Shortlist_Evaluation_FormJoshuaRFP_2517.pdf
PDF 199 KB Posted
- Attached to
- Elevator & Escalator Replacement, RJS
- Solicitation number
- 25-17
- Issued by
- Florida
About this file
This is a shortlist evaluation form for the Tampa Sports Authority's Elevator & Escalator Replacement project at Raymond James Stadium in Tampa, Florida, issued under RFP 25-17. The project scope encompasses the removal and modernization of twenty existing escalators and ten existing elevators that have exceeded industry lifecycle standards. All escalators must be reversible with minimum flat steps at top and bottom, with east and west club escalators operating in tandem. All elevators must include modernized push buttons, car position indicators, lighting, key-switch floor lockoff capabilities integrated with existing access control systems, and retention of existing cladding and cab interiors where possible. The contractor is responsible for all permitting, inspections, and associated building work including potential lighting, emergency power operations, disconnects, and HVAC upgrades in machine rooms. A mandatory pre-proposal meeting was held on September 9, 2026, with proposals due September 22, 2026, and written questions due September 16, 2026 by 10:00 AM. Shortlist notifications occurred October 8, 2026, with presentations and interviews scheduled for October 14-15, 2026, and final ranking on October 20, 2026. Contract award was anticipated following Finance Committee approval on October 27, 2026 and Board approval on November 3, 2026, with the contract extending through certificate of occupancy upon project completion.
Pricing is F.O.B. to Tampa, Florida, with all applicable federal, state, and local taxes excluded. The shortlist evaluation criteria weight Quality and Experience (30 points), Technical Approach (20 points), Price Proposal and Value (30 points), Schedule and Timeline (10 points), and SBE/Veteran Owned Business participation (10 points), with up to 5 bonus points available for certification. Final interview scoring comprises Experience and Qualifications (40 points), Financial Proposal (40 points), and Interview Responsiveness (20 points). A bid bond equal to 5 percent of the proposal amount is required; the selected contractor must furnish performance and payment bonds equal to 100 percent of the contract sum, maintain Commercial General Liability Insurance of $1 million combined single limit and Professional Liability Insurance of $1 million, and provide Workers' Compensation per Florida statute. Schindler Elevator Corporation has maintained the existing equipment since 1998 and will remain under that maintenance contract until removal begins. Liquidated damages are $1,500 per calendar day for failure to achieve substantial completion and $750 per calendar day for failure to achieve final completion.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .