other or the SOW documents the Contractor shall bring these conflicts to the attention of the COR for clarification and resolution.

1.7.10. Government Provided Documentation

The Government does not warranty any documents provided to be free from discrepancies, ambiguities, errors, omissions, or changing conditions. It is the responsibility of the Contractor to confirm existing conditions and resolve discrepancies between documents.

1.7.11. Coordination with Utilities

The Contractor shall, as needed, cooperate and coordinate with Public Utilities and adhere to their work requirements. The Contractor shall not use a utility’s scheduling to justify delays. The Contractor should work closely and early with local utility providers to ensure the work is completed on time.

1.7.12. Work Under Other Contracts

The Contractor shall cooperate with other contractors performing work at this facility. All work related to electrical or mechanical items shall be coordinated with the onsite Facilities Engineer and the onsite

Operations and Maintenance contractor.

1.7.13. Permits

No permits required.

1.7.14. Safety

The contractor shall comply with the requirements of 29 CFR, Part 1910, Occupational Safety and Health Administration (OSHA) General Industry and Health Standards. The Contractor shall promptly correct any non-complying work or conditions. The Contractor shall be responsible to ensure its work does not affect the safety of the public or employees of the Government. Neither the Government nor its representatives shall bear any responsibility for safety precautions at the project work site. If, however, in the opinion of the COR a life-threatening condition exists, the COR will orally (to be confirmed in writing) require the Contractor to immediately suspend work in the affected area until the condition is corrected. Whenever the Contractor’s operations may create a hazardous condition, it shall at its own expense, furnish, install, and maintain such guards, fences, barricades, railing, light, signs, or other devices necessary to prevent accidents, injury to personnel or damage to equipment. The Contractor shall submit a job specific safety plan for review and approval by the Government within ten (14) calendar days after award of the contract for approval by the COR. The safety plan must be available on the job site at all times and must be reviewed with all subcontractors working under this contract for the duration of the project. The safety plan must also address the Contractor’s Lock Out-Tag Out (LOTO) procedures.

1.7.15. Security

The Contractor is responsible for its own security arrangement including its subcontractor’s material, equipment, and personnel.

1.7.16. Key Control

Key card access may be provided or the hangar will be opened as required.

1.7.17. Work In-Progress

The Contractor shall be responsible for the protection and safe keeping of all work in progress prior to occupancy or final acceptance by the Government. The Contractor shall use plastic sheeting where required to prevent the spread of dust and grime to the surrounding work spaces or into ventilation systems.

1.7.18. Clean-up

The Contractor shall ensure that the project areas and all areas adjacent to the project area are maintained in a clean and safe condition. Clean-up shall be performed on a daily basis.

All debris from project operations shall be disposed of either off-site or in a contractor provided dumpster at no additional cost to the Government. The contractor shall work with the COR to determine placement of the dumpster if it is determined to be required.

1.7.19. Photography

Cameras are not permitted without written permission from the Security Office via the COR. If approved, permission will be granted in writing and will provide necessary guidelines. A copy of any film and or electronic files will be turned over to the Security Office for their review and approval for a stated purpose/audience. The Contractor is responsible for any costs of processing any photos and any digital media used to transfer photos.

1.7.20. Smoke Free Environment

The WRC facilities are smoke free areas. The Contractor and its employees shall adhere to all applicable rules and regulations regarding maintenance of a smoke free environment on the job site.

1.7.21. Hazardous Materials

The Contractor shall not cause or permit any hazardous material to be brought upon, kept or used in or about the premises by its agents, employees, or subcontractors without the prior consent of the COR.

Hazardous materials that are necessary to the performance of this contract shall be used, kept and stored in a manner that complies with all laws regulating any such hazardous material brought upon, used or kept at this site. The Contractor shall provide Safety Data Sheets (SDS) to the COR for any hazardous materials used in the performance of this contract.

As used herein, the term “Hazardous Material” means any hazardous or toxic substance, material, or waste, including but not limited to, those substances, materials, and wastes listed in the Department of Transportation Hazardous Material Table (49 CFR 172.101, Purpose and Use of Hazardous Materials Table) or by the Environmental Protection Agency as hazardous substances (40 CFR 68.130, List of Substances) and amendments thereto, petroleum products, or other substances, material and wastes that are or become regulated under any applicable local, state or Federal law.

1.7.22. Workmanship Standards

All methods, materials and workmanship provided by the Contractor under this contract shall, at a minimum, be performed in accordance with professional industry standards and shall comply with applicable International Building Codes for construction. Field measurements are the responsibility of the Contractor.

1.7.23. Qualified Workers and Removal

The contractor shall use only qualified workers who are thoroughly trained and experienced in the necessary crafts and who are completely familiar with the specified requirements and the methods needed for proper performance of the work. Any contractor employee who is considered incompetent, careless, insubordinate, unsuitable or otherwise objectionable or whose continued employment is contrary to the public interest by the Government’s designated representative will be promptly removed from the contract work upon notification to the Contractor by the CO that such conditions(s) described above exist.

1.7.24. Guarantee

The contractor shall guarantee all work to be in accordance with the contract requirements and free from defective or inferior materials, equipment, and workmanship for one year after the date of completion of work.

1.7.25. Existing Conditions

The Contractor shall perform a site visit to assess conditions. Any cost perceived or incurred during the execution of work that is not anticipated and could have been avoided by gathering information as part of an on-site visit will be the full responsibility by the Contractor.

1.7.26. Unknown Task Requirements

The Contractor may encounter hidden deterioration or unknown damage that requires repair in the judgment of the Contractor. It is the Contractor’s responsibility to determine the extent of the required repair and report such findings to the COR in writing. The Contractor’s report to the COR shall include a detailed description of the damage and the proposed repair, the reason why the repair is necessary, and a detailed cost breakdown using the hourly rate, materials and subcontractor markup rates established in the Contractor’s schedule of prices. Upon determination by the Contracting Officer and the COR that the reported work must be accomplished, the Contractor will be given a notice to proceed for such work via the issuance of a contract modification within a reasonable period of time.

1.8. ACCESS TO THE WORKSITE

All persons employed within the boundaries of the property or restricted-access areas therein, and all persons permitted to enter such property and areas shall comply with the security regulations for the

NOAA WRC.

The Contractor shall coordinate any site visits with the Government.

1.8.1. Site Access

At the commencement of the work under this contract, the following security procedures shall apply to the Contractor and all subcontractors:

a. The Contractor must supply the COR with a list of individuals needing access to the site at least 24 hours before the individual will arrive on site. Individuals not on the access list will be turned away at the gate. Delays in work will not be allowed due to late or and incomplete listings of individuals to be on site.

b. The Contractor’s vehicles, its subcontractor’s vehicles, employees of the Contractor or subcontractors entering the NOAA WRC shall use the main gate located at 7600 Sand Point Way NE. The gate is open daily from 5:00 AM to 7:00 PM. The Contractor shall make arrangements with the COR for access on and off the site after these hours. The WRC normal business hours are 7:00 AM to 4:30 PM, Monday through Friday, excluding Federal Holidays. The Contractor will be required to conduct work during these hours. If the Contractor desires to work outside the normal business hours, the request will be submitted a minimum of 24 hours in advance to the COR to obtain approvals so that the Government may inspect the work progress.

c. The Contractor shall obtain a temporary Identification (ID) pass through the Security Office. The NOAA WRC Security Pass and ID Office hours are Monday through Friday, 9:00 AM to 4:00 PM. The Contractor shall arrive early to allow for sufficient time to process the associated paperwork. Two forms of identification are required, one of which must bear a photograph of the requestor.

d. Do not enter NOAA WRC buildings without building passes or park in unauthorized areas. The COR will provide the Contractor with a keycard to access the buildings during execution of this contract. The Contractor shall return the keycard to the COR upon completion of all work required by this contract.

e. In the case of any questions as to the eligibility of an individual to obtain a pass the Contractor shall notify the COR. The COR will obtain a determination whether the individual will be able to obtain a pass.

f. Personnel may be subject to inspection of their personal effects when entering and leaving the facility. In addition, unscheduled inspections of personal effects may be made while on site.

g. The COR shall be notified if any scheduled work is canceled or rescheduled.

h. Effective January 19, 2015, the Real ID Act of 2005 (Public Law 109-13) mandates new requirements for State issued driver's licenses and identification cards. Access to the NOAA WRC will require one of the following forms of identification:

- State issued Real ID Compliant Driver's Licenses and Identification Cards (Enhanced Driver's License, and Identification Cards from a U.S. State or Territory),

- U.S. Passport,

- U.S. Passport Card,

- U.S. Department of Defense CAC, which includes the NOAA issued ID,

- U.S. Federal agency HSPD-12 compliant ID cards,

- U.S. Veterans ID

- U.S. Military Dependent's ID Card

- U.S. Trusted Traveler Card – Global Entry, SENTRI, or NEXUS

- U.S. Transportation Workers Identification Credential (TWIC)

Individuals wishing to have access to the NOAA WRC should ensure they have one of the above listed acceptable forms of personal identification.

1.8.2. National Emergencies

The Government reserves the right to close down the job site and order the Contractor personnel off of the premises in the event of a national emergency or shut down for as long as any security issues persist. The Contractor may only return to the site with verbal approval from the CO or COR.

1.8.3. Recognized Holidays:

- New Year’s Day

- Martin Luther King Jr.’s Birthday

- President’s Day

- Memorial Day

- Juneteenth

- Independence Day

- Labor Day

- Columbus Day

- Veteran’s Day

- Thanksgiving Day

- Christmas Day

In addition to the days designated as holidays, the Government observes the following days:

- Any other day designated by Federal Statute

- Any other day designated by Executive Order

- Any other day designated by a President's Proclamation

It is understood and agreed between the Government and the contractor that observance of such days by Government personnel shall not otherwise be a reason for an additional period of performance, or entitlement to compensation except as set forth within the contract. If a contractor believes that an unplanned absence has an impact on the price or period of performance, it should notify the contracting officer (CO) of the changed condition and submit a claim for equitable adjustment (see FAR 52.233-1).

Nothing in this clause abrogates the rights and responsibilities of the parties relating to "stop work" provisions as cited in other sections of this contract.

1.8.4. Investigations

At the commencement of the work (mobilization on site) under this contract, the following security procedures shall apply to the Contractor and all subcontractors.

1.8.5. Investigative Requirements for Low Risk Contracts

Each person employed under this Low Risk contract shall undergo security processing by the Department’s Office of Security as indicated below before being eligible to work on the premises of any Department of Commerce owned, leased, or controlled facility in the United States or overseas or obtain access to a DOC IT system. All DOC security processing pertinent to this contract will be conducted at no cost to the contractor.

For Non-IT Service Contracts, the following background investigations are required.

a. Contracts more than 180 days – National Agency Check and Inquiries (NACI)

b. Contracts less than 180 days – Special Agency Check (SAC)

In addition to the investigations noted above, non-U.S. citizens must have a background check that includes an Immigration and Customs Enforcement (ICE-formerly Immigration and Naturalization Service) agency check.

1.8.6. Security Processing Requirements for Low Risk Non-IT Service Contracts Processing requirements for Low Risk non-IT Service Contracts are as follows:

a. Contract employees employed in Low Risk non-IT service contracts for more than 180 days will require a National Agency Check and Inquiries (NACI) to be processed. The Contracting Officer’s Representative (COR) will forward a completed Standard Form SF-85, Questionnaire for Non- Sensitive Positions, Form FD-258, Fingerprint Chart, and Credit Release Authorization to the servicing Security Officer within three working days from start of work, which will send the investigative packet to the Office of Personnel Management.

b. Contract employees employed in Low Risk non-IT service contracts for less than 180 days require a Special Agency Check (SAC), Form OFI-86C, to be processed. The COR will forward a completed Form OFI-86C, FD-258, Fingerprint Chart, and Credit Release Authorization to the servicing Security Officer, who will send the investigative packet to the Office of Personnel Management for processing.

c. Any contract employee with a favorable SAC who remains on the contract over 180 days will be required to have a NACI conducted to continue working on the job site.

d. For Low Risk non-IT service contracts, the scope of the SAC will include checks of the Security/Suitability Investigation Index, other agency files, Defense Clearance Investigation Index, FBI Fingerprint, and the FBI Information Management Division.

e. In addition, for those individuals who are not U.S. citizens (lawful permanent residents) the COR must request a Customs and Immigration Service (CIS) check on the SAC, Form OF- 86C, by checking Block #7, Item 1. In Block 13, the COR should enter the employee’s Alien Registration Receipt Card number to aid in verification.

f. Copies of the appropriate forms can be obtained from the COR or the Office of Security. Upon receipt of the required forms, the COR will forward the forms to the servicing Security Officer. The Security Officer will process the forms and advise the COR whether work can commence prior to the completion of the suitability determination based on the type of work and risk to the facility (i.e., adequate controls and restrictions are in place). The COR will notify the Contractor of an approved contract start date as well as favorable or unfavorable finding of the suitability determinations.

g. If any work is canceled, notify the COR.

1.9. REQUIRED DELIVERABLES

The following items shall be delivered to the Government to consider the project substantially complete:

Deliverable Frequency Medium Format Copies

Project Schedule Within ten (10) calendar days after post-award meeting EMAIL PDF 1

Kick-Off Meeting Within (14) Calendar Days of Award ONLINE ONLINE N/A

Safety Plan Within (14) Calendar Days of Award EMAIL PDF N/A

*Electrical Load Survey Within (60) Calendar Days of Award EMAIL PDF 1

Progress Meetings Bi-weekly – Virtual Meetings+ Onsite Investigations ONLINE ONLINE N/A

Meeting Minutes After Each Meeting within (1) week EMAIL PDF 1

Submittal Log & Submittals Log within ten (30) calendar days after the post-award meeting.

Submittals as required

EMAIL – Web-based Program

.xls or web based 1

Work Plan Within (30) calendar days after post-award meeting – bi-weekly updates

EMAIL PDF 1

Load Basis of Design At 100% Drawing Set Table with Eqpt and kVA N/A

Design Documents 100% **Prior to Approval of Long lead Eqpt

EMAIL/MAIL PDF – FULL SIZE

PRINTS 2

Circuit Breaker Coordination Study 100% Drawings EMAIL PDF N/A

Approval of Long Lead Eqpt NA EMAIL or Web-based Program

PDF or ONLINE N/A

Issued for Construction (IFC) Drawings*

Following approval of 100% Design Documents EMAIL PDF 1

Construction Progress Reports Weekly EMAIL PDF 1

As Built Drawings + Panel Schedules At Completion MAIL &

EMAIL

PDF, Full Size Prints & AutoCAD files

Manufacturer's Product Data/Manuals At 100% CD HAND

DELIVERED ORIGINALS N/A

Manufacturer's Product Data/Manuals With official offer. EMAIL PDF N/A

Warranty Documentation With official offer. EMAIL PDF N/A

Identification of Employees and Equipment 30 Days Prior to Arrival On-Site EMAIL TBD N/A

Reception of Large Equipment Identify 3 Days Prior to Arrival EMAIL TBD N/A

Invoices Negotiated – Bi-Weekly Payroll Reports Required EMAIL PDF 1

All deliverables listed above shall be submitted to the COR at the frequency, by the medium, and in the format and quantity listed above.

1.10. WORK PLANS

During the Preconstruction/Work Plan Phase, the contractor will be required to prepare all necessary drawings and work plans for NOAA’s approval prior to commencement of the Construction Phase.

During the Construction Phase, the contractor shall carry out such activities as are necessary to complete the construction in the approved design documents. The contractor shall be responsible for providing all of the necessary supervision, labor and materials to fully complete the work described below.

1.10.1. Work Plan– General

Provide a detailed package consisting of single line diagrams, design, engineering calculations, criteria, manufacturers' data/cut sheets, specifications, estimates, etc., suitable to provide details to construct or perform the work covered in this Statement of Objectives.

1.11. QUALITY ASSURANCE

The Contractor shall provide a QC plan for design review, construction, commissioning and demonstrate proper operation of the new generator and the supporting systems in accordance with the approved test plan. Submit the QC plan as part of the Project Manual Submittal.

1.12. FINAL ACCEPTANCE AND INSPECTION

The Contractor shall advise the Government when all work is completed. The Government will not accept the work until it determines that all work has been satisfactorily completed within the terms of the contract.

1.12.1. As-Built Drawings

As-Built Drawings: The Contractor shall maintain an accurate set of as-built drawings to be updated daily and subject to inspection prior to approving invoices. If the as-built drawings are not updated, then the invoice will be disapproved. At the completion of the task order, as-built drawings shall be submitted to the COR. As-built drawings shall include an updated electrical one-line diagram.

1.12.2. Final Test and Inspection

The Contractor shall provide no less than two weeks notification to the COR prior to final inspection. The purpose of the final inspection is to ensure all systems are fully operational and ready for acceptance by the Government. The Site QC Manager shall sign off on request for final inspection, verifying all items have been completed and are operational and ready for Government acceptance.

PART 2: BASE REQUIREMENTS

2.1. GENERAL

2.1.1. The Contractor shall provide a proposal that includes work plans with associated supporting information and pricing for NOAA’ s consideration for the work related to each CLIN commensurate with the Requirements listed in Part 2.

2.1.2. Technical Exhibits are provided to help define the scope and to provide known conditions and historical background to the Hangar 32 electrical system and hazardous materials in the hangar.

2.1.3. All work to be performed in accordance with applicable codes, standards, regulations and accepted industry standards. All work including work practices are to be craftsman-like and subject to inspection by the Government.

2.1.4. Hangar 32 is a 1938 structure that contains regulated building materials such as Lead-

Containing Paint (LCP), Asbestos, and Polychlorinated Biphenyls (PCB’s). The technical exhibits provide guidance to the areas tested for these materials.

a. Interior surfaces of Hangar 32 were found to contain lead and other RCRA 8 metals. References to Lead-Containing Paint (LCP) should be interpreted to include RCRA metals lead-containing materials (LCM) may also include the following, coating of wall, window coatings.

b. Lead and other RCRA metals control procedures are not specific requirements of one contractor, instead control and monitoring are required of any contractor disturbing LCM or LCP.

c. The Contractor shall assume that LCP is present on any painted building material not tested. All work that may disturb LCP or LCM shall be in accordance with L&I Regulation WAC 296-155-176, OSHA Regulation 29 CFR 1926.62. Provide dust control, employee exposure assessments, and waste characterization.

d. The walls dividing the main hangar and the north & south lean-tos are constructed of transite (ACM) panels. It is not anticipated that there is work that will affect the transite walls. Any removal of conduits or penetration through the transite panels shall be controlled to contain asbestos exposure. Place appropriate encapsulant a minimum of 6” back from the leading edges of the hole edges to seal the transite. Leave no friable fibers exposed.

e. It is assumed that some building debris will be recycled, other debris will be disposed of. Contractor’s disposal characterization shall include testing for each waste or recycle stream prior to removal from site.

2.1.5. The Contractor shall provide as-built one-line electrical diagrams with associated breaker and wire sizes as well as updated panel schedules for newly installed panels and reconnection to existing panels.

2.1.6. As-built Drawings and new panel schedules shall be Stamped by an Electrical Professional Engineer licensed in the State of Washington.

2.1.7. Provide short circuit arc fault calculations for any newly installed panels and label arc fault rating on the panel and associated existing panels or sub-panels as required by the NEC.

2.1.8. Provide detailed costs for each CLIN separately.

a. Proposal shall clearly show labor, including hourly rates, and materials breakouts for all major scopes (CLINS) and phases of the project, including subcontractor and consultant costs.

b. Proposal shall include an electronic copy of the associated cost information output in a Microsoft Excel format.

2.1.9. The Contractor shall walk the site with the WRC Site Facilities Maintenance Division (FMD) on the date noted in the solicitation as a condition to submitting a Proposal.

2.1.10. Provide all labor, materials, and management required to complete all of the construction, changes, and modifications to the facility as outlined.

2.1.11. Submittals, schedules, and other submissions are preferred to be managed by a Contractor provided web-based construction planning service such as Procore or similar. Equipment submittals shall have the associated equipment schedule provided at the front of the submittal. NOAA uses Google Drives which may be used to upload submittals in lieu of web-based construction planning service. The contractor will need to have a Google GMAIL account in order to have shared Google Drive access.

2.1.12. Project Milestone Plan shall be routinely updated to reflect equipment lead times and other impacted schedule dates.

2.1.13. The contractor shall provide daily reports of work completed including pictures.

2.1.14. Hangar 32 has various services critical to NOAA’s mission, especially freezers. Coordinate any electrical shut-offs with WRC Facilities at least a week in advance to ensure operations and freezers are not impacted.

2.2 Electrical Repairs

- CLIN 0001 Panel Repairs Room 109

Provide all services to repair faulty installation in panel F2 (#647) as noted in the McKinstry Survey.

- K.O. seals needed, 3”,1”,3/4”, 1/2”

- CKT-26,28,30 has 2wires per, wrong size

- wire for 100A 3-pole

- Demo and make safe any noticeable exposed wires or unused electrical equipment in the room as identified during a contractor walkthrough.

- CLIN 0002 NE Stairwell and Hangar Entry

Provide all services to demo old, unused, unsafe panels, disconnects, fuse boxes in north east stairwell.

- See one line diagram for scope. Items: #654, S6, #651, Old empty panel, old Panel B single phase, old panel B three phase

- Demo and make safe any noticeable exposed wires or unused electrical equipment in the room as identified during a contractor walkthrough.

- Take precautions when working at the wall between the stairwell and hangar as it is transite (asbestos based) material that shall not be disturbed without proper containment.

- Remove all old, unused, unsafe panels, disconnects, fuse boxes.

- If unsafe panels are in use, provide a new panel outside of the stairwell. Panel shall have a main disconnect, arc flash notation, and be located in agreement with WRC Facilities. Rewire any downstream subpanels.

- Remove pass through panel F and reroute power to Panel GG on Level 2.

- Make repairs to Panel DD and associated equipment as noted in the McKinstry Hangar 32 Remediation Electrical Facility Assessment and any other code problems discovered.

- Cut all dead wires back to the floor, remove wires from panels removed to the nearest J-Box outside of the stairwell. Make all safe.

- Repair wall openings and provide fresh new sheetrock, taped, mudded and finished. Painting not required.

- CLIN 0003 Center Wind Tunnel

Provide all services to repair associated equipment as noted in the McKinstry Hangar 32 Remediation Electrical Facility Assessment and any other code problems discovered

- See one line diagram for scope. Items #657, #658. #659.

- Demo and make safe any noticeable exposed wires or unused electrical equipment in the room as identified during a contractor walkthrough.

- CLIN 0004 SE Stairwell and Hangar Entry

Provide all services and engineering to demo old, unused, unsafe panels, disconnects, fuse boxes in south east stairwell.

- See one line diagram for scope. Items: Item # 657, #658, #659, #664, #666 Old empty panel, old Panel C single phase, old panel C three phase, Panel CB-1 #663

- Demo and make safe any noticeable exposed wires or unused electrical equipment in the room as identified during a contractor walkthrough.

- Take precautions when working at the wall between the stairwell and hangar as it is transite (asbestos based) material that shall not be disturbed without proper containment.

- Remove all old, unused, unsafe panels, disconnects, fuse boxes.

- If unsafe panels are in use, provide a new panel outside of the stairwell. Panel shall have a main disconnect, arc flash notation, and be located in agreement with WRC Facilities. Rewire any downstream subpanels.

- The panels noted as C in the stairwell are not in use.

- Make repairs to associated equipment as noted in the McKinstry Hangar 32 Remediation Electrical Facility Assessment and any other code problems discovered.

- Cut all dead wires back to the floor, remove wires from panels removed to the nearest J-Box outside of the stairwell. Make all safe.

- Replace Panel CB-1 with a new panel to serve existing loads and panel II.

- Repair wall openings and provide new sheetrock, taped, mudded and finished. Painting not required.

- CLIN 0005 SW Stairwell and Hangar Entry

Provide all services to demo old, unused, unsafe panels, disconnects, fuse boxes in south west stairwell.

- See one line diagram for scope. Items: (2) old empty panels, Panel D #679, Panel P2 #680, FU-1 #668,

- Demo and make safe any noticeable exposed wires or unused electrical equipment in the room as identified during a contractor walkthrough.

- Take precautions when working at the wall between the stairwell and hangar as it is transite (asbestos based) material that shall not be disturbed without proper containment.

- Remove all old, unused, unsafe panels, disconnects, fuse boxes.

- If unsafe panels are in use, provide a new panel outside of the stairwell. Panel shall have a main disconnect, arc flash notation, and be located in agreement with WRC Facilities. Rewire any downstream subpanels.

- Make repairs to associated equipment as noted in the McKinstry Hangar 32 Remediation Electrical Facility Assessment and any other code problems discovered.

- Cut all dead wires back to the floor, remove wires from panels removed to the nearest J-Box outside of the stairwell. Make all safe.

- Repair wall openings and provide fresh new sheetrock, taped, mudded and finished. Painting not required.

- CLIN 0006 NE Hangar Entry - Optional CLIN

Provide all services including engineering:

- Install new Generator Manual Transfer Switch and portable generator power connection to power panel DD.

- Panel services a critical freezer so coordination is required prior to work.

PART 3: GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3.1. GENERAL

The government shall provide the utilities listed below:

3.1.1. All utilities in the facility will be available for the contractor’s use in performance of duties outlined in this SOW. The contractor shall instruct employees in utilities conservation practices.

The contractor shall be responsible for operating under conditions that preclude the waste of utilities.

3.1.2. Restroom facilities are available for the Contractor’s use and are located in Hangar 32.

PART 4: CONTRACTOR FURNISHED ITEMS AND SERVICES

4.1. GENERAL

Except for those items specifically stated to be government furnished in Part 3, the contractor shall furnish everything required to perform the work outlined herein.

TECHNICAL EXHIBIT 1: REQUIREMENTS SUMMARY

Item Objective Acceptable

Quality Level

(AQL)

Method of Surveillance

Incentive/ Disincentive

Design Drawings

Deliver Design Drawings on time (based on negotiated schedule) and work with the Government to make corrections as needed.

100% Completed

100% Review

Disincentive Corrective action plan submitted to COR for review.

Construction

Complete construction on time (based on proposed schedule) and ensure all aspects of design, architectural, and engineering drawings are met.

100% Completed

100% Inspection

Disincentive Corrective action plan submitted to COR for review.

Disincentive Reduction of profit % or amount by 0.5% per day.

Delivery, Installation, and Commissioning of Equipment

Deliver, Install, and Commission equipment to industry standards.

100% Completed

100% Inspection

Disincentive Corrective action plan submitted to COR for review.

Section IX - Contract Clauses

Clauses Incorporated by Reference Clause Number Clause Title

52.222-9 Apprentices and Trainees (JUL 2005) (DEVIATION FEB 2025)

52.203-17 Contractor Employee Whistleblower Rights. (NOV 2023)

52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements. (JAN 2017)

52.204-9 Personal Identity Verification of Contractor Personnel.

(JAN 2011)

52.204-13 System for Award Management-Maintenance. (OCT 2018) (Deviation JAN 2026)

52.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .