Shortlist_Evaluation_FormDavid_MRFP_2517.pdf

PDF 185 KB Posted

Attached to
Elevator & Escalator Replacement, RJS
Solicitation number
25-17
Issued by
Florida

About this file

This is a shortlist evaluation form for the Tampa Sports Authority's Elevator & Escalator Replacement project at Raymond James Stadium in Tampa, Florida, issued under RFP 25-17. The project encompasses the removal and modernization of twenty existing escalators and ten existing elevators that have exceeded the industry lifecycle standard of 20-25 years. All escalators must be reversible with a minimum of two flat steps at the top and bottom, with east and west club escalators operating in tandem. All elevators must include modernized push buttons, car position indicators, lighting, key-switch floor lockoff capabilities integrated with the existing access control system, and retention of existing cladding and cab interiors where possible. The contractor is responsible for all permitting, inspections, and associated building work including potential lighting, emergency power operations, disconnects, and HVAC upgrades in machine rooms. A mandatory pre-proposal meeting is scheduled for September 9, 2026, with proposals due September 22, 2026, and written questions due September 16, 2026 by 10:00 AM. Shortlist notifications occur October 8, 2026, with presentations and interviews scheduled for October 14-15, 2026, and final ranking on October 20, 2026. Contract award is anticipated following Finance Committee approval on October 27, 2026, and Board approval on November 3, 2026, with the contract extending through certificate of occupancy upon project completion.

The shortlist evaluation weights Quality and Experience at 30 points, Technical Approach at 20 points, Price Proposal and Value at 30 points, Schedule and Timeline at 10 points, and SBE/Veteran Owned Business participation at 10 points with up to 5 bonus points available for certification. F.O.B. pricing is required quoted to Tampa, Florida, with all applicable federal, state, and local taxes excluded. A bid bond equal to 5 percent of the proposal amount is required, and the selected contractor must furnish performance and payment bonds equal to 100 percent of the contract sum, maintain Commercial General Liability Insurance of $1 million combined single limit and Professional Liability Insurance of $1 million, and provide Workers' Compensation per Florida statute. Schindler Elevator Corporation has maintained the existing equipment since 1998 and will remain under that maintenance contract until removal begins. Liquidated damages are assessed at $1,500 per calendar day for failure to achieve substantial completion and $750 per calendar day for failure to achieve final completion.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .