Shortlist Evaluation Form Summary

This is a shortlist evaluation form for the Tampa Sports Authority's RFP 25-17 for the replacement of elevators and escalators at Raymond James Stadium in Tampa, Florida. The project requires removal and modernization of twenty escalators and ten elevators that have exceeded industry lifecycle standards of 20-25 years. All escalators must be reversible with minimum two flat steps at top and bottom, with east and west club escalators operating in tandem. All elevators must include modernized push buttons, car position indicators, lighting, key-switch floor lockoff capabilities integrated with existing access control systems, and retention of existing cladding and cab interiors where feasible. The contractor bears responsibility for all permitting, inspections, and associated building work including potential lighting, emergency power operations, disconnects, and HVAC upgrades. Proposals were due September 22, 2026, with a mandatory pre-proposal meeting on September 9, 2026, and written questions due September 16, 2026 by 10:00 AM. Shortlist notifications occurred October 8, 2026, with presentations and interviews scheduled for October 14-15, 2026, and final ranking on October 20, 2026. Contract award is anticipated following Finance Committee approval on October 27, 2026 and Board approval on November 3, 2026, with the contract extending through certificate of occupancy upon project completion.

The shortlist evaluation weighted Quality and Experience (30 points), Technical Approach (20 points), Price Proposal and Value (30 points), Schedule and Timeline (10 points), and SBE/Veteran Owned Business participation (10 points), with up to 5 bonus points available for certification. F.O.B. pricing is required quoted to Tampa, Florida, with all applicable taxes excluded. Schindler Elevator Corporation is the incumbent, having maintained existing equipment since 1998 and remaining under contract until removal begins. A bid bond equal to 5 percent of the proposal amount is required, with selected contractor obligated to furnish performance and payment bonds equal to 100 percent of the contract sum, maintain Commercial General Liability Insurance of $1 million combined single limit and Professional Liability Insurance of $1 million, and provide Workers' Compensation per Florida statute. Liquidated damages are assessed at $1,500 per calendar day for failure to achieve substantial completion and $750 per calendar day for failure to achieve final completion.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .