Addendum_2RFP_2517_Elevators_Escalators_RJS.pdf

PDF 97 KB Posted

Attached to
Elevator & Escalator Replacement, RJS
Solicitation number
25-17
Issued by
Florida

About this file

This Addendum to RFP 25-17 pertains to the Tampa Sports Authority's elevator and escalator replacement project at Raymond James Stadium in Tampa, Florida. The scope encompasses the removal and modernization of twenty existing escalators and ten existing elevators that have exceeded industry lifecycle standards of 20-25 years. All escalators must be reversible with minimum two flat steps at top and bottom, with east and west club escalators operating in tandem. All elevators must include modernized push buttons, car position indicators, lighting, key-switch floor lockoff capabilities integrated with existing access control systems, and retention of existing cladding and cab interiors where possible. The contractor is responsible for all permitting, inspections, and associated building work including potential lighting, emergency power operations, disconnects, and HVAC upgrades in machine rooms. A mandatory pre-proposal meeting is scheduled for September 9, 2026, with written questions due September 16, 2026 by 10:00 AM and proposals due September 22, 2026. Shortlist notifications will occur October 8, 2026, followed by presentations and interviews October 14-15, 2026, with final ranking on October 20, 2026. Contract award is anticipated following Finance Committee approval on October 27, 2026 and Board approval on November 3, 2026. The contract extends through certificate of occupancy upon project completion.

Pricing is F.O.B. to Tampa, Florida, with all applicable federal, state, and local taxes excluded. A bid bond equal to 5 percent of the proposal amount is required, and the selected contractor must furnish performance and payment bonds equal to 100 percent of the contract sum, maintain Commercial General Liability Insurance of $1 million combined single limit and Professional Liability Insurance of $1 million, and provide Workers' Compensation per Florida statute. Schindler Elevator Corporation has maintained existing equipment since 1998 and will remain under that maintenance contract until removal begins. Liquidated damages are $1,500 per calendar day for failure to achieve substantial completion and $750 per calendar day for failure to achieve final completion. The shortlist evaluation weights Quality and Experience (30 points), Technical Approach (20 points), Price Proposal and Value (30 points), Schedule and Timeline (10 points), and SBE/Veteran Owned Business participation (10 points), with up to 5 bonus points available for certification. Final interview scoring comprises Experience and Qualifications (40 points), Financial Proposal (40 points), and Interview Responsiveness (20 points).

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .